l LOIA REV 09 (MC) AP-470 n :
V LOSS OF INSTRUMENT AIR 1.0 ENTRY CONDITIONS JEIAPR5SSis590psig. L THEN use this procedure. [
2.0 IMMEDIATE ACTIONS ;
NOTE i
There are no immediate actions for this procedure.
- m. t
?
r I
n /1 8 l Approved by MNPO -
S/ [JN) ate //MI8f (SIGNATURE ON FILE) / f AP-470 PAGE 1 of 29 LOIA 9812070113 901124 <
[
PDR ADOCK-05000302 ,
F PDR 1 1
l l
.. c !
O l
i
)
i l
l l l l
l BLANK PAGE O.
l l
AP-470 REV 09 (MC) PAGE 2 0F 29 LOIA 9
2.0 FOLLOW UP ACTIONS
(] ACTIONS DETA]LS
()
3.1 Ensure in-house air compressors are running. SAP-1A SAP-1B IAP-1A IAP-1B 3.2 Notify personnel of plant e STA conditions.
- Plant operators e NSM e HP (notify of degraded IA conditions as a 3recaution for personnel using ]reathing air) e Announce on PA " Terminate all (O), use of station air" l
,/~~,
,v t AP-470 REV 09 (MC) PAGE 3 0F 29 LOIA 1
9 e
- O BLANK PAGE O
O AP-470 REV 09 (MC) PAGE 4 0F 29 LOIA i
l
.'3.0 FOLLOW UP ACTIONS (CONT *D)
ACTIONS O DETAILS 3.3 Notify SP0 to start berm air compressors. SAP-1C
~
SAP-10 SAP-1E 3.4 E at any time. DHR is in 1 E A DHR Train is in service, service. THEN notify PP0 to manually -
AND IA PRESS < 80 psig, throttle the following valves THEN establish manual (75 ft AB A DH Room):
control of DHR cooling.
AND GO TO Step 3.27 in _ _ DCV-17 "A DH Cooler Bypass this procedure Control" DCV-177 "A DH Cooler Outlet Control" 2 E B DHR Train is in service.
(N THEN notify PPO to manually
() throttle the following valves (75 ft AB B DH Room):
DCV-18 "B DH' Cooler Bypass Control DCV-178 "B DH Cooler Outlet Control" 3 GO TO Step 3.27 in this procedure.
3.5 E at any time. IA PRESS 1 Depress Rx trip push button is < 80 psig.
AND any abnormal system 2 CONCURRENTLY PERFORM E0P-2.
operation exists. Vital System Status THEN trip Rx and Verification, beginning with GO TO Step 3.11 in this Step 2.1 procedure.
3 GO TO Step 3.11 in this procedure.
A U
l AP-470 REV 09 (MC) PAGE 5 0F 29 LOIA
Applicable carry-over steps:
3.4 E DHR is in service AND IA PRESS < 80 psig.
3.5 E IA PRESS is < 80 psig AND abnormal system operation exists.
f
+
d i
O AP-470 REV 09 (MC) PAGE 6 OF 29 LOIA
. . ~ . . . . _ . _ . , . . . _ _ . . _ _ _ _ _ . . _ . . . . _ _ _ _ . _ . . _ . _ __ .. ._. _ _ _.
t
- 3.0 FOLLOW UP ACTIONS (CONT'D) e ACTIONS DETAILS j O !
3.6 JF at any time. IA PRESS l 1s > 90 psig. l THEN EXIT this procedure. l i
3.7 Bypass IA dryers. e Notify SP0 to open IAV-31 "IADR-1 & :
IADR-2 Bypass Iso" (95 ft TB behind IADR-1). .
i I
3.8 Place both IA dryer e Notify SPD to ensure all the prefilters and following valves are open afterfilters in service. (95 ft TB by IADR-1): ;
IAV-11 "Prefilter IAFL-2A Inlet !
Iso" !
IAV-12 "Prefilter IAFL-2B Inlet '
j . Iso" .
IAV-14 "Prefilter IAFL-2B Outlet Iso" l IAV-544 "Prefilter IAFL-2A :
Outlet Iso" :
IAV-18 "Afterfilter IAFL-3B .
Inlet Iso" :
IAV-545 "Afterfilter IAFL-3A Inlet Iso" IAV-19'"Afterfilter IAFL-3A Outlet Iso"
, IAV-20 "Afterfilter IAFL-3B p Outlet Iso" l
1
?
