| {{#Wiki_filter:CP&L April 2, 2008 Carolina Power and Light Company ATTN: Mr. Robert J. Duncan, II Vice President - Harris Plant Shearon Harris Nuclear Power Plant P. O. Box 165, Mail Code: Zone 1 New Hill, North Carolina 27562-0165 | | {{#Wiki_filter:UNITED STATES CP&L NUCLEAR REGULATORY COMMISSION REGION II SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931 April 2, 2008 Carolina Power and Light Company ATTN: Mr. Robert J. Duncan, II Vice President - Harris Plant Shearon Harris Nuclear Power Plant P. O. Box 165, Mail Code: Zone 1 New Hill, North Carolina 27562-0165 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
Line 22: |
Line 22: |
|
| |
|
| ==SUMMARY== | | ==SUMMARY== |
| - SHEARON HARRIS NUCLEAR PLANT - DOCKET NO. 50-400 | | - SHEARON HARRIS NUCLEAR PLANT - |
| | DOCKET NO. 50-400 |
|
| |
|
| ==Dear Mr. Duncan:== | | ==Dear Mr. Duncan:== |
|
| |
|
| This refers to the meeting conducted at your staff's request at the Region II Office in Atlanta, Georgia on March 27, 2007, at 1:00 p.m. The meeting's purpose was to introduce the site's new management team and to discuss plant status and various management initiatives at the Shearon Harris Nuclear Plant. Enclosed is a list of attendees and the information presented during the meeting. | | This refers to the meeting conducted at your staffs request at the Region II Office in Atlanta, Georgia on March 27, 2007, at 1:00 p.m. The meetings purpose was to introduce the sites new management team and to discuss plant status and various management initiatives at the Shearon Harris Nuclear Plant. Enclosed is a list of attendees and the information presented during the meeting. |
| The discussions included the following topics: operational focus; maintenance fundamentals; equipment reliability; human performance; unit staffing plans; NRC cross-cutting aspects; site/security collaboration; training throughput and exam issues and sustaining good performance. The meeting was candid and informative and provided useful insight into your staff's understanding and resolution of the discussed topics. The meeting did not result in specific action items or decisions. | | The discussions included the following topics: operational focus; maintenance fundamentals; equipment reliability; human performance; unit staffing plans; NRC cross-cutting aspects; site/security collaboration; training throughput and exam issues and sustaining good performance. The meeting was candid and informative and provided useful insight into your staffs understanding and resolution of the discussed topics. The meeting did not result in specific action items or decisions. |
| In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room (PDR) or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | | In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room (PDR) or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). |
| | | ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). |
| Should you have any questions concerning this meeting, please contact me at (404) 562-4603. | | Should you have any questions concerning this meeting, please contact me at (404) 562-4603. |
| Sincerely, /RA/ Randall A. Musser, Chief Reactor Projects Branch 4 Division of Reactor Projects | | Sincerely, |
| | /RA/ |
| | Randall A. Musser, Chief Reactor Projects Branch 4 Division of Reactor Projects |
|
| |
|
| ==Enclosure:== | | ==Enclosure:== |
| As Stated | | As Stated Docket Nos.: 50-400 License Nos.: NPF-63 |
| | |
| Docket Nos.: 50-400 License Nos.: NPF-63 UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931 | |
| | |
| _________________________ OFFICE RII:DRP RII:DRP SIGNATURE GJW RAM NAME GWilson RMusser DATE 04/02/2008 04/02/2008 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO CP&L 2cc w/encl: Paul Fulford Manager Performance Evaluation and Regulatory Affairs PEB5 Carolina Power & Light Company Electronic Mail Distribution Chris L. Burton Director Site Operations Carolina Power & Light Company Shearon Harris Nuclear Power Plant Electronic Mail Distribution J. Wayne Guganious Training Manager Harris Progress Energy Carolinas, Inc.
| |
| Electronic Mail Distribution Thomas J. Natale Manager Support Services Shearon Harris Nuclear Power Plant Electronic Mail Distribution David H. Corlett Supervisor Licensing/Regulatory Programs Carolina Power & Light Company Electronic Mail Distribution David T. Conley Associate General Counsel Legal Dept. Progress Energy Service Company, LLC Electronic Mail Distribution John H. O'Neill, Jr. Shaw, Pittman, Potts & Trowbridge 2300 N. Street, NW Washington, DC 20037-1128
| |
|
| |
|
| Beverly Hall Chief Radiation Protection Section N.C. Department of Environmental Commerce & Natural Resources Electronic Mail Distribution Public Service Commission State of South Carolina P.O. Box 11649 Columbia, SC 29211 | | OFFICE RII:DRP RII:DRP SIGNATURE GJW RAM NAME GWilson RMusser DATE 04/02/2008 04/02/2008 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO CP&L 2 cc w/encl: |
| | Paul Fulford John H. O'Neill, Jr. |
| | Manager Shaw, Pittman, Potts & Trowbridge Performance Evaluation and Regulatory 2300 N. Street, NW Affairs PEB5 Washington, DC 20037-1128 Carolina Power & Light Company Electronic Mail Distribution Beverly Hall Chief Chris L. Burton Radiation Protection Section Director Site Operations N.C. Department of Environmental Carolina Power & Light Company Commerce & Natural Resources Shearon Harris Nuclear Power Plant Electronic Mail Distribution Electronic Mail Distribution Public Service Commission J. Wayne Guganious State of South Carolina Training Manager P.O. Box 11649 Harris Columbia, SC 29211 Progress Energy Carolinas, Inc. |
| | Electronic Mail Distribution Herb Council Chair Thomas J. Natale Board of County Commissioners of Wake Manager County Support Services P.O. Box 550 Shearon Harris Nuclear Power Plant Raleigh, NC 27602 Electronic Mail Distribution Tommy Emerson David H. Corlett Chair Supervisor Board of County Commissioners of Licensing/Regulatory Programs Chatham County Carolina Power & Light Company 186 Emerson Road Electronic Mail Distribution Siler City, NC 27344 David T. Conley Kelvin Henderson Associate General Counsel Plant General Manager Legal Dept. Carolina Power and Light Company Progress Energy Service Company, LLC Shearon Harris Nuclear Power Plant Electronic Mail Distribution Electronic Mail Distribution |
|
| |
|
| Herb Council Chair Board of County Commissioners of Wake County P.O. Box 550 Raleigh, NC 27602 Tommy Emerson Chair Board of County Commissioners of Chatham County 186 Emerson Road Siler City, NC 27344 Kelvin Henderson Plant General Manager Carolina Power and Light Company Shearon Harris Nuclear Power Plant Electronic Mail Distribution CP&L 3 Letter to Robert J. Duncan, II from Randall A. Musser dated April 2, 2008
| | CP&L 3 Letter to Robert J. Duncan, II from Randall A. Musser dated April 2, 2008 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
Line 49: |
Line 50: |
|
| |
|
| ==SUMMARY== | | ==SUMMARY== |
| - SHEARON HARRIS NUCLEAR PLANT - DOCKET NO. 50-400 Distribution w/encl: | | - SHEARON HARRIS NUCLEAR PLANT - |
| C. Evans, RII L. Slack, RII OE Mail RIDSNRRDIRS PUBLIC M. Vaaler, NRR | | DOCKET NO. 50-400 Distribution w/encl: |
| | C. Evans, RII L. Slack, RII OE Mail RIDSNRRDIRS PUBLIC M. Vaaler, NRR |
|
| |
|
| Enclosure LIST OF ATTENDEES Nuclear Regulatory Commission V. McCree, Acting Regional Administrator, Region II (RII)
| | LIST OF ATTENDEES Nuclear Regulatory Commission V. McCree, Acting Regional Administrator, Region II (RII) |
| J. Shea, Director, Division of Reactor Projects (DRP), RII K. Kennedy, Director, Division of Reactor Safety, RII R. Musser, Branch Chief, Reactor Projects Branch 4, DRP, RII G. Wilson, Senior Project Engineer, Reactor Projects Branch 4, DRP, RII M. Widmann, Branch Chief, Operator Licensing, DRS, RII P. Lessard, Resident Inspector Development Program, DRP, RII Carolina Power and Light Company - Shearon Harris Nuclear Plant C. Burton, Director, Site Operations K. Hendersen, Plant General Manager J. Warner, Operations Manager J. Dufner, Maintenance Manager J. Dills, Outage and Scheduling Manager S. O'Connor, Engineering Manager}} | | J. Shea, Director, Division of Reactor Projects (DRP), RII K. Kennedy, Director, Division of Reactor Safety, RII R. Musser, Branch Chief, Reactor Projects Branch 4, DRP, RII G. Wilson, Senior Project Engineer, Reactor Projects Branch 4, DRP, RII M. Widmann, Branch Chief, Operator Licensing, DRS, RII P. Lessard, Resident Inspector Development Program, DRP, RII Carolina Power and Light Company - Shearon Harris Nuclear Plant C. Burton, Director, Site Operations K. Hendersen, Plant General Manager J. Warner, Operations Manager J. Dufner, Maintenance Manager J. Dills, Outage and Scheduling Manager S. OConnor, Engineering Manager Enclosure}} |
|
---|
Category:Letter
MONTHYEARML24290A1102024-10-24024 October 2024 Notification of Licensed Operator Initial Examination 05000400/2025301 05000400/LER-2024-001-01, Automatic Reactor Trip Due to Main Generator Lock-Out2024-10-23023 October 2024 Automatic Reactor Trip Due to Main Generator Lock-Out IR 05000400/20240112024-09-10010 September 2024 NRC Inspection Report 05000400/2024011 IR 05000400/20240052024-08-26026 August 2024 Updated Inspection Plan for Shearon Harris Nuclear Power Plant, Unit 1 (Report 05000400-2024005) Rev 1 ML24059A4252024-08-14014 August 2024 Issuance of Amendment No. 202 Regarding Alignment of Certain Technical Specifications with Improved Standard Technical Specifications ML24213A0522024-08-0202 August 2024 Issuance of Amendment No. 201 to Extend Completion Time of Inoperable Reactor Coolant System Accumulator Using Consolidated Line Item Improvement Process ML24212A3412024-07-31031 July 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000400/20240022024-07-29029 July 2024 – Integrated Inspection Report 05000400/2024002 ML24170A7312024-07-29029 July 2024 – Exemption from the Requirements of 10 CFR 50.55a(H)(2) Using the Risk-Informed Process for Evaluations Letter 05000400/LER-2024-001, Automatic Reactor Trip Due to Main Generator Lock-Out2024-07-22022 July 2024 Automatic Reactor Trip Due to Main Generator Lock-Out ML24183A0972024-07-12012 July 2024 ISFSI; Catawba 1, 2 & ISFSI; McGuire 1, 2 & ISFSI; Oconee 1, 2, 3 & ISFSI; Shearon Harris 1; H. B. Robinson 2 & ISFSI; and Radioactive Package Shipping Under 10 CFR 71 (71-266 & 71-345) – Review of QA Program Changes EPID L-2024-LLQ-0002 IR 05000400/20243022024-06-27027 June 2024 – NRC Operator Licensing Examination Approval 05000400/2024302 IR 05000400/20244012024-06-25025 June 2024 – Security Baseline Inspection Report05000400/2024401 ML24162A1372024-06-24024 June 2024 – Regulatory Audit Summary Related to the Review of Exemption Request from Certain Requirements in 10 CFR 50.55a(h)(2)(EPID L-2024-LLE-00040) ML24136A1382024-05-20020 May 2024 – Notification of an NRC Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000400/2024011) and Request for Information (RFI) ML24116A2592024-05-14014 May 2024 Staff Evaluation Related to Aging Management Plan and Inspection Plan for Reactor Vessel Internals ML24127A1592024-05-0808 May 2024 – Notification of Licensed Operator Initial Examination 05000400/2024302 IR 05000400/20240012024-05-0505 May 2024 Integrated Inspection Report 05000400/2024001 ML24100A0912024-04-10010 April 2024 Operator License Examination Report ML24058A2462024-03-18018 March 2024 – Supplemental Information Needed for Using the Risk-Informed Process for Evaluations for the Request for Exemption from Certain Requirements in 10 CFR 50.55a(h)(2) IR 05000400/20230062024-02-28028 February 2024 Annual Assessment Letter for Shearon Harris Nuclear Power Plant - NRC Inspection Report 05000400/2023006 ML24032A2632024-02-23023 February 2024 – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0044 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000400/20230042024-01-30030 January 2024 Integrated Inspection Report 05000400/2023004 ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000400/20230032023-11-0909 November 2023 Integrated Inspection Report 05000400/2023003 ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23234A1702023-10-0303 October 2023 Issuance of Amendment No. 199 Regarding Administrative Changes to the Renewed Facility Operating License and Technical Specifications ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000400/20230052023-08-23023 August 2023 Updated Inspection Plan for Shearon Harris Nuclear Power Plant, Unit 1 (Report 05000400/2023005) ML23234A2542023-08-22022 August 2023 RQ Inspection Notification Letter IR 05000400/20234022023-07-26026 July 2023 Security Baseline Inspection Report 05000400/2023402 IR 05000400/20230022023-07-24024 July 2023 Integrated Inspection Report 05000400/2023002 IR 05000400/20234402023-07-17017 July 2023 Special Inspection Report 05000400/2023440 and Preliminary Greater than Green Finding and Apparent Violation Cover Letter 05000400/LER-2022-006-02, Auxiliary Feedwater Pump Inoperability2023-07-11011 July 2023 Auxiliary Feedwater Pump Inoperability IR 05000400/20243012023-05-15015 May 2023 – Notification of Licensed Operator Initial Examination 05000400/2024301 IR 05000400/20230012023-05-10010 May 2023 – Integrated Inspection Report 05000400 2023001 IR 05000400/20234042023-05-0404 May 2023 Cyber Security Inspection Report 05000400/2023404 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML23118A1392023-04-28028 April 2023 Submittal of Updated Final Safety Analysis Report (Amendment 65), Technical Specification Bases Revision, Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment Changes IR 05000400/20234032023-04-0505 April 2023 Security Baseline Inspection Report 05000400/2023403 IR 05000400/20230102023-03-15015 March 2023 Comprehensive Engineering Team Inspection (CETI) Inspection Report 05000400/2023010 ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility 05000400/LER-1922-006-01, Auxiliary Feedwater Pump Inoperability2023-03-10010 March 2023 Auxiliary Feedwater Pump Inoperability IR 05000400/20220062023-03-0101 March 2023 Annual Assessment Letter for Shearon Harris Nuclear Power Plant - NRC Inspection Report 05000400/2022006 ML23033A5272023-02-0808 February 2023 Correction of Typographical Errors Incurred During Issuance of License Amendment No. 196 IR 05000400/20220042023-02-0707 February 2023 Integrated Inspection Report 05000400/2022004 05000400/LER-2022-007-01, Automatic Reactor Trip Due to Loss of Power from the a Auxiliary Bus2023-01-26026 January 2023 Automatic Reactor Trip Due to Loss of Power from the a Auxiliary Bus ML23020A1252023-01-23023 January 2023 Notification of Target Set Inspection and Request for Information (NRC Inspection Report 05000400/2023403) 05000400/LER-2022-006, Auxiliary Feedwater Pump Inoperability2022-12-20020 December 2022 Auxiliary Feedwater Pump Inoperability 2024-09-10
[Table view] Category:Meeting Summary
