| | title = Safety Insp Rept 50-295/87-12 on 870508-12.Major Areas Inspected:Events Surrounding Inadvertent Opening of All Four MSIVs & Subsequent Safety Injection on 870430.Event Caused by Communications Error & Failure to Refer to Procedures | | | title = Safety Insp Repts 50-295/87-12 & 50-304/87-15 on 870518-28. No Violations Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings,Insp of Electrical & Instrumentation Corrective & Preventative Maint Activities |
| | author name = Hinds J | | | author name = Falevits Z, Gardner R |
| | author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) | | | author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| | addressee name = | | | addressee name = |
| | addressee affiliation = | | | addressee affiliation = |
| | docket = 05000295 | | | docket = 05000295, 05000304 |
| | license number = | | | license number = |
| | contact person = | | | contact person = |
| | document report number = 50-295-87-12, NUDOCS 8706030086 | | | document report number = 50-295-87-12-01, 50-295-87-12-1, 50-304-87-15, NUDOCS 8706230224 |
| | package number = ML20214N792 | | | package number = ML20215G314 |
| | document type = INSPECTION REPORT, NRC-GENERATED, INSPECTION REPORT, UTILITY, TEXT-INSPECTION & AUDIT & I&E CIRCULARS | | | document type = INSPECTION REPORT, NRC-GENERATED, INSPECTION REPORT, UTILITY, TEXT-INSPECTION & AUDIT & I&E CIRCULARS |
| | page count = 10 | | | page count = 9 |
| }} | | }} |
|
| |
|
Line 20: |
Line 20: |
| =Text= | | =Text= |
| {{#Wiki_filter:- | | {{#Wiki_filter:- |
| ' | | < |
| | . |
| | s . |
| | : |
| | , U.S.' NUCLEAR REGULATORY COMMISSION |
| | |
| | ==REGION III== |
| | i |
| | : Reports No. . 50-295/87012(DRS); 50-304/87015(DRS) |
| | t Docket Nos. 50-295; 50-304 |
| | ~ |
| | Licenses No.'DPR-39; DPR-48 |
| | . Licensee: Commonwealth Edison Company Post Office Box-767 i Chicago, IL 60690 Facility Name: Zion Nuclear Power Station, Units 1 and 2 Inspection At: Zion, Illinois Inspection Conducted: May 18-28, 1987 I Inspector: Zelig.Falevits 6[/6/87 Date M k- ~ |
| | / / |
| | Approved'By: Ronald N. Gardner, Chief Plant Systems-Section b// b/87 Date Inspection Summary ; |
| | Inspection on May 18-28, 1987 (Reports No. 50-295/87012(DRS); |
| | No. 50-304/87015(DRS)) |
| | Areas Inspected: Routine,' announced safety inspection of licensee action on previous. inspection. findings; inspection of electrical and instrumentation corrective and preventative maintenance activities; review of procedures, work requests and drawings; and training (92702, 62704, 62705, 41400). |
| | |
| | Results: Of the four. areas inspected, no violations or deviations were-identifie PDR ADOCK 05000295 G PDR |
| | |
| . | | . |
| U.S. NUCLEAR REGULATORY COMMISSION REGION !!!
| |
| Report No. 50-295/87012(DRP)
| |
| Docket No. 50-295 License No. OPR-39 Licensee: Coninonwealth Edison Company P. O. Box 767 Chicago, IL 60690 Facility Name: Zion Nuclear Power Station, Unit 1 Inspection At: Zion, IL Inspection Conducted: May 8 through May 12, 1987 Inspectors: M. M. Holzmer P. L. Eng N. Williamsen
| |
| " J i L g . c'.
| |
| Approved B M. Hinds, Jr ting Chief f.24 J7 Reactor Projects Section 1A DTie Inspection Sunenary inspection on May 11 thrnugh May 12, 1987 (Report No. 50-295/87012(DRp)
| |
| Areas inspected: Special safety inspection of events surroundin opening of alTTour Unit 1 main steam isolation valves (MSIVs) g inadvertent and subsequent safety injection on April 30, 198 Resu_I ts: One Unresolved Item was identified regarding this event. The inspection disclosed that this was a significant event in that all four MSIVs were open and unable to close automatically or manually from the control room for approximately 20 minutes. The event was caused by a coninunications error and by a failure to refer to procedures, i
| |
| l l
| |
| 0706030006 070027 PDH ADUCK 0000029D PDH U
| |
| _ - - _ - _
| |
|
| |
| , _____ _____ ___ _ _ __ _______
| |
| '
| |
| . | | . |
| DETAILS Persons Contacted | | ) |
| | DETAILS 1. Persons Contacted Commonwealth Edison Company (CECO) |
| | ' |
| | *K. Depperschmidt, Electrical Maintenance Scheduler |
| | *R. Johnson, Assistant Superintendent Maintenance |
| | * T'Niemi, Master Mechanic |
| | *J. Ballard, Supervisor Quality Control |
| | *D. Johnson, Stores Supervisor |
| | *F. Tschakert, Instrument Maintenance Scheduler |
| | *J. Rappeport, Quality Assurance Engineer |
| | *J.'Yost, Quality Control Inspector |
| | *C. Schultz, Regulatory Assurance Supervisor |
| | *D. Wozniak, Engineer, SNED |
| | * Stone, Quality Assurance Superintendent |
| | *R. Budowle, Assistant Superintendent Technical Services |
| *G. Plim1, Station Manager | | *G. Plim1, Station Manager |
| *E. Fuerst, Superintendent, Production
| | *T. Rieck, Services Superintendent |
| *T. Rieck, Superintendent, Services | | *E. Fuerst, Production Superintendent T. Chladek, EM Foreman S. Hazelriggner, EM Foreman M. Baily, Environment Qualifications Coordinator G. Fanning, Technical Staff Engineer S. Sassaman, Technical Staff Engineer S. Petrovski, Staff Engineer |
| * Kurth, Assistant Station Superintendent, Operations L. Pruett, Unit 1 Operating Engineer N. Valos Unit 2 Operating Engineer ! | | ! |
| R. Cascarano, Technical Staff Supervisor T. Printz, Assistant Technical Staff Supervisor
| | U.S. NRC |
| *C. Schultz, Regulatory Assurance Administrator
| | * Holzmer, Senior Resident Inspector , |
| *J. Dallard, Quality Control Supervisor !
| | *P. Eng, Resident Inspector ' |
| * Stone. Quality Assurance Supervisor | | *R. Sutphin, Regional Inspector i |
| *P. LeBlond, Licensing Administrator | | *T. Vandel, Regional Inspector |
| *T. Droccolo, Assistant to Assistant Station Superintendent, Operations | | ' |
| *T. Wenig Engineer. Technical Staff | | * Denotes these present during the exit interview on May 28, 198 The inspector also contacted other licensee and contractor personnel during the course of this inspectio . Licensee Action on Previous Inspection Items (Closed) Violation [295/86023-01(DRS); 304/86022-01(DRS)]: On September 20,1986, Unit 2 reactor tripped during an EHC transient which was due to a valving error whereby the instrument mechanic, after replacing turbine impulse pressure transmitter 2PT-MS24, inadvertently opened the test connection valve rather than the isolation valve as required by desig l I |
| *G. Wagner, Maintenance Manager, Corporate Office
| |
| *J. Harbin, Shift Engineer The inspectors also met with and interviewed shift supervisors, licensed operators, and non-licensed operator * Indicates persons present at exit intervie . Safety In'ection JST)_ Due to inadvertent _ Opening of All Four Unit 1 Main 5 team tim atton valves (H51vl _Dackground The MSIVs at Zion are hydraulically opened, pneumatically shut. 35 inch globe valves. Hydraulic oil is piped to the underside of the MSIV actuating piston, and nitrogen pressure is maintained above the piston (scoAttachment1). When the hydraulic oil pum) is running i andnohydraulicdrainvalvopathsareopen(seeAttachment2),the ! | |
| MSIV will open. When either one of the two trip solenoid valves l (D A E in Attachment 2) are open, oli pressure will bleed of f and !
| |
| nitrogen pressure will overcome hydraulle pressure, forcing the MS!V -
| |
| closed. The trip solenoid valves aro "energiro to open" valves and -
| |
| areenvironmentallyqualified(EQ). To maintain their EQ status, the licensee has procedurally limited the length of time tno trip i solenoid valves can remain energized by requiring that the fuses to the trip solenoid valves will be removed if the M"ilVs are to remain closed longer than 24 hours, Event _ C_hr_on_o_ logy On April 30, 1987 UnitIwasinhotshutdown(Mode 3)atnormal operating temperature and grossure, with all four M$lys closed, j Operators had just placed OutofService"(005)tagsonthemain
| |
| '
| |
|
| |
|
| L
| | . |
| | . |
| | Subsequently, the licensee had taken disciplinary action with the ! |
| | responsible individual. Licensee management discussed this event with the Technical Staff and maintenance personnel. The applicable procedure was rewritten to separate the MS24 instrument loop into an independent procedure, and a second verification was incorporated into the applicable instrument loop procedur The inspector reviewed licensee corrective actions and found them adequate to resolve this issu (Closed) Violation [295/86023-02(DRS); 304/86022-03(DRS)]: This item ! |
| | concerned an Operational Analysis Department (OAD) test engineer who opened test switches without using the proper procedures. The opened test switch prevented the D.G. 480V transformer feed breaker from closing automatically as required by design. The licensee determined the root cause of this event to be the failure of the Technical Staff engineer to coordinate the troubleshooting activitie The inspector ; |
| | reviewed licensee completed and proposed corrective action which included: training of engineers on the OAD calibration methodology; changes in administrative procedure, and the use of the work request form to identify test switches which are to be opened or closed during troubleshooting activitie Licensee action appeared to be adequate. This item is considered close . Inspection and Review of Electrical and Instrumentation Corrective and Preventative Maintenance Activities The purpose of this inspection was to ascertain whether corrective j and preventative maintenance activities relative to electrical and i instrumentation components and systems were conducted in accordance with ) |
| | licensee-approved procedures, instructions, and latest drawings; that ! |
| | activities were performed by preplanned schedules and as required to maintain the units in safe operating condition; that the procedures, instructions, and drawings used met the requirements of technical ( |
| | specifications, regulatory guides, and industry codes and standards committed to by the license The inspector observed selected maintenance activities in progress and reviewed the procedures and documents for the corrective and preventative maintenance program relative to electrical and instrumentation maintenanc The attributes examined included: the appropriate approval signatures l obtained from operations prior to conducting the activity and at the time ! |
| | of returning the system to service; use of latest approved drawings, instructions or vendor manuals; establishment of QA/QC hold points and appropriate acceptance criteria; provisions for assuring that the applicable Technical Specifications and plant operation modes were noted; provisions for calibration of tools, equipment used and designation of required tests; provisions to insure that materials, parts, and components, are suitable for their intended use including environmental qualification; control of housekeeping; control of jumpers and lifted leads; provisions |
|
| |
|
| _ _ _ _ _ _ _ _ _ _ _
| | . |
| i* ,
| | . |
| l steam system for personnel protection for Unit 1 generator work. | | ) |
| | ; |
| | to insure that personnel qualifications necessary to perform the maintenance activities have been delineated; measures established to perform trend analysis for repetitive component failures based on maintenance history (root cause failure); responsibility for reporting to licensee management details concerning deficiencies identified during maintenance; a method to insure that service information, 10 CFR 21 ; |
| | Notices, IE Information Notices and Bulletins are available to the proper i maintenance personne l The inspector also conducted interviews with selected personnel relative to their trainin Observation of Maintenance Activities in Progress (1) The inspector observed an inspection and maintenance performed on limitorque motor operated Valve No. 2MOV-FW0050, "S/G 28 Aux FW Stop Valve." This task was conducted under WR No. 257122, dated ! |
| | February 19, 1987, and WR No. 253285, dated September 12, 1986, and to the requirements of maintenance Procedure No. E022-1, i Revision 5. Section I of the procedure delineated the required inspection check points and provided for documenting any discrepancies noted and recommended-action to resolve the Section II of the procedure included the required step by step check points and data to be recorded under the repair and maintenance activities. The electrical maintenance craftsman (EM) appeared to be knowledgeable in the task being performed; all required applicable attributes were addresse (2) On May 21, 1987, the inspector observed a performance test conducted on Unit 2, Battery Charger 212, using Procedure No. TSS 15.6.388, Revision 8, dated August 25, 1983. This test was required by Technical Specification Section 4.15.1.E. and was done to. comply with surveillance test requirements to test for proper equalized voltages of the battery charge At the beginning of the test, the 480V feed breaker to the battery charger located in Bus 238 switchgear, Cubicle 2C, had tripped on closure. Attempts made by the operator to reset the breaker locally had failed. The electrician then manually repositioned the overcurrent time delay plunger assembly located inside the breaker. This action reset and reclosed the breaker (the plunger was stuck, apparently due to dusty conditions in the unit). The inspector noted that the Technical Staff engineer continued the test without documenting the fact that the breaker had failed to clos In addition, l the test procedure lacked the provisions for documenting the ! |
| | test summary, problems, or deficiencies noted during the ! |
| | conduct of the test. The test engineer stated that at the conclusion of the test (which lasted 12 hours) he would note the identified problems or deficiencies in a letter and would attach the letter to the procedure. The inspector informed ! |
| | the licensee that this does not appear to be an acceptable f |
| | ! |
| | ! |
|
| |
|
| l Zion procedures require that when the MSIVs are to be closed for
| | i |
| !
| |
| more than 24 hours, the fuses for the MSIV trip solenoid valves l are to be removed in order to de-energize the MS!V trip solenoid l valves. This is for environmental qualification reasons (See
| |
| '
| |
| paragraph 2.c). At about 11:00 a.m. due to a communications error between the Shif t Control Room Engineer (SCRE) and the equipment l
| |
| oaerator (EO), the E0 removed the MSIV trip solenoid fuses before l
| |
| tie MSIV hydraulic pumps were secured. As the fuses for the MSIV l trip solenoid valves were pulled, all four MSIVs opened sequentially, pressurizing the main stcam lines. Asafetyinjection(SI) occurred due to high steam delta prescere for Loop B caused by the sequential steam readmission. Water was injected by the centrifugal charging pumps through the boron injection tank to the reactor coolant system for approximately six minutes. Steam header pressure increased from approximately 80 psig to about 785 psig in four minute '
| |
| Reactor coolant system (RCS) temperature decreased 27'F to about 516* !
