MONTHYEARML20217H4661999-10-18018 October 1999 Forwards Changes to EPIPs IAW 10CFR50.54(q) & 10CFR50,App E, Section V.Details of Changes Encl ML20217J4411999-10-18018 October 1999 Forwards Exemption from Certain Requirements of 10CFR73.55 for Zion Nuclear Power Station,Units 1 & 2 in Response to Application Dtd 990730,to Allow Util to Discontinue Specific Aspects of Security Plan & SER ML20216J8241999-09-30030 September 1999 Notifies of Removal of NRC Headquarters & Region III Offices from Controlled Copy Distribution of Certain CE Documents. Specific Documents,Associated Controlled Copy Numbers & NRC Location Affected Are Shown on Attachment to Ltr ML20216G9541999-09-27027 September 1999 Forwards Environ Assessment & Finding of No Significant Impact Re 990730 Application for Exemption.Exemption Would Allow Zion Nuclear Power Station to Discontinue Specific Aspects of Security Plan A99025, Forwards Response to NRC 990820 RAI Re Proposed Defueled TS for Zion Station1999-09-15015 September 1999 Forwards Response to NRC 990820 RAI Re Proposed Defueled TS for Zion Station ML20211L1551999-09-0101 September 1999 Forwards Insp Repts 50-295/99-03 & 50-304/99-03 on 990608-0812 at Zion 1 & 2 Reactor Facilities.No Violations Noted.Activities in Areas of Facility Mgt & Control, Decommissioning Support,Sf & Radiological Safety Examined ML20211J9701999-08-31031 August 1999 Discusses Request for Approval of Defueled Station Emergency Plan & Exemption from Certain Requirements of 10CFR50.47, Emergency Plans, for Plant,Units 1 & 2.Exemption & Safety Evaluation Encl ML20211J0311999-08-30030 August 1999 Agrees with Content in NRC 990810 Memo Re Plant Spent Fuel Pool.Memo Contains Accurate Summation of Info That Util Communicated to NRC During 990713 Telcon ML20211G1221999-08-27027 August 1999 Forwards fitness-for-duty Program Performance Data for Each of Comm Ed Nuclear Power Stations & Corporate Support Employees within Scope of Rule for six-month Period Ending 990630,IAW 10CFR26.71(d) ML20211G8191999-08-26026 August 1999 Forwards Amend 6 to Fire Protection Rept for Zion Nuclear Power Station,Units 1 & 2, IAW 10CFR50.71(e).Attachment 1 Contains Summary of Changes ML20211F5971999-08-20020 August 1999 Submits Request for Addl Info Re Proposed Defueled TSs for Plant,Per NRC Bulletin 94-001, Potential Fuel Pool Draindown Caused by Inadequate Maint Practices at Dresden Unit 1 ML20211C7401999-08-19019 August 1999 Informs That NRC Plans to Stop Using Office Complex at Zion Nuclear Generating Station Which Commonwealth Edison Provided for NRC Resident Inspectors Under 10CFR50.70(b)(1). NRC-owned Equipment to Be Moved on or About 991001 ML20211J4421999-08-13013 August 1999 Forwards, EA & Finding of No Significant Impact Re Application for Exemption ,as Suppl by 990708 & 19 Ltrs.Proposed Exemption Would Modify Emergency Response Plan Requirements as Listed ML20210N5651999-08-0606 August 1999 Forwards Rev 8 to Nuclear Generating Stations Emergency Plan, for Plants.With Summary of Changes ML20210M9131999-08-0202 August 1999 Forwards Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for Fys 2000 & 2001 for Comed ML20210J0861999-07-30030 July 1999 Requests NRC Approval of Exemption from Certain Requirements of 10CFR73, Physical Protection of Plants & Matls, by 990921.Exemption Is Needed to Support Scheduled 991001 Implementation of Plant Sf Ni.Encl Withheld,Per 10CFR73.21 ML20210C3641999-07-20020 July 1999 Discusses OI Rept 3-98-017 Completed on 980224 Re Contract Security Officer That Inadvertently Brought Personal Handgun Into Search Area at Plant & Forward NOV ML20210C4201999-07-20020 July 1999 Discusses Investigation Rept 3-98-017 Into Info Reported to Comed on 980224,informing NRC That N Everson Brought Personal Handgun Into Personnel Search Area at Plant.Nrc Determined That Violation Occurred.Nov Encl ML20210C2561999-07-19019 July 1999 Forwards Rev 1 to Calculation 22S-B-110X-0068, Determination of Heat Load for Assemblies F50D & Z33A, as Replacement Pages to Rev 0.Calculation Submitted Re Request for Approval of Proposed Plant Defueled Station EP ML20210B7071999-07-16016 July 1999 Responds to Requesting Review & Approval of Three Proposed Changes to Ceco QA TR,CE-1A Per 10CFR50.54(a)(3) & 10CFR50.4(b)(7) ML20209E7391999-07-0808 July 1999 Forwards Proposed Revised Znps Defueled Station Emergency Plan & Supporting Calculations.Revs to Proposed Defueled Station Emergency Plan Have Been Reviewed & Approved IAW Comed QA Program ML20196J9131999-07-0101 July 1999 Submits Status of Nuclear Property Insurance Currently Maintained for Braidwood,Byron,Dresden,Lasalle County,Quad Cities & Zion Nuclear Power Stations,Per 10CFR50.54(w)(3) ML20196J9061999-07-0101 