ATTACHMENT B FLORIDA POWER CORPORATION CRYSTAL RIVER UNIT 3 DOCKET NUMBER 50-302 / LICENSE NUMBER DPR-72 REVISED BASES PAGE (STRIKEOUT AND HIGHLIGHT FONT)

Deletions are indicated by strikeout.

Additional and replacement text are indicated by shading.

P DR bK05 302 PDR_

AC Sources-Shutdown B 3.8.2 BAS,ES~ .

SURVEILLANCE SR 3.8.2.1 (continued)

REQUIREMENTS source to transfer to. SR 3.8.1.9 and SR 3.8.1.10 are also not required to be met since the ability to respond to ES bctuations in other than MODES 1. 2. 3 or 4 is not a requirement for CR-3.

i This SR is modified by a Note. ThetNOTElindicates?SRs 3.8:1.3 ?3:8.1:iB Fand 3.8.lill:are not1 required!to be serformeditoscomply- with SR' 3.8.2?11 sThe reason' for^ the lote is't6' preclude' situations'in ihidh the OPERABLE EDG would be paralleled with the offsite power network or rendered inoperable during performance of SRs. With limited AC sources available, a single event could compromise both r the required offsite circuit and the EDG. It is the intent that these SRs must still be capable of being met, but I

actual performance is not required. Refer to the Bases for LCO 3.8.1 for a discussion of each SR.

Additiohally 7the "mpact of entering the ACTIONS cf this Specification *during Surveillance testing was evaluated as part of ITS implementation and a unique situation was discovered relative to the monthly EDG testing performed as

] art of surveillance procedures SP-354A and SP-354B and the iODES and Conditions addressed by this Specification._ The EDG tear down and inspection is periodically performed during MODES 5 and 6 outages, typically taking in excez cf one month to ccm lete. Thus, it was concluded the probability of CF3 c601d! coincidentally having ha0elonly one OPERABLE EDG'dnd~be4r4 required to perform SP-354 was h49h- This created a concern since certain portions of SP-354 render the EDG inoperable, requiring entry into the ACTIONS of this Specification. Required Action B.3 requires action be initiated immediately to restore the EDG to OPERABLE status. Thus, a situation-is-established in which SP-354 is performed, the ACTIONS are entered. SP-354 is immediately termirated (in order to restore OPERABILITY of the EDG). In this case. SP-354 could never be performed.

The need to perform SP-354 was evaluated in light of this concern. It was decided that since the periods of inoperability for:: the1performdndb7afnths4 portions:6ffSP;354 associated with!SR-3.8.112~and % 8il:67were*bFief'ahd'the' SRs 3rovi'dsd"corsfidence'in the"0PERABILITY- of the EDG, the SP~siould be aerformed. Expeditiously performing the

  1. 6rti.ons?oGS)-354 as~s6diated9ithlSRJ3_.871?2fandf3;811s6 during these MODES satisfies the intent o f' Required' Action B.3 and is therefore acceptable. For2 MODE 5Eandf6 suriefilandeitestingberformediih?accordance Jwith,SP 354lto meet SR1318?l;3:willL3e 3erformed;at the1: frequency;of;SR" ^
3. 8 (123ionlylwhen ;boths E )G;trai nsfa rej operabl e F

-Crystal River Unit 3 B 3.8-29 Amendment No.

1 .

ATTACHMENT C l

FLORIDA POWER CORPORATION CRYSTAL RIVER UNIT 3 DOCKET NUMBER 50-302 / LICENSE NUMBER DPR-72 REVISED BASES PAGE (REVISION BAR FONT)

, , ATTACHMENT T0 llCENSE AMDENDMENT NO.

FACILITY OPERATING LICENSE NO. DPR-72 DOCKET NO. 50-302 Replace the following pages of the Appendix "A" Technical Specifications with the attached pages. The revised pages are identified by amendment number and contain vertical lines indicating-the area of change.

Remove Replace 3.3-21 3.3-21 B 3.3-71 8 3.3-71 B 3.8-17 B 3.8-17 B 3.8-29 B 3.8-29 4

.)

AC Sources-Shutdown B 3.8.2 BAS.ES*

l SURVEILLANCE SR 3.8.2.1 (continued) i REQUIREMENTS source to transfer to. SR 3.8.1.9 and SR 3.8.1.10 are also not required to be met since the ability to respond to ES actuations in other than MODES 1, 2, 3 or 4 is not a requirement for CR-3.

This SR is modified by a Note. The NOTE indicates SRs 3.8.1.'3, and 3.8.1.11 are not required to be 3.8.1.3 performed to comply with SR 3.8.2.1. The reason for the Note is to preclude situations in which the OPERABLE EDG would be paralleled with the offsite power network or rendered inoperable during erformance of SRs. With limited AC sources available, a sin le event could compromise both the required offsite circui and the EDG. It is the intent but that these actual SRs mustisstill performance notbe capable ofRefer required. beingtomet, the Bases for LC0 3.8.1 for a discussion of each SR.

the impact of entering the ACTIONS of this l Additionally, Specificationduring Surveillance testing was evaluated as part of ITS implementation and a unique situation was discovered relative to the monthly EDG testing performed as part of surveillance procedures SP-354A and SP-354B and the MODES and Conditions addressed by this Specification. The EDG tear down and inspection is )eriodically performed during MODES 5 and 6 outages. T 1us it was concluded CR-3 couldcoincidentallyhaveonlyonedPERABLEEDGandbe required to perform SP 354. This created a concern since certain portions of SP-354 render the EDG inoperable, requiring entry into the ACTIONS of this Srecification.

RequiredActionB.3requiresactionbeinifiatedimmediately to restore the EDG to OPERABLE status. Thus, a situation is the ACTIONS ere established entered, SP-351 in which SP-354 is terminate is immediately performed,d (in order to restore OPERABILITY of the EDG). In this case, SP 354 could never be perfermed.

The need to perform SP 354 was evaluated in light of this concern. It was decided that since the periods of inoperability for the performance of the portions of SP-354 associated with SR 3.8.1.2 and 3.8.1.6 were brief and the SRs )rovided confidence in the OPERABILITY of the EDG, the SP siould be performed. Expeditiously performinc the portions of SP-354 associated with SR 3.8.1.2 anc 3.8.1.6 during these MODES satisfies the intent of Required Action B.3 and is therefore acceptable. For MODE 5 and 6 surveillance testing )erformed in accordance with SP-354 to meet SR 3.8.1.3 will )e performed at the frequency of SR 3.8.1.3 only when both EDG trains are operable.

RLFERENCES None.

.-a Crystal River Unit 3 B 3.8-29 Amendment No.