O AP-470 REV 09'(MC) PAGE 7 0F 29 LOIA I
e
.- l Applicable carry-over steps:
3.4 E DHR is in service AND IA PRESS < 80 psig.
3.5 E IA PRESS is < 80 psig AND abnormal system operation exists.
3.6 E IA PRESS is > 90 psig THEN. EXIT this procedure.
O O
AP-470 REV 09 (MC) PAGE 8 0F 29 LOIA
l
[
3'0 FOLLOW-UP ACTIONS (CONT'D)
ACTIONS DETAILS i O '
3.9 Jf IA PRESS does NOT e Nctify available personnel to j recover. . isolate individual air sup)1y root !
THEN inspect IA'and SA valves on loop header,s wit 1 leaks: !
loops for leaks. !
TB Loop 119 ft TB Loop 95 ft j i
AB Loop 95 ft ;
l l
i 3.10 WHEN IA PRESS is
> 90 psig, i THEN EXIT this prccedure. j O 1 i
i t
i l
i O i AP-470 REV 09 (MC) PAGE 9 0F 29 LOIA j l
. - . . . . > , . . . - ..-n,. , . _ . . . .. = - . , , . . - , , , , ,
9 .aa 6muaw a-.m...m4 a-4,A,_- _: -
4 6
O BLANK PAGE O
P i
l
{
l 1 O AP-470 REV 09 (MC) PAGE 10 0F 29 LOIA 1
1
^
~
3.0 FOLLOW UP ACTIONS-(CONT'D) j l
l ACTIONS DETAILS O !
l STATUS 1 The following conditions. exists: !
I' e Rx is tripped e IA PRESS is s 80'psig and any abnormal system operation exists :
l i
3.11 Initiate EFIC. 1 Depress "EFW INITIATE" push j buttons on EFIC channels A l and B. !
2 Ensure EFWPs start and control flow: j l
EFP-1 EFP-2
{
[ Rule 3. EFW Control]
3 Ensure level in available OTSGs is at or trending toward required level.. .
See Table 1 t i
i i
i l
O -
l AP-470 REV 09 (MC) PAGE 11 0F 29 LOIA !
i
a .a .-.e . _ . . _a_ a a a 4 4. m. a _44 sm 4.s,2a &,hA4, , &-. _sw AB = m.A.k4 e __4rm. A J. --4a Amah,_m, e 9 0
O BLANK PAGE ,
O AP-470 REV 09 (MC) PAGE 12 0F 29 LOIA
? 3.0 FOLLOW UP ACTIONS (CONT'Dl- !
ACTIONS DETAILS !
O i
-3.12 Initiate MSLI and MFLI. 1 Depress " MAIN STM ISOLATION" push buttons on EFIC channels A ;
and B for both OTSGs.
2 Depress " MAIN FEED ISOLATION" i push buttons on EFIC channels A :
and B for both OTSGs. !
3 Select' MBVs to
- MAN" and select all FW isolation valves to "CLOSE": ;
}
LLBV FWV-31 FWV-32
{
MBV toggle " MAN" " MAN" l
MBV FWV-30 FWV-29 SUBV FWV-36 FWV-33 e Cross-tie FWV-28 i O Suction FWV-14 FWV-15 4 Ensure both MFWPs are tripped: l A OTSG B OTSG !
FWP-2A FWP-2B 5 Ensure all MSIVs closed: i A OTSG B OTSG i MSV-412 MSV-413 MSV-411 MSV-414 i
O
\i AP-470 REV 09.(MC) PAGE 13 0F 29 LOIA l 5
r
.t l
A., i -_a amA ,a _, -,a. L - s a w O
BLANK PAGE O
AP-470 O-REV 09 (MC) PAGE 14 0F 29 LOIA
/ 3.0 FOLLOW UP ACTIONS (CONT'D) 1 l
ACTIONS DETAILS O
3.13 Align backup air supply to e Notify SP0 to open IAV-676 "ADV ADVs. Backup Air Supply Iso" (119 ft TB ;
behind FWHE-38). i 3.14 Isolate letdown. 1 Close MUV-49 :
2 E MUV-49 will NOT close. ,
THEN close MUV-567 l t
l 3.15 Isolate normal makeup. 1 Maintain PZR level > 80 in with 'l MUV-24 !
2 Close MUV-27 l l
O 3.16 _ Maintain MUT level a 55-in.
e Cycle appropriate BWST to MUP valve to raise MUT level.
i i
MUV-73 j HUV-58 i i
3.17 E at any time. RCP CB0 is ,
lost. RCP-1A THEN trip all RCPs. !
RCP-1C l
RCP-1B l
RCP-1D j l
I O. AP-470 I
REV 09 (MC) PAGE 15 0F 29 LOIA }
l J
, ~- ,, .- - . ~ , - - ,, -, - , - -
Applicable carry-over steps:
3.17 Jf RCP CB0 is lost. THEN trip all RCPs.
O O
AP-470 REV 09 (MC) PAGE 16 0F 29 LOIA
3.0 FOLLOW-UP ACTIONS (CONT'D)
,e') ACTIONS DETAILS LJ 3.18 IF at any time SW low TTow for an RCP is RCP-1A
. indicated by either of the following: RCP-1C "PP SEAL & WTR FLOW" RCP-1B lamp extinguished on RCP control switch RCP-1D "RC PUMP CLG WTR FLOW LOW" annunciator alarm is illuminated , ,
THEN trip affected RCP.
3.19 JE at any time, all RCPs e Ensure level in available OTSGs are tripped. is at or trending toward Nat THEN establish Nat Circ. Circ level.
c'~~; [ Rule 3. EFW Control]
e Monitor all 4 Tcolds for Nat Circ indications.
e Indications of Nat Circ:
Thot tracking Tincore Tcold tracking OTSG Tsat AT (Thot - Tcold) stable or lowering i
1 l
l l
LJ AP-470 REV 09 (MC) PAGE 17 0F 29 LOIA !
- m. ..- C. + a a a
- a _ A.
Applicable carr.y-over steps:
3.17 E RCP CB0 is lost. THEN trip all RCPs.
3.18 E SW low flow on any RCP. THEN trip affected RCP.
3.19 E all RCPs are tripped. THEN establish Nat Circ.
O I
l l
G AP-470 REV 09 (MC) PAGE 18 0F 29 LOIA
I
' 3.0 FOLLOW UP ACTIONS (CONT *D) l ACTIONS DETAILS O ]
l 3.20 Reduce RCP seal injection e Notify PPO to perform the following to a 3 gpm per pump. in order (95 ft AB NU valve alley):
Open MUV-34 " Seal Injection Control Bypass Outlet Iso" l Open MUV-35 " Seal Injection Control Bypass Inlet Iso".
t Throttle MUV-17 " Seal Injection '
l Control Bypass" :
Close MUV-14 " Seal Injection Control Inlet Iso" !
3.21 Control RCS TEMP using ADVs.
O !
k i
i i
l I
I l
AP-.470 .REV 09 (MC) PAGE 19 0F 29 LOIA
Applicable carry-over steps:
3.17 E RCP CB0 is lost, THEN trip all RCPs.
3.18 LF SW low flow on any RCP. THEN trip affected RCP.
3.19 E all RCPs are tripped. THEN establish Nat Circ.
O O
AP-470 REV 09 (MC) PAGE 20 0F 29 LOIA
3.0 FOLLOW-UP ACTIONS (CONT *D) i ACTIONS OFTAILS l O !
3.22. Ensure emergency RB 1.At least 1 Emergency SW Pump i cooling is in service. running:
[ Rule 5. EDG Control] SWP-1A !
i SWP-1B :
2 At least 1 Emergency SW Raw Water .
Pump running:
RWP-2A l
RWP-2B !
3 Proper RB cooling unit operation:
l E ES has NOT actuated.
THEN ensure both ES selected RB cooling units running in slow ;
speed. -
E ES has actuated.
THEN ensure only 1 ES selected ;
RB cooling unit running in slow .
speed. j 4 CI valves to RB cooling units i closed: .
SWV-151 .
SWV-152 SWV-355 5 SW valves to RB cooling units open: .
SWV-353 l SWV-354 !
i I
O AP-470 l
REV 09 (MC) PAGE 21 0F 29 LOIA
~
Applicable carry-over steps:
3.17 IF RCP CB0 is lost. THEN trip all RCPs.
3.18 _ SW low flow on any RCP THEN trip affected RCP.
3.19 IE all RCPs are tripped. THEN establish Nat Circ.
O 1
AP-470 REV 09 (MC) PAGE 22 0F 29 LOIA l
l
i
' ~
- 3.0 FOLLOW UP ACTIONS (CONT'D)
N ACTIONS DETAILS f i
3.23 lE at any time. PZR level e Control cooldown using ADVs. l 1s > 250 in. l THEN control PZR level by e CONCURRENTLY PERFORM E0P-14.
starting an RCS cooldown. Enclosure 15. E0P Temperature .;
Log. l t
i 3.24 Break condenser vacuum. 1 Select condenser ARPs to
" PULL TO LOCK":
ARP-1A ARP-1B 2 Open condenser vacuum Bkrs. j ARV-48 ARV-49 ;
i O !
3.25 Ensure WG compressors are o Notify PP0 to select WG compressors .
stopped. to " PULL TO LOCK" (WDCP-3 Radwaste
- Control Panel): j WDP-1A WDP-1B !
3.26 Isolate GW to AS e Notify SP0 to close ASV-53 "GS !
desuperheater. DESUPERHEATER OUTLET 150" (119 ft TB !
at AS Hdr).. ,
l 1
O -
AP-470 REV 09 (MC) PAGE 23 0F 29 LOIA l
l
Applicable carry-over steps:
3.17 E RCP CB0 is lost. THEN trip all RCPs.
3.18 E SW low flow on any RCP THEN trip affected RCP.
3.19 E all RCPs are tripped. THEN establish Nat Circ.
3.23 E PZR level is > 250 in. THEN control PZR level.
l 0
l l
l O
1 l
l
< l l
O AP-470 REV 09 (MC) PAGE 24 0F 29 LOIA l
-. _ . . . _ . _ . - . _ . _ - _ _ . . - ~ _ - _ - _ _ . _ _ _ _ _ . . . _ . _ . _ . . _ . - _ _ .
i i
- 3.0 FOLLOW UP ACTIONS'(CONT'D) .
L ACTIONS DETAILS l
- O.
l- 3.27 E at any time. IA valves ,
fail.
THEN select failed valves L to their failed position. i l
See OP-411. Instrument and- !
Station Air. Enclosure 4. .
Loss of IA Equipment !
Failure Modes j 1
- 3. 28 _. at ny time. SC cooling-SAP-1A SAP-1B THEN stop SC cooled l' components. IAP-1A IAP-1B FWP-2A FWP-2B l i
FWP-1A FWP-1B !
CDP-1A CDP-1B
'v ARP-2A ARP-2B ,
]
! 3.29 E at any time. IA PRESS I
is > 90 psig.
THEN GO TO OP-411.
- . Instrument and Station Air l l. System. Section 4.8.
! ' Restoration From AP-470 3.30- Bypass IA dryers. e Notify SP0 to open IAV-31 "IADR-1 &
l IADR-2 Bypass Iso" (95-ft TB behind IADR-1).
I i I
-AP-470 REV 09 (MC) PAGE 25 0F 29 LOIA j l
L
- ta. , . _ _ . _
Applicable carry-over steps:
3.17 E RCP CB0 is lost, THEN trip all RCPs.
3.18 E SW low flow on any RCP. THEN trip affected RCP.
3.19 E all RCPs are tripped. THEN establish Nat Circ.
3.23 E PZR level is > 250 in. THEN control PZR level.
3.27 E IA valves fail. THEN select failed valves to.
3.28 E SC cooling is lost. THEN stop SC cooled components.
3.29 E IA PRESS is > 90 psig. THEN GO TO OP-411.
O
(
l O
AP-470 REV 09 (MC) PAGE 26 0F 29 LOIA
i
. . -- 3.0 FOLLOW-UP ACTIONS (CONT *D) l t
ACTIONS DETAll.S i
3,31 Place both IA dryer e Notify SP0 to ensure the following .
u prefilters and are open (95 ft TB by IADR-1): j afterfilters in service.
IAV-11 "Prefilter IAFL-2A Inlet i Iso" l IAV-12 "Prefilter IAFL-2B Inlet Iso" )
IAV-14 "Prefilter IAFL-2B Outlet !
l- Iso" l
! IAV-544 "Prefilter IAFL-2A !
l Outlet Iso" !
i IAV-18 "Afterfilter IAFL-3B ;
Inlet Iso" ;
IAV-545 "Afterfilter IAFL-3A !
Inlet Iso" '
IAV-19 "Afterfilter IAFL-3A l Outlet Iso" t IAV-20 "Afterfilter IAFL-3B i Outlet Iso" i
3.32 IE IA PRESS does NOT e Notify available personnel to recover, isolate individual air sup)1y root
loops for leaks.
TB Loop 119 ft TB Loop 95 ft AB Loop 95 ft I
3.33 WHEN IA' PRESS is
> 90 psig.
THEN GO TO OP-411.
Instrument and Station Air i
- i. System. Section 4.8. )
,_s Restoration From AP-470 )
b :
i AP-470- REV 09 (MC) PAGE 27 0F 29 LOIA i !
i
! O i
4 4
A i
k i
4
- BLANK PAGE 9
J d
r 4
4 O
AP-470 REV 09 (MC) PAGE 28 0F 29 LOIA
'1 -
"LLL" > 20 in = 1 RCP running with i adequate SCM j Table 1: "NAT CIRC" > 70% No RCPs running with 1 Required 0TSG levels adequate SCM l j "ISCM" > 90% Inadequate SCM 2
1 i
d 9
- 4 i T. l Y .
i '
+
< *l .
4 ;
I b
i i' .
i I -
1
[
!O i
4 .
I e
'l I l
l d
1 I
t AP 470 REV 09 (MC) PAGE 29 0F 29 (LAST PAGE) LOIA