July 1999 Provides Evidence That Util Maintains Guarantee of Payment of Deferred Premiums in Amount of $10 Million for Each of Thirteen Reactors,Per 10CFR140.21 ML20209B8241999-06-30030 June 1999 Forwards Five 3.5 Inch Computer Diskettes Containing Revised Annual Dose Repts for 1994 Through 1998 for Individuals Receiving Neutron Dose Not Previously Included in Reported Total Effective Dose Equivalent Values.Without Diskettes ML20196D3301999-06-18018 June 1999 Forwards Insp Repts 50-295/99-02 & 50-304/99-02 on 990121-0608.No Violations or Deviations Were Identified. Weakness Noted in Self Assessment/Corrective Action Program in Which Series of Personnel Errors Not Recorded in PIF Sys ML20195H9391999-06-15015 June 1999 Forwards Revised Monthly Operating Rept for Apr 1999 for Zion Nuclear Power Station,Units 1 & 2.Data Was Revised to Reflect Change in Daylight Savings Time ML20207H6121999-06-10010 June 1999 Provides Synopsis of OI Rept 3-1998-012 & Summary of Relevant Facts Re Violation Involving Employment Discrimination Against SRO at Zion Station.Enforcement Conference Scheduled for 990707 ML20195E3451999-06-0707 June 1999 Forwards 3.5 Inch Computer Diskette Containing Revised File Format for Annual Dose Rept for 1998,per 990520 Telcon Request from Nrc.Each Station Data Is Preceded by Header Record,Which Provides Info Necessary to Identify Data ML20195D6351999-06-0404 June 1999 Notifies NRC of Actions That Has Been Taken in Accordance with 10CFR26, Fitness for Duty Programs A99018, Responds to NRC Re Violations Noted in IR 3-98- 017.Corrective Actions:Three Security Guards Unescorted Access to All Comm Ed Nuclear Stations Put on Temporary Hold1999-05-27027 May 1999 Responds to NRC Re Violations Noted in IR 3-98- 017.Corrective Actions:Three Security Guards Unescorted Access to All Comm Ed Nuclear Stations Put on Temporary Hold ML20195B2301999-05-19019 May 1999 Requests Approval of Proposed Changes to QA Topical Rept CE-1-A,rev 66a.Attachment a Describes Changes,Reason for Change & Basis for Concluding That Revised QAP Incorporating Proposed Changes Continues to Satisfy 10CFR50AppB ML20207B5991999-05-14014 May 1999 Informs That NRC Ofc of NRR Reorganized,Effective 990328.As Part of Reorganization,Div of Licensing Project Mgt Was Created.Reorganization Chart Encl ML20206F5381999-04-30030 April 1999 Forwards Magnetic Tape Containing Annual Dose Repts for 1998 for Braidwood,Byron,Dresden,Lasalle County,Quad Cities & Zion Nuclear Power Stations,Per 10CFR20.2206(c).Without Magnetic Tape ML20206D8041999-04-30030 April 1999 Forwards Zion Nuclear Power Station Annual Radiological Environ Operating Rept & Listing of Commitments ML20206B9371999-04-27027 April 1999 Discusses Investigation Rept 3-98-17 Re Info Reported by Licensee on 980224 That Firearm Detected During Routine Search of Contractor Employee & Failure to Rept Incident to Supervisor.Oi Rept Synopsis Encl ML20206B4051999-04-23023 April 1999 Ack Receipt of Encl FEMA Ltr,Transmitting FEMA Evaluation Rept for 980819 Annual Medical Drill for Zion Nuclear Power Station.No Deficiencies Noted.Two Areas Requiring Corrective Action Noted During Drill ML20206B2471999-04-20020 April 1999 Informs That SE Kuczynski Has Been Transferred to Position No Longer Requiring SRO License.Cancel License SOP-31030-1, Effective 990412 ML20205S5811999-04-16016 April 1999 Responds to Which Urged Full Public Hearing to Held on Concerns Raised by R Robarge & E Dienethal Re Zion Npp.Commission Issued 990302 Memo & Order Affirming ASLB Decision to Deny Petition to Intervene A99014, Provides Description of Actions Comed Has Taken to Reinforce Safety Conscious Work Environ at Zion Nuclear Power Station1999-04-15015 April 1999 Provides Description of Actions Comed Has Taken to Reinforce Safety Conscious Work Environ at Zion Nuclear Power Station ML20205Q9971999-04-13013 April 1999 Requests NRC Approval of Plant Defueled Station Emergency Plan in Accordance with 10CFR50.54(q).Ltrs of Agreement Between Util & Offsite Agencies Who Have Agreed to Provide Assistance to Plant Encl.Calculations Also Encl ML20205P2071999-04-0909 April 1999 Discusses Insp Repts 50-295/98-02,50-304/98-02 & OI Rept 3-98-015 Completed on 981112 & Forwards Nov.Violation Involves Zion Supervisor Who Willingly Failed to Protect Unattended SGI from Unauthorized Disclosure ML20205K5841999-03-31031 March 1999 Submits Rept on Status of Decommissioning Funding for Reactors Owned by Comm Ed.Attachment 1 Contains Amount of Decommissioning Funds Estimated to Be Required Pursuant to 10CFR50.75(b) & (C) ML20206B4331999-03-26026 March 1999 Forwards Rept for Annual Medical Drill Conducted for Zion Nuclear Power Station on 980819.Two