| |
| The licensee responded to the SI por their Emergency Response Guidelines (ERGS). The SI was terminated in about six minute An Unusual Event was declared at 11:20 a.m. in accordance with the licensee's Generating Station's Emergency Plan. The MSIVs remained open untti the licensee removed power to the four MSIV hydraulic oil pumps and opened hydraulic valves R8 (see Attachment 2) for each MSIV to allow nitrogen pressure to close the MSI The Unusual Event was terminated at 11:50 Root Causes And Other problems (1) Failure to provide and roccive precise verbal coninunications.
| |
|
| |
|
| l
| | - |
| '
| |
| Poor conrnunications resulted in the E0 interpreting a question about pulling the MSIV fuses as an order to perform the tas The SCRE did not intend to provide an order aut was requesting confirmation of the next sequence of events. Verbal repeat i back of the order was not required nor was it performe (2) Failure to review the applicable system operating instruction !
| |
| prior to removing the MSIVs from servic !
| |
| $1nce System Operating Instruction, 501-31 " Main Steam", was :
| |
| not reviewed by the E0 prior to pulling the fuses, the need to have the MSIV hydraulic pumps de energized was not identifie j The E0 would nomally perform the removal of the fuses as part l of $01 3 !
| |
| i I (3) The design of the MSIV hydraulic system requires that when the MSIVs are closed the trip solonutd valves must remain energized. However, to maintain the solenoid environmental :
| |
| qualifications, thit length of time during which they must !
| |
| remain energized must be limited. Thus to keep the MS!Vs closed for long periods of time other measures must bu take ,
| |
| i l
| |
| l
| |
| --_ _ ___- _ _ ____ _ ___ _ _ _ _ _ _ _ - _ - - _ _ _ _ _ - _ _ _ - _ _ _ - _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
| |
|
| |
|
| r
| |
| *
| |
| .
| |
| (4) The 00S for the main steam system was apparently inadequate and in violat10n of the licensee's 005 procedur (5) The licensee took approximately 25 minutes to close all four MSIV's by opening the MSIV hydraulic pump breaker and opening valve R8. The MSIVs could have been more quickly closed from the control room if the MSIV fuses had been replaced, Corrective Actions The licensee stopped all non-esser.tial operations department work, including 005 tagging and changes to plant conditions until each operating shif t was briefed regarding the event and interim steps to prevent recurrence. Briefings were held before each shift was allowed to resume normal activitie The licensee's subsequent corrective actions are listed belo The status of each item is provide *
| |
| Expedite engineering review of the design of the MSIV system to include the fail state of the valve as well as the energized life of the solenoid Status: Station Nuclear Engineering Department (SNED) was requested to perform the review following a station modification review connittee meeting on May 12, 198 *
| |
| Install warning plaques on the MSIV trip solenoid fuses and hydraulic pump motor control centers (MCCs) to ensure the proper sequence of de-energizing the valve Status: Temporary warning si and MCCs on Saturday, May 2, gns 1987, finalwere placed Wording Was on the fuses determined on May 5, 1987, and permanent signs were installed by May 9, 198 * Initiate procedure changes to require operators to log the procedure and the step numbers that apply to current plant conditions and evolutions. The changes would also require that the appropriate section of that procedure be reviewed by the oncoming operator, prior to shif t chang Status: In place May 1, 1987 by Standing Order 87-1 Permanent procedure changes will be made through the normal proces "
| |
| Require that all completed steps of key procedures be properly signed off, rather than marked with a check mar Status: Inplemented by Night Order May 2, 19075 made permanent by Standing Order 01 12, May 6, 1907. This was formerly the
| |
|
| |
| . _ - _ _ _ _ _ - _ _-_---__- _ _ ___ __ _ __ _ _ _ _ __- _ _ ______ _ _ _ __ . - _ _
| |
|
| |
| , _ .___ __--_--_ _ _---- _ _ __.._ *
| |
| . | | . |
| practice for Periodic Tests (pts) and Maintenance Instructions (mis). All General Operating Procedures (GOPs) with the exception of G0P-3 are now corrected per this standing orde Formal procedure changes will follow through the normal proces *
| | method of documenting identified deficiencies. A review of the previous corrective maintenance performed on the same breaker in September 1985, under work request No. Z45099, revealed that the identical problem had occurred with the same breaker, whereby, the breaker tripped while the battery was on equalize charge and could not be reclosed. Work performed in 1985 to resolve the problem involved the recalibration of the associated Ampetector overcurrent relay. The functional test conducted subsequent to the calibration, which was performed in December 1985, indicated that the relay tripped within 49 m.sec. (the acceptance criteria was set at <50 m.sec.). Had it tripped at |
| Implement and train on formal " repeat-back" communicatio Status: Initially communicated to each shift verbally immediately following the incident and prior to each shift performing any shift activities. This was followed by Standing Order 87-11 on May 1, 198 Procedure changes will follow by the normal process. Additional instructions will be given during each crew's subsequent training weeks. The first such session will take place on May 15, 198 *
| | >50 m. sec. the breaker would have then required a complete i maintenance and cleanup (the breaker located upstream, which feeds l the entire switchgear, is set to trip at > 50 m. sec. ) . During i an identical test conducted in April 1983 on the same overcurrent J relay, the relay tripped within 30 m. sec. The inspector expressed his concern that the licensee did not appear to have an adequate trending program to identify repeat component failures or generic component i failure j At the completion of the test on May 21, 1987, the licensee issued WR No. Z606223 to investigate the cause of the failure of the breaker to close and stay closed. The breaker was bench tested and the overcurrent time delay plunger assembly was i cleaned and replaced. The inspector noted that work request, WR No. Z606223, did not require that the breaker be retested at the conclusion of the troubleshooting and repair. In addition, the WR stated that "Further testing may be needed as problem seems to be occurring when AC is turned on to the 212 charger." |
| Review System Operating Instructions (501's) to determine if they should be made " mandatory-in-hand" procedure Status: Initial review has been completed and the above change will not be made at this time. However, Standing Order 87-11, dated May 1, 1987, requires a review of procedures prior to any particular evolution, to determine whether an S0I (or other procedure) pertains to the evolution. If a procedure does exist, it must be reviewed prior to the evolution; if not, then pre-cautions and limitations of the associated S0I must be reviewed for applicabilit The above requirement, specified in Standing Order 87-11 May 1, 1987, will be updated to require the Shift Engineer to determine whether a procedure is needed, for those evolutions or conditions where presently there are no procedure *
| |
| Review the method of control of orders given to operator Status: The control of orders given to operators has been more clearly defined in Standing Order 87-13, dated May 7, 1987. In addition, Standing Order 87-13 changes the division of responsibilities between the shift Control Room Supervisor (normally the SCRE) and the shift's Second Licensed Foreman, in order to distribute the workload more evenly. This change allows the SCRE to devote more attention to unit operatio "
| |
| Licensing will perform a review to determine whether an unanalysed condition existed for this even Status: The completed review is expected by May 15, 198 " Review the shift's actions on April 30, 1987, in response to the Safety Injectio ,
| |
|
| |
|
| , _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _______ _ _ ___ ________________ ______ _ ______-_____-_ . _ _
| | The inspector expressed the concern that the root cause of the problem appears to still be indeterminate. The licensee indicated that a review of this issue would be conducted to determine the root caus licensee action and This review NRC issue [295/87012-01(DRS); |
| *
| | is considered unresolved pending(DRS)]. |
| | 304/87015-01 (3) The inspector observed Instrument Mechanics (IMs) perform troubleshooting to WR No. 260162, dated May 19, 1987, to identify a ground fault located in an annunciator circui The inspector noted that the IMs had exhibited technical difficulty during the troubleshooting activity, specifically, in the use of the proper drawing for the activity and in the interpretation of the voltage readings observed during the performance of this troubleshooting activity. Finally, with the assistance of the EM, the ground fault was identified and traced to a bare spare conductor (which should have been taped) |
| | inside device 1TSH-CD678. The licensee stated that taping of spare conductors is a " Skill of Craft" activity, which is not required to be noted in a procedure. The licensee indicated that the new TSH switches (recently installed) will be inspected and that all spare conductors would be tape . |
| . | | . |
| Status: The operating department management met with the shift personnel and concluded that the actions taken were fully consistent with the Emergency Response Guidelines (ERGS) and that the reclosing of the MSIVs was done in a conservative and timely fashio NRC interviews of shift management and review of plant parameters from computer graphs revealed that the steam header pressurized in about 5 to 10 minutes. Thus the event was essentially terminated prior to closing the MSIVs. Shift management stated that by the time they had proceeded through the ERGS for SI and SI termination, they felt they could take more time and be more deliberate than they could if there was a continuing steam deman The shift management stated that there were conflicting indications, which could out be verified by personnel in the control room, regarding the position of the MSIV hydraulic pump breaker. For that reason, they chose to ensure that the breaker was open prior to opening MSIV hydraulic valve R8. Because the flow rate through R8 is approximately the same as the capacity of the hydraulic pump, opening R8 with the pump energized would not ensure that the MSIV's would clos * Incorporate the applicable steps of S01-31, " Main Steam", into the GOPs, where possibl Status: This is under evaluation and the conclusions will be documente " Review the depth and extent of the Operating Engineer's (0E)
| |
| control over the shift, through the Shift Engineer (SE).
| |
|
| |
|
| Status: This review has been done by the Production Superintendent and the Assistant Superintendent-0perations and OE control is deemed adequat * Review the out-of-service (005) practices at Zion, since initially MSIV's were not taken 00S properl Status: Although the licensee believes that the improper 005 was not a cause of the SI, 00S practices are still of concern to the licensee because the MSIV 005 was apparently not in accordance with Zion's procedures. Initial review indicated that the 005 problem was confined to the MSIV Zion station procedures stated that "Where it is possible to energize or liven the equipment from more than one source, the appropriate Out Of Service Card shall be placed on all isolating devices (switches, valves, etc.) before the work is started. It is not sufficient to attach an Out of Service Card to a remote switch only." The Assistant Superintendent-Operations had follow-up discussions with each crew regarding the standing orders issued and this 00S problem on May 6, 1987 through May 8, 198 r
| | No deviations or violations were identifie b. Maintenance Program Review (1) The inspector conducted interviews with personnel of various seniority levels in several departments, including operations, Technical Staff, Maintenance and Quality Assurance. Relative to maintenance, licensee personnel noted that the preventative maintenance program at Zion is designed to anticipate and prevent equipment failure and degradation, thereby, increase equipment life and improve its performance. This task is being accomplished through routine scheduled maintenance tests, inspections, equipment overhauls and surveillance The inspector reviewed the licensee's Total Job Management (TJM) |
| ..
| | system used to plan and organize maintenance activities ar.d to ensure that the work is done effectively and efficiently and in compliance with all set requirement The central focal document used to implement the TJM program is the new Work Request, Form No. 86-2228-(s). In addition, the TJM program emphasizes good communications within departments as an essential element in performing an effective job and delineates maintenance job responsibilities and assignment The TJM program is compatible with the Quality Assurance Program at Zion. Furthermore, the TJM program appears to be an effective system for planning and accomplishing maintenance work activitie During this inspectico, a revie., of the TJM pending work request subsystem weekly status report indicated that as of April 9, 1987, a total of 3668 work requests were pending for Units 1 and 2; and as of May 15, 1987, a total of 4097 work request were pending for Units 1 and (2) Corrective maintenance activities at Zion are performed with Administrative Procedures and are indicated by the logging and routing of a work request (WR). Any Zion staff member can initiate a WR upon discovering the need for repair, maintenance or modification. Responsibilities of personnel involved in the routing and completion of a WR are defined in Zion Administrative Procedure ZAP-3-51-1 and in the TJM progra Management awareness of maintenance activities and problems at Zion is accomplished by numerous reports, meetings and committees. The data is used by managers and plant personnel to focus attention to those areas where it is most needed to enhance operations and eliminate problem No violations or deviations were identifie j l |
| ,
| | , |
| * Mandate that the " center desk NS0" issue all 00S jobs to nonlicensed operator Status: This has been the practice at Zion. In the discussion with the shift crews on May 6, 1987 through May 8, 1987 on 00S practices this was re-emphasized as the accepted practice for issuing 00S jobs to the A and B operators for write-up and card hanging (e) Safety Significance:
| |
| Unit I was in hot shutdown (Mode 3) at normal operating temperature and pressure. The Reactor Coolant System (RCS) was cooled 27 degrees during the event. RCS pressure never exceeded 2280 psi The licensee determined that 3% of the design SI cycle life had been used as a result of this transient. The Unit was in a condi-tion for approximately twenty-five minutes during which all four MSIVs were open and unable to be closed by an automatic signal, or by manual action from the control roo The secondary plant main steam headers were pressurized from 80 psig to about 800 psig in about four minutes. The main steam lines saw a total heat up of about 200 degrees during the period of pressurization. Since the MSIV's were closed only seven hours earlier, the main steam lines had not cooled significantly from normal operating temperature of 500 F prior to the re-pressurizatio A walkdown of containment and secondary steam piping did not identify any damage. There were no personnel injuries as a result of this even Section 14.2.5.3 of the Zion Final Safety Analysis Report (FSAR)
| |
| states that the MSIVs are designed to close within 10 seconds of a large steamline break, and that for any break in any location, no more than one steam generator (SG) would blowdown, even if one of the isolation valves fails to close. Had a large steamline break occurred during the April 30, 1987 event, the MSIVs would have been incapable of both automatic and manual closure from the engineered safety feature logic system (ESF). For any steamline break downstream of the main steam check valves, all four SGs would have blowndown. This would have constituted an unanalyzed conditio (f) Inspector Comments (1) The event occurred at 11:00 a.m. on April 30, 1987. The event was reported to the NRC at 11:46 a.m. the same da This was within the one hour requirement of 10 CFR 50.72 (a)(3 for declaration of Emergency Classes (eg Unusual Events .
| |
| (2) The licensee's corrective action was prompt as shown by the stop work, immediate shift briefings, and series of Standing
| |
|
| |
|
| r
| | . |
| ..
| |
| . | | . |
| Orders. The extent of the corrective actions exceeds that shown in responses to previous operating events, especially as it pertains to communications and enforcement of procedural adheranc (3) Past performance in the operating area has been averag Ratings given in NRC's Systematic Assessment of Licensee Performance have been Category 2 (average) for the last 3 assessment periods. Communications have been adequate in most cases, but are generally casual. Adherance to GOPs has been very good, but S0Is have not been rigorously use Several events have occurred since the beginning of the year involving failure of operators to adhere to procedures, or erroneous assumptions on the part of operators regarding. plant conditions or evolutions in progres (4) No specific notices had been given to the licensee by licensee audits, or NRC or industry notification regarding similar event (5) This is the first SI at Zion since January of 1984. Other violations of operating procedures have occurred, but their safety significance has been classified as mino .
| | ) |
| (g) Evaluation
| | 4. Review of Procedures, Work Requests and Drawings During this inspection, the inspector reviewed the following documents related to electrical and instrumentation corrective and preventive maintenance activities: |
| ;
| | l WR No. 233515, dated April 22, 1987 - 2A D.G. Control Solenoid l WR No. Z33514, dated May 15, 1987 .2B D.G. Control Solenoid l Zion Administrative Procedure No. ZAP-3-51-1, Revision 23 - Origination and Routing of Work Request l Q.A. Surveillance QAS-22-87-059, Page 5 and QAS 22-87-050, Page 10 - Surveillance Area Hold Point l WR No. 254967, dated April 1, 1987 - E.Q. Inspection of Limitorque Per E022- l Inspection and Maintenance of Limitorque E.Q. MOV, Procedure No. E022-1, Revision 5 - on Valve 2MOV-SI9011 l 7.5KVA Instrument Inverter Circulating Current Test, PT-33, Revision 0 - Unit 1 test performed on May 20, 198 l Jumper / Lifted Lead / Block /8ypass Field Verification - Monthly PT-105 test, Revision 6, Verification done May 19, 198 l Maintenance Department Administrative Instructions, MDAI-3-51-8B, Preventive Maintenance Program, Revision 1 l Electrical Maintenance Initial Training List Matrix - EM' l Work Request Statistical Report for Month of March 198 l Zion Administrative Procedure ZAP 5-51-5, l Revision 27, - Procedure Content and Forma l Total Job Management (TJM) - Nuclear Station , |
| This is considered an Unresolved Item per. ding review by a Region III 2 Enforcement Board (295/87012-01(DRP)). Unresolved Items Unresolved items are matters about which more information is required in order to ascertain whether they are acceptable items, violations, or deviations. One Unresolved Item disclosed during this inspection is discussed in Paragraph . Exit Interview The inspectors met with licensee representatives (denoted in Paragraph 1)
| | ! |
| throughout the inspection period and at the conclusion of the inspection on May 12, 1987, to summarize the scope and findings of the inspection activities. The licensee acknowledged the inspectors' comment The inspectors discussed the likely informational content of the inspection report with regard to documents or processes reviewed by the inspectors during the inspection. The licensee did not identify any documents or processes as proprietary, i
| | l Westinghouse - Instructions for Low Voltage Power Circuit Breakers Type DS and DS (ETI No. 000014) The inspector's review identified the following concerns: |
| | | (1) On April 7, 1987, an EM mechanic performed an inspection and preventative maintenance on safety related Valve 2MOV-SI9011 l The mechanic used maintenance Procedure No. E022-1 and WR 54967, dated April 1, 1987, to perform this activit Section II, Steps 12 and 13 of Procedure No. E022-1 which required motor rotation checks and operability checks had been signed off by the EM as completed and acceptabl In addition, j t |
| 1
| | l |
| , -,,-n_,- .n -
| |
| . . > , , , - - +-,,w , . . . . , ..w--------sr-e. -,n,. --+-- --r e-n - -- m. -
| |
| -m
| |
|
| |
|
| . | | . |
| . ATTACHMENT 1 l
| |
| '
| |
| . | | . |
| !
| | ) |
| OIL FOR SEALING l\ - - - - ~ ~ - -
| | Step 9 of the Station Traveler, found in the work package, which required adjustments to the valve limit switches and to the torque switches and a functional test was signed off as |
| l r
| | ' |
| *-NITROGEN FILL IIF - ] ; ---- (FROM MANIFOLD)
| | acceptable and dated April 12, 198 On April 19, 1987, during the review of.WR 54967, associated with. Valve No. 2MOV-SI9011A, the inspector noted that the work i package contained a 3 " x 5" index sheet which stated ' |
| STOP TUBE e
| | "2MOV-SI9011A won't manually engage to set limits properly." |
| \v !'
| |
| s il e s
| |
| /s '
| |
| l/
| |
| ,/ *
| |
| / 9" OIL $
| |
|
| |
|
| ~ l $
| | The index sheet was dated May 7, 1987, and signed off by the E The inspector raised'the concern that although the E022-1 procedure contained a " comments" section in which this deficiency should'have been noted,.the EM elected to note the deficiency on the index sheet contrary to the requirements of the. procedure. In addition, although the Traveler appeared to indicate that.the problem had been corrected, the index sheet was still in the work package indicating that the problem had" . |
| $ PISTON '
| | not.been resolved. No audit trail could be established to j determine what was done to correct.the problem. The licensee informed the inspector that a review will be conducted to address the inspector's concern (2) The following documents listed the title of Valve 2M0V-SI9011A ' |
| Y
| | as " Cold Leg Injection Isolation Valve" rather than " Hot Leg Injection Isolation Valve." |
| ,
| |
| f $
| |
| .
| |
| /l/
| |
| f
| |
| '
| |
|
| |
|
| '
| | (a) Work Request WR No. Z54967 (b) Station Maintenance Computer Program (c) MOV Nameplate Data ( |
| *
| | ! |
| h
| | (3) WR No. Z54967 Station Traveler, signed and dated May 9, 1987, by the QC Supervisor and QA Engineer / Inspector was classified as |
| / | | .non-safety related for work on safety-related Valve 2MOV-SI9011 j J |
| / s
| | (4) WR No. 253285 contained a signature but no date under " Shift J authorization to start work." |
| ' /
| |
| / s /
| |
| / ' l h
| |
| * , /
| |
| t s/
| |
| # 8
| |
| ' /
| |
| - a Ne
| |
| /
| |
| f p p
| |
| j VO LUM E ' | |
| _
| |
| #
| |
| (PISTON SEAL f INTEGRITY) INSPECTION v l 5 l DRAIN VALVE , | |
| 81 i L
| |
| Il lI
| |
| ; O : -JJ l L_ _ __ _ __ _
| |
| L _ _ _ _ _ _
| |
| *--Oi t
| |
|
| |
|
| NITROGEN RELIEF FIGURE 2la -H-C2 MSIV HYDR AU LIC ACTUATOR / ACCUMULATOR
| | (5) WR No. Z55112 contained a signature but no date under " Shift Supervisor Approval" and under the " Maintenance Department" block (6) WR No. 260162, dated May 19, 1987, requested work to be performed on a B0P circuit. This WR was erroneously classified as safety-related. Also, the " Requested By" block was not filled i '(7) ' Station Travelers attached to WR No. Z33513 and No. Z33514 which installed spike suppression devices in the D.G.'s circuitry contained Q.A. Hold Points. Apparently somebody other than Q.A. filled in the requirements noted in the Hold Point blocks. The licensee could not determine who filled in the requirements for Q.A. to witness the installation of the spike |
| - . . . . _ - . | |
|
| |
|
| .
| | l |
| P ATTACIDIENT 2 ,
| |
| PT PSH N MSIV ACTUATING PISTON Na .
| |
| G THROTTLE VALVE HYDRAULIC M ANI FOLD
| |
| _ ___
| |
| PI l
| |
| l R4 E R2
| |
| .
| |
| Y 4 I AL _ h D A Na
| |
| #
| |
| - THROTTLE VALVE
| |
| >< ;; X OPENING R7 B M !
| |
| SIDE ACCUMU- ;; l LATOR R8 C R5
| |
| # M ANIFO D
| |
| [
| |
| I X
| |
| R6
| |
| ?O A
| |
| jN OC z
| |
| {_
| |
| FILTER ](
| |
|
| |
|
| ^
| |
| >
| |
| RESERVOIR RESERVOIR CROSS CONNECT-lSTR A I N ERl Q-
| |
| , | | , |
| Qi
| | , ... |
| '
| | .. ., |
| FIGURE 210 -II- ci
| | ) |
| -_ _
| | suppression devices. WR No. Z33513 Traveler indicated by the , |
| | EM's signature and date that the spike suppression devices had been installed on April 22, 1987, while the Q A. engineer signed and dated the (witness) Hold Point block on April 21, , |
| | 1987. In addition, Page 5 of Hold Point Log No. QAS-22-87-059 ' |
| | noted that the Q.A. inspection required by the Hold Point was performed on April 23, 198 i WR'No. Z33514 Traveler requested.that Q.A. witness the installation of four Varistors; three were installed on May 13, 1987, and one was installed on May 15, 1987; the Q.A. Hold Point block was signed and dated May 13, 1987. The inspector expressed the concern that Q.A. Hold Points requirements had been filled in by an unknown individual; ', hat Q.A. elected to witness a portion of the requirements noted in the hold point without changing the requirements. Also, dates of the inspection and witnessing on the WR, Traveler and Hold Point Log Appear to contradict. Although items (2) and (7) above appear to have minor safety significance, they are indicative of the.need for licensee personnel to pay more attention t ; |
| | detail Items (1) through (7) noted above are considered unresolved pending licensee action and NRC review [295/87012-02(DRS); |
| | 304/87015-02(DRS)]. |
| | 5 .- Training |
| | .The effectiveness of the licensee's training program was reviewed by the inspector during the witnessing of the licensee's ,,erformance of maintenance and surveillance activities. The EM personnel appeared to be knowledgeable of the task being performed. Observation of IM personnel conducting troubleshooting indicated that additional training in this area is warrante No violations or deviations were identifie . Unresolved Items |
| | 'An unresolved item is a matter about which more information is required in order to ascertain whether it is an acceptable item, an open item, a deviation, or a violation. An unresolved item disclosed during this inspection is discussed in Paragraphs 3.a(2) and . Exit Interview The Region III inspector met with licensee representatives (denoted under Paragraph 1) at the conclusion of.the inspection on May 28, 1987. The inspector summarized the purpose and findings of the inspection. The licensee acknowledged this information. The inspector also discussed the likely informational content of the inspection report with regard to |
| | . documents or processes reviewed by the inspector during the inspectio The licensee did not identify any such documents / processes as proprietar . - _ _ . . . - - |
| }} | | }} |
Similar Documents at Zion |
---|
Category:INSPECTION REPORT
MONTHYEARIR 05000295/19990031999-09-0101 September 1999 Insp Repts 50-295/99-03 & 50-304/99-03 on 990608-0812.No Violations Noted.Major Areas Inspected:Licensee Facility & Control,Decommissioning Support Activities,Sf Safety & Radiological Safety IR 05000295/19990021999-06-18018 June 1999 Insp Repts 50-295/99-02 & 50-304/99-02 on 990121-0608.No Violations Noted.Major Areas Inspected:Licensee Facility Management & Control,Decommissioning Support Activities,Sf Safety & Radiological Safety IR 05000295/19980101998-11-0303 November 1998 Insp Repts 50-295/98-10 & 50-304/98-10 on 980814-1008.No Violations Noted.Major Areas Inspected:Facility Mgt & Control,Decommissioning Support Activities,Sf Safety & Radiological Safety IR 05000295/19980091998-09-0808 September 1998 Insp Repts 50-295/98-09 & 50-304/98-09 on 980626-0813.No Violations Noted.Major Areas Inspected:Facility Mgt & Control,Decommissioning Support Activities,Sf Safety & Radiological Safety IR 05000295/19980071998-06-26026 June 1998 Insp Repts 50-295/98-07 & 50-304/98-07 on 980425-0609.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000295/19980061998-04-23023 April 1998 Insp Repts 50-295/98-06 & 50-304/98-06 on 980330-0403.No Violations Noted.Major Areas Inspected:Plant Support IR 05000295/19980041998-03-31031 March 1998 Insp Repts 50-295/98-04 & 50-304/98-04 on 980203-0313.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000295/19980021998-03-0606 March 1998 Insp Repts 50-295/98-02 & 50-304/98-02 on 980112-0219.No Violations Noted.Major Areas Inspected:Plant Support ML20203H8841998-02-25025 February 1998 Insp Repts 50-295/97-32 & 50-304/97-32 on 971217-980202. Violations Noted.Major Areas Inspected:Operations, Engineering & Plant Support ML20202D7441998-02-0606 February 1998 Insp Repts 50-295/98-03 & 50-304/98-03 on 980120-23. Violations Noted.Major Areas Inspected:Plant Support Performance & Specifically,Evaluation of Effectiveness of Radiation Protection Program IR 05000295/19970271998-01-30030 January 1998 Insp Repts 50-295/97-27 & 50-304/97-27 on 971117-25.No Violations Noted.Major Areas Inspected:Licensed Reactor Operator & Senior Reactor Operator Requalification Training Programs ML20199G3461998-01-27027 January 1998 Insp Repts 50-295/97-23 & 50-304/97-23 on 970908-1216. Violations Noted.Major Areas Inspected:Engineering ML20199A2461998-01-21021 January 1998 Insp Repts 50-295/97-25 & 50-304/97-25 on 971011-1216. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000295/19970291998-01-0909 January 1998 Insp Repts 50-295/97-29 & 50-304/97-29 on 971202-05.No Violations Noted.Major Areas Inspected:Licensee Performance During Plant Biennial Exercise of Emergency Plan IR 05000295/19970211997-12-0909 December 1997 Insp Repts 50-295/97-21 & 50-304/97-21 on 970602-0919.No Violations Noted.Major Areas Inspected:Licensee Developed Phoenix Training Program as Part of Station Restart Action Plan IR 05000295/19970261997-12-0505 December 1997 Insp Repts 50-295/97-26 & 50-304/97-26 on 971027-31. Violations Noted.Major Areas Inspected:Plant Support, Performance & Evaluated Effectiveness of Radiation Protection Program IR 05000295/19970311997-12-0404 December 1997 Predecisional Enforcement Conference Repts 50-295/97-31 & 50-304/97-31 on 971201.Violations Noted.Major Areas Discussed:Violations Involving Failures to Adequately Implement fitness-for-duty Program Requirements ML20202D9401997-11-28028 November 1997 Insp Repts 50-295/97-22 & 50-304/97-22 on 970830-1010. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000295/19970171997-10-10010 October 1997 Insp Repts 50-295/97-17 & 50-304/97-17 on 970619-0922.No Violations Noted But pre-decisional Enforcement Conference Will Be Scheduled to Discuss Violations Cited.Major Areas inspected:fitness-for-duty Related Events IR 05000295/19970181997-10-0202 October 1997 Insp Repts 50-295/97-18 & 50-304/97-18 on 970409-0730. Violations Noted.Major Areas Inspected:Engineering IR 05000295/19970191997-09-30030 September 1997 Insp Repts 50-295/97-19 & 50-304/97-19 on 970719-0829. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000295/19970161997-08-28028 August 1997 Insp Repts 50-295/97-16 & 50-304/97-16 on 970530-0718. Violations Noted.Major Areas Inspected:Operations, Maintenance & Engineering IR 05000295/19970201997-08-26026 August 1997 Insp Repts 50-295/97-20 & 50-304/97-20 on 970728-0801. Violations Noted.Major Areas Inspected:Aspects of Licensee Plant Support Performance & Specifically,An Evaluation of Effectiveness of RP Program IR 05000295/19970131997-08-15015 August 1997 Insp Repts 50-295/97-13 & 50-304/97-13 on 970404-0529. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support Re Failure to Immediately Notify CR of Fire in Unit 1 Containment Resulting in Violation ML20149G6381997-07-17017 July 1997 Insp Rept 50-295/97-12 on 970311-0425.Violations Noted.Major Areas Inspected:Operations,Maint & Engineering Associated W/Unit 1 Loss of Offsite Power Event That Occurred on 970311 ML20149H9961997-07-16016 July 1997 Predecisional Enforcement Conference Rept on 970703.Areas Discussed:Violations Noted in Insp Repts 50-295/97-02, 50-304/97-02,50-295/97-07 & 50-304/97-07 on 970206-0402 & 0312-0428 & Corrective Actions IR 05000295/19970151997-06-26026 June 1997 Insp Repts 50-295/97-15 & 50-304/97-15 on 970602-06.No Violations Noted.Major Areas Inspected:Licensee Plant Support Performance & Effectiveness of RP Program ML20140G8291997-06-0404 June 1997 Insp Repts 50-295/97-02 & 50-304/97-02 on 970206-0402. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000295/19970141997-05-30030 May 1997 Partially Withheld NRC Security Insp Repts 50-295/97-14 & 50-304/97-14 on 970428-0502 (Ref 10CFR73.21(c)(2). No Violations Noted.Major Areas Inspected:Physical Security Program IR 05000295/19970071997-05-21021 May 1997 Insp Repts 50-295/97-07 & 50-304/97-07 on 970312-0428. Violations Noted.Major Areas inspected:follow-up on 970225-0307,AIT Insp of Improper Control Rod Manipulation Event ML20148B7831997-05-0606 May 1997 Insp Repts 50-295/97-09 & 50-304/97-09 on 970324-0414. Violations Noted.Major Areas Inspected:Licensee Radiation Protection Program IR 05000295/19970081997-04-30030 April 1997 Insp Repts 50-295/97-08 & 50-304/97-08 on 970317-21. Violations Noted.Major Areas Inspected:Insp Included Review of EP Program,Aspect of Plant Support IR 05000295/19960021997-04-0101 April 1997 Insp Repts 50-295/96-02 & 50-304/96-02 on 961203-970122.No Violations Noted.Major Areas Discussed:Shipment of Radioactive Matls Exceeding Limits of 49CFR173.425 & Inadequately Training Personnel IAW Procedure ML20137J6871997-03-24024 March 1997 Insp Repts 50-295/96-20 & 50-304/96-20 on 961207-970205. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000295/19970041997-03-0606 March 1997 Partially Withheld Insp Repts 50-295/97-04 & 50-304/97-04 on 970203-07.No Violations Noted.Details Withheld (Ref 10CFR73.21) ML20134P4881997-02-11011 February 1997 Insp Repts 50-295/96-21 & 50-304/96-21 on 961203-970122. Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Radiological Protection & Chemistry Controls IR 05000295/19960171997-02-0303 February 1997 Insp Repts 50-295/96-17 & 50-304/96-17 on 961012-1206. Violations Noted.Major Areas Inspected:Licensee Operations, Maint & Engineering ML20134G0481997-01-28028 January 1997 Insp Repts 50-295/96-14 & 50-304/96-14 on 960824-1011. Violations Noted.Major Areas Inspected:Operations, Maintenance & Engineering IR 05000295/19960131996-12-23023 December 1996 Insp Repts 50-295/96-13 & 50-304/96-13 on 961001-03,28-30 & 1107.Violations Noted.Major Areas Inspected:Maint. Observed & Reviewed ISI Procedures,Personnel Certifications IR 05000295/19960181996-12-0202 December 1996 Partially Withheld Insp Repts 50-295/96-18 & 50-304/96-18 on 961028-1101 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Corrective Actions,Mgt Support,Effectiveness of Mgt Controls & Security Program Plans ML20135B6851996-11-27027 November 1996 Predecisonal Enforcement Conference Repts 50-295/96-11 & 50-304/96-11 on 961112.No Violations Noted.Areas Discussed: Apparent Violations Identified During 960722-0822 Insp Along W/Corrective Actions Taken or Planned by Licensee IR 05000295/19960161996-11-21021 November 1996 Insp Repts 50-295/96-16 & 50-304/96-16 on 960923-1024. Violations Noted.Major Areas Insp:Radiation Protection Program ML20129E3401996-10-22022 October 1996 Insp Repts 50-295/96-11 & 50-304/96-11 on 960722-0822. Violations Noted.Major Areas Inspected:Team Insp of Engineering & Technical Support ML20129F1121996-10-22022 October 1996 Insp Repts 50-295/96-10 & 50-304/96-10 on 960713-0829. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support & Security ML20129F0761996-09-16016 September 1996 Insp Repts 50-295/96-08 & 50-304/96-08 on 960608-0726. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000295/19930241994-01-27027 January 1994 Insp Repts 50-295/93-24 & 50-304/93-24 on 940110-14.No Violations Noted.Major Areas Inspected:Rp Program,Review of Organizational Changes,Audits & Appraisals & External Exposure Controls IR 05000295/19930231994-01-14014 January 1994 Insp Repts 50-295/93-23 & 50-304/93-23 on 931124-940106. Violations Noted.Major Areas Inspected:Outage Activities, Events,Operational Safety,Maintenance & Surveillance IR 05000295/19930181993-12-14014 December 1993 Insp Repts 50-295/93-18 & 50-304/93-18 on 931004-29.No Violations Noted.Major Areas Inspected:Engineering & Technical Support & Related Mgt Activities ML20058H2611993-12-0707 December 1993 Insp Repts 50-295/93-20 & 50-304/93-20 on 931112-1123. Violations Noted.Major Areas Inspected:Resident Insp of Licensee Action on Previous Insp Findings,Summary of Outage Activities & Operational Safety Verification IR 05000295/19930211993-12-0101 December 1993 Insp Repts 50-295/93-21 & 50-304/93-21 on 931115-19.No Violations Noted.Major Areas Inspected:Rp Program,Review of Surveys & Contamination Control 1999-09-01
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000295/19990031999-09-0101 September 1999 Insp Repts 50-295/99-03 & 50-304/99-03 on 990608-0812.No Violations Noted.Major Areas Inspected:Licensee Facility & Control,Decommissioning Support Activities,Sf Safety & Radiological Safety IR 05000295/19990021999-06-18018 June 1999 Insp Repts 50-295/99-02 & 50-304/99-02 on 990121-0608.No Violations Noted.Major Areas Inspected:Licensee Facility Management & Control,Decommissioning Support Activities,Sf Safety & Radiological Safety IR 05000295/19980101998-11-0303 November 1998 Insp Repts 50-295/98-10 & 50-304/98-10 on 980814-1008.No Violations Noted.Major Areas Inspected:Facility Mgt & Control,Decommissioning Support Activities,Sf Safety & Radiological Safety IR 05000295/19980091998-09-0808 September 1998 Insp Repts 50-295/98-09 & 50-304/98-09 on 980626-0813.No Violations Noted.Major Areas Inspected:Facility Mgt & Control,Decommissioning Support Activities,Sf Safety & Radiological Safety IR 05000295/19980071998-06-26026 June 1998 Insp Repts 50-295/98-07 & 50-304/98-07 on 980425-0609.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000295/19980061998-04-23023 April 1998 Insp Repts 50-295/98-06 & 50-304/98-06 on 980330-0403.No Violations Noted.Major Areas Inspected:Plant Support IR 05000295/19980041998-03-31031 March 1998 Insp Repts 50-295/98-04 & 50-304/98-04 on 980203-0313.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000295/19980021998-03-0606 March 1998 Insp Repts 50-295/98-02 & 50-304/98-02 on 980112-0219.No Violations Noted.Major Areas Inspected:Plant Support ML20203H8841998-02-25025 February 1998 Insp Repts 50-295/97-32 & 50-304/97-32 on 971217-980202. Violations Noted.Major Areas Inspected:Operations, Engineering & Plant Support ML20202D7441998-02-0606 February 1998 Insp Repts 50-295/98-03 & 50-304/98-03 on 980120-23. Violations Noted.Major Areas Inspected:Plant Support Performance & Specifically,Evaluation of Effectiveness of Radiation Protection Program IR 05000295/19970271998-01-30030 January 1998 Insp Repts 50-295/97-27 & 50-304/97-27 on 971117-25.No Violations Noted.Major Areas Inspected:Licensed Reactor Operator & Senior Reactor Operator Requalification Training Programs ML20199G3461998-01-27027 January 1998 Insp Repts 50-295/97-23 & 50-304/97-23 on 970908-1216. Violations Noted.Major Areas Inspected:Engineering ML20199A2461998-01-21021 January 1998 Insp Repts 50-295/97-25 & 50-304/97-25 on 971011-1216. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000295/19970291998-01-0909 January 1998 Insp Repts 50-295/97-29 & 50-304/97-29 on 971202-05.No Violations Noted.Major Areas Inspected:Licensee Performance During Plant Biennial Exercise of Emergency Plan IR 05000295/19970211997-12-0909 December 1997 Insp Repts 50-295/97-21 & 50-304/97-21 on 970602-0919.No Violations Noted.Major Areas Inspected:Licensee Developed Phoenix Training Program as Part of Station Restart Action Plan IR 05000295/19970261997-12-0505 December 1997 Insp Repts 50-295/97-26 & 50-304/97-26 on 971027-31. Violations Noted.Major Areas Inspected:Plant Support, Performance & Evaluated Effectiveness of Radiation Protection Program IR 05000295/19970311997-12-0404 December 1997 Predecisional Enforcement Conference Repts 50-295/97-31 & 50-304/97-31 on 971201.Violations Noted.Major Areas Discussed:Violations Involving Failures to Adequately Implement fitness-for-duty Program Requirements ML20202D9401997-11-28028 November 1997 Insp Repts 50-295/97-22 & 50-304/97-22 on 970830-1010. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000295/19970171997-10-10010 October 1997 Insp Repts 50-295/97-17 & 50-304/97-17 on 970619-0922.No Violations Noted But pre-decisional Enforcement Conference Will Be Scheduled to Discuss Violations Cited.Major Areas inspected:fitness-for-duty Related Events IR 05000295/19970181997-10-0202 October 1997 Insp Repts 50-295/97-18 & 50-304/97-18 on 970409-0730. Violations Noted.Major Areas Inspected:Engineering IR 05000295/19970191997-09-30030 September 1997 Insp Repts 50-295/97-19 & 50-304/97-19 on 970719-0829. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000295/19970161997-08-28028 August 1997 Insp Repts 50-295/97-16 & 50-304/97-16 on 970530-0718. Violations Noted.Major Areas Inspected:Operations, Maintenance & Engineering IR 05000295/19970201997-08-26026 August 1997 Insp Repts 50-295/97-20 & 50-304/97-20 on 970728-0801. Violations Noted.Major Areas Inspected:Aspects of Licensee Plant Support Performance & Specifically,An Evaluation of Effectiveness of RP Program IR 05000295/19970131997-08-15015 August 1997 Insp Repts 50-295/97-13 & 50-304/97-13 on 970404-0529. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support Re Failure to Immediately Notify CR of Fire in Unit 1 Containment Resulting in Violation ML20149G6381997-07-17017 July 1997 Insp Rept 50-295/97-12 on 970311-0425.Violations Noted.Major Areas Inspected:Operations,Maint & Engineering Associated W/Unit 1 Loss of Offsite Power Event That Occurred on 970311 ML20149H9961997-07-16016 July 1997 Predecisional Enforcement Conference Rept on 970703.Areas Discussed:Violations Noted in Insp Repts 50-295/97-02, 50-304/97-02,50-295/97-07 & 50-304/97-07 on 970206-0402 & 0312-0428 & Corrective Actions IR 05000295/19970151997-06-26026 June 1997 Insp Repts 50-295/97-15 & 50-304/97-15 on 970602-06.No Violations Noted.Major Areas Inspected:Licensee Plant Support Performance & Effectiveness of RP Program ML20140G8291997-06-0404 June 1997 Insp Repts 50-295/97-02 & 50-304/97-02 on 970206-0402. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000295/19970141997-05-30030 May 1997 Partially Withheld NRC Security Insp Repts 50-295/97-14 & 50-304/97-14 on 970428-0502 (Ref 10CFR73.21(c)(2). No Violations Noted.Major Areas Inspected:Physical Security Program IR 05000295/19970071997-05-21021 May 1997 Insp Repts 50-295/97-07 & 50-304/97-07 on 970312-0428. Violations Noted.Major Areas inspected:follow-up on 970225-0307,AIT Insp of Improper Control Rod Manipulation Event ML20148B7831997-05-0606 May 1997 Insp Repts 50-295/97-09 & 50-304/97-09 on 970324-0414. Violations Noted.Major Areas Inspected:Licensee Radiation Protection Program IR 05000295/19970081997-04-30030 April 1997 Insp Repts 50-295/97-08 & 50-304/97-08 on 970317-21. Violations Noted.Major Areas Inspected:Insp Included Review of EP Program,Aspect of Plant Support IR 05000295/19960021997-04-0101 April 1997 Insp Repts 50-295/96-02 & 50-304/96-02 on 961203-970122.No Violations Noted.Major Areas Discussed:Shipment of Radioactive Matls Exceeding Limits of 49CFR173.425 & Inadequately Training Personnel IAW Procedure ML20137J6871997-03-24024 March 1997 Insp Repts 50-295/96-20 & 50-304/96-20 on 961207-970205. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000295/19970041997-03-0606 March 1997 Partially Withheld Insp Repts 50-295/97-04 & 50-304/97-04 on 970203-07.No Violations Noted.Details Withheld (Ref 10CFR73.21) ML20134P4881997-02-11011 February 1997 Insp Repts 50-295/96-21 & 50-304/96-21 on 961203-970122. Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Radiological Protection & Chemistry Controls IR 05000295/19960171997-02-0303 February 1997 Insp Repts 50-295/96-17 & 50-304/96-17 on 961012-1206. Violations Noted.Major Areas Inspected:Licensee Operations, Maint & Engineering ML20134G0481997-01-28028 January 1997 Insp Repts 50-295/96-14 & 50-304/96-14 on 960824-1011. Violations Noted.Major Areas Inspected:Operations, Maintenance & Engineering IR 05000295/19960131996-12-23023 December 1996 Insp Repts 50-295/96-13 & 50-304/96-13 on 961001-03,28-30 & 1107.Violations Noted.Major Areas Inspected:Maint. Observed & Reviewed ISI Procedures,Personnel Certifications IR 05000295/19960181996-12-0202 December 1996 Partially Withheld Insp Repts 50-295/96-18 & 50-304/96-18 on 961028-1101 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Corrective Actions,Mgt Support,Effectiveness of Mgt Controls & Security Program Plans ML20135B6851996-11-27027 November 1996 Predecisonal Enforcement Conference Repts 50-295/96-11 & 50-304/96-11 on 961112.No Violations Noted.Areas Discussed: Apparent Violations Identified During 960722-0822 Insp Along W/Corrective Actions Taken or Planned by Licensee IR 05000295/19960161996-11-21021 November 1996 Insp Repts 50-295/96-16 & 50-304/96-16 on 960923-1024. Violations Noted.Major Areas Insp:Radiation Protection Program ML20129E3401996-10-22022 October 1996 Insp Repts 50-295/96-11 & 50-304/96-11 on 960722-0822. Violations Noted.Major Areas Inspected:Team Insp of Engineering & Technical Support ML20129F1121996-10-22022 October 1996 Insp Repts 50-295/96-10 & 50-304/96-10 on 960713-0829. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support & Security ML20129F0761996-09-16016 September 1996 Insp Repts 50-295/96-08 & 50-304/96-08 on 960608-0726. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000295/19930241994-01-27027 January 1994 Insp Repts 50-295/93-24 & 50-304/93-24 on 940110-14.No Violations Noted.Major Areas Inspected:Rp Program,Review of Organizational Changes,Audits & Appraisals & External Exposure Controls IR 05000295/19930231994-01-14014 January 1994 Insp Repts 50-295/93-23 & 50-304/93-23 on 931124-940106. Violations Noted.Major Areas Inspected:Outage Activities, Events,Operational Safety,Maintenance & Surveillance IR 05000295/19930181993-12-14014 December 1993 Insp Repts 50-295/93-18 & 50-304/93-18 on 931004-29.No Violations Noted.Major Areas Inspected:Engineering & Technical Support & Related Mgt Activities ML20058H2611993-12-0707 December 1993 Insp Repts 50-295/93-20 & 50-304/93-20 on 931112-1123. Violations Noted.Major Areas Inspected:Resident Insp of Licensee Action on Previous Insp Findings,Summary of Outage Activities & Operational Safety Verification IR 05000295/19930211993-12-0101 December 1993 Insp Repts 50-295/93-21 & 50-304/93-21 on 931115-19.No Violations Noted.Major Areas Inspected:Rp Program,Review of Surveys & Contamination Control 1999-09-01
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000295/19990031999-09-0101 September 1999 Insp Repts 50-295/99-03 & 50-304/99-03 on 990608-0812.No Violations Noted.Major Areas Inspected:Licensee Facility & Control,Decommissioning Support Activities,Sf Safety & Radiological Safety IR 05000295/19990021999-06-18018 June 1999 Insp Repts 50-295/99-02 & 50-304/99-02 on 990121-0608.No Violations Noted.Major Areas Inspected:Licensee Facility Management & Control,Decommissioning Support Activities,Sf Safety & Radiological Safety IR 05000295/19980101998-11-0303 November 1998 Insp Repts 50-295/98-10 & 50-304/98-10 on 980814-1008.No Violations Noted.Major Areas Inspected:Facility Mgt & Control,Decommissioning Support Activities,Sf Safety & Radiological Safety IR 05000295/19980091998-09-0808 September 1998 Insp Repts 50-295/98-09 & 50-304/98-09 on 980626-0813.No Violations Noted.Major Areas Inspected:Facility Mgt & Control,Decommissioning Support Activities,Sf Safety & Radiological Safety IR 05000295/19980071998-06-26026 June 1998 Insp Repts 50-295/98-07 & 50-304/98-07 on 980425-0609.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000295/19980061998-04-23023 April 1998 Insp Repts 50-295/98-06 & 50-304/98-06 on 980330-0403.No Violations Noted.Major Areas Inspected:Plant Support IR 05000295/19980041998-03-31031 March 1998 Insp Repts 50-295/98-04 & 50-304/98-04 on 980203-0313.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000295/19980021998-03-0606 March 1998 Insp Repts 50-295/98-02 & 50-304/98-02 on 980112-0219.No Violations Noted.Major Areas Inspected:Plant Support ML20203H8841998-02-25025 February 1998 Insp Repts 50-295/97-32 & 50-304/97-32 on 971217-980202. Violations Noted.Major Areas Inspected:Operations, Engineering & Plant Support ML20202D7441998-02-0606 February 1998 Insp Repts 50-295/98-03 & 50-304/98-03 on 980120-23. Violations Noted.Major Areas Inspected:Plant Support Performance & Specifically,Evaluation of Effectiveness of Radiation Protection Program IR 05000295/19970271998-01-30030 January 1998 Insp Repts 50-295/97-27 & 50-304/97-27 on 971117-25.No Violations Noted.Major Areas Inspected:Licensed Reactor Operator & Senior Reactor Operator Requalification Training Programs ML20199G3461998-01-27027 January 1998 Insp Repts 50-295/97-23 & 50-304/97-23 on 970908-1216. Violations Noted.Major Areas Inspected:Engineering ML20199A2461998-01-21021 January 1998 Insp Repts 50-295/97-25 & 50-304/97-25 on 971011-1216. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000295/19970291998-01-0909 January 1998 Insp Repts 50-295/97-29 & 50-304/97-29 on 971202-05.No Violations Noted.Major Areas Inspected:Licensee Performance During Plant Biennial Exercise of Emergency Plan IR 05000295/19970211997-12-0909 December 1997 Insp Repts 50-295/97-21 & 50-304/97-21 on 970602-0919.No Violations Noted.Major Areas Inspected:Licensee Developed Phoenix Training Program as Part of Station Restart Action Plan IR 05000295/19970261997-12-0505 December 1997 Insp Repts 50-295/97-26 & 50-304/97-26 on 971027-31. Violations Noted.Major Areas Inspected:Plant Support, Performance & Evaluated Effectiveness of Radiation Protection Program IR 05000295/19970311997-12-0404 December 1997 Predecisional Enforcement Conference Repts 50-295/97-31 & 50-304/97-31 on 971201.Violations Noted.Major Areas Discussed:Violations Involving Failures to Adequately Implement fitness-for-duty Program Requirements ML20202D9401997-11-28028 November 1997 Insp Repts 50-295/97-22 & 50-304/97-22 on 970830-1010. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000295/19970171997-10-10010 October 1997 Insp Repts 50-295/97-17 & 50-304/97-17 on 970619-0922.No Violations Noted But pre-decisional Enforcement Conference Will Be Scheduled to Discuss Violations Cited.Major Areas inspected:fitness-for-duty Related Events IR 05000295/19970181997-10-0202 October 1997 Insp Repts 50-295/97-18 & 50-304/97-18 on 970409-0730. Violations Noted.Major Areas Inspected:Engineering IR 05000295/19970191997-09-30030 September 1997 Insp Repts 50-295/97-19 & 50-304/97-19 on 970719-0829. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000295/19970161997-08-28028 August 1997 Insp Repts 50-295/97-16 & 50-304/97-16 on 970530-0718. Violations Noted.Major Areas Inspected:Operations, Maintenance & Engineering IR 05000295/19970201997-08-26026 August 1997 Insp Repts 50-295/97-20 & 50-304/97-20 on 970728-0801. Violations Noted.Major Areas Inspected:Aspects of Licensee Plant Support Performance & Specifically,An Evaluation of Effectiveness of RP Program IR 05000295/19970131997-08-15015 August 1997 Insp Repts 50-295/97-13 & 50-304/97-13 on 970404-0529. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support Re Failure to Immediately Notify CR of Fire in Unit 1 Containment Resulting in Violation ML20149G6381997-07-17017 July 1997 Insp Rept 50-295/97-12 on 970311-0425.Violations Noted.Major Areas Inspected:Operations,Maint & Engineering Associated W/Unit 1 Loss of Offsite Power Event That Occurred on 970311 ML20149H9961997-07-16016 July 1997 Predecisional Enforcement Conference Rept on 970703.Areas Discussed:Violations Noted in Insp Repts 50-295/97-02, 50-304/97-02,50-295/97-07 & 50-304/97-07 on 970206-0402 & 0312-0428 & Corrective Actions IR 05000295/19970151997-06-26026 June 1997 Insp Repts 50-295/97-15 & 50-304/97-15 on 970602-06.No Violations Noted.Major Areas Inspected:Licensee Plant Support Performance & Effectiveness of RP Program ML20140G8291997-06-0404 June 1997 Insp Repts 50-295/97-02 & 50-304/97-02 on 970206-0402. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000295/19970141997-05-30030 May 1997 Partially Withheld NRC Security Insp Repts 50-295/97-14 & 50-304/97-14 on 970428-0502 (Ref 10CFR73.21(c)(2). No Violations Noted.Major Areas Inspected:Physical Security Program IR 05000295/19970071997-05-21021 May 1997 Insp Repts 50-295/97-07 & 50-304/97-07 on 970312-0428. Violations Noted.Major Areas inspected:follow-up on 970225-0307,AIT Insp of Improper Control Rod Manipulation Event ML20148B7831997-05-0606 May 1997 Insp Repts 50-295/97-09 & 50-304/97-09 on 970324-0414. Violations Noted.Major Areas Inspected:Licensee Radiation Protection Program IR 05000295/19970081997-04-30030 April 1997 Insp Repts 50-295/97-08 & 50-304/97-08 on 970317-21. Violations Noted.Major Areas Inspected:Insp Included Review of EP Program,Aspect of Plant Support IR 05000295/19960021997-04-0101 April 1997 Insp Repts 50-295/96-02 & 50-304/96-02 on 961203-970122.No Violations Noted.Major Areas Discussed:Shipment of Radioactive Matls Exceeding Limits of 49CFR173.425 & Inadequately Training Personnel IAW Procedure ML20137J6871997-03-24024 March 1997 Insp Repts 50-295/96-20 & 50-304/96-20 on 961207-970205. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000295/19970041997-03-0606 March 1997 Partially Withheld Insp Repts 50-295/97-04 & 50-304/97-04 on 970203-07.No Violations Noted.Details Withheld (Ref 10CFR73.21) ML20134P4881997-02-11011 February 1997 Insp Repts 50-295/96-21 & 50-304/96-21 on 961203-970122. Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Radiological Protection & Chemistry Controls IR 05000295/19960171997-02-0303 February 1997 Insp Repts 50-295/96-17 & 50-304/96-17 on 961012-1206. Violations Noted.Major Areas Inspected:Licensee Operations, Maint & Engineering ML20134G0481997-01-28028 January 1997 Insp Repts 50-295/96-14 & 50-304/96-14 on 960824-1011. Violations Noted.Major Areas Inspected:Operations, Maintenance & Engineering IR 05000295/19960131996-12-23023 December 1996 Insp Repts 50-295/96-13 & 50-304/96-13 on 961001-03,28-30 & 1107.Violations Noted.Major Areas Inspected:Maint. Observed & Reviewed ISI Procedures,Personnel Certifications IR 05000295/19960181996-12-0202 December 1996 Partially Withheld Insp Repts 50-295/96-18 & 50-304/96-18 on 961028-1101 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Corrective Actions,Mgt Support,Effectiveness of Mgt Controls & Security Program Plans ML20135B6851996-11-27027 November 1996 Predecisonal Enforcement Conference Repts 50-295/96-11 & 50-304/96-11 on 961112.No Violations Noted.Areas Discussed: Apparent Violations Identified During 960722-0822 Insp Along W/Corrective Actions Taken or Planned by Licensee IR 05000295/19960161996-11-21021 November 1996 Insp Repts 50-295/96-16 & 50-304/96-16 on 960923-1024. Violations Noted.Major Areas Insp:Radiation Protection Program ML20129E3401996-10-22022 October 1996 Insp Repts 50-295/96-11 & 50-304/96-11 on 960722-0822. Violations Noted.Major Areas Inspected:Team Insp of Engineering & Technical Support ML20129F1121996-10-22022 October 1996 Insp Repts 50-295/96-10 & 50-304/96-10 on 960713-0829. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support & Security ML20129F0761996-09-16016 September 1996 Insp Repts 50-295/96-08 & 50-304/96-08 on 960608-0726. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000295/19930241994-01-27027 January 1994 Insp Repts 50-295/93-24 & 50-304/93-24 on 940110-14.No Violations Noted.Major Areas Inspected:Rp Program,Review of Organizational Changes,Audits & Appraisals & External Exposure Controls IR 05000295/19930231994-01-14014 January 1994 Insp Repts 50-295/93-23 & 50-304/93-23 on 931124-940106. Violations Noted.Major Areas Inspected:Outage Activities, Events,Operational Safety,Maintenance & Surveillance IR 05000295/19930181993-12-14014 December 1993 Insp Repts 50-295/93-18 & 50-304/93-18 on 931004-29.No Violations Noted.Major Areas Inspected:Engineering & Technical Support & Related Mgt Activities ML20058H2611993-12-0707 December 1993 Insp Repts 50-295/93-20 & 50-304/93-20 on 931112-1123. Violations Noted.Major Areas Inspected:Resident Insp of Licensee Action on Previous Insp Findings,Summary of Outage Activities & Operational Safety Verification IR 05000295/19930211993-12-0101 December 1993 Insp Repts 50-295/93-21 & 50-304/93-21 on 931115-19.No Violations Noted.Major Areas Inspected:Rp Program,Review of Surveys & Contamination Control 1999-09-01
[Table view] Category:UTILITY
