ML080940009

From kanterella
Jump to navigation Jump to search
Public Meeting Summary for 03/27/08
ML080940009
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 04/02/2008
From: Randy Musser
NRC/RGN-II/DRP/RPB4
To: Duncan R
Carolina Power & Light Co
Shared Package
ML080940008 List:
References
Download: ML080940009 (5)


Text

UNITED STATES CP&L NUCLEAR REGULATORY COMMISSION REGION II SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931 April 2, 2008 Carolina Power and Light Company ATTN: Mr. Robert J. Duncan, II Vice President - Harris Plant Shearon Harris Nuclear Power Plant P. O. Box 165, Mail Code: Zone 1 New Hill, North Carolina 27562-0165

SUBJECT:

PUBLIC MEETING

SUMMARY

- SHEARON HARRIS NUCLEAR PLANT -

DOCKET NO. 50-400

Dear Mr. Duncan:

This refers to the meeting conducted at your staffs request at the Region II Office in Atlanta, Georgia on March 27, 2007, at 1:00 p.m. The meetings purpose was to introduce the sites new management team and to discuss plant status and various management initiatives at the Shearon Harris Nuclear Plant. Enclosed is a list of attendees and the information presented during the meeting.

The discussions included the following topics: operational focus; maintenance fundamentals; equipment reliability; human performance; unit staffing plans; NRC cross-cutting aspects; site/security collaboration; training throughput and exam issues and sustaining good performance. The meeting was candid and informative and provided useful insight into your staffs understanding and resolution of the discussed topics. The meeting did not result in specific action items or decisions.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room (PDR) or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Should you have any questions concerning this meeting, please contact me at (404) 562-4603.

Sincerely,

/RA/

Randall A. Musser, Chief Reactor Projects Branch 4 Division of Reactor Projects

Enclosure:

As Stated Docket Nos.: 50-400 License Nos.: NPF-63

OFFICE RII:DRP RII:DRP SIGNATURE GJW RAM NAME GWilson RMusser DATE 04/02/2008 04/02/2008 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO CP&L 2 cc w/encl:

Paul Fulford John H. O'Neill, Jr.

Manager Shaw, Pittman, Potts & Trowbridge Performance Evaluation and Regulatory 2300 N. Street, NW Affairs PEB5 Washington, DC 20037-1128 Carolina Power & Light Company Electronic Mail Distribution Beverly Hall Chief Chris L. Burton Radiation Protection Section Director Site Operations N.C. Department of Environmental Carolina Power & Light Company Commerce & Natural Resources Shearon Harris Nuclear Power Plant Electronic Mail Distribution Electronic Mail Distribution Public Service Commission J. Wayne Guganious State of South Carolina Training Manager P.O. Box 11649 Harris Columbia, SC 29211 Progress Energy Carolinas, Inc.

Electronic Mail Distribution Herb Council Chair Thomas J. Natale Board of County Commissioners of Wake Manager County Support Services P.O. Box 550 Shearon Harris Nuclear Power Plant Raleigh, NC 27602 Electronic Mail Distribution Tommy Emerson David H. Corlett Chair Supervisor Board of County Commissioners of Licensing/Regulatory Programs Chatham County Carolina Power & Light Company 186 Emerson Road Electronic Mail Distribution Siler City, NC 27344 David T. Conley Kelvin Henderson Associate General Counsel Plant General Manager Legal Dept. Carolina Power and Light Company Progress Energy Service Company, LLC Shearon Harris Nuclear Power Plant Electronic Mail Distribution Electronic Mail Distribution

CP&L 3 Letter to Robert J. Duncan, II from Randall A. Musser dated April 2, 2008

SUBJECT:

PUBLIC MEETING

SUMMARY

- SHEARON HARRIS NUCLEAR PLANT -

DOCKET NO. 50-400 Distribution w/encl:

C. Evans, RII L. Slack, RII OE Mail RIDSNRRDIRS PUBLIC M. Vaaler, NRR

LIST OF ATTENDEES Nuclear Regulatory Commission V. McCree, Acting Regional Administrator, Region II (RII)

J. Shea, Director, Division of Reactor Projects (DRP), RII K. Kennedy, Director, Division of Reactor Safety, RII R. Musser, Branch Chief, Reactor Projects Branch 4, DRP, RII G. Wilson, Senior Project Engineer, Reactor Projects Branch 4, DRP, RII M. Widmann, Branch Chief, Operator Licensing, DRS, RII P. Lessard, Resident Inspector Development Program, DRP, RII Carolina Power and Light Company - Shearon Harris Nuclear Plant C. Burton, Director, Site Operations K. Hendersen, Plant General Manager J. Warner, Operations Manager J. Dufner, Maintenance Manager J. Dills, Outage and Scheduling Manager S. OConnor, Engineering Manager Enclosure