Areas Requiring Corrective Action Identified During Drill ML20205B4241999-03-23023 March 1999 Provides Results of drive-in Drill Conducted on 990208,as Well as Augmentation Phone Drills Conducted Since 981015,as Committed to in Util A99011, Responds to NRC Re Violations Noted Insp Repts 50-295/98-02 & 50-304/98-02.Corrective Actions:Uncontrolled Safeguards Documents Were Immediately Taken Into Possession & Controlled by Plant Security Supervisor1999-03-18018 March 1999 Responds to NRC Re Violations Noted Insp Repts 50-295/98-02 & 50-304/98-02.Corrective Actions:Uncontrolled Safeguards Documents Were Immediately Taken Into Possession & Controlled by Plant Security Supervisor ML20207D6831999-03-0101 March 1999 Forwards fitness-for-duty Program Performance Data for Each Comed Nuclear Power Station & Corporate Support Employees for Six Month Period Ending 981231,per 10CFR26.71(d) A99009, Forwards Znps Annual Occupational Exposure Rept, for Exposures Occurring in 1998.Listing of Commitments Contained in Ltr Provided as Attachment B1999-03-0101 March 1999 Forwards Znps Annual Occupational Exposure Rept, for Exposures Occurring in 1998.Listing of Commitments Contained in Ltr Provided as Attachment B ML20202J4381999-02-0303 February 1999 Forwards Zion Fuel Evaluation Info,Per Discussion ML20203C7001999-02-0202 February 1999 Informs That Mhb Technical Associates No Longer Wishes to Receive Us Region III Docket Info Re Comed Nuclear Facilities.Please Remove Following Listing from Service List A99001, Forwards Zion 1998 Annual Rept of Revised Regulatory Commitments1999-01-19019 January 1999 Forwards Zion 1998 Annual Rept of Revised Regulatory Commitments 1999-09-30
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217H4661999-10-18018 October 1999 Forwards Changes to EPIPs IAW 10CFR50.54(q) & 10CFR50,App E, Section V.Details of Changes Encl ML20216J8241999-09-30030 September 1999 Notifies of Removal of NRC Headquarters & Region III Offices from Controlled Copy Distribution of Certain CE Documents. Specific Documents,Associated Controlled Copy Numbers & NRC Location Affected Are Shown on Attachment to Ltr A99025, Forwards Response to NRC 990820 RAI Re Proposed Defueled TS for Zion Station1999-09-15015 September 1999 Forwards Response to NRC 990820 RAI Re Proposed Defueled TS for Zion Station ML20211J0311999-08-30030 August 1999 Agrees with Content in NRC 990810 Memo Re Plant Spent Fuel Pool.Memo Contains Accurate Summation of Info That Util Communicated to NRC During 990713 Telcon ML20211G1221999-08-27027 August 1999 Forwards fitness-for-duty Program Performance Data for Each of Comm Ed Nuclear Power Stations & Corporate Support Employees within Scope of Rule for six-month Period Ending 990630,IAW 10CFR26.71(d) ML20211G8191999-08-26026 August 1999 Forwards Amend 6 to Fire Protection Rept for Zion Nuclear Power Station,Units 1 & 2, IAW 10CFR50.71(e).Attachment 1 Contains Summary of Changes ML20210N5651999-08-0606 August 1999 Forwards Rev 8 to Nuclear Generating Stations Emergency Plan, for Plants.With Summary of Changes ML20210M9131999-08-0202 August 1999 Forwards Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for Fys 2000 & 2001 for Comed ML20210J0861999-07-30030 July 1999 Requests NRC Approval of Exemption from Certain Requirements of 10CFR73, Physical Protection of Plants & Matls, by 990921.Exemption Is Needed to Support Scheduled 991001 Implementation of Plant Sf Ni.Encl Withheld,Per 10CFR73.21 ML20210C2561999-07-19019 July 1999 Forwards Rev 1 to Calculation 22S-B-110X-0068, Determination of Heat Load for Assemblies F50D & Z33A, as Replacement Pages to Rev 0.Calculation Submitted Re Request for Approval of Proposed Plant Defueled Station EP ML20209E7391999-07-0808 July 1999 Forwards Proposed Revised Znps Defueled Station Emergency Plan & Supporting Calculations.Revs to Proposed Defueled Station Emergency Plan Have Been Reviewed & Approved IAW Comed QA Program ML20196J9061999-07-0101 July 1999 Provides Evidence That Util Maintains Guarantee of Payment of Deferred Premiums in Amount of $10 Million for Each of Thirteen Reactors,Per 10CFR140.21 ML20196J9131999-07-0101 July 1999 Submits Status of Nuclear Property Insurance Currently Maintained for Braidwood,Byron,Dresden,Lasalle County,Quad Cities & Zion Nuclear Power Stations,Per 10CFR50.54(w)(3) ML20209B8241999-06-30030 June 1999 Forwards Five 3.5 Inch Computer Diskettes Containing Revised Annual Dose Repts for 1994 Through 1998 for Individuals Receiving Neutron Dose Not Previously Included in Reported Total Effective Dose Equivalent Values.Without Diskettes ML20195H9391999-06-15015 June 1999 Forwards Revised Monthly Operating Rept for Apr 1999 for Zion Nuclear Power Station,Units 1 & 2.Data Was Revised to Reflect Change in Daylight Savings Time ML20195E3451999-06-0707 June 1999 Forwards 3.5 Inch Computer Diskette Containing Revised File Format for Annual Dose Rept for 1998,per 990520 Telcon Request from Nrc.Each Station Data Is Preceded by Header Record,Which Provides Info Necessary to Identify Data ML20195D6351999-06-0404 June 1999 Notifies NRC of Actions That Has Been Taken in Accordance with 10CFR26, Fitness for Duty Programs A99018, Responds to NRC Re Violations Noted in IR 3-98- 017.Corrective Actions:Three Security Guards Unescorted Access to All Comm Ed Nuclear Stations Put on Temporary Hold1999-05-27027 May 1999 Responds to NRC Re Violations Noted in IR 3-98- 017.Corrective Actions:Three Security Guards Unescorted Access to All Comm Ed Nuclear Stations Put on Temporary Hold ML20195B2301999-05-19019 May 1999 Requests Approval of Proposed Changes to QA Topical Rept CE-1-A,rev 66a.Attachment a Describes Changes,Reason for Change & Basis for Concluding That Revised QAP Incorporating Proposed Changes Continues to Satisfy 10CFR50AppB ML20206D8041999-04-30030 April 1999 Forwards Zion Nuclear Power Station Annual Radiological Environ Operating Rept & Listing of Commitments ML20206F5381999-04-30030 April 1999 Forwards Magnetic Tape Containing Annual Dose Repts for 1998 for Braidwood,Byron,Dresden,Lasalle County,Quad Cities & Zion Nuclear Power Stations,Per 10CFR20.2206(c).Without Magnetic Tape ML20206B2471999-04-20020 April 1999 Informs That SE Kuczynski Has Been Transferred to Position No Longer Requiring SRO License.Cancel License SOP-31030-1, Effective 990412 A99014, Provides Description of Actions Comed Has Taken to Reinforce Safety Conscious Work Environ at Zion Nuclear Power Station1999-04-15015 April 1999 Provides Description of Actions Comed Has Taken to Reinforce Safety Conscious Work Environ at Zion Nuclear Power Station ML20205Q9971999-04-13013 April 1999 Requests NRC Approval of Plant Defueled Station Emergency Plan in Accordance with 10CFR50.54(q).Ltrs of Agreement Between Util & Offsite Agencies Who Have Agreed to Provide Assistance to Plant Encl.Calculations Also Encl ML20205K5841999-03-31031 March 1999 Submits Rept on Status of Decommissioning Funding for Reactors Owned by Comm Ed.Attachment 1 Contains Amount of Decommissioning Funds Estimated to Be Required Pursuant to 10CFR50.75(b) & (C) ML20206B4331999-03-26026 March 1999 Forwards Rept for Annual Medical Drill Conducted for Zion Nuclear Power Station on 980819.Two Areas Requiring Corrective Action Identified During Drill ML20205B4241999-03-23023 March 1999 Provides Results of drive-in Drill Conducted on 990208,as Well as Augmentation Phone Drills Conducted Since 981015,as Committed to in Util A99011, Responds to NRC Re Violations Noted Insp Repts 50-295/98-02 & 50-304/98-02.Corrective Actions:Uncontrolled Safeguards Documents Were Immediately Taken Into Possession & Controlled by Plant Security Supervisor1999-03-18018 March 1999 Responds to NRC Re Violations Noted Insp Repts 50-295/98-02 & 50-304/98-02.Corrective Actions:Uncontrolled Safeguards Documents Were Immediately Taken Into Possession & Controlled by Plant Security Supervisor A99009, Forwards Znps Annual Occupational Exposure Rept, for Exposures Occurring in 1998.Listing of Commitments Contained in Ltr Provided as Attachment B1999-03-0101 March 1999 Forwards Znps Annual Occupational Exposure Rept, for Exposures Occurring in 1998.Listing of Commitments Contained in Ltr Provided as Attachment B ML20207D6831999-03-0101 March 1999 Forwards fitness-for-duty Program Performance Data for Each Comed Nuclear Power Station & Corporate Support Employees for Six Month Period Ending 981231,per 10CFR26.71(d) ML20202J4381999-02-0303 February 1999 Forwards Zion Fuel Evaluation Info,Per Discussion ML20203C7001999-02-0202 February 1999 Informs That Mhb Technical Associates No Longer Wishes to Receive Us Region III Docket Info Re Comed Nuclear Facilities.Please Remove Following Listing from Service List A99001, Forwards Zion 1998 Annual Rept of Revised Regulatory Commitments1999-01-19019 January 1999 Forwards Zion 1998 Annual Rept of Revised Regulatory Commitments A98056, Forwards List of Revised Various Commitments Originally Contained in Util to Nrc.Changes in Commitments Were Satisfactorily Evaluated Using NEI Commitment Change Methodology1998-12-11011 December 1998 Forwards List of Revised Various Commitments Originally Contained in Util to Nrc.Changes in Commitments Were Satisfactorily Evaluated Using NEI Commitment Change Methodology ML20198C2501998-12-11011 December 1998 Forwards Rev 45 to Zion Nuclear Power Station Security Plan, Per Requirements of 10CFR50.4(b)(4).Rev Includes Listed Changes.Licensee Has Concluded That Changes Do Not Decrease Safeguards Effectiveness of Plan.Encl Withheld ML20196B5871998-11-20020 November 1998 Requests That Svc List for All NRC Correspondence Re Any of Six Comed Nuclear Stations Be Modified Per Attached List.All Other Names Previously Listed Should Be Removed A98051, Forwards List of Revised Regulatory Commitments Which Were Evaluated as Satisfactory Using NEI Commitment Change Methodology1998-11-20020 November 1998 Forwards List of Revised Regulatory Commitments Which Were Evaluated as Satisfactory Using NEI Commitment Change Methodology A98055, Forwards List of Revised Regulatory Commitments Which Were Evaluated as Satisfactory Using NEC Commitment Change Methodology1998-11-20020 November 1998 Forwards List of Revised Regulatory Commitments Which Were Evaluated as Satisfactory Using NEC Commitment Change Methodology ML20195E6451998-11-12012 November 1998 Provides Results of drive-in Drill Conducted on 981007,as Well as Augmentation Phone Drill Conducted on 980917 A98059, Forwards Page Change Instruction for Aug 1998 DSAR for Zion Nuclear Power Station,Units 1 & 2.Instruction Was Omitted from 981110 DSAR Due to Administrative Error1998-11-11011 November 1998 Forwards Page Change Instruction for Aug 1998 DSAR for Zion Nuclear Power Station,Units 1 & 2.Instruction Was Omitted from 981110 DSAR Due to Administrative Error A98053, Forwards Change Instructions for Update to Zion UFSAR, Rewritten to Reflect Permanent Defueled Condition of Plant. & DSAR,1998-11-10010 November 1998 Forwards Change Instructions for Update to Zion UFSAR, Rewritten to Reflect Permanent Defueled Condition of Plant. & DSAR, ML20155D2701998-10-27027 October 1998 Forwards Changed Pages from 980423 Submittal Providing Addl Info Marked with Revision Bars & Revised Pages to QA Topical Rept Section 18,for Review ML20198C7401998-10-21021 October 1998 Informs That Encl Correspondence Was Received from Constituent,C Paxton Re Request for Investigation as to Documentation Also Encl.Without Encl ML20154J4951998-10-0707 October 1998 Forwards Revised Security Plans for CE Listed Nuclear Power Stations,Per 10CFR50.4(b)(4).Changes Do Not Decrease Effectiveness of Station Security Plans.Encl Withheld A98050, Forwards Zion Station Special Rept Number 30412398002SR.Rept for Reporting Period of Jan 1996-Dec 1997.Attachment B Provides Listing of Commitments Contained in Submittal1998-10-0505 October 1998 Forwards Zion Station Special Rept Number 30412398002SR.Rept for Reporting Period of Jan 1996-Dec 1997.Attachment B Provides Listing of Commitments Contained in Submittal ML20151Y5101998-09-11011 September 1998 Provides Results of drive-in-drill Conducted on 980804 & Augmentation Phone Drills Conducted Between 980601 & 0831 ML20238F7571998-08-28028 August 1998 Forwards fitness-for-duty Program Performance Data for Each of Util Nuclear Power Stations for Six Month Period Ending 980630 A98047, Forwards Revised Scope of One Commitment Contained in Response to NOV1998-08-28028 August 1998 Forwards Revised Scope of One Commitment Contained in Response to NOV ML20153F6811998-08-26026 August 1998 Informs of E Dienethal & R Robarge Concerns Re Safety of Areas in & Around City of Zion ML20237D9281998-08-24024 August 1998 Provides Description of Approach Being Taken by Comed to Develop Dsar.New Safety Classification Will Be Developed for Equipment Determined to Be Important to Defueled Condition 1999-09-30
[Table view] |
Text
'
j f M( C mmonwsith Edison
- ) . One First National Plaza. Chicago, ininois D 7' Address Reply to: Post Office Box 767 i' / Chicago, Illinois 60690 October 5, 1978 Director of Nuclear Reactor Regulation U.S. ' Nuclear Regulatory Consnission Washington, D.C. 20555 ,
Subject:
Zion Station Units 1 and 2
. Proposed Amendment to Facility' Operating License Nos. DPR-39 and DPR-48 Incorporating ECCS Flow Rate Surveillances-NRC Docket Nos. 50-295 and 50-304
. References (a): July 18, 1977 letter from A. Schwencer-to R. L. Bolger. NRC. Docket Nos. 50-295 and 50-304 (b) : September if>, 1977 letter from D. E. O'Brien to A. Schwencer. NRC Docket Nos. 50-295 and t 50-304 t7~
(c): . September 8,1978 letter from William F.
Naughton to Director of-Nuclear Reactor Regulation, NRC. Docket Nos. 50-2f5 and 50-304 t
. ~
~.
Dear Sirs
~
Pursuant to 10 CFR 50.59 Commonwealth Edison Company hereby requests a change to Operating. License'Nos. DPR-39 and DPR-48, Appendix A, Technical Specifications, as specified in Attachment 1. The purpose of this amendment is to incorporate ECCS flow rate surveillance requirements in the Zion Station Technical Specifications per the NRC Staff's requests of Reference (a) .
