ML19318B706: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:_
{{#Wiki_filter:_
____ __.____                      _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
s  .
s  .
                                                                                                                          ..
                                                                                                                           **I
                                                                                                                           **I
:::
                                                                       .                                                  ". M. i.
                                                                       .                                                  ". M. i.
e!.                              ""
e!.                              ""
                                                                  -  ;.!!
                                                                            .
i.:.35 E
i.:.35 E
                                                                                                      .. !. ....
                                                                                                              .                ..
:                      i.'8v.7                                            !!!!
:                      i.'8v.7                                            !!!!
:.
                                              ..
                                                                                .
                                                                                ..                                          :::    -
                                                                                                                                    *
:-                                :::
                                                                                -
                                               ...                              E':s
                                               ...                              E':s
                                               *r*-                                  8
                                               *r*-                                  8
                                                                                                          .
                                                  *
                                                                                                         *e                              :;
                                                                                                         *e                              :;
S                              lt
S                              lt
Line 47: Line 31:
                                           .                          .E                                .23
                                           .                          .E                                .23
:.e          .
:.e          .
                                                    ..        .
                                                                .
:                                  '                            !!.
so m e._  _-          -      - - -
so m e._  _-          -      - - -
I..
I..
                                     ..g.E W      ..
                                     ..g.E W      ..
3...
3...
2
2 I. s- ; =-r 2:
:
                                                                .
                                                                  "
I. s- ; =-r
                                                                            .        -
                                                                                                                      -
2:
33 3.!:
33 3.!:
                                             -      :: ! =
                                             -      :: ! =
                                                     ''8 8 . .g                          .Ey:
                                                     ''8 8 . .g                          .Ey:
:*.w
:*.w
                                                                                                            .                          !.
                                                                                                                                         'I w:1          "
                                                                                                                                         'I
                                                                                                                                          "
                                        .."
w:1          "
:;:
                                                                ,
                                             =
                                             =
                                           .        s          :.                                    :3
                                           .        s          :.                                    :3 823" I                            =[. 3                              .
                                                                                                      ....
so j .g: .                                                          !!
:
                                                                                                                                        ..
* 823" I                            =[. 3                              .
so
:
                                                                  "
j .g: .                                                          !!
gr                                                            e
gr                                                            e
                                                                         .a l
                                                                         .a l
Line 88: Line 49:
                                                                                                                 *** i i
                                                                                                                 *** i i
                                                                       "di
                                                                       "di
                                                                  -
                                                                       *:5
                                                                       *:5
                                                                       "*                                        E"5            *            **3                            .                                                    .
                                                                       "*                                        E"5            *            **3                            .                                                    .
                                                                             .            3                      ::: !                  -    :-l:a                          ;                                                    e
                                                                             .            3                      ::: !                  -    :-l:a                          ;                                                    e
                                                                       *%                              [
                                                                       *%                              [
                                                                                                      ,
sj.:
                                                                                                                **
                                                                                                                          .
                                                                                                                                !
                                                                                                                                -
* sj.:
                                                                                                                                            .
                                                                                                                                                                            &                                                    :
                                                                                                                                                                                                                                  .
                                                                                           .          .                                                                                                                          s 3:.
                                                                                           .          .                                                                                                                          s 3:.
:            !                  I                                                                                                        :
:            !                  I                                                                                                        :
                                   .                                                    E                                                                                                                                        E
                                   .                                                    E                                                                                                                                        E
                                -
                                                                                         *j. *:        i                                    ..!!
                                                                                         *j. *:        i                                    ..!!
:: :                          :                                    !::
s            :
s            :
:
3 I
3 I
                                                                                                                                                                                                                 ."s
                                                                                                                                                                                                                 ."s
Line 116: Line 65:
a.
a.
                             =
                             =
                            .
                                !.                                                        .                          ,
                                                                                                                      .
                                                                                                                                             . *.  :s.                                                                            -
                                                                                                                                             . *.  :s.                                                                            -
                                                                                                                                                                                                                                  .
s                                                          *                          ..                                                                                                          .
s                                                          *                          ..                                                                                                          .
                                *
                                                                                         .I*
                                                                                         .I*
                                                                                        *                                      :
                                                                                   -    ::{              -      ". 23t. =5                                                                                                      =
                                                                                   -    ::{              -      ". 23t. =5                                                                                                      =
IE                                  l':
IE                                  l':
I                      325            3
I                      325            3 s
                                                                                                                                                                                                                                  !
3::                                                          *!"
s 3::                                                          *!"
                                                    .
a  : e
a  : e
:.g.:e.
:.g.:e.
                                                        .
t
t
: v.                                  s.
: v.                                  s.
                                                    **
3:            n
3:            n
                                                                                   -    ta=
                                                                                   -    ta=
                                                                                                      $
                                                                                         .Is*  6 A              .-
                                                                                         .Is*  6 A              .-
* 3
3
                                         *a                          .                    .I          -
                                         *a                          .                    .I          -
II                            *                    ,2 31=I                            !g :,              p3            .
II                            *                    ,2 31=I                            !g :,              p3            .
Line 148: Line 86:
a="            1 I,v.*                        3 s .: *.*                        a
a="            1 I,v.*                        3 s .: *.*                        a
                                                                                           .Ear
                                                                                           .Ear
                                                                                                                     .D p p'
                                                                                                                     .D p p' I      .
                                                                                                                          .
                                                                                                      .:                          '
I      .
                                                                                                                                                           .@ D NON 7 -                                                              F!
                                                                                                                                                           .@ D NON 7 -                                                              F!
bh                              bjjulj djj ij                                                          b CRYSTAL RIVER-UNIT 3                                          6-2 800627 OM]
bh                              bjjulj djj ij                                                          b CRYSTAL RIVER-UNIT 3                                          6-2 800627 OM]
__ .      __.                                  .. .                  ..      . _ _ _ _ .                                        - _ - -                                                                              -    . _ _ .


