Category:TECHNICAL SPECIFICATIONS
MONTHYEARML20212C0961999-09-16016 September 1999 Proposed ITS & Bases Changes Strikeout & Shadowed Text & Revision Bar Format,Increasing Licensed Capacity for Spent Fuel Assembly Storage in SFP & Revising Configuration for Storage of Fresh Fuel ML20211L1011999-09-0202 September 1999 Proposed Tech Specs Re Once Though SG Tube Surveillance Program,Alternate Repair Criteria (ARC) for Axial Tube End Crack (Tec) Indications ML20209D2971999-07-0808 July 1999 Proposed Tech Specs,Changing ITS for CREVS & VFTP & Correcting Typo in ITS Section 5.6.2.12 ML20195B8091999-05-26026 May 1999 Proposed Tech Specs,Revising ITS Bases That Will Update NRC Copies of ITS ML20195B7081999-05-17017 May 1999 Proposed ITS Section 3.3.8, EDG Lops, SR 3.3.8.1,revising Note for Surveillance & Deleting Note for Frequency ML20206S7691999-05-12012 May 1999 Proposed Improved Tech Specs Pages 3.4-21 Through 3.4-21D ML20206N1401999-05-10010 May 1999 Proposed ITS Administrative Controls Section 5.8, High Radiation Area ML20206M0961999-05-0707 May 1999 Proposed Tech Specs,Revising Wording for SR 3.5.2.5 to Be More Consistent with NUREG-1430,Rev 1 & Clarifying Process of Valve Position Verification ML20206H6541999-05-0505 May 1999 Proposed Tech Specs,Proposing Alternate Repair Criteria for Axial Tube End crack-like Indications in Upper & Lower Tubesheets of CR-3 OTSGs ML20204D9211999-03-18018 March 1999 Proposed Tech Specs Re OTSG Tubes Surveillance Program,Tube Repair Roll Process ML20202E6551999-01-27027 January 1999 Proposed Tech Specs Re OTSG Tubes Surveillance Program,Insp Interval Extension ML20196D6761998-11-30030 November 1998 Proposed Tech Specs LCO 3.9.3,allowing Both Doors in Personnel Air Locks & Single Door in Oeh to Be Open During Refueling Operations ML20195K4551998-11-24024 November 1998 Proposed Tech Specs,Installing diesel-driven EFW Pump to Remove Interim ITS & Provide Resolution to EDG Capacity Limitations ML20195K0031998-11-23023 November 1998 Proposed Tech Specs Re LAR Number 241,rev 0 for High Pressure Injection Sys Mods ML20195H6581998-11-17017 November 1998 Proposed Improved Tech Specs (Its),Revising 5.7.2 by Changing Type of Structural Integrity Assessment Required from Probabilistic to Deterministic ML20155F4501998-10-30030 October 1998 Proposed Revised Improved Tech Specs (ITS) Deleting Note Re Number of Required Channels for Degrees of Subcooling Function & Subdividing Core Exit Temp Function Into Two New Functions in ITS Table 3.3.17-1 ML20155F4021998-10-30030 October 1998 Proposed Revised Improved Tech Specs (ITS) Section 5.6.2.19, ITS Section 3.4.11,Bases 3.4.11 & 3.4.3 Re PTLR & LTOP Limits ML20155F9551998-10-30030 October 1998 Proposed Tech Specs Pages to LAR 245,changing Methodology for Sf Pool B Criticality Analysis ML20154P3101998-10-16016 October 1998 Proposed Tech Specs Resolving USQ by Leaving Valves DHV-34 & DHV-35 Normally Closed ML20154C1581998-09-30030 September 1998 Proposed Tech Specs Pages Re LAR 238,to Correct RCS Leakage Detection Capability of RB Atmosphere Gaseous Radioactivity Monitor Described in ITS Bases & FSAR ML20238F4761998-08-31031 August 1998 Proposed Tech Specs,Proposing New Repair Process for Plant OTSGs ML20151X0431998-08-31031 August 1998 Proposed Tech Specs Adding Three Addl Reg Guide 1.97 Type a Category 1 Pami Variables & One Type B Category 1 Pami Variable to ITS Table 3.3.17-1, Pami ML20236V8831998-07-30030 July 1998 Proposed Tech Specs Pages Re