In response to the NRC Staff requests of Reference (a), Commonwealth Edison informed the NRC Staff per Reference (b) that manual throttle valves are.used on both the HPSI and LPSI systems'at Zion Station and that during the upcoming refueling outages an ECCS flow balance test would be performed on each unit. In addition,' Commonwealth Edison indicated
~ that following these testof tamper-proof covers would be installed over each of,thelvalves. 1Per Referenco-(c),
. Commonwealth Edison indicated to the NRC that the flow verification tests had been performed and that tamper-proof
~;
i a c p
" ^ '
3/4/o
g__, .. .r. , , s, _ , . _ - ,_. . . ,, . _., _ , ,. .._
l ,
~! '9,r , ,
- Y. ' ^ ,. l s > * * 'r N .g 7 "' ' , 'y s
-+
+n ,y -,
,, - , p g. ->
. ,, 3* .. ,
(.f g -
->- 3. , L \, '
NRC Doc h h o /50-295/304. -
n1 .
..g . , , , ,
~
'. 'lVDirector;of Nuclear, Reactor Regulation . ' ' '
. , 4 H, e. October / 5, .' 1978 ~ -
m # s .
Page.2 t
. e- -
Jp " -
' e 4 s <.
C , i e . _j
- . covers;hadsbeen, installed over'ench' of the valves following these '
L' test's'. " Reference ? (c) _. also ' indicated that Comunonwealth Edison' *had
- performed additionaltinvestigations to' determine 'acceptablej
' toleranceson ECCS.flowsTsinc~ e the[ design flows.specifici'in the i tZion' Final ~ Safety"AnalysistReportfwere single values?with'no;
~
.y uncertainties included. c Based (on Lthese , investigations, . Cossaonwealth ' .
~ Edison concluded'thatfaL15% tolerance'on:ECCS flows was acceptable
< 'and that'the BCCS flow rates-lfromI the' Zion' Unit 1 and'2? tests ~ fell?
W within this rangel:
~
e .
? E'
, n :o e .. , = , . . _
'The.purpo.wselof.this. proposed change is!to provihel.. ,
7 '
surveillance. requirements that assure, proper ECCS' flows'will be- "
' maintained in.the event.of a LOCA. Maintenance'of proper flow' .
resistance'and: pressure drop;in
~" '
the pipingisystem toeach injection ,
spointiis necessaryjtos. ~i , _
4 e (1) Preventi totallpump flowf frcun [ exceeding. runout 4 L
[ 2 conditions when ;the1 system is . in' its ' minienna resistanee configurationsy' V .'
, p,, ' +
'e ,
.(2) Provide Lthe proper flow split between? inIebtion.
- points in"accordance with the assumptions used in,
' "' ~
the ECCS-LOCA analysesr"and >
' I
'(3) Pr ide an' acce$ table level of' total ECCS flow to . ,
Lall" injection points equal to or above;that as'sumed r -in the BCCS-LOCA analyses.- *
, ,y ,
I i . + . . . I, ._,. ,
'The< proposed technical specific'ati,ons in Attachment 1 y havefbeen' reviewed by comanonwealth Edison.On-Site.and Off Site , -
Review with the conclusion'that.there are no unreviewed safety. ,
questions. o
. m. . .
. Pursuant.to 10.CFR 170, Casumonwealth Edison has determined that this: proposed amendment'is.a combined. class II.and.. Class I' Amendment. 'As such, Comanonwealth Edison'has enclos'ed;a fee,re-- ,
}
h ;mittanceiin the amount ~ of: $1',600.00 for.this proposed'~smondment. '
The basis for this fee'~determinationjis:that the proposed l changes., .
> are prisaarily administrative in that the" proposed change Lin- '
3 corporates surveillance requirements of setpoints previouslyl,re-
' viewed,and approved by the ~NRC Staff. -
- A '*
.c -
[
1 ,
l; i \-
9 .
,".L,'d t >
r is e'
$ (
~- ,
.I .
e f..
- _f, e.-~..r , . . . ~ . . , . -- ,,?_, _1 ..m. _ m ,,m ', ,,,.L .,, _ , , , , . _ , , , , _ , , ,,, ,
e ,'/' "
77.7. Ff{ <
_[.'rp,, ,fj) 'Y <-
ls s -a m m. . r ,e ,
, 3 . g _, t -
ew
{ y, y un ,em .
s a
d g y *b s,
]4 --,
3' s 'u es , , , ., .
. %3 ' , ,
, , . . s ,
( , '7 u *a g .. ], a j ; Nd ' , , _ F_g , - . . - ,
4 , <
7
, , + ' Q.'i ;f.
je. '
- ' y:, ,
.e ,
- p,3 gg_'tC;
. 'NRCLDocket~Non. 50 295/304, , .
a s
- .. y
-'~7y i,
s . a w- s
~.. rs. a
,. se _
s 7
S - -l 4 (.,' a4.. , ,, ,4 - :l'. -
L #L 5
Y
- ( -ipe *h
.'e b
f y'l I
~,- '.'.#
g.. LDi. rector:of:Nucl' ear,; Reactor Regulationuss ac "
a
?g .g' >
m, . :
.j
-a J ' October:5i i19.78., .e<g a,, ,
6 L -
' ~
~
~ . 4- ;i "
T s -
M'
.m
'Page;3' g 4 ,
- 3
-.;qf _ ,
<e,?FP .
f.
n y& -
xm'
- 4 s ,
c/ t4 3, m
E #= ,
.2 A.
y; 3
7 a f,. ~
, # y
% , t
., i m
- a ,.
o . .