                                                                    - - - - - , , --------,
52 PRESIDENT I
  -
SEN!OR VICE PRES.                              SENIOR VICE PRES.
52 PRESIDENT
                          ,.  -
I SEN!OR VICE PRES.                              SENIOR VICE PRES.
ENGINEERING                                CORPORATE SERVS.
ENGINEERING                                CORPORATE SERVS.
8 CONSTRUCTION                                  8 GEN. COUNSEL              j VICE PRESIDENT                                  VICE PRESIDENT POWER                                        ENVIRONMENT PRODUCTICN                                  & NEW TECHNOLOGY DIRECTOR ENVIRONMENTAL &
8 CONSTRUCTION                                  8 GEN. COUNSEL              j VICE PRESIDENT                                  VICE PRESIDENT POWER                                        ENVIRONMENT PRODUCTICN                                  & NEW TECHNOLOGY DIRECTOR ENVIRONMENTAL &
Line 166: Line 97:
FIGURE 5.1 1 ORGANIZATION FOR IMPLEMENTING ENVIRONMENTAL TECHNICA L SPECIFICATIOh S .
FIGURE 5.1 1 ORGANIZATION FOR IMPLEMENTING ENVIRONMENTAL TECHNICA L SPECIFICATIOh S .


_ _    _        _  _ -______ _--              _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
  ,
    .
      .
5-4 PRESIDENT SENIOR                                                            SENIOR VICE PRESIDENT                    NUCLEAR VICE PR Ee : DENT ENGINEERING                  GENERAL REVIEW                  CORPORATE SERVICES
5-4 PRESIDENT SENIOR                                                            SENIOR VICE PRESIDENT                    NUCLEAR VICE PR Ee : DENT ENGINEERING                  GENERAL REVIEW                  CORPORATE SERVICES
                 & CONSTRUCTION                    COMMITTEE                    8 GENERAL COUNSEL VICE PRESIDENT                      PLANT                      VICE PRESIDENT POWER                          REVIEW                        ENVIRONMENT PRODUCTICN                    COMMITTEE                              &
                 & CONSTRUCTION                    COMMITTEE                    8 GENERAL COUNSEL VICE PRESIDENT                      PLANT                      VICE PRESIDENT POWER                          REVIEW                        ENVIRONMENT PRODUCTICN                    COMMITTEE                              &
Line 177: Line 104:
l l
l l
l FI G. 5.3 -1  ORGANIZATION FOR INDEPENDENT REVIEW AND AUDIT.
l FI G. 5.3 -1  ORGANIZATION FOR INDEPENDENT REVIEW AND AUDIT.
                                    -          -                              -
                                                                                                                                        --. - . - - .    -- ---


                                                      ..      -    _ _ _ . _        _ _ _ - - _ . _ _ _
ADMINISTRATIVE CONTROLS AUTHORITY 6.5.1.7  The Plant Review Committee shall:
.  .
ADMINISTRATIVE CONTROLS
      .
AUTHORITY 6.5.1.7  The Plant Review Committee shall:
: a. Recommend to the Nuclear Plant Manager written approval or disapproval of items considered under 6.5.1(a) through (d) above.
: a. Recommend to the Nuclear Plant Manager written approval or disapproval of items considered under 6.5.1(a) through (d) above.
: b. Render determinations in writing with regard to whether or not each item considered under 6.5.1.6(3) through (e) above constitutes an unreviewed safety question.
: b. Render determinations in writing with regard to whether or not each item considered under 6.5.1.6(3) through (e) above constitutes an unreviewed safety question.
Line 199: Line 120:
: g. Mechanical and electrical engineering                                                      <
: g. Mechanical and electrical engineering                                                      <
: h. Quality as.urance practices CRYSTAL RIVER - UNIT 3                6-7
: h. Quality as.urance practices CRYSTAL RIVER - UNIT 3                6-7
  .


. .
ADMINi3TRATIVE CONTROLS RECORDS 6.5.2.11  Records of NGRC activities shall be prepared, approved and dis-tributed as indicated below:
ADMINi3TRATIVE CONTROLS RECORDS 6.5.2.11  Records of NGRC activities shall be prepared, approved and dis-tributed as indicated below:
: a. Minutes of each NRCC meeting shall be prepared, approved and forwarded to the Senior Vice President, Engineering and Con-struction, within 14 days following each aeeting.
: a. Minutes of each NRCC meeting shall be prepared, approved and forwarded to the Senior Vice President, Engineering and Con-struction, within 14 days following each aeeting.
Line 211: Line 130:
: b. Each REPORTABli OCCURRENCE requiring 24-hour notification to the Commission shall be reviewed by the PRC and submitted to the NGRC and the Assistant Vice President, Nuclear Operations.
: b. Each REPORTABli OCCURRENCE requiring 24-hour notification to the Commission shall be reviewed by the PRC and submitted to the NGRC and the Assistant Vice President, Nuclear Operations.
CRYSTAL RIVER - UNIT 3                6-11
CRYSTAL RIVER - UNIT 3                6-11
                                                    .


.
ADMINISTRATIVE CONTROLS 6.7 SAFETY LIMIT VIOLATION 6.7.1    The following actions shall be taken in the event a Safety Limit is violated:
ADMINISTRATIVE CONTROLS 6.7 SAFETY LIMIT VIOLATION 6.7.1    The following actions shall be taken in the event a Safety Limit is violated:
: a. The facility shall be placed in at least HOT STANDBY within one hour.
: a. The facility shall be placed in at least HOT STANDBY within one hour.
Line 230: Line 147:
                                                                                   -p
                                                                                   -p