CREVS & Ventilation Filter Test Program ML20236E9851998-06-30030 June 1998 Proposed Tech Specs Re Exigent License Amend Request 228,rev 1 for Once Through SG Tube Surveillance Program ML20249B2671998-06-18018 June 1998 Proposed Tech Specs Pages Re one-time Exigent License Amend to Allow Operation W/Number of Indications Previously Identified as Tube End Anomalies & Multiple Tube End Anomalies in OTSG Tubes ML20247P8931998-05-22022 May 1998 Proposed Improved Tech Specs 5.2.1 Re Onsite & Offsite Organizations ML20217P5181998-04-28028 April 1998 Proposed Tech Specs Re Reactor Coolant Pump Motor Flywheel Insp ML20217G0121998-04-23023 April 1998 Proposed Improved Tech Specs Section 5.7.2, Special Repts, Clarifying That Complete Results of OTSG Tube Inservice Insp Shall Be Submitted to NRC 90 Days After Startup (Breaker Closure) ML20217C6341998-03-20020 March 1998 Proposed Tech Specs Re Editorial Changes to Improved TS Saftey Limits & Administrative Controls to Replace Titles of Senior Vice President,Nuclear Operations & Vice President, Nuclear Production W/Position of Chief Nuclear Officer ML20217C4931998-03-20020 March 1998 Proposed Improved Tech Specs 5.6.2.8.c Re Reactor Coolant Pump Motor Flywheel Insp ML20203D1611998-02-20020 February 1998 Proposed Tech Specs,Providing Revs to CR-3 Improved TS Bases That Update NRC Copies of Improved TS ML20198S9151998-01-22022 January 1998 Proposed Tech Specs Consisting of Rev 1 to TS Change Request 210,correction of Typo & Addition of Footnotes ML20202G8511997-12-0505 December 1997 Proposed Tech Specs Establishing New Improved TSs (ITS) Surveillance Requirement for Performance of Periodic Integrated Leak Test of Cche Boundary & Revising ITS Bases 3.7.12 to Define Operability of Cche ML20202G7991997-12-0505 December 1997 Proposed Tech Specs Revising Description of Starting Logic for RB Recirculation Sys Fan Coolers to Ensure That Only One RB Fan Starts on Es RB Isolation & Cooling Signal ML20199G8461997-11-21021 November 1997 Proposed Tech Specs Pages Involving Additional Restrictions, Editorial Clarifications & Typos ML20212F2741997-10-31031 October 1997 Proposed Tech Specs Pages Re Decay Heat Removal Requirements in Mode 4 ML20212C9801997-10-25025 October 1997 Proposed Tech Specs Re Power Operated Relief Valve Lift Setpoint TS Limit That Has Been Revised for Instrument Uncertainty ML20217F5231997-10-0404 October 1997 Proposed Tech Specs Pages Addressing Revision to Description of Electrical Controls for Operating Reactor Building (RB) Recirculation Sys fan/cooler,AHF-IC,as Discussed in FSAR & Improved TS ML20217D2741997-10-0101 October 1997 Proposed Tech Specs Adding Methodology to Monitor first-span Intergranular Attack (Iga) Indications & Disposition Growth During Future B OTSG Eddy Current Exams ML20210T9771997-09-12012 September 1997 Proposed Tech Specs Replacement Pages Re New Improved TS 3.4.11 Re Low Temp Overpressure Protection Sys ML20216F8481997-09-0909 September 1997 Proposed Tech Specs Re Analysis Rev for Makeup Sys Letdown Line Failure Accident as Discussed in FSAR ML20217Q2121997-08-26026 August 1997 Proposed Tech Specs Changing Design Basis of EDG Air Handling Sys ML20217N2501997-08-20020 August 1997 Proposed Improved Tech Specs 5.6.2.10 Re Tube Surveillance ML20210K8921997-08-16016 August 1997 Proposed Tech Specs 3.8.1.3,requesting one-time Outage on Each EDG to Perform Necessary Mod & Maint ML20151L7541997-08-0404 August 1997 Proposed Tech Specs Extending