Rev 2 to AP-510, Rapid Power Reduction
ML20196F724
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 11/23/1998
From: Wilson I
FLORIDA POWER CORP.
To:
Shared Package
ML20196F697 List:
References
AP-510, NUDOCS 9812070114
Download: ML20196F724 (19)


Text

____ _ _ ______ _

g e

RPR REV 02 (MC)

AP-510 Ur~

RAPID POWER REDUCTION 1.0 ENTRY CONDITIONS lE conditions exist which require a rapid power reduction.

THEN use this procedure.

2.0 IMMEDIATE ACTIONS Note There are no imediate actions for this procedure.

\\

i AA

}

Approved by HNP b.

/] & lf0kDate ///Z 5/7[

(SIGNATURE'ON FILE)

/

AP-510 PAGE 1 of 19 RPR

  • a" 18au Paa b f F

PM

g O

l i

)

3 BLANK PAGE O

O AP-510 REV 02 (MC)

PAGE 2 of 19 RPR e

m

~. -. _ _

.. ~. _ _, _ -.. _... _ _. _. _... _ _

3.0 FOLLOW-UP ACTIONS ACTIONS DETAILS I

3.1 Notify personnel of plant e

STA conditions.

e Plant operators e

NSM l

e Dispatcher

?

t i

3. 2.

Adjust ICS " LOAD RATE" to desired setpoint.

i i

3.3 Adjust " UNIT LOAD MASTER" i

demand to "10" 3.4

' Maintain Imbalance within e Adjust APSRs to maintain limits.

limits.

i See OP-103D, Withdrawal Limit Curves.

t i

3.5 Maintain MUT level e Cycle appropriate BWST to MVP valve 2 55 in.

to raise MUT level:

MUV-73 MUV-58 j

l s

i 3.6 Notify Chemistry of 2 15%

t Rx power change in any

}

1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> time period.

i O

AP-510 REV 02 (MC)

PAGE 3 of 19-RPR l

l

O' BLANK PAGE O

O AP-510 REV 02 (MC)

PAGE 4 of 19 RPR I

{

l

3.0 FOLLOW UP ACTIONS (CONT'D)

(^')

ACTIONS DETAILS

\\v 3.7 E at any time, a rapid OP-204. Power Operations.

power reduction is Section 4.2 NOT required.

THEN stop power reduction OP-208. Plant Shutdown, and GO T0 the applicable Section 4.1 OP.

OP-203. Plant Startup.

Section 4.1 3.8 WHEN Rx power is < 80%.

  • Notify SPO to ensure ASV-27 "MS to THEN ensure MS is AS Control" (119 ft TB by AS Hdr) is supplying AS.

supplying Aux Steam header.

3.9 E at any time. FWV-28 is 1

Notify PP0 to obtain keys 11, 74

opened, and 75 from Control Room.

THEN ensure EFIC MFW

,o isolation is properly 2 Notify PPO to select EFIC MFW t

)

aligned.

isolation pump trip key switches to

BOTH" :

"EFIC CHANNEL A MAIN FW ISOLATION MAIN FW PUMP TRIP" (CRD Room. AUX RELAY CAB. RR3A)

"EFIC CHANNEL B MAIN FW ISOLATION MAIN FW PUMP TRIP" (B EFIC Room. AUX RELAY CAB RR5B1) 3.10 _ _ Maintain DFT level between 10 and 13 ft.

'~,l AP-510 REV 02 (MC)

PAGE 5 of 19 RPR

Applicable Carry-over steps:

3.7 E rapid power reduction is NOT required. THEN stop power.

3.9 E FWV-28 is opened. THEN ensure EFIC MFW isolation..

O 9:

AP-510 REV 02 (MC)

PAGE 6 of 19 RPR

3.0 F0ll0W-UP ACTIONS (CONT'D)

(~)

ACTIONS DETAILS

\\'

3.11 E at any time. ICS transfers to tracking mode.

THEN reset " UNIT LOAD MASTER" demand to "10" to resume power decrease.

3.12 E at any time. MBVs

  • Select MBVs to " MAN" and "CLOSE" close.

THEN ensure MBVs remain FWV-30 closed.

FWV-29 3.13 Verify Aux Transformer is not supplying any bus.

,^3 L ")

E Aux Transformer is supplying any busses.

THEN PERFORM Enclosure 1.

Shutdown Electrical Lineup.

3.14 WHEN both OTSGs are on low 1

Select Rx Diamond to " MANUAL" level limits.

THEN align ICS for 2

Select " REACTOR DEMAND'" to shutdown conditions.

" HAND" 3

Select "SG/RX DEMAND" to " HAND" and lower demand to "0" 4 Select both FW Loop Demands to

" HAND" and lower demand to "0" "STM GEN A FW DEMAND" "STM GEN B FW DEMAND"

,e m AP-510 REV 02 (MC)

PAGE 7 of 19 RPR

1 Applicable Carry-over steps:

3.7 E rapid power reduction is !iO.I requireci. THEN stop power.

O 3.9 E FWV-28 is opened. THEN ensure EFIC MFW isolation.

3.11 E ICS transfers to tracking mode. THEN reset " UNIT LOAD MASTER" l

i l

O l

l l

1 l

l 1

l 0

l AP-510 REV 02 (MC)

PAGE 8 of 19 RPR 1

1

3.0 FOLLOW-UP ACTIONS (CONT'D)

(")

ACTIONS DETAILS 1/

3.15 Maintain PZR level.

See OP-103A. Startup Curves. Curve 5 3.16 Begin RCS cooldown.

CONCURRENTLY PERFORM E0P-14. 5. E0P Temperature Log (RCS TEMP).

Begin sequential control rod e

group insertion.

Maintain RCS cooldown rate s 50*F/8 hr.

3.17 Notify SP0 to CONCURRENTLY n

PERFORM E0P-14. Enclosure

()

1. SP0 Post Trip Actions.

3.18 WHEN Rx Power is < 12%.

1 Establish manual turbine THEN trip Main Turbine.

control.

2 Establish 50 MWe turbine load (45 to 55).

3 Ensure TBVs are controlling MS Hdr PRESS.

4 Depress Main Turbine trip push button.

5 Verify TVs and GVs are closed.

f

.t Nj AP-510 REV 02 (MC)

PAGE 9 of 19 RPR

Applicable Carry-over steps:

3.7 E rapid power reduction is NOT required. THEN stop power.

3.9 E FWV-28 is opened. THEN ensure EFIC MFW isolation.

O AP-510 REV 02 (MC)

PAGE 10 of 19 RPR

f 3.0 FOLLOW-UP ACTIONS (CONT'D) k ACTIONS DETAILS l

3.19 Ensure Main Generator output Bkrs are open.

Bkr 1661 Bkr 1662 i

i I

IE any output Bkr fails to 1 Select affected output Bkr to open.

" BACKUP"-

THEN attempt to o)en output Bkr using 3ackup "BKR 1661 TRIP COIL SELECT 0P, trip coils.

SWITCH"

.l "BKR 1662 TRIP COIL SELECTOR i

SWITCH" 2 Open,affected output Bkrs:

Bkr 1661 i

Bkr 1662 l

3 IE output Bkrs are NOT open.

l O.

THEN notify Dispatcher to j

separate CR-3 from grid.

l P

I 3.20 _ IE CR-3 is separated from e

Open field Bkr.

the grid, j

THEN shutdown Main Select voltage regulator to i

Generator.

"0FF".

t

)

O AP-510 REV 02 (MC)

PAGE 11 of 19 RPR 4

Applicable Carry-over steps:

3.7 E rapid power reduction is NOT required. THEN stop power.

3.9 E FWV-28 is opened. THEN ensure EFIC MFW isolation..

O l

1 l

l e.

AP-510 REV 02 (MC)

PAGE 12 of 19 RPR l

l l

~

3.0 FOLLOW-UP ACTIONS (CONT *D)

ACTIONS DETAILS 3.21 Ensure Main Turbine oil pumps are running.

TBP-8 TBP-2 3.22 Ensure all Main Turbine drain valves are open.

TDV-2 TDV-6 TDV-1 TDV-5 TDV-3 TDV-7 TDV-4 TDV-9 TDV-10 TDV-8 3.23 J.E this procedure was entered from E0P-6. Steam Generator Tube Rupture.

THEN EXIT this procedure.