- .2 ,
- a yI # i i Plisase JaddressE'any(additional quest' ons that(you m
.i, , . 7< ;:
have'toLthis office.',?.
+ ,
(
, i y
ts r -
,8
. . , s
'y ., . - I - ~ - - . <
s* . . . '^ ,
g *k oThreeL(3)l signed originals and thirty-seven((37)Ecopies '
, i sfithis laitter are ~provided forfyour use. .
6f
- W;t i
)t w,,
i .
b l tv'ery truly-yourst I '
tg; .$.. 't
, m
>: 4 -
V ,
. f, , :
s a W
, ,, ? 7 a . fu i
is . W" 1 r , ,
>t ' , - , ,4 i g
. . e l' g .
e\.
g
< f' -. 4
'l
. . , j g i C ,
c . , , <
~ ,
, , , .n
- m, >
g, ,
'Cor, dell-Reed. .
' ' ~
. .m
,,N
, " ' uAs'sistant' vice-President "
4 At t
, a: - , s u 5 - s1
,. n <
- w
. . .. a
'.\ ,
T attachmenta i ~ -
O, $ '
T, g
9, c_ .
.M 7 , 1 .
, , r w1 4 >
\h
. ~
^r m em , '. , s
.t SUBSCRIBED;and' SWORN'tol . ,
'n r m' -
-F befor. sane. is M M ' day ?^ & 4 '
< C - :
Af/~i d. 1) ,11978' <
of a w , - . t .
t . -
i h : h Y)] :
\' ,
-u .
ll,' NotaryyPublic . U- n' "c y '
m ,
m
> .a .,
,a , ... - >
.,*,h
'5
' ' ' 6g -
. +
0 'e y A .t
- ., ,, ? ?
.r'
- g. ,
s t
_n f' f.
.g w
d E I n ".+
y >+ ' ' r y ':. *
-.! s 4, .i : '
. f. . , ,
? .,
, , . r. '
i*- *
, e . . s
. 4 s '- /
s ;
i +
& * [; T -,,
2, s ,
l-. '
n s ,
,., .y ;,
i : ey '$. ,
s -
( t g W ti F
- ,f , '
4 T , j'o s ' . .
?,' , /, &'
t ' '$ ?
~
g i s t
6 qp t
,)..
y, j .-
,' [ ,
s 4
U.
(,g 3
h .c 4 d..
A
, y w 'r .m . ..4 t ,t t
, ,1 -
- g6 e , \, ,. d
- )
Y
,;, a- 9'
+
M- l1 ;. , <
(? , , y y. (' ,
~
{ a '
s
__t r s f 1. , N '. $ l 'T
^
..., :t, [ g }
a,* . . .-
- g- ,c s
,.r..-
.m,, + e
,e . ,,
y.. s; Y
-9. T Njj ' -.
's t, '- _k , y,,.. *
. ' .. l ~g
, a t
'~ s s %p. 7,. '
g ,
p'- /
s., 4 I
)
1 ,. ,
' . f.
'4'-
a, I
. Vs_
4 4' ..t!
4 0
is c a' c s u! -
.,3
, +
'y '
a.
A t
,~. -U' 4 , -
r -,44. ,
4
.~ ' , '
.4 11 ll- '
( L e 3-E' # E d -
.,f ,-
t
' .K g 3 k 1.*
i
, , ,{
( f' i ' -,
+ -- f^
4-w
,# s 3
4 i.-s V,'-
- - .t. .N .. b ye. 3 2
,: i., d N
, .-[ - 4 .
, .t
. ,. ,ba ,r y
i *,g r, j ('k y 4 ,
ii, 4 .' s.* -
,,. r
_ 4' 4 t dJ Q ; , % ' ,); ./p' e y 3'~ .q .* i '. ' } * ]Y ' y N
, , t i, '.yE ,
g- t t , _ $-
s_
. ;* ',4.. , ... 7. 'p, - -, 3 i;u .e . . . ,. n' g : k .
e* , -
pl ': 'q ' ' f 4 5 p*4, , ,p,. ,
- d. 1$
/ P t b in /1 4 g f/
if}' . $ .. ! .f ... ? / %
I' hq.i 7 \ ' Q ,, '( 'f lM i'
(d' v N. n '
n
.37 y,.
x -3^
"Q;Ly 4 % % 4K4 W,HA A '(Ij. w . g ..
'I '
- - , \
q - -
t
- % s,+ s -
sy%.4>
p
- y# ;. yf s c ,7 , < s o, -
', ga3 , ,
, 4 &c ,
-t x, s
, m . ,,f. 4 ,.
j 4 - c ,
a ,
n 5*z '
it S ,,j .., ,m" o m , ., <. . -(m I , , -. J'. 34 5u ;}k e le,%4 r _,,.f 4 'p. .-
I '
~
7 .;- **f~ ,
5 g , 3 ( , -
,p-: y ,-
, e' ',: v y , g ._ f 2. /z v e p, ,
h' i w
h -(., -
} 6. Pi g, - -' 't * * . * ' #
~1
_f Ii,,r I
\, e j~ , ,
h
J I
, c.