                            ._                          .- -                              _.
        .    .
    . .
5-1 5.0  ADMINISTRATIVE CONTROLS Objective To define the organization, assign responsibilities, describe the environmental surveillance procedures, provide for a re-view and audit function, and prescribe the reporting require-ments in order to insure continuing protection of the environ-ment and implement the Environmental Technical Specif1 cations.
5-1 5.0  ADMINISTRATIVE CONTROLS Objective To define the organization, assign responsibilities, describe the environmental surveillance procedures, provide for a re-view and audit function, and prescribe the reporting require-ments in order to insure continuing protection of the environ-ment and implement the Environmental Technical Specif1 cations.
5.1  ORGANIZATION The organization responsible for environmental protection, en-vironmental monitoring and the implementation of the Environ-mental Technical Specifications,for Crystal River Unit 3, is shown in Figure 5.1-1.
5.1  ORGANIZATION The organization responsible for environmental protection, en-vironmental monitoring and the implementation of the Environ-mental Technical Specifications,for Crystal River Unit 3, is shown in Figure 5.1-1.
Line 238: Line 152:
   .            responsibility for the conduct of the operational environmen-tal monitoring program and the implementation of Environmental Technical Specifications becomes the responsibility of the Power Production Department.
   .            responsibility for the conduct of the operational environmen-tal monitoring program and the implementation of Environmental Technical Specifications becomes the responsibility of the Power Production Department.
The plant organization is responsible for the development of Operating and Surveillance Procedures described generally in Section 5.5 and supplying field data to the Manager, Nuclear Support Services as required by Sections 2, 3, and 4 of the Environmental Technical Specifications.
The plant organization is responsible for the development of Operating and Surveillance Procedures described generally in Section 5.5 and supplying field data to the Manager, Nuclear Support Services as required by Sections 2, 3, and 4 of the Environmental Technical Specifications.
'
The Manager, Nuclear Support Serv %es is responsible for con-sultant contracts, State and local regulatory agreements, assembly of data, preparation and review of reports required by Section 5.6 of these Environmental Technical Specifica-tivas, and making recommendations to improve environmental protection practices.
The Manager, Nuclear Support Serv %es is responsible for con-sultant contracts, State and local regulatory agreements, assembly of data, preparation and review of reports required by Section 5.6 of these Environmental Technical Specifica-tivas, and making recommendations to improve environmental
-
protection practices.
All reports and correspondence with the NRC regarding the En-vironmental Technical Specifications shall be approved and signed by the Assistant Vice President, Nuclear Operations.
All reports and correspondence with the NRC regarding the En-vironmental Technical Specifications shall be approved and signed by the Assistant Vice President, Nuclear Operations.
The Nuclear Plant Manager shall, however, make reports by telephone and telegraph of any incident or occurrence
The Nuclear Plant Manager shall, however, make reports by telephone and telegraph of any incident or occurrence requiring reporting within 24 hours or less, as required in Section 5.6.
,
requiring reporting within 24 hours or less, as required in Section 5.6.
:
                      #        , .        -
                                               -9m .-Q,-      -
                                               -9m .-Q,-      -
                                                               .9. -a    -    - - - - -
                                                               .9. -a    -    - - - - -


_        . _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
    .
5-5 5.4      ACTION TO BE TAKEN IF LIMITING CONDITION FOR OPERATION IS EXCEEDED 5.4.1    Imediate remedial actions as permitted by these environmental technical specifications shall be implemented until such time as the limiting condition for operation is met.
5-5 5.4      ACTION TO BE TAKEN IF LIMITING CONDITION FOR OPERATION IS EXCEEDED 5.4.1    Imediate remedial actions as permitted by these environmental technical specifications shall be implemented until such time as the limiting condition for operation is met.
5.4.2    The occurrence shall be promptly reported ta the Chairman of the Nuclear General Review Committee and investigated as specified in Section 5.3.
5.4.2    The occurrence shall be promptly reported ta the Chairman of the Nuclear General Review Committee and investigated as specified in Section 5.3.
  .
5.4.3    The Nuclear General Review Committee shall prepare and submit a report for each occurrence in accordance with Section 5.3.10.
5.4.3    The Nuclear General Review Committee shall prepare and submit a report for each occurrence in accordance with Section 5.3.10.
5.4.4    The Assistant Vice President, Nuclear Operations, shall report the occurrence to the NRC as specified in Section 5.6.2.
5.4.4    The Assistant Vice President, Nuclear Operations, shall report the occurrence to the NRC as specified in Section 5.6.2.
5.5      PROCEDURES 5.5.1    Explicit written procedures, including applicable check-off lists and instructions, shall be prepared for the implementa-tion of the monitoring requirements described in Sections 2 and 3, approved as specified in Section 5.5.2, and adhered to for operation of all systems and components involved in carry-ing out the effluent release and environmental monitoring pro-grams. Procedure shall include sampli.19, instrument calibra-ti on , analysis, and action to be taken when limits are approached or exceeded. Calibratior. frequencies and standards for instruments used in performing the measurements shall be included. Testing frequency of alarms shall be included.
5.5      PROCEDURES 5.5.1    Explicit written procedures, including applicable check-off lists and instructions, shall be prepared for the implementa-tion of the monitoring requirements described in Sections 2 and 3, approved as specified in Section 5.5.2, and adhered to for operation of all systems and components involved in carry-ing out the effluent release and environmental monitoring pro-grams. Procedure shall include sampli.19, instrument calibra-ti on , analysis, and action to be taken when limits are approached or exceeded. Calibratior. frequencies and standards for instruments used in performing the measurements shall be included. Testing frequency of alarms shall be included.
These frequencies shall be determined from experience with                                                              i similar instruments in similar environments and from manufac-                                                          l turers' technical manuals.                                                                                              l 5.5.2    All procedures implemented by plant staff personnel described in Section 5.5.1 above, and changes thereto, shall be reviewed as specified in Section 5.3 and approved by the Nuclear Plant Manager prior to      implementation.      Temporary changes                                                        to
These frequencies shall be determined from experience with                                                              i similar instruments in similar environments and from manufac-                                                          l turers' technical manuals.                                                                                              l 5.5.2    All procedures implemented by plant staff personnel described in Section 5.5.1 above, and changes thereto, shall be reviewed as specified in Section 5.3 and approved by the Nuclear Plant Manager prior to      implementation.      Temporary changes                                                        to procedures which do not change the intent of the original procedure may be made, provided such changes are approved by two members of the plant management staff, one of whom holds a Senior Operator's license.      Such changes shall be documented, subsequently reviewed, and approved by tne Plant and Nuclear General Review Committees.        All Procedures and changes to procedures utilized by contractors to implement the environ-mental and monitoring programs described in Section 3 shall be                                                          i reviewed and approved by the Manager, Nuclear Support Services.
!
procedures which do not change the intent of the original procedure may be made, provided such changes are approved by two members of the plant management staff, one of whom holds a Senior Operator's license.      Such changes shall be documented, subsequently reviewed, and approved by tne Plant and Nuclear General Review Committees.        All Procedures and changes to procedures utilized by contractors to implement the environ-mental and monitoring programs described in Section 3 shall be                                                          i reviewed and approved by the Manager, Nuclear Support
                                                                                                                                      '
Services.
TSCRN55(DN-65)
TSCRN55(DN-65)
_}}
_}}

Latest revision as of 17:12, 21 February 2020

Revised Tech Specs for Administrative Controls
ML19318B706
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 04/23/1980
From:
FLORIDA POWER CORP.
To:
Shared Package
ML19318B672 List:
References
NUDOCS 8006270347
Download: ML19318B706 (8)


Text

_

s .

    • I

. ". M. i.

e!. ""

i.:.35 E

i.'8v.7  !!!!

... E':s

  • r*- 8
  • e  :;

S lt

.KU. -d

. .E .23

.e .

so m e._ _- - - - -

I..

..g.E W ..

3...

2 I. s- ; =-r 2:

33 3.!:

-  :: ! =

8 8 . .g .Ey:

  • .w

'I w:1 "

=

. s  :. :3 823" I =[. 3 .

so j .g: .  !!

gr e

.a l

l r  :  :

      • i i

"di

  • 5

"* E"5 * **3 . .

. 3  ::: ! -  :-l:a  ; e

  • % [

sj.:

. . s 3:.

! I  :

. E E

  • j. *: i ..!!

s  :

3 I

."s

"  ; av 3 "

E i g 2  :==

a.

=

. *. :s. -

s * .. .

.I*

-  ::{ - ". 23t. =5 =

IE l':

I 325 3 s

3:: *!"

a  : e

.g.:e.

t

v. s.

3: n

- ta=

.Is* 6 A .-

3

  • a . .I -

II * ,2 31=I !g :, p3 .

a.1 I .W I  :]

=* : =*- ' _E I's :

a=" 1 I,v.* 3 s .: *.* a

.Ear

.D p p' I .

.@ D NON 7 - F!

bh bjjulj djj ij b CRYSTAL RIVER-UNIT 3 6-2 800627 OM]

52 PRESIDENT I

SEN!OR VICE PRES. SENIOR VICE PRES.

ENGINEERING CORPORATE SERVS.

8 CONSTRUCTION 8 GEN. COUNSEL j VICE PRESIDENT VICE PRESIDENT POWER ENVIRONMENT PRODUCTICN & NEW TECHNOLOGY DIRECTOR ENVIRONMENTAL &

LICENSING AFFAIRS MANAGER ASST.VICE PRESIDENT PRODUCTION NUCLEAR SERVICES OPERATIONS NUCLEAR PLANT MANAGER MANAGER M.lCLEAR SUPPORT SERVICES NUCLEAR PLANT STAFF l

FIGURE 5.1 1 ORGANIZATION FOR IMPLEMENTING ENVIRONMENTAL TECHNICA L SPECIFICATIOh S .

5-4 PRESIDENT SENIOR SENIOR VICE PRESIDENT NUCLEAR VICE PR Ee : DENT ENGINEERING GENERAL REVIEW CORPORATE SERVICES

& CONSTRUCTION COMMITTEE 8 GENERAL COUNSEL VICE PRESIDENT PLANT VICE PRESIDENT POWER REVIEW ENVIRONMENT PRODUCTICN COMMITTEE &

NEW TECNNOLOGY ASST. VICE PRESIDENT DIRECTOR NUCLEAR OUALITY '

OPERATIONS PROGRAMS  !

l l

l l

l FI G. 5.3 -1 ORGANIZATION FOR INDEPENDENT REVIEW AND AUDIT.

ADMINISTRATIVE CONTROLS AUTHORITY 6.5.1.7 The Plant Review Committee shall:

a. Recommend to the Nuclear Plant Manager written approval or disapproval of items considered under 6.5.1(a) through (d) above.
b. Render determinations in writing with regard to whether or not each item considered under 6.5.1.6(3) through (e) above constitutes an unreviewed safety question.
c. Provide written notification within 24 hours to the Assistant Vice President, Nuclear Operations and the Nuclear l General Review Committee of disagreement between the PRC and the Nuclear Plant Manager; however, the Nuclear Plant Manager shall have responsibility for resolution of such disagreements pursuant to 6.1.1 above.

RECORDS 6.5.1.8 The Plant Review Committee shall maintain written minutes of each meeting and copies shall be provided to the Assistant Vice President, l Nuclear Operations, and Chairman of the Nuclear General Review Committee.

6.5.2 NUCLEAR GENERAL REv'!EW COMMITTEE (NGRC)

FUNCTION 6.5.2.1 The Nuclear General Review Committee shall function to provide independent review and audit of designated activities in the areas of:

a. Nuclear powt.r plant operations
b. Nuclear engineering
c. Chemistry and radiochemistry
d. Metallurgy
e. Instrumentation and control
f. Radiological safety
g. Mechanical and electrical engineering <
h. Quality as.urance practices CRYSTAL RIVER - UNIT 3 6-7

ADMINi3TRATIVE CONTROLS RECORDS 6.5.2.11 Records of NGRC activities shall be prepared, approved and dis-tributed as indicated below:

a. Minutes of each NRCC meeting shall be prepared, approved and forwarded to the Senior Vice President, Engineering and Con-struction, within 14 days following each aeeting.
b. Reports of reviews encompassed by Secti.m 6.5.2.8 above, shall be prepared, approved and forwarded to the Senior Vice President, Engineering and Construction, within 14 days fol-lowing completion of the review.
c. Audit reports encompassed by Section 6.5.2.9 above, shall be forwarded to the Senior Vice President, Engineering and Con-struction, and to the management positions responsible for the areas audited within 30 days after completion of the __ ._

audit.

6.6 REPORTABLE OCCURRENCE ACTION 6.6.1 The following actions shall be taken for REPORTABLE OCCURRENCES:

a. The Commission shall be notified and/or a report submitted pursu-ant to the requirements of Specification 6.9.
b. Each REPORTABli OCCURRENCE requiring 24-hour notification to the Commission shall be reviewed by the PRC and submitted to the NGRC and the Assistant Vice President, Nuclear Operations.

CRYSTAL RIVER - UNIT 3 6-11

ADMINISTRATIVE CONTROLS 6.7 SAFETY LIMIT VIOLATION 6.7.1 The following actions shall be taken in the event a Safety Limit is violated:

a. The facility shall be placed in at least HOT STANDBY within one hour.
b. The Safety Limit violation shall be reported to the Commission, the Assistant Vice President, Nuclear Operations, and to the NGRC within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
c. A Safety Limit Violation Report shall be prepared. The report shall be reviewed by the PRC. This report shall describe (1) applicable circumstances preceding the violation, (2) effects of the violation upon facility components, systems or structures, and (3) corrective action taken to prevent recurrence.
d. The Safety Limit Violation Report shall be submitted to the Commission, the NGRC and the Assistant Vice President, Nuclear Operations, within 14 days of the violation.