O mbV02(MC)

PAGE 13 of 19 RPR AP-510 l

s

Applicable Carry-over steps:

3.7 E rapid power reduction is NOT required. THEN stop power..

3.9 E FWV-28 is opened. THEN ensure EFIC MFW isolation.

O O

AP-510 REV 02 (MC)

PAGE 14 of 19 RPR

j c3.0 FOLLOW-UP ACTIONS (CONT'D) i f

ACTIONS ~

DETAILS 3.24 Align CD System for low 1

Select both CDP-1A~and CDP-1B j

flow operation.

controllers to " HAND" and reduce

' demand to "0".

l i

-2 Ensure only 1 CDP is running.

3 Close CD Htr outlet' valves:

CDV-44 CDV-43 l

-4 Maintain CD system PRESS between

-l 90 and 150 psig, j

5 Throttle CDV-242 to maintain DFT level between 8 and 11 ft; i

i RQte j

The following step will add a 125 psig bias to the TBVs.

O I

.i i

3.25 WHEN Rx power lowers to l

5%.

THEN trip Rx and GO TO l

E0P-2 Vital System Status l

Verification beginning with step 2,l' t

I i

i AP-510-REV 02 (MC)

PAGE 15 of 19 RPR l

l t

i O

a l

l I

BLANK PAGE O

O AP-510 REV 02 (MC)

PAGE 16 of 19 RPR

4 5.0 ENCLOSURE 1 SHUTDOWN ELECTRICAL LINEUP-l A

ACTIONS DETAILS

- U l.1' E Bkr 3101 is closed.

1 Select " AUTO TRANSFER 3103" to THEN transfer the A 6900V

" MAN".

bus to START UP transformer.

2 Close Bkr 3103 3

Open Bkr 3101 j

l 1.2 E Bkr 3201 is closed.

1 Select " AUTO TRANSFER 3203" to THEN transfer the A unit

" MAN".

'4160V bus to START UP transformer.

2 Close Bkr 3203 l

3 Open Bkr 3201 i

b

. 1.3

- E Bkr 3207 is closed, 1

Select " SYNC 3211" to "0N" AND the OFFSITE transformer is the desired 2

Close Bkr 3211

]

g source.

t THEN transfer the A ES 3

Open Bkr 3207 i

4160V to Bus to the 0FFSITE transformer.

4 Select " SYNC 3211" to "0FF" 1.4 E Bkr 3207 is closed.,

1 Select " SYNC 3205" to "0N".

AND the BEST is the desired source, 2

Close Bkr 3205 THEN transfer the A ES 4160V Bus to the BEST.

3 Open Bkr 3207 4

Select " SYNC 3205" to "0FF" t

5 t

[

O AP-510 REV 02 (MC)

PAGE 17 of 19 RPR

4 i

e i

i i-k 1

a 1

i i

4 i

BLANK PAGE O

i J

O AP-510 REV 02 (MC)

PAGE 18 of 19 RPR

~.

'*:. i*.-

5.0 ENCLOSURE 1 SHUTDOWN ELECTRICAL LINEUP (CONT'D)

TN -

ACTIONS DETAILS V

1.5 E Bkr 3102 is closed.

1 Select " AUTO TRANSFER 3104" to i

THEN transfer the B 6900V

  • MAN".

bus to START UP

' transformer.

2 Close Bkr 3104 i

3 Open Bkr 3102 l

l l

- 1.6 E Bkr 3202 is closed.

1 Select " AUTO TRANSFER 3204" to THEN transfer the B unit

" MAN" 1

4160V bus to the START UP transformer.

2 Close Bkr 3204 3

Open Bkr 3202 i

i t

i 1.7 E Bkr 3208 is closed.

1 Select " SYNC 3206" to "0N" i

AND the BEST is the-s desired source.

2 Close Bkr 3206 IHEN transfer the B ES 4160V Bus to the_BEST.

3 Open Bkr 3208 1.8 E Bkr 3208 is closed.

1 Select " SYNC 3212" to "0N".

AND the OFFSITE-transformer is the desired 2

Close Bkr 3212

source, j

THEN transfer the B ES 3

Open Bkr 3208 i

4160V to Bus to the f

0FFSITE transformer.

4 Select " SYNC 3212" to "0FF" i

i r

O AP-510 REV 02 (MC)

PAGE 19 of 19 (LAST PAGE)

RPR

)