-1 4 i i
t i
i ZION STATION UNITS 1 AND 2 NRC DOCKET ~NOS. 50-295'AND 50-304 ATTACHMENT 1 r
t
-i l
3 i
,I,.
l s
-- - a- ,-,,' , o..e,, ..~ w, . , . , . ,- v n A. .e , e ~~~ -n ,- 4 ,,- , -n, , n , ,
t LLIMITING CONDITION.FDR OPERATION -SURVEILLANCE REQUIREMENT
~
I [3.8.3 .D. If these conditions cannot be met 4.8.3 D. Not Applicable 4
1 the reactor shall be brought to the
- hot shutdown condition within four '
s
! hours. After a maximum of 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />
] in the hot shutdown condition, if the ,
- syutem is not operable the reactor shall be brought to the cold shutdown 4 condition within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
t.
- 4. System testing of centrifugal charging, 4.- System testing of centrifugal charging,..
- j. safety injection, and residual heat safety injection, and residual heat removal' pump systems.- removal pump systems.
A system test shall be' performed f A.- A system test shall.be performed 'A.
.by manually initiating the safety at each refueling outage. The
-injection signal to initiate test shall:be considered
- operation of the centrifugal satisfactory if control board charging, safety injection, and indication and visual observa-residual heat removal pump systems. tions indicate that.all
- com-i The centrifugal. charging and safety- ponents,.as plant: conditions
, injection pumps shall'be. blocked- allow, have received.the safety
, from starting during the test. If injection signal and-operated one of two residual heat removal - satisfactorily.
pumps is not operating, it shall be blocked from starting the test.. B. Proper valve steet position shall be verified within'4 1 hours1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />
- h. Proper E.C.C.S. injection flows :following the completion of will be maintained by verifying stroking or maintenance which-valve-stem positions and performing may affect 1 the position of the flow balance' tests. . following throttle valves when they are required operable:
l l
SI8810A, B, C, D ,
SI9003A, B, C,2D 173 ~ SI9013A, B,C,D _
l e
.s,-m .- ,w-,-- r - , . - ,--
.y.- --
...-.y , _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ , _ _ _
. LIMITING CONDITION R)R CPERATION SURVEILLANCE REQUIRDIENT 4.8.4.B A flow balance test shall be per-formed on the affected lines during the next refueling outage following '
valve stroking or maintenance or other system modifications which might alter the E.C.C.S. flow characteristics.
E.C.C.S. flow rates for single pump operation shall meet the following requirements under the minimum resistance configuration:
- 1. Charging pump cold leg injection plus seal injection shall not' exceed 550 GPM; 1
- 2. SI pump hot or cold leg injection plus mini-flow shall not exceed 650 GPM;
- 3. The minimum charging pump cold leg injection through any 3 lines shall be 265 GPM; and
- 4. The minimum SI pump cold leg injection through any 3 lines shall be 432 GPM.
'173A l
s
I Basis:
4.8 Complete Energency Core Cooling Systems The "Recircualtion Sump to RHR Pump Isolation l
- tests cann:M: be performed when the re- Valves" are stroked at a test pressure of '
- . actor is operating because a safety 20 psig to simulate post loss-of-coolant
- injection nignal causes reactor trip, accident conditions. The valves are used sain feedwater isolation and containment during the recirculation phase approximately '
isolation. The method of assuring 30 minutes after the accident. 'At this time operability of these systems is therefore, the contairement pressure is 'less than 20 psig. ' i to ecebine systems tests to be performed during unit refueling shutdowns, with more The purpose of these surveillance requirements j frequent component tests, which can be per- is to provide assurance that proper E.C.C.S.
! formed during reactor operation. flows will be maintained in the event of a LOCA. Maintenance of proper. flow resistance
- The refueling outage systems tests and pressure drop in the piping system to demonstrate proper automatic operation of each injection point'is necessary to
- (1) the Emergency Core Cooling Systems. With prevent total pump flow from exceeding runout the pumps blocked-from starting a test conditions when the system is in its minimum signal is applied to initiate automatic resistance configuration; (2) provide the
~
action and verification is made that the proper flow split between injection points components receive-the safety injection in accordance with the assumptions used in signal in the proper sequence. The test the ECCS-LOCA analyses; and (3) provide an demonstrates the operation of the valves, acceptable level of total ECCS flow to all pump circuit breakers, and automatic injection points. equal to or above that circuitry. ll) assumed in the ECCS-LOCA analyses.
The active components (pumps and valves) Accumulator check valve operability tests
' are to be tested monthly to verify that are conducted to ensure that, if required, the pumps are in satisfactory running the accumulators will discharge as designed order and that the valves are free to move. to the reactor coolant system. The leak The test interval of one month is based on tightness of the valves is also checked to the judgment that more frequent testing assure that the accumulators will not be would not significantly increase the re- overpressurized during operation.
liability (i.e., the probability that the component would operate when required), (1)FSAR Section 6.2 and would result in increased wear over a long period of time.
The valves are fully stroked each refueling outage to verify their operability for component isolation.