6.8 PROCEDURES 6.8.1 Written procedures shall be established, implemented, and asintained covering the activities referenced below:

a. The applicable procedures recommended in Appendix "A" of Regulatory Guide 1.33, November 1972.
b. Refueling operations.
c. Surveillance and test activities of safety-reisted equipment.
d. Security Plan implementation.
e. Emergency Plan implementation.
f. Fire Protection Program implementation.

6.8.2 Each procedure and administrative policy of 6.8.1 above, and changes thereto, shall be reviewed by the PRC and approved by the Nuclear Plant Manager prior to implementation and reviewed periodically as set forth in administrative procedures.

CRYSTAL RIVER - UNIT 3 6 .

-p

5-1 5.0 ADMINISTRATIVE CONTROLS Objective To define the organization, assign responsibilities, describe the environmental surveillance procedures, provide for a re-view and audit function, and prescribe the reporting require-ments in order to insure continuing protection of the environ-ment and implement the Environmental Technical Specif1 cations.

5.1 ORGANIZATION The organization responsible for environmental protection, en-vironmental monitoring and the implementation of the Environ-mental Technical Specifications,for Crystal River Unit 3, is shown in Figure 5.1-1.

5.2 RESPONSIBILITY The responsibility for the conduct of the preoperational en-viiciimental ~ monitoring program described in Section 3 and special studies described in Section 4 is that of the Environ-ment and New Tecnnology Department under the direction of the Director of Environmental and Licensing Affairs. The

. responsibility for the conduct of the operational environmen-tal monitoring program and the implementation of Environmental Technical Specifications becomes the responsibility of the Power Production Department.

The plant organization is responsible for the development of Operating and Surveillance Procedures described generally in Section 5.5 and supplying field data to the Manager, Nuclear Support Services as required by Sections 2, 3, and 4 of the Environmental Technical Specifications.

The Manager, Nuclear Support Serv %es is responsible for con-sultant contracts, State and local regulatory agreements, assembly of data, preparation and review of reports required by Section 5.6 of these Environmental Technical Specifica-tivas, and making recommendations to improve environmental protection practices.

All reports and correspondence with the NRC regarding the En-vironmental Technical Specifications shall be approved and signed by the Assistant Vice President, Nuclear Operations.

The Nuclear Plant Manager shall, however, make reports by telephone and telegraph of any incident or occurrence requiring reporting within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or less, as required in Section 5.6.

-9m .-Q,- -

.9. -a - - - - - -

5-5 5.4 ACTION TO BE TAKEN IF LIMITING CONDITION FOR OPERATION IS EXCEEDED 5.4.1 Imediate remedial actions as permitted by these environmental technical specifications shall be implemented until such time as the limiting condition for operation is met.

5.4.2 The occurrence shall be promptly reported ta the Chairman of the Nuclear General Review Committee and investigated as specified in Section 5.3.

5.4.3 The Nuclear General Review Committee shall prepare and submit a report for each occurrence in accordance with Section 5.3.10.

5.4.4 The Assistant Vice President, Nuclear Operations, shall report the occurrence to the NRC as specified in Section 5.6.2.

5.5 PROCEDURES 5.5.1 Explicit written procedures, including applicable check-off lists and instructions, shall be prepared for the implementa-tion of the monitoring requirements described in Sections 2 and 3, approved as specified in Section 5.5.2, and adhered to for operation of all systems and components involved in carry-ing out the effluent release and environmental monitoring pro-grams. Procedure shall include sampli.19, instrument calibra-ti on , analysis, and action to be taken when limits are approached or exceeded. Calibratior. frequencies and standards for instruments used in performing the measurements shall be included. Testing frequency of alarms shall be included.

These frequencies shall be determined from experience with i similar instruments in similar environments and from manufac- l turers' technical manuals. l 5.5.2 All procedures implemented by plant staff personnel described in Section 5.5.1 above, and changes thereto, shall be reviewed as specified in Section 5.3 and approved by the Nuclear Plant Manager prior to implementation. Temporary changes to procedures which do not change the intent of the original procedure may be made, provided such changes are approved by two members of the plant management staff, one of whom holds a Senior Operator's license. Such changes shall be documented, subsequently reviewed, and approved by tne Plant and Nuclear General Review Committees. All Procedures and changes to procedures utilized by contractors to implement the environ-mental and monitoring programs described in Section 3 shall be i reviewed and approved by the Manager, Nuclear Support Services.

TSCRN55(DN-65)

_