ML20205C628: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 30: Line 30:
==Dear Mr. Olson:==
==Dear Mr. Olson:==


In my July 21, 1986 letter to you, I enclosed a portion of an NRC l                  Staff Report entitled "Results of NRR's Investigation and Evaluation of l                  Ten Licensed Operators Involved in TMI-2 Preaccident Leak Rate Testing Irregularities." The NRC is subject to a recent federal court order requiring that certain written material about .TMI-2 leak rate testing be disclosed only to authorized persons because it was the subject of a in        Some of this material is contained on page 3 of grand    jury (2)quiry.
In my {{letter dated|date=July 21, 1986|text=July 21, 1986 letter}} to you, I enclosed a portion of an NRC l                  Staff Report entitled "Results of NRR's Investigation and Evaluation of l                  Ten Licensed Operators Involved in TMI-2 Preaccident Leak Rate Testing Irregularities." The NRC is subject to a recent federal court order requiring that certain written material about .TMI-2 leak rate testing be disclosed only to authorized persons because it was the subject of a in        Some of this material is contained on page 3 of grand    jury (2)quiry.
l                  Enclosure                        of the Staff Report. Page 3 begins with the name " Joseph R. Congdon". Page 3 should have been removed from the material sent to you but, through inadvertence, it was enclosed with my letter. Please remove page 3 from your copy of the Staff Report and mail it back to me in the enclosed franked self-addressed envelope.
l                  Enclosure                        of the Staff Report. Page 3 begins with the name " Joseph R. Congdon". Page 3 should have been removed from the material sent to you but, through inadvertence, it was enclosed with my letter. Please remove page 3 from your copy of the Staff Report and mail it back to me in the enclosed franked self-addressed envelope.
Thank you for your cooperation.
Thank you for your cooperation.

Latest revision as of 00:58, 7 December 2021

Requests Return of Page 3 of Encl 2 to NRC Rept, Results of NRR Investigation & Evaluation of 10 Licensed Operators Involved in TMI-2 Preaccident Leak Rate Testing Irregularities. Served on 860811
ML20205C628
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 08/08/1986
From: Kelley J
Atomic Safety and Licensing Board Panel
To: Olson D
AFFILIATION NOT ASSIGNED
References
CON-#386-294 LRP, NUDOCS 8608120412
Download: ML20205C628 (1)


Text

_ _ _ _ _ _ _ _ _ _

2.%

Socaco,

. .,  % UNITED STATES

$ 't lyi(

E NUCLEAR REGULATORY COMMISSION 3 [ ATOMIC SAFETY AND LICENSING BOARD PANEL W ASHINGTON, D.C. 20555 D METED

% , .s, ,/

'86 AUG 11 A10:19 0FFICE OF sitnt 1/uiy 00CMETihu ?. SE6vlCf.

August 8, 1986 BRM f

Docket No. LRP SERVED AUG#1986 Mr. Dennis I. Olson 2731 B. Lochaven Drive Ijamsv111e,MD 21754

Dear Mr. Olson:

In my July 21, 1986 letter to you, I enclosed a portion of an NRC l Staff Report entitled "Results of NRR's Investigation and Evaluation of l Ten Licensed Operators Involved in TMI-2 Preaccident Leak Rate Testing Irregularities." The NRC is subject to a recent federal court order requiring that certain written material about .TMI-2 leak rate testing be disclosed only to authorized persons because it was the subject of a in Some of this material is contained on page 3 of grand jury (2)quiry.

l Enclosure of the Staff Report. Page 3 begins with the name " Joseph R. Congdon". Page 3 should have been removed from the material sent to you but, through inadvertence, it was enclosed with my letter. Please remove page 3 from your copy of the Staff Report and mail it back to me in the enclosed franked self-addressed envelope.

Thank you for your cooperation.

Sincerely, a es

/

. Ke ey, Chairman esiding ard cc: Service List 8608120412 860808 PDR ADOCK 05000320 G PDR hb{ _ _ _ - - - - - - - - _ - - - _ - - - - - _