ML20136J286: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML20136J286
| number = ML20136J286
| issue date = 01/02/1986
| issue date = 01/02/1986
| title = Responds to NRC 851203 Ltr Re Violations Noted in Insp Rept 50-309/85-31.Corrective Actions:Procedure 7.211, Chemistry Section Training, Will Be Revised to Eliminate Ambiguity & Two Chemistry Technicians Retrained
| title = Responds to NRC Re Violations Noted in Insp Rept 50-309/85-31.Corrective Actions:Procedure 7.211, Chemistry Section Training, Will Be Revised to Eliminate Ambiguity & Two Chemistry Technicians Retrained
| author name = Whittier G
| author name = Whittier G
| author affiliation = MAINE YANKEE ATOMIC POWER CO.
| author affiliation = MAINE YANKEE ATOMIC POWER CO.
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = 6900L-SDE, GDW-86-01, GDW-86-1, MN-86-01, MN-86-1, NUDOCS 8601130315
| document report number = 6900L-SDE, GDW-86-01, GDW-86-1, MN-86-01, MN-86-1, NUDOCS 8601130315
| title reference date = 12-03-1985
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| page count = 2
| page count = 2

Latest revision as of 22:12, 13 December 2021

Responds to NRC Re Violations Noted in Insp Rept 50-309/85-31.Corrective Actions:Procedure 7.211, Chemistry Section Training, Will Be Revised to Eliminate Ambiguity & Two Chemistry Technicians Retrained
ML20136J286
Person / Time
Site: Maine Yankee
Issue date: 01/02/1986
From: Whittier G
Maine Yankee
To: Murley T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
6900L-SDE, GDW-86-01, GDW-86-1, MN-86-01, MN-86-1, NUDOCS 8601130315
Download: ML20136J286 (2)


Text

-- - .

EDISON DRIVE MAIRE HARHEE ATOMICPOWERCOMPARUe nuousra, us,ne o<sa6 (207) 623-3521 e

January 2, 1986 MN-86-01 GDW-86-01 Region I United States Nuclear Regulatory Commission Office of Inspection and Enforcement 631 Park Avenue King of Prussia, Pennsylvania 19406 Attention: Dr. Thomas E. Murley, Regional Administrator

References:

(a) License No. OPR-36 (Docket No. 50-309)

(b) USNRC Letter to WAPCo dated December 3,1985 - Inspection Report No. 50-309/85-31

Subject:

Response to Notice of Violation Gentlemen:

Pursuant to 10 CFR 2.201, this constitutes our response to the Notice of Violation contained in Appendix A of Reference (b).

Notice of Violation Technical Specification 5.4, " Training" states "A retraining ... program for the facility staff shall be maintained under the direction of the Plant Manager (sic) and shall meet or exceed the requirements and recommendations of Section 5.5 of ANSI N18.1-1971 and Appendix "A" of 10 CFR Part 55."

License Procedure No. 7.211, " Chemistry Section Training" states that

" Personnel shall receive retraining at least annually (once per calendar year), a record of which shall be maintained in the individuals Chemistry training record...."

Contrary to the above, two Chemistry Technicians have not been retrained annually as required. The Technicians were last trained in January 1984.

This is a Severity Level IV violation (Supplement IV).

Maine Yankee Response:

(1) Corrective Steps Which Have Been Taken and Results Achieved:

In accordance with Procedure 7.211, Chemistry Section Training, the two Chemistry technicians who had not received retraining as identified in Reference (b) successfully completed the required retraining. 8601130315 860102 6900L-SDE ADOCK O 309 y)O p ()

{DR 4p

I

  • *' MAIN 2 YANKEE ATOMIC POWE3 COMPANY -

w .

United States Nuclear Regulatory Commission Page Two ,

Attention: Dr. Thomas E. Murley, Regional Adninistrator MN-86-01 e

(2) Corrective Steps Which Will Be Taken to Avoid Further Violations: 1 I

A comprehensive training program matrix for the Technical Support i Department personnel has been developed to ensure department personnel are scheduled to receive the required training and retraining, as applicable, within the time interval specified by applicable procedures.

1. Procedure 7.211, Chemistry Section Training, will be revised to eliminate the ambiguity regarding the frequency of retraining.

(3) Date When Full Compliance Will be Achieved:

. All required Chemistry Section retraining was completed by December 31, 1985.

We trust this information is satisfactory, however, if you have any questions, please do not hesitate to contact me. ,

'/ery truly yours, MINE YAfEEE ATOMIC POWER C0t4'ANY t

kh bV G. D. Whittier, Manager Nuclear Engineering & Licensing GDW/bjp cc: Mr. Ashok C. Thadani Mr. Cornelius F. Holden i 9

6900L-SDE

_____ __ _- - . - _ _ .