Frequency of EDG Surveillances During Period of Time CR-3 EDGs Are Being Modified ML20196J1431997-07-29029 July 1997 Proposed Tech Specs Adding EDG Kilowatt Indication to post- Accident Monitoring Instrumentation to Support CR-3 Restart Issue of EDG Load Mgt ML20196H0281997-07-18018 July 1997 Proposed Tech Specs Changes Establishing Requirements for Low Temperature Overpressure Protection Sys ML20148K7811997-06-14014 June 1997 Proposed Tech Specs Re Efw,Hpi,Emergency Feedwater Initiation & Control Sys ML20138H8781997-05-0101 May 1997 Proposed Tech Specs Replacing Prescriptive Requirements of 10CFR50,App J,Option a w/performance-based Approach to Leakage Testing Contained in 10CFR50,App J,Option B ML20137X5361997-04-18018 April 1997 Proposed Tech Specs,Providing Revs to CR-3 Improved TS Bases That Update NRC Copies of Improved TS 1999-09-02
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20212C1121999-09-16016 September 1999 Criticality Safety Analysis of W Spent Fuel Storage Racks in Pool B of Crystal River Unit 3 ML20212C0961999-09-16016 September 1999 Proposed ITS & Bases Changes Strikeout & Shadowed Text & Revision Bar Format,Increasing Licensed Capacity for Spent Fuel Assembly Storage in SFP & Revising Configuration for Storage of Fresh Fuel ML20211L1011999-09-0202 September 1999 Proposed Tech Specs Re Once Though SG Tube Surveillance Program,Alternate Repair Criteria (ARC) for Axial Tube End Crack (Tec) Indications ML20212C0991999-08-31031 August 1999 Criticality Safety Analysis of Crystal River Unit 3 Pool a for Storage of 5% Enriched Mark B-11 Fuel in Checkerboard Arrangement with Water Holes ML20209D2971999-07-0808 July 1999 Proposed Tech Specs,Changing ITS for CREVS & VFTP & Correcting Typo in ITS Section 5.6.2.12 ML20195B8091999-05-26026 May 1999 Proposed Tech Specs,Revising ITS Bases That Will Update NRC Copies of ITS ML20195B7081999-05-17017 May 1999 Proposed ITS Section 3.3.8, EDG Lops, SR 3.3.8.1,revising Note for Surveillance & Deleting Note for Frequency ML20206S7691999-05-12012 May 1999 Proposed Improved Tech Specs Pages 3.4-21 Through 3.4-21D ML20206N1401999-05-10010 May 1999 Proposed ITS Administrative Controls Section 5.8, High Radiation Area ML20206M0961999-05-0707 May 1999 Proposed Tech Specs,Revising Wording for SR 3.5.2.5 to Be More Consistent with NUREG-1430,Rev 1 & Clarifying Process of Valve Position Verification ML20206H6541999-05-0505 May 1999 Proposed Tech Specs,Proposing Alternate Repair Criteria for Axial Tube End crack-like Indications in Upper & Lower Tubesheets of CR-3 OTSGs ML20204D9211999-03-18018 March 1999 Proposed Tech Specs Re OTSG Tubes Surveillance Program,Tube Repair Roll Process ML20205A7651999-03-18018 March 1999 Rev 29 to AR-305, Es E Annunciator Response ML20205A7961999-03-15015 March 1999 Rev 22 to AR-301, ESA Annunciator Response ML20205A8051999-03-15015 March 1999 Rev 33 to AR-303, ESC Annunciator Response ML20205A8211999-03-15015 March 1999 Rev 35 to AR-403, PSA H Annunciator Response ML20205A3441999-03-12012 March 1999 Rev 25 to AR-402, PSA G Annunciator Response ML20204D5781999-03-0909 March 1999 Rev 10 to AP-513, Toxic Gas ML20204D5821999-03-0808 March 1999 Rev 22 to AR-603, Tgf O Annunciator Response ML20207H7741999-03-0303 March 1999 Rev 15 to AR-602, Tgf N Annunciator Response ML20207J6591999-03-0202 March 1999 Rev 18 to AR-504, ICS L Annunciator Response ML20207J6461999-03-0202 March 1999 Rev 21 to AR-301, ESA Annunciator Response ML20206S7561999-02-28028 