MONTHYEARIR 05000295/19900261990-11-16016 November 1990 Insp Repts 50-295/90-26 & 50-304/90-28 on 901022-26.No Violations or Deviations Noted.Major Areas Inspected: Training Concerns & Quality Verification Effectiveness IR 05000295/19900201990-11-0808 November 1990 Insp Repts 50-295/90-20 & 50-304/90-22 on 900910,24-28 & 1018.Violations Noted.Major Areas Inspected:Followup of Licensee Actions on Previously Identified Items IR 05000295/19900211990-11-0202 November 1990 Insp Repts 50-295/90-21 & 50-304/90-23 on 900902-1013.No Violations Noted.Major Areas Inspected:Previous Insp Findings,Summary of Operations,Operational Safety, Surveillance Observation,Maint Observation & LERs IR 05000295/19900221990-10-30030 October 1990 Insp Repts 50-295/90-22 & 50-304/90-24 on 900924-1012. Violations Noted.Major Areas Inspected:Radiation Protection Program IR 05000295/19900191990-10-22022 October 1990 Insp Repts 50-295/90-19 & 50-304/90-21 on 900813-1003.No Violations Noted.Major Areas Inspected:Physical Security Insp Involving Mgt Support,Security Program Plans,Audits, Protected & Vital Area Access Control IR 05000295/19900181990-09-24024 September 1990 Insp Repts 50-295/90-18 & 50-304/90-20 on 900730-0803.No Violations Noted.Major Areas Inspected:Operability of Svc Water Sys IR 05000295/19900151990-09-0505 September 1990 Insp Repts 50-295/90-15 & 50-304/90-17 on 900716-0808. Violations Noted.Major Areas Inspected:Liquid & Solid Radwaste Mgt & Transportation Programs,Including Organizational,Mgt Controls & Training IR 05000295/19900111990-09-0404 September 1990 Insp Repts 50-295/90-11 & 50-304/90-13 on 900424-0508 & 29. Violation Noted.Major Areas Inspected:Work Assignments of Licensee Employee Involved in Unmonitored Discharge of Radwaste IR 05000295/19900121990-08-0202 August 1990 Insp Repts 50-295/90-12 & 50-304/90-14 on 900717-19.No Violations,Deficiencies or Deviations Noted.One Exercise Weakness Identified.Major Areas Inspected:Annual Emergency Preparedness Exercise IR 05000295/19900161990-07-30030 July 1990 Insp Repts 50-295/90-16 & 50-304/90-18 on 900702-06,16 & 20. No Violations or Deviations Noted.Major Areas Inspected: Chemistry Program,Procedures,Organization & Training IR 05000304/19900121990-06-29029 June 1990 Insp Rept 50-304/90-12 on 900430-0510.Major Areas Inspected: Inservice Insp Related Activities,Steam Generator Indications,Mods,Erosion/Corrosion & Pipe Supports IR 05000295/19900071990-06-22022 June 1990 Insp Repts 50-295/90-07 & 50-304/90-07 on 900414-0602.No Violations Noted.Major Areas Inspected:Summary of Operations,Operational Safety Verification & ESF Sys Walkdown,Surveillance/Maint Observation & Technical Support IR 05000295/19890231989-09-14014 September 1989 Insp Repts 50-295/89-23 & 50-304/89-21 on 890717-21 & 0811. Violations Noted.Major Areas Inspected:Implementation of Licensee Fire Protection Program,Including Actions on Previous Insp Findings IR 05000295/19890251989-09-14014 September 1989 Insp Repts 50-295/89-25 & 50-304/89-23 on 890209-0807.No Violations Noted.Major Areas Inspected:Applicable Portions of Plant Security Program Re Alleged Inadequate Performance & Mgt Practices within Licensee Security Organization IR 05000295/19890241989-09-0808 September 1989 Insp Repts 50-295/89-24 & 50-304/89-22 on 890731-0829.No Violations Noted.Major Areas Inspected:Confirmatory Measurements & Radiological Environ Monitoring Including Review of Open Items Audits & Appraisals IR 05000295/19890181989-08-30030 August 1989 Insp Repts 50-295/89-18 & 50-304/89-17 on 890619-23 & 0717-21 & 24.Violations Noted.Major Areas Inspected:Maint, Support of Maint & Related Mgt Activities ML20246K9781989-08-25025 August 1989 Enforcement Conference Repts 50-295/89-26 & 50-304/89-24. Major Areas Discussed:Enforcement Options,Circumstances Surrounding & Corrective Actions in Response to Potential Violations of Security Plan IR 05000295/19890201989-07-28028 July 1989 Insp Repts 50-295/89-20 & 50-304/89-18 on 890619-0714.No Violations Noted.Major Areas Inspected:Liquid & Solid Radwaste Mgt & Transportation Programs,Including Organization & Mgt Controls & Compliance w/10CFR61 IR 05000295/19890151989-07-24024 July 1989 Safety Insp Repts 50-295/89-15 & 50-304/89-15 on 890509-0629.Violations Noted.Major Areas Inspected:Action on Previous Insp Findings,Summary of Operations & 890508 Unplanned Gas Release Due to Personnel Error IR 05000295/19890191989-06-16016 June 1989 Insp Rept 50-295/89-19 on 890331.No Violations Noted. Major Areas Discussed:Containment Spray Valve 1 MOV CS-0049 Being Inoperable & Rendering One Train of Containment Spray Sys Unable to Function in Recirculation Mode IR 05000295/19890161989-06-16016 June 1989 Insp Repts 50-295/89-16 & 50-304/89-16 on 890515-31.No Violations or Deviations Noted.Major Areas Inspected: Previously Identified Findings Re Environ Qualification of Electrical Equipment IR 05000295/19890121989-05-17017 May 1989 Insp Repts 50-295/89-12 & 50-304/89-12 on 890420 & 0502-05. No Violations,Deviations or Deficiencies Noted.Major Areas Inspected:Annual Emergency Preparedness Exercise IR 05000295/19890081989-04-10010 April 1989 Insp Repts 50-295/89-08 & 50-304/89-08 on 890210-0323. Violations Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings,Summary Operations & 890219 Shutdown of Unit 2 to Repair Failed Control Rod IR 05000295/19890021989-03-0808 March 1989 Insp Repts 50-295/89-02 & 50-304/89-02 on 890104-0217. Violations Noted.Major Areas Inspected:Insp of Licensee Action on Previous Insp Findings,Summary of Operations & 890115 Unit 1 Shutdown for Steam Generator Tube Leakage IR 05000295/19890061989-03-0303 March 1989 Insp Repts 50-295/89-06 & 50-304/89-06 on 890214-17.Major Areas Inspected:Emergency Preparedness Program,Licensee Action on Previously Identified Items,Emergency Plan Activations & Operational Status of Program IR 05000295/19890071989-02-24024 February 1989 Enforcement Conference Repts 50-295/89-07 & 50-304/89-07 on 890216.Major Areas Discussed:Radioactive Matl Transport & Safeguards Events,Apparent Violations Associated W/Events & Licensee Perspective & Corrective Actions IR 05000295/19880251989-02-23023 February 1989 Insp Repts 50-295/88-25 & 50-304/88-25 on 881215-890104.No Violations Noted.Major Areas Inspected:Radiation Protection Program,Including Organization & Mgt Controls,Changes in Organization,Personnel,Facilities,Equipment & Procedures IR 05000295/19880041988-11-28028 November 1988 Addendum to Insp Repts 50-295/88-04 & 50-304/88-05, Consisting of Comparisons of Results of Liquid Spike Sent to Plant & Criteria for Comparing Analytical Measurements IR 05000295/19880191988-11-25025 November 1988 Insp Repts 50-295/88-19 & 50-304/88-19 on 880824-1110. Violations Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings,Summary of Operations,Unit 2 Trip on 881008 & 12 & 881019 Unit 2 Valve Block Slippage IR 05000295/19880241988-11-22022 November 1988 Insp Repts 50-295/88-24 & 50-304/88-24 on 881024-28.No Violations Noted.Major Areas Inspected:Chemistry Program, Including Procedures,Organization & Training & Primary & Secondary Sys Water QC Programs IR 05000295/19880181988-10-20020 October 1988 Insp Repts 50-295/88-18 & 50-304/88-18 on 880927-29 & 1014. No Violations Noted.Major Areas Inspected:Annual Emergency Preparedness Exercise.Four Exercise Weaknesses Identified Which Will Require Corrective Action IR 05000295/19880201988-09-27027 September 1988 Insp Repts 50-295/88-20 & 50-304/88-20 on 880831-0902. Violations Noted.Major Areas Inspected:Liquid & Solid Radwaste Program,Including Organization & Mgt Controls, Effluent Releases & Records/Repts of Releases IR 05000295/19880161988-09-0909 September 1988 Insp Repts 50-295/88-16 & 50-304/88-16 on 880720-0823.No Violations Noted.Major Areas Inspected:Operational Safety Verification & Engineered Safety Feature Sys Walkdown, Surveillance Observation & Maint Observation IR 05000295/19880031988-08-12012 August 1988 Safety Sys Outage Mod Insp Rept 50-295/88-03 on 880329-0602. Violations Noted.Major Areas Inspected:Design,Installation & Testing of Several Mods to Be Performed During Outage & Util Corrective Action Program IR 05000295/19880151988-08-11011 August 1988 Insp Rept 50-295/88-15 on 880628-30 & 0803.Open Item Re Bench Testing of Crosby Valves Noted.Major Areas Inspected: LER 88-012 Re Test Methods of Main Steam Safety Valves Exceeding High Setpoint Tolerance When Tested by Steam IR 05000295/19880131988-08-0808 August 1988 Insp Repts 50-295/88-13 & 50-304/88-14 on 880526-0719.No Violations or Deviations Noted.Major Areas Inspected: Licensee Action on Previous Findings,Summary of Operations & Main Steam Safety Valves Set Nonconservatively IR 05000295/19880121988-06-22022 June 1988 Insp Repts 50-295/88-12 & 50-304/88-13 on 880414-0603. Violations Noted.Major Areas Inspected:Licensee Action on Previous Findings,Summary of Operations,Unit 1 Startup from Refueling & Testing of Accumulator Backup Check Valves IR 05000295/19880021988-06-0202 June 1988 Insp Repts 50-295/88-02 & 50-304/88-03 on 871124-880407.No Violations Noted.Major Areas Inspected:Review of Allegations Received by Region Iii,Including Drug Use by Personnel Employed at Plant & Harassment Re Safety Concerns IR 05000295/19880111988-05-26026 May 1988 Insp Repts 50-295/88-11 & 50-304/88-12 on 880418-29.No Violations or Deviations Noted.Major Areas Inspected: Radiation Protection Program During Refueling/Maint Outage, Including,Organization & Mgt Controls IR 05000295/19880101988-05-24024 May 1988 Insp Repts 50-295/88-10 & 50-304/88-11 on 880405-21. Violations Noted.Major Areas Inspected:Previous Insp Findings,Lers & Snubber Surveillance & Functional Testing IR 05000295/19880091988-04-27027 April 1988 Insp Repts 50-295/88-09 & 50-304/88-10 on 880225-0413. Violation Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings,Summary of Operations & Erroneous Setting of Main Steam Safety Valve Lift Setpoints on 880329 ML20148R7111988-04-0707 April 1988 Insp Repts 50-295/87-34 & 50-304/87-35 on 871116-880314. Violations Noted.Major Areas Inspected:Assessment of Compliance w/10CFR50,App R & Review of Fire Protection Program Requirements IR 05000295/19880051988-03-25025 March 1988 Insp Repts 50-295/88-05 & 50-304/88-06 on 880115-0224.No Violations or Deviations Noted.Major Areas Inspected:Action on Previous Insp Findings,Summary of Operations,Operational Safety Verification,Lers & IE Bulletins IR 05000295/19880071988-03-15015 March 1988 Safety Insp Repts 50-295/88-07 & 50-304/88-08 on 880302-04. No Violations or Deviations Noted.Major Areas Inspected: Containment Leak Rate Test (Cilrt) Procedure & Performance Witnessing & Review of Cilrt Results IR 05000295/19880081988-03-0202 March 1988 Partially Withheld Insp Repts 50-295/88-08 & 50-304/88-09 on 880201-19.Violation Noted.Major Areas Inspected: Circumstances Surrounding Inadequate Search of Package Matl Observed on 880201 IR 05000295/19880061988-02-23023 February 1988 Insp Repts 50-295/88-06 & 50-304/88-07 on 880208-11.No Violations Noted.Major Areas Inspected:Emergency Preparedness Program,Including Licensee Action on Previously Identified Areas & Emergency Plan Activations ML20149F8991988-02-10010 February 1988 Insp Repts 50-295/88-04 & 50-304/88-05 on 880112-15 & 19.No Violations Noted.Major Areas Inspected:Qa & Confirmatory Measures for in-plant Radiochemical Analyses & Action on Open Items Previously Identified ML20150C3281988-02-0909 February 1988 Insp Repts 50-295/87-24 & 50-304/87-25 on 870914-18.One Open Item Noted.Major Areas Inspected:Check Valve Testing Program,Check Valve Location,Check Valve Maint & Failure History & Response to INPO Event Rept 86-3 IR 05000295/19870361988-01-27027 January 1988 Insp Repts 50-295/87-36 & 50-304/87-37 on 871120-880114. Violation Noted.Major Areas Inspected:Operational Safety Verification & ESF Sys Walkdown & Inspector Followup of IE Bulletin 87-002 IR 05000295/19870381988-01-0707 January 1988 Insp Repts 50-295/87-38 & 50-304/87-39 on 871207-17. Violation Noted.Major Areas Inspected:Licensee Actions Re IE Bulletin 84-02 & Licensee Implementation of Generic Ltr 83-28 in Areas Including Equipment Classification 1990-09-05
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000295/19990031999-09-0101 September 1999 Insp Repts 50-295/99-03 & 50-304/99-03 on 990608-0812.No Violations Noted.Major Areas Inspected:Licensee Facility & Control,Decommissioning Support Activities,Sf Safety & Radiological Safety ML20210C3781999-07-20020 July 1999 Notice of Violation from Insp on 990318.Violations Noted: on 980224,individual Attempted to Enter Protected Area of Plant with Firearm.Search Equipment Operator Failed to Failed to Secure Item & Prevent Access ML20210C4301999-07-20020 July 1999 Notice of Violation from Investigation on 990318.Violation Noted:On 980224,recipient Caused Util to Be in Violation of Section 2.C.6 of Licenses DPR-39 & DPR-48.Recipient Attempted to Enter Protected Area of Station with Handgun IR 05000295/19990021999-06-18018 June 1999 Insp Repts 50-295/99-02 & 50-304/99-02 on 990121-0608.No Violations Noted.Major Areas Inspected:Licensee Facility Management & Control,Decommissioning Support Activities,Sf Safety & Radiological Safety ML20205P2211999-04-0909 April 1999 Notice of Violation from Insp & Investigation Completed on 981112.Violation Noted:From Approx July,1997 to 980122,SGI Was Not Stored in Locked Storage Container While Unattended IR 05000295/19980101998-11-0303 November 1998 Insp Repts 50-295/98-10 & 50-304/98-10 on 980814-1008.No Violations Noted.Major Areas Inspected:Facility Mgt & Control,Decommissioning Support Activities,Sf Safety & Radiological Safety IR 05000295/19980091998-09-0808 September 1998 Insp Repts 50-295/98-09 & 50-304/98-09 on 980626-0813.No Violations Noted.Major Areas Inspected:Facility Mgt & Control,Decommissioning Support Activities,Sf Safety & Radiological Safety IR 05000295/19980071998-06-26026 June 1998 Insp Repts 50-295/98-07 & 50-304/98-07 on 980425-0609.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support PNO-III-98-030, on 980517,armed Security Guard on Patrol in Owner Controlled Area Reported to Security Person Lying Near Road.Guard Subsequently Reported Being Shot.No Intruder Found.Guard Admitted Shooting Himself in Foot1998-05-18018 May 1998 PNO-III-98-030:on 980517,armed Security Guard on Patrol in Owner Controlled Area Reported to Security Person Lying Near Road.Guard Subsequently Reported Being Shot.No Intruder Found.Guard Admitted Shooting Himself in Foot IR 05000295/19980061998-04-23023 April 1998 Insp Repts 50-295/98-06 & 50-304/98-06 on 980330-0403.No Violations Noted.Major Areas Inspected:Plant Support IR 05000295/19980041998-03-31031 March 1998 Insp Repts 50-295/98-04 & 50-304/98-04 on 980203-0313.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000295/19980021998-03-0606 March 1998 Insp Repts 50-295/98-02 & 50-304/98-02 on 980112-0219.No Violations Noted.Major Areas Inspected:Plant Support ML20203H8841998-02-25025 February 1998 Insp Repts 50-295/97-32 & 50-304/97-32 on 971217-980202. Violations Noted.Major Areas Inspected:Operations, Engineering & Plant Support ML20203H8601998-02-25025 February 1998 Notice of Violation from Insp on 971217-980202.Violation Noted:Licensee Returned to Svc Valves 2FW0038 & 2FW0042 in Locked Position Instead of Locked Closed Position ML20202D7291998-02-0606 February 1998 Notice of Violation from Insp on 970120-23.Violation Noted: on 980115,radiation Protection Technician Performed Calibration of Auxiliary Bldg Exit Personnel Contamination Monitor & Failed to Reset Monitor to Initial Setting ML20202D7441998-02-0606 February 1998 Insp Repts 50-295/98-03 & 50-304/98-03 on 980120-23. Violations Noted.Major Areas Inspected:Plant Support Performance & Specifically,Evaluation of Effectiveness of Radiation Protection Program IR 05000295/19970271998-01-30030 January 1998 Insp Repts 50-295/97-27 & 50-304/97-27 on 971117-25.No Violations Noted.Major Areas Inspected:Licensed Reactor Operator & Senior Reactor Operator Requalification Training Programs ML20199G3461998-01-27027 January 1998 Insp Repts 50-295/97-23 & 50-304/97-23 on 970908-1216. Violations Noted.Major Areas Inspected:Engineering ML20199G3271998-01-27027 January 1998 Notice of Violation from Insp on 970908-1216.Violation Noted:As of 970724,licensee Failed to Ensure That Training Provided to Selected Contractor Craft & Quality Control Insp Personnel Performing Raychem Splice Applications ML20199A2461998-01-21021 January 1998 Insp Repts 50-295/97-25 & 50-304/97-25 on 971011-1216. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 07100011/20120161998-01-21021 January 1998 Notice of Violation from Insp on 971011-1216.Violations Noted:Procedures Were Not Appropriate to Circumstances in Listed Instances PNO-III-98-006, on 980115,licensee Announced Permanent Shut Down of Station.Util Plans to Maintain Plant in Safstor Decommissioning Mode Until Approx 20141998-01-15015 January 1998 PNO-III-98-006:on 980115,licensee Announced Permanent Shut Down of Station.Util Plans to Maintain Plant in Safstor Decommissioning Mode Until Approx 2014 ML20198P5561998-01-15015 January 1998 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $110,000.Violations Noted:Three FFD Trained Supervisors Failed to Require for-cause Test for Employee W/Smell of Alcohol in Protected Area ML20216D7411998-01-12012 January 1998 EN-98-002:on 980115,notice of Proposed Imposition of Civil Penalty in Amount of $110,000 Issued to Licensee.Action Based on Severity Level III Problem Involving Implementation of fitness-for-duty Program at Zion Station IR 05000295/19970291998-01-0909 January 1998 Insp Repts 50-295/97-29 & 50-304/97-29 on 971202-05.No Violations Noted.Major Areas Inspected:Licensee Performance During Plant Biennial Exercise of Emergency Plan IR 05000295/19970211997-12-0909 December 1997 Insp Repts 50-295/97-21 & 50-304/97-21 on 970602-0919.No Violations Noted.Major Areas Inspected:Licensee Developed Phoenix Training Program as Part of Station Restart Action Plan ML20203E5111997-12-0505 December 1997 Notice of Violation from Insp on 971027-31.Violation Noted:On 971017-18,entrance to Truck Bay of Radioactive High Level Waste Area Was Not Locked & Personnel Did Not Have Direct Oversight IR 05000295/19970261997-12-0505 December 1997 Insp Repts 50-295/97-26 & 50-304/97-26 on 971027-31. Violations Noted.Major Areas Inspected:Plant Support, Performance & Evaluated Effectiveness of Radiation Protection Program IR 05000295/19970311997-12-0404 December 1997 Predecisional Enforcement Conference Repts 50-295/97-31 & 50-304/97-31 on 971201.Violations Noted.Major Areas Discussed:Violations Involving Failures to Adequately Implement fitness-for-duty Program Requirements ML20202D9291997-11-28028 November 1997 Notice of Violation from Insp on 970830-1010.Violation Noted:On 970910,while Returning QA Fire Pump Breaker to Svc IAW out-of-svc Number 970009297,non-licensed Operator Did Not Close Control Power Knife Switch as Required ML20202D9401997-11-28028 November 1997 Insp Repts 50-295/97-22 & 50-304/97-22 on 970830-1010. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000295/19970171997-10-10010 October 1997 Insp Repts 50-295/97-17 & 50-304/97-17 on 970619-0922.No Violations Noted But pre-decisional Enforcement Conference Will Be Scheduled to Discuss Violations Cited.Major Areas inspected:fitness-for-duty Related Events IR 05000295/19970181997-10-0202 October 1997 Insp Repts 50-295/97-18 & 50-304/97-18 on 970409-0730. Violations Noted.Major Areas Inspected:Engineering ML20211J7991997-10-0202 October 1997 Notice of Violation from Insp on 970409-0730.Violation Noted:Zion Station Measures to Control Matls Were Inadequate & Did Not Prevent Installation of Following,From 1992 to 1997,high Efficiency Particulate Air Filters ML20217F0861997-09-30030 September 1997 Notice of Violation from Insp on 970719-0829.Violation Noted:On 970827,engineering Contractor Operated 2C Svc Water Pump Lower Bearing Suppl Isolation valve,2SW0624,w/o Authorization from Operations Dept IR 05000295/19970191997-09-30030 September 1997 Insp Repts 50-295/97-19 & 50-304/97-19 on 970719-0829. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering ML20217A3371997-09-12012 September 1997 Notice of Violation from Insp on 961207-970527.Violation Noted:During 1996 Unit 2 Refueling Outage,Irradiated Fuel Was Moved & Fuel Was Stored in Pool W/Less than 60 Days Decay Time & Fuel Bldg Exhaust Sys Was Operating PNO-III-97-071, on 970903,Comm Ed Announced Series of Mgt Changes & Restructuring of Nuclear Div Organization.New Site Vice Presidents at Braidwood & Quad Cities Former Plant Managers.State of Il Will Be Notified of Mgt Changes1997-09-0303 September 1997 PNO-III-97-071:on 970903,Comm Ed Announced Series of Mgt Changes & Restructuring of Nuclear Div Organization.New Site Vice Presidents at Braidwood & Quad Cities Former Plant Managers.State of Il Will Be Notified of Mgt Changes ML20217R2441997-09-0202 September 1997 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $330,000.Violation Noted:Primary Nso Did Not Establish Power at or Less than Point of Adding Heat IAW GOP-4,step 5.21.f IR 05000295/19970161997-08-28028 August 1997 Insp Repts 50-295/97-16 & 50-304/97-16 on 970530-0718. Violations Noted.Major Areas Inspected:Operations, Maintenance & Engineering ML20216C4801997-08-28028 August 1997 Notice of Violation from Insp on 970530-0718.Violation Noted:On 970510,during Performance of OSP 97-012,section 5.58,licensee Failed to Close 3L Kiene Valve ML20211C9071997-08-27027 August 1997 EN-97-080:on 970902,notice of Proposed Imposition of Civil Penalty in Amount of $330,000 Issued to Licensee.Action Based on Three Severity Level III Violations Pertaining to Reactivity Mgt Problems & Command/Control Problems IR 05000295/19970201997-08-26026 August 1997 Insp Repts 50-295/97-20 & 50-304/97-20 on 970728-0801. Violations Noted.Major Areas Inspected:Aspects of Licensee Plant Support Performance & Specifically,An Evaluation of Effectiveness of RP Program ML20217R3411997-08-26026 August 1997 Notice of Violation from Insp on 970728-0801.Violation Noted:High Radiation Area W/Radiation Levels Greater than 1000 Mrem/Hr Was Not Locked & Personnel Did Not Have Direct Oversight of & Positive Control Over Each Entry Into Area IR 05000295/19970131997-08-15015 August 1997 Insp Repts 50-295/97-13 & 50-304/97-13 on 970404-0529. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support Re Failure to Immediately Notify CR of Fire in Unit 1 Containment Resulting in Violation ML20217P9661997-08-15015 August 1997 Notice of Violation from Insp on 970404-0529.Violations Noted:Fire Resulted When Mechanical Maint Personnel Did Not Ensure That Adequate Natural or Mechanical Ventilation Was Established While Applying Flammable Lubricant to Rv Holes ML20149G6381997-07-17017 July 1997 Insp Rept 50-295/97-12 on 970311-0425.Violations Noted.Major Areas Inspected:Operations,Maint & Engineering Associated W/Unit 1 Loss of Offsite Power Event That Occurred on 970311 ML20149G6341997-07-17017 July 1997 Notice of Violation from Insp on 970311-0425.Violation Noted:On 970311,licensee Identified That Procedure Did Not Exist for Responding to Loss of Offsite Power That Resulted When Unit 1 Sys Auxiliary Transformer Tripped ML20149H9961997-07-16016 July 1997 Predecisional Enforcement Conference Rept on 970703.Areas Discussed:Violations Noted in Insp Repts 50-295/97-02, 50-304/97-02,50-295/97-07 & 50-304/97-07 on 970206-0402 & 0312-0428 & Corrective Actions IR 05000295/19970151997-06-26026 June 1997 Insp Repts 50-295/97-15 & 50-304/97-15 on 970602-06.No Violations Noted.Major Areas Inspected:Licensee Plant Support Performance & Effectiveness of RP Program 1999-09-01
[Table view] |
Inspection Report - Zion - 1987012 |
---|
|
|
Text
-
<
.
s .
, U.S.' NUCLEAR REGULATORY COMMISSION
REGION III
i
- Reports No. . 50-295/87012(DRS); 50-304/87015(DRS)
t Docket Nos. 50-295; 50-304
~
Licenses No.'DPR-39; DPR-48
. Licensee: Commonwealth Edison Company Post Office Box-767 i Chicago, IL 60690 Facility Name: Zion Nuclear Power Station, Units 1 and 2 Inspection At: Zion, Illinois Inspection Conducted: May 18-28, 1987 I Inspector: Zelig.Falevits 6[/6/87 Date M k- ~
/ /
Approved'By: Ronald N. Gardner, Chief Plant Systems-Section b// b/87 Date Inspection Summary ;
Inspection on May 18-28, 1987 (Reports No. 50-295/87012(DRS);
No. 50-304/87015(DRS))
Areas Inspected: Routine,' announced safety inspection of licensee action on previous. inspection. findings; inspection of electrical and instrumentation corrective and preventative maintenance activities; review of procedures, work requests and drawings; and training (92702, 62704, 62705, 41400).
Results: Of the four. areas inspected, no violations or deviations were-identifie PDR ADOCK 05000295 G PDR
.
.
)
DETAILS 1. Persons Contacted Commonwealth Edison Company (CECO)
'
- K. Depperschmidt, Electrical Maintenance Scheduler
- R. Johnson, Assistant Superintendent Maintenance
- J. Ballard, Supervisor Quality Control
- D. Johnson, Stores Supervisor
- F. Tschakert, Instrument Maintenance Scheduler
- J. Rappeport, Quality Assurance Engineer
- J.'Yost, Quality Control Inspector
- C. Schultz, Regulatory Assurance Supervisor
- D. Wozniak, Engineer, SNED
- Stone, Quality Assurance Superintendent
- R. Budowle, Assistant Superintendent Technical Services
- G. Plim1, Station Manager
- T. Rieck, Services Superintendent
- E. Fuerst, Production Superintendent T. Chladek, EM Foreman S. Hazelriggner, EM Foreman M. Baily, Environment Qualifications Coordinator G. Fanning, Technical Staff Engineer S. Sassaman, Technical Staff Engineer S. Petrovski, Staff Engineer
!
U.S. NRC
- Holzmer, Senior Resident Inspector ,
- P. Eng, Resident Inspector '
- R. Sutphin, Regional Inspector i
- T. Vandel, Regional Inspector
'
- Denotes these present during the exit interview on May 28, 198 The inspector also contacted other licensee and contractor personnel during the course of this inspectio . Licensee Action on Previous Inspection Items (Closed) Violation [295/86023-01(DRS); 304/86022-01(DRS)]: On September 20,1986, Unit 2 reactor tripped during an EHC transient which was due to a valving error whereby the instrument mechanic, after replacing turbine impulse pressure transmitter 2PT-MS24, inadvertently opened the test connection valve rather than the isolation valve as required by desig l I
.
.
Subsequently, the licensee had taken disciplinary action with the !
responsible individual. Licensee management discussed this event with the Technical Staff and maintenance personnel. The applicable procedure was rewritten to separate the MS24 instrument loop into an independent procedure, and a second verification was incorporated into the applicable instrument loop procedur The inspector reviewed licensee corrective actions and found them adequate to resolve this issu (Closed) Violation [295/86023-02(DRS); 304/86022-03(DRS)]: This item !
concerned an Operational Analysis Department (OAD) test engineer who opened test switches without using the proper procedures. The opened test switch prevented the D.G. 480V transformer feed breaker from closing automatically as required by design. The licensee determined the root cause of this event to be the failure of the Technical Staff engineer to coordinate the troubleshooting activitie The inspector ;
reviewed licensee completed and proposed corrective action which included: training of engineers on the OAD calibration methodology; changes in administrative procedure, and the use of the work request form to identify test switches which are to be opened or closed during troubleshooting activitie Licensee action appeared to be adequate. This item is considered close . Inspection and Review of Electrical and Instrumentation Corrective and Preventative Maintenance Activities The purpose of this inspection was to ascertain whether corrective j and preventative maintenance activities relative to electrical and i instrumentation components and systems were conducted in accordance with )
licensee-approved procedures, instructions, and latest drawings; that !
activities were performed by preplanned schedules and as required to maintain the units in safe operating condition; that the procedures, instructions, and drawings used met the requirements of technical (
specifications, regulatory guides, and industry codes and standards committed to by the license The inspector observed selected maintenance activities in progress and reviewed the procedures and documents for the corrective and preventative maintenance program relative to electrical and instrumentation maintenanc The attributes examined included: the appropriate approval signatures l obtained from operations prior to conducting the activity and at the time !
of returning the system to service; use of latest approved drawings, instructions or vendor manuals; establishment of QA/QC hold points and appropriate acceptance criteria; provisions for assuring that the applicable Technical Specifications and plant operation modes were noted; provisions for calibration of tools, equipment used and designation of required tests; provisions to insure that materials, parts, and components, are suitable for their intended use including environmental qualification; control of housekeeping; control of jumpers and lifted leads; provisions
.
.
)
to insure that personnel qualifications necessary to perform the maintenance activities have been delineated; measures established to perform trend analysis for repetitive component failures based on maintenance history (root cause failure); responsibility for reporting to licensee management details concerning deficiencies identified during maintenance; a method to insure that service information, 10 CFR 21 ;
Notices, IE Information Notices and Bulletins are available to the proper i maintenance personne l The inspector also conducted interviews with selected personnel relative to their trainin Observation of Maintenance Activities in Progress (1) The inspector observed an inspection and maintenance performed on limitorque motor operated Valve No. 2MOV-FW0050, "S/G 28 Aux FW Stop Valve." This task was conducted under WR No. 257122, dated !
February 19, 1987, and WR No. 253285, dated September 12, 1986, and to the requirements of maintenance Procedure No. E022-1, i Revision 5.Section I of the procedure delineated the required inspection check points and provided for documenting any discrepancies noted and recommended-action to resolve the Section II of the procedure included the required step by step check points and data to be recorded under the repair and maintenance activities. The electrical maintenance craftsman (EM) appeared to be knowledgeable in the task being performed; all required applicable attributes were addresse (2) On May 21, 1987, the inspector observed a performance test conducted on Unit 2, Battery Charger 212, using Procedure No. TSS 15.6.388, Revision 8, dated August 25, 1983. This test was required by Technical Specification Section 4.15.1.E. and was done to. comply with surveillance test requirements to test for proper equalized voltages of the battery charge At the beginning of the test, the 480V feed breaker to the battery charger located in Bus 238 switchgear, Cubicle 2C, had tripped on closure. Attempts made by the operator to reset the breaker locally had failed. The electrician then manually repositioned the overcurrent time delay plunger assembly located inside the breaker. This action reset and reclosed the breaker (the plunger was stuck, apparently due to dusty conditions in the unit). The inspector noted that the Technical Staff engineer continued the test without documenting the fact that the breaker had failed to clos In addition, l the test procedure lacked the provisions for documenting the !
test summary, problems, or deficiencies noted during the !
conduct of the test. The test engineer stated that at the conclusion of the test (which lasted 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />) he would note the identified problems or deficiencies in a letter and would attach the letter to the procedure. The inspector informed !
the licensee that this does not appear to be an acceptable f
!
!
i
-
.
method of documenting identified deficiencies. A review of the previous corrective maintenance performed on the same breaker in September 1985, under work request No. Z45099, revealed that the identical problem had occurred with the same breaker, whereby, the breaker tripped while the battery was on equalize charge and could not be reclosed. Work performed in 1985 to resolve the problem involved the recalibration of the associated Ampetector overcurrent relay. The functional test conducted subsequent to the calibration, which was performed in December 1985, indicated that the relay tripped within 49 m.sec. (the acceptance criteria was set at <50 m.sec.). Had it tripped at
>50 m. sec. the breaker would have then required a complete i maintenance and cleanup (the breaker located upstream, which feeds l the entire switchgear, is set to trip at > 50 m. sec. ) . During i an identical test conducted in April 1983 on the same overcurrent J relay, the relay tripped within 30 m. sec. The inspector expressed his concern that the licensee did not appear to have an adequate trending program to identify repeat component failures or generic component i failure j At the completion of the test on May 21, 1987, the licensee issued WR No. Z606223 to investigate the cause of the failure of the breaker to close and stay closed. The breaker was bench tested and the overcurrent time delay plunger assembly was i cleaned and replaced. The inspector noted that work request, WR No. Z606223, did not require that the breaker be retested at the conclusion of the troubleshooting and repair. In addition, the WR stated that "Further testing may be needed as problem seems to be occurring when AC is turned on to the 212 charger."
The inspector expressed the concern that the root cause of the problem appears to still be indeterminate. The licensee indicated that a review of this issue would be conducted to determine the root caus licensee action and This review NRC issue [295/87012-01(DRS);
is considered unresolved pending(DRS)].
304/87015-01 (3) The inspector observed Instrument Mechanics (IMs) perform troubleshooting to WR No. 260162, dated May 19, 1987, to identify a ground fault located in an annunciator circui The inspector noted that the IMs had exhibited technical difficulty during the troubleshooting activity, specifically, in the use of the proper drawing for the activity and in the interpretation of the voltage readings observed during the performance of this troubleshooting activity. Finally, with the assistance of the EM, the ground fault was identified and traced to a bare spare conductor (which should have been taped)
inside device 1TSH-CD678. The licensee stated that taping of spare conductors is a " Skill of Craft" activity, which is not required to be noted in a procedure. The licensee indicated that the new TSH switches (recently installed) will be inspected and that all spare conductors would be tape .
.
No deviations or violations were identifie b. Maintenance Program Review (1) The inspector conducted interviews with personnel of various seniority levels in several departments, including operations, Technical Staff, Maintenance and Quality Assurance. Relative to maintenance, licensee personnel noted that the preventative maintenance program at Zion is designed to anticipate and prevent equipment failure and degradation, thereby, increase equipment life and improve its performance. This task is being accomplished through routine scheduled maintenance tests, inspections, equipment overhauls and surveillance The inspector reviewed the licensee's Total Job Management (TJM)
system used to plan and organize maintenance activities ar.d to ensure that the work is done effectively and efficiently and in compliance with all set requirement The central focal document used to implement the TJM program is the new Work Request, Form No. 86-2228-(s). In addition, the TJM program emphasizes good communications within departments as an essential element in performing an effective job and delineates maintenance job responsibilities and assignment The TJM program is compatible with the Quality Assurance Program at Zion. Furthermore, the TJM program appears to be an effective system for planning and accomplishing maintenance work activitie During this inspectico, a revie., of the TJM pending work request subsystem weekly status report indicated that as of April 9, 1987, a total of 3668 work requests were pending for Units 1 and 2; and as of May 15, 1987, a total of 4097 work request were pending for Units 1 and (2) Corrective maintenance activities at Zion are performed with Administrative Procedures and are indicated by the logging and routing of a work request (WR). Any Zion staff member can initiate a WR upon discovering the need for repair, maintenance or modification. Responsibilities of personnel involved in the routing and completion of a WR are defined in Zion Administrative Procedure ZAP-3-51-1 and in the TJM progra Management awareness of maintenance activities and problems at Zion is accomplished by numerous reports, meetings and committees. The data is used by managers and plant personnel to focus attention to those areas where it is most needed to enhance operations and eliminate problem No violations or deviations were identifie j l
,
.
.
)
4. Review of Procedures, Work Requests and Drawings During this inspection, the inspector reviewed the following documents related to electrical and instrumentation corrective and preventive maintenance activities:
l WR No. 233515, dated April 22, 1987 - 2A D.G. Control Solenoid l WR No. Z33514, dated May 15, 1987 .2B D.G. Control Solenoid l Zion Administrative Procedure No. ZAP-3-51-1, Revision 23 - Origination and Routing of Work Request l Q.A. Surveillance QAS-22-87-059, Page 5 and QAS 22-87-050, Page 10 - Surveillance Area Hold Point l WR No. 254967, dated April 1, 1987 - E.Q. Inspection of Limitorque Per E022- l Inspection and Maintenance of Limitorque E.Q. MOV, Procedure No. E022-1, Revision 5 - on Valve 2MOV-SI9011 l 7.5KVA Instrument Inverter Circulating Current Test, PT-33, Revision 0 - Unit 1 test performed on May 20, 198 l Jumper / Lifted Lead / Block /8ypass Field Verification - Monthly PT-105 test, Revision 6, Verification done May 19, 198 l Maintenance Department Administrative Instructions, MDAI-3-51-8B, Preventive Maintenance Program, Revision 1 l Electrical Maintenance Initial Training List Matrix - EM' l Work Request Statistical Report for Month of March 198 l Zion Administrative Procedure ZAP 5-51-5, l Revision 27, - Procedure Content and Forma l Total Job Management (TJM) - Nuclear Station ,
!
l Westinghouse - Instructions for Low Voltage Power Circuit Breakers Type DS and DS (ETI No. 000014) The inspector's review identified the following concerns:
(1) On April 7, 1987, an EM mechanic performed an inspection and preventative maintenance on safety related Valve 2MOV-SI9011 l The mechanic used maintenance Procedure No. E022-1 and WR 54967, dated April 1, 1987, to perform this activit Section II, Steps 12 and 13 of Procedure No. E022-1 which required motor rotation checks and operability checks had been signed off by the EM as completed and acceptabl In addition, j t
l
.
.
)
Step 9 of the Station Traveler, found in the work package, which required adjustments to the valve limit switches and to the torque switches and a functional test was signed off as
'
acceptable and dated April 12, 198 On April 19, 1987, during the review of.WR 54967, associated with. Valve No. 2MOV-SI9011A, the inspector noted that the work i package contained a 3 " x 5" index sheet which stated '
"2MOV-SI9011A won't manually engage to set limits properly."
The index sheet was dated May 7, 1987, and signed off by the E The inspector raised'the concern that although the E022-1 procedure contained a " comments" section in which this deficiency should'have been noted,.the EM elected to note the deficiency on the index sheet contrary to the requirements of the. procedure. In addition, although the Traveler appeared to indicate that.the problem had been corrected, the index sheet was still in the work package indicating that the problem had" .
not.been resolved. No audit trail could be established to j determine what was done to correct.the problem. The licensee informed the inspector that a review will be conducted to address the inspector's concern (2) The following documents listed the title of Valve 2M0V-SI9011A '
as " Cold Leg Injection Isolation Valve" rather than " Hot Leg Injection Isolation Valve."
(a) Work Request WR No. Z54967 (b) Station Maintenance Computer Program (c) MOV Nameplate Data (
!
(3) WR No. Z54967 Station Traveler, signed and dated May 9, 1987, by the QC Supervisor and QA Engineer / Inspector was classified as
.non-safety related for work on safety-related Valve 2MOV-SI9011 j J
(4) WR No. 253285 contained a signature but no date under " Shift J authorization to start work."
(5) WR No. Z55112 contained a signature but no date under " Shift Supervisor Approval" and under the " Maintenance Department" block (6) WR No. 260162, dated May 19, 1987, requested work to be performed on a B0P circuit. This WR was erroneously classified as safety-related. Also, the " Requested By" block was not filled i '(7) ' Station Travelers attached to WR No. Z33513 and No. Z33514 which installed spike suppression devices in the D.G.'s circuitry contained Q.A. Hold Points. Apparently somebody other than Q.A. filled in the requirements noted in the Hold Point blocks. The licensee could not determine who filled in the requirements for Q.A. to witness the installation of the spike
l
,
, ...
.. .,
)
suppression devices. WR No. Z33513 Traveler indicated by the ,
EM's signature and date that the spike suppression devices had been installed on April 22, 1987, while the Q A. engineer signed and dated the (witness) Hold Point block on April 21, ,
1987. In addition, Page 5 of Hold Point Log No. QAS-22-87-059 '
noted that the Q.A. inspection required by the Hold Point was performed on April 23, 198 i WR'No. Z33514 Traveler requested.that Q.A. witness the installation of four Varistors; three were installed on May 13, 1987, and one was installed on May 15, 1987; the Q.A. Hold Point block was signed and dated May 13, 1987. The inspector expressed the concern that Q.A. Hold Points requirements had been filled in by an unknown individual; ', hat Q.A. elected to witness a portion of the requirements noted in the hold point without changing the requirements. Also, dates of the inspection and witnessing on the WR, Traveler and Hold Point Log Appear to contradict. Although items (2) and (7) above appear to have minor safety significance, they are indicative of the.need for licensee personnel to pay more attention t ;
detail Items (1) through (7) noted above are considered unresolved pending licensee action and NRC review [295/87012-02(DRS);
304/87015-02(DRS)].
5 .- Training
.The effectiveness of the licensee's training program was reviewed by the inspector during the witnessing of the licensee's ,,erformance of maintenance and surveillance activities. The EM personnel appeared to be knowledgeable of the task being performed. Observation of IM personnel conducting troubleshooting indicated that additional training in this area is warrante No violations or deviations were identifie . Unresolved Items
'An unresolved item is a matter about which more information is required in order to ascertain whether it is an acceptable item, an open item, a deviation, or a violation. An unresolved item disclosed during this inspection is discussed in Paragraphs 3.a(2) and . Exit Interview The Region III inspector met with licensee representatives (denoted under Paragraph 1) at the conclusion of.the inspection on May 28, 1987. The inspector summarized the purpose and findings of the inspection. The licensee acknowledged this information. The inspector also discussed the likely informational content of the inspection report with regard to
. documents or processes reviewed by the inspector during the inspectio The licensee did not identify any such documents / processes as proprietar . - _ _ . . . - -