MONTHYEARML24124A0342024-05-0101 May 2024 Summary of Public Meeting Concerning Annual Assessment of Catawba Nuclear Station Units 1 and 2, McGuire Nuclear Station Units 1 and 2, Oconee Nuclear Station Units 1, 2, and 3, Brunswick Steam Electric Plant Units 1 and 2, Shearon Harris ML24011A1652024-02-12012 February 2024 December 11, 2023, Summary of Meeting with Duke Energy to Discuss a Shearon Harris Nuclear Power Plant, Unit 1 Planned Exemption Request Related to Turbine Control System and Reactor Protection System Circuitry ML23157A3202023-06-26026 June 2023 Summary of April 26, 2023, Meeting with Duke Energy to Discuss a Shearon Harris Nuclear Power Plant, Unit 1 Planned License Amendment Request Related to Turbine Control System and Reactor Protection System Circuitry ML23151A1232023-05-31031 May 2023 Public Meeting Summary - 2022 Annual Assessment Meeting Regarding Shearon Harris Nuclear Plant ML22167A1852022-06-30030 June 2022 Summary of June 6, 2022, Meeting with Duke Energy to Discuss Shearon Harris Nuclear Power Plant, Unit 1 Closeout of Generic Safety Issue (GSI) 191 ML22129A0062022-05-10010 May 2022 Summary of April 20, 2022, Meeting with Duke Energy Progress, LLC, to Discuss Proposed License Amendment Request to Revise Reactor Coolant System Pressure Isolation Valve Operational Leakage Surveillance Requirement Frequency (L-2022-LRM 00 ML22130A0302022-05-0909 May 2022 Summary of Public Meeting on 2021 Annual Assessment Meeting Regarding Brunswick Steam Electric Plant, Docket Nos. 50-325 and 50-324; and Shearon Harris Nuclear Power Plant, Docket No. 50-400, Meeting Number 20220350 ML21341A5542021-12-29029 December 2021 Summary of November 29, 2021, Meeting with Duke Energy Progress, LLC and Duke Energy Carolinas, LLC to Discuss a Planned License Amendment Request to Relocate ML21172A2672021-08-13013 August 2021 Regulatory Audit Summary Related to the Review of LAR to Revise 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors, Categorization Process to Reflect an Alternative Seis ML21131A1472021-05-11011 May 2021 Public Meeting Summary 2020 Annual Assessment Meeting Regarding Brunswick Steam Electric Plant, Docket Nos. 50-325 and 50-324; and Shearon Harris Nuclear Power Plant, Docket No. 50-400, Meeting Number 20210385 ML20136A2222020-05-15015 May 2020 Har - Bru 2019 Aam Meeting Summary ML19331A8062020-01-29029 January 2020 Summary of November 13, 2019 Closed Meeting with Duke Energy Carolinas, LLC and Duke Energy Progress, LLC, to Discuss Security-Related Information for Its Licensed Facilities ML19329A0232019-11-27027 November 2019 Summary of October 29, 2019 Conference Call with Duke Energy Progress, LLC Regarding the Fall 2019 Steam Generator Tube Inspections ML19241A2902019-09-24024 September 2019 Summary of August 22, 2019, Meeting with Duke Energy Progress, LLC Proposed License Amendment Request to Adopt Risk-Informed Completion Times ML19220A6702019-08-26026 August 2019 Summary of August 7, 2019, Meeting with Duke Energy Progress, LLC and Duke Energy Carolinas, LLC to Discuss a Proposed License Amendment Request for a Common Emergency Plan ML19113A0652019-05-14014 May 2019 Summary of Meeting with Duke Energy to Discuss Proposed License Amendment Request for Shearon Harris, Unit 1, Technical Specification Changes Associated with Departure from Nucleate Boiling Ratio Safety Limit ML19120A1342019-05-0606 May 2019 3/15/19 Summary of Public Meeting with Nuclear Entergy Institute, Duke Energy, and Southern Nuclear Operating Company Post-Pilot Implementation of Tornado Missile Risk Evaluator Methodology at Vogtle, Units 1 and 2 and Shearon Harris, Unit ML19123A3522019-05-0202 May 2019 Public Meeting Summary - Shearon Harris Nuclear Plant, Docket No. 50-400 ML19087A0622019-04-11011 April 2019 Summary of March 25, 2019, Public Teleconference with Duke Energy to Discuss the Request for Additional Information Response Regarding the Proposed Alternative to the Depth Sizing Qualification Requirement (Duke Energy Fleet Relief Request ML18352A3572019-01-0808 January 2019 Summary of Meeting with Duke Energy Progress, LLC to Discuss Proposed License Amendment Request for Shearon Harris Nuclear Power Plant, Unit 1, Regarding Emergency Plan Changes ML18361A6712019-01-0808 January 2019 Summary of Meeting with Duke Energy Progress, LLC to Discuss License Amendment Request for Shearon Harris Unit 1, Regarding 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, ML18355A8142019-01-0707 January 2019 Summary of December 20, 2018, Teleconference Meeting with Duke Energy Progress, LLC to Discuss a Proposed License Amendment Request for Shearon Harris Unit 1, Regarding a Risk-Informed Essential Services Chilled Water System TS ML18094A2632018-08-17017 August 2018 Summary of 01/18/2018, Public Meeting with Nuclear Energy Institute, Duke Energy, Southern Nuclear Operating Co., Entergy Operations, Inc. to Discuss Development of Tornado Missile Risk Evaluator Methodology ML18109A0912018-04-19019 April 2018 Summary of 2017 Annual Assessment Public Meeting Regarding Shearon Harris Nuclear Plant, Docket No. 50-400 ML18088A0732018-04-0303 April 2018 March 27, 2018, Summary of Presubmittal Meeting with Duke Energy Progress, LLC to Discuss a Proposed Relief Request for Shearon Harris Nuclear Power Plant, Unit 1 ML18064A1332018-03-19019 March 2018 Summary of February 27, 2018, Meeting with Duke Energy Progress, LLC to Discuss Proposed License Amendment Request for Shearon Harris Nuclear Power Plant, Unit 1, Regarding Emergency Plan Emergency Action Level Scheme Changes (L-2017-LRM-00 ML17340A1302017-12-22022 December 2017 Summary of November 29, 2017, Meeting with Duke Energy Progress, LLC to Discuss Proposed License Amendment Requests to Implement the Requirement of 10 CFR 50.69 at Brunswick, Shearon Harris, and H. B. Robinson ML17340A0612017-12-0808 December 2017 11/8/17 Summary of Teleconference with Entergy Operations, Inc., Tornado Missile Risk Evaluator with Applicability to Submittals from Duke Energy and Southern Nuclear Operating Co, Inc. ML17244A0742017-09-28028 September 2017 8/17/2017 Summary of Public Meeting with Nuclear Energy Institute and Licensees to Discuss the Tornado Missile Risk Evaluation Tool for Grand Gulf, Shearon Harris, and Vogtle, Units 1 and 2 ML17257A0992017-09-26026 September 2017 Summary of Public Meeting with Nuclear Energy Institute and Licensees to Discuss the Tornado Missile Risk Evaluation Tool for Grand Gulf, Shearon Harris, and Vogtle, Units 1 and 2 ML17223A1212017-08-17017 August 2017 Summary of August 3, 2017, Meeting with Duke Energy Progress, LLC on Proposed License Amendment Request to Implement Fuel Reload Design Methodology Reports for Shearon Harris and H. B. Robinson ML17145A3142017-05-25025 May 2017 EOC Meeting Summary ML16286A0152016-11-0101 November 2016 Summary Of September 29, 2016, Duke Energy Progress, LLC. To Discuss Proposed License Amendment Request Regarding Shearon Harris Nuclear Power Plant, Unit 1, BWR Storage Rack Inserts And The Spent Fuel Pool Criticality Analysis (CAC No. MF8327) ML16235A2382016-10-17017 October 2016 Summary of the July 12-13, 2016 Audit Supporting the U.S. Nuclear Regulatory Commission Review of DPC-NE-1008-P, Nuclear Design Methodology Using CASMO-5/SIMULATE-3 for Westinghouse Reactors ML16125A0992016-05-20020 May 2016 Summary of May 2, 2016, Meeting with Duke Energy Progress, Inc. to Discuss Fuel Reload Design Methodology Reports and Proposed Supplement to a License Amendment Request Regarding Shearon Harris and H.B. Robinson ML16134A1552016-05-12012 May 2016 Public Meeting Summary - 2015 Annual Assessment Public Meeting Regarding Shearon Harris Nuclear Plant ML16112A3772016-04-25025 April 2016 Summary of Meeting with Duke Energy Progress, Inc. to Discuss the Shearon Harris Nuclear Plant, Unit 1, TSTF-425 LAR Request for Additional Information Reponses ML16034A5242016-03-11011 March 2016 Summary of February 1, 2016, Pre-submittal Meeting with Duke Energy Regarding Consolidation of Emergency Operations Facilities ML16035A4802016-02-12012 February 2016 Jsc Meeting Summary Attachment ML15280A2532015-11-25025 November 2015 Summary of Mtg. with Duke Energy Progress Inc. to Discuss Fuel Reload Design Methodology Reports & Proposed License Amendment Request Shearon Harris Nuclear Power Plant Unit 1 and H.B. Robinson Steam Electric Plant Unit No. 2 (MF6701/MF6702 ML15202A4752015-09-24024 September 2015 Summary of Meeting with Duke Energy Progress, Inc. to Discuss Shearon Harris Nuclear Power Plant, Unit 1, Proposed License Amendment Request Regarding Technical Specifications for the Pressurizer and Main Steam Line Safety Valves (MF6233) ML14129A3352014-05-0909 May 2014 Summary of Category 1 Public Meeting - Annual Assessment of Shearon Harris Nuclear Plant ML13312A9882013-11-0808 November 2013 Summary of Public Meeting with Duke Energy Carolinas, LLC, to Provide Opportunities to Discuss the Planned Fukushima-Related Modifications ML13204A2672013-09-27027 September 2013 07/09/13 Summary of Meeting with Duke Energy Regarding a Nonconservative Technical Specification Loss of Offsite Power Voltage Setpoint License Amendment Request ML13218B3692013-09-27027 September 2013 7/30/2013 - Summary of Meeting with Duke Energy Regarding a Change to the Emergency Response Facility Activation Timeliness and Criteria ML13225A2932013-08-12012 August 2013 7/23-24/2013, Summary of Meeting 2013 U.S. Nuclear Regulatory Commission (NRC) Initial Exam Writers' Workshop ML13171A3292013-06-20020 June 2013 Public Meeting Summary, Category 3, NRC Special Inspection on Reactor Vessel Head Nozzle Repair of Shearon Harris Nuclear Plant ML13155A1052013-06-12012 June 2013 May 2, 2013, Summary of Meeting with Duke Energy Concerning the Relocation of the Emergency Operating Facilities ML13151A2262013-05-30030 May 2013 Meeting Summary - Category 1 Public Meeting Annual Assessment - Shearon Harris Nuclear Plant - Docket 50-400 ML12277A0252012-11-0202 November 2012 10/2/12 Summary of Meeting with Duke Energy Carolinas to Discuss Nonconservative Technical Specifications License Amendment Requests 2024-05-01
[Table view] |
Text
UNITED STATES CP&L NUCLEAR REGULATORY COMMISSION REGION II SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931 April 2, 2008 Carolina Power and Light Company ATTN: Mr. Robert J. Duncan, II Vice President - Harris Plant Shearon Harris Nuclear Power Plant P. O. Box 165, Mail Code: Zone 1 New Hill, North Carolina 27562-0165
SUBJECT:
PUBLIC MEETING
SUMMARY
- SHEARON HARRIS NUCLEAR PLANT -
DOCKET NO. 50-400
Dear Mr. Duncan:
This refers to the meeting conducted at your staffs request at the Region II Office in Atlanta, Georgia on March 27, 2007, at 1:00 p.m. The meetings purpose was to introduce the sites new management team and to discuss plant status and various management initiatives at the Shearon Harris Nuclear Plant. Enclosed is a list of attendees and the information presented during the meeting.
The discussions included the following topics: operational focus; maintenance fundamentals; equipment reliability; human performance; unit staffing plans; NRC cross-cutting aspects; site/security collaboration; training throughput and exam issues and sustaining good performance. The meeting was candid and informative and provided useful insight into your staffs understanding and resolution of the discussed topics. The meeting did not result in specific action items or decisions.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room (PDR) or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Should you have any questions concerning this meeting, please contact me at (404) 562-4603.
Sincerely,
/RA/
Randall A. Musser, Chief Reactor Projects Branch 4 Division of Reactor Projects
Enclosure:
As Stated Docket Nos.: 50-400 License Nos.: NPF-63
OFFICE RII:DRP RII:DRP SIGNATURE GJW RAM NAME GWilson RMusser DATE 04/02/2008 04/02/2008 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO CP&L 2 cc w/encl:
Paul Fulford John H. O'Neill, Jr.
Manager Shaw, Pittman, Potts & Trowbridge Performance Evaluation and Regulatory 2300 N. Street, NW Affairs PEB5 Washington, DC 20037-1128 Carolina Power & Light Company Electronic Mail Distribution Beverly Hall Chief Chris L. Burton Radiation Protection Section Director Site Operations N.C. Department of Environmental Carolina Power & Light Company Commerce & Natural Resources Shearon Harris Nuclear Power Plant Electronic Mail Distribution Electronic Mail Distribution Public Service Commission J. Wayne Guganious State of South Carolina Training Manager P.O. Box 11649 Harris Columbia, SC 29211 Progress Energy Carolinas, Inc.
Electronic Mail Distribution Herb Council Chair Thomas J. Natale Board of County Commissioners of Wake Manager County Support Services P.O. Box 550 Shearon Harris Nuclear Power Plant Raleigh, NC 27602 Electronic Mail Distribution Tommy Emerson David H. Corlett Chair Supervisor Board of County Commissioners of Licensing/Regulatory Programs Chatham County Carolina Power & Light Company 186 Emerson Road Electronic Mail Distribution Siler City, NC 27344 David T. Conley Kelvin Henderson Associate General Counsel Plant General Manager Legal Dept. Carolina Power and Light Company Progress Energy Service Company, LLC Shearon Harris Nuclear Power Plant Electronic Mail Distribution Electronic Mail Distribution
CP&L 3 Letter to Robert J. Duncan, II from Randall A. Musser dated April 2, 2008
SUBJECT:
PUBLIC MEETING
SUMMARY
- SHEARON HARRIS NUCLEAR PLANT -
DOCKET NO. 50-400 Distribution w/encl:
C. Evans, RII L. Slack, RII OE Mail RIDSNRRDIRS PUBLIC M. Vaaler, NRR
LIST OF ATTENDEES Nuclear Regulatory Commission V. McCree, Acting Regional Administrator, Region II (RII)
J. Shea, Director, Division of Reactor Projects (DRP), RII K. Kennedy, Director, Division of Reactor Safety, RII R. Musser, Branch Chief, Reactor Projects Branch 4, DRP, RII G. Wilson, Senior Project Engineer, Reactor Projects Branch 4, DRP, RII M. Widmann, Branch Chief, Operator Licensing, DRS, RII P. Lessard, Resident Inspector Development Program, DRP, RII Carolina Power and Light Company - Shearon Harris Nuclear Plant C. Burton, Director, Site Operations K. Hendersen, Plant General Manager J. Warner, Operations Manager J. Dufner, Maintenance Manager J. Dills, Outage and Scheduling Manager S. OConnor, Engineering Manager Enclosure