February 1999 Rev 2 to Pressure/Temp Limits Rept, Dtd Feb 1999 ML20203C7461999-02-0303 February 1999 Rev 2 to AR-801, FSA Annunciator Response ML20202E6551999-01-27027 January 1999 Proposed Tech Specs Re OTSG Tubes Surveillance Program,Insp Interval Extension ML20202B1411999-01-22022 January 1999 Rev 22 to AR-401, PSA F Annunciator Response ML20199G5201999-01-15015 January 1999 Rev 11 to AP-961, Earthquake ML20199G5581999-01-12012 January 1999 Rev 4 to AP-404, Loss of Decay Heat Removal ML20199G5691999-01-12012 January 1999 Rev 4 to AP-604, Waterbox Tube Failure ML20198T2411999-01-0606 January 1999 Rev 19 to AR-701, Ssf P Annunciator Response ML20196G6771998-12-0101 December 1998 Rev 17 to Annunciator Response AR-702, Ssf Q Annunciator Response ML20196D6761998-11-30030 November 1998 Proposed Tech Specs LCO 3.9.3,allowing Both Doors in Personnel Air Locks & Single Door in Oeh to Be Open During Refueling Operations ML20196G5851998-11-25025 November 1998 Rev 32 to AR-303, ESC Annunciator Response ML20196G3371998-11-25025 November 1998 Reissued Rev 15 to AR-702, Ssf Q Annunciator Response ML20195K4551998-11-24024 November 1998 Proposed Tech Specs,Installing diesel-driven EFW Pump to Remove Interim ITS & Provide Resolution to EDG Capacity Limitations ML20196F6691998-11-24024 November 1998 Rev 11 to AP-330, Loss of Nuclear Svc Cooling ML20195K0031998-11-23023 November 1998 Proposed Tech Specs Re LAR Number 241,rev 0 for High Pressure Injection Sys Mods ML20196F7721998-11-23023 November 1998 Rev 3 to EOP-12, Station Blackout ML20196F7031998-11-23023 November 1998 Rev 3 to AP-404, Loss of Decay Heat Removal ML20196F7541998-11-23023 November 1998 Rev 7 to EOP-08, LOCA Cooldown ML20196F7461998-11-23023 November 1998 Rev 6 to EOP-07, Inadequate Core Cooling ML20196F7241998-11-23023 November 1998 Rev 2 to AP-510, Rapid Power Reduction ML20196F7161998-11-23023 November 1998 Rev 9 to AP-470, Loss of Instrument Air ML20196F8711998-11-23023 November 1998 Rev 28 to AR-305, Es E Annunciator Response ML20196F9451998-11-19019 November 1998 Rev 7 to AP-1080, Refueling Canal Level Lowering ML20196F9381998-11-19019 November 1998 Rev 27 to AP-770, Emergency Diesel Generator Actuation ML20195H6581998-11-17017 November 1998 Proposed Improved Tech Specs (Its),Revising 5.7.2 by Changing Type of Structural Integrity Assessment Required from Probabilistic to Deterministic ML20196D8321998-11-13013 November 1998 Rev 1 to Crystal River Unit 3 ASME Section Xi,Isi Program Interval 3 & Ten Yr NDE Program ML20195H8761998-11-0505 November 1998 Rev 23 to AR-302, Esb Annunciator Response ML20155F4021998-10-30030 October 1998 Proposed Revised Improved Tech Specs (ITS) Section 5.6.2.19, ITS Section 3.4.11,Bases 3.4.11 & 3.4.3 Re PTLR & LTOP Limits 1999-09-02
[Table view] |
Text
,
ATTACHMENT B FLORIDA POWER CORPORATION CRYSTAL RIVER UNIT 3 DOCKET NUMBER 50-302 / LICENSE NUMBER DPR-72 REVISED BASES PAGE (STRIKEOUT AND HIGHLIGHT FONT)
Deletions are indicated by strikeout.
Additional and replacement text are indicated by shading.
bK05 DR 302 P
PDR_
AC Sources-Shutdown B 3.8.2 BAS,ES~
SURVEILLANCE SR 3.8.2.1 (continued)
REQUIREMENTS source to transfer to. SR 3.8.1.9 and SR 3.8.1.10 are also not required to be met since the ability to respond to ES bctuations in other than MODES 1. 2. 3 or 4 is not a requirement for CR-3.
i This SR is modified by a Note. ThetNOTElindicates?SRs 3.8:1.3 ?3:8.1:iB Fand 3.8.lill:are not1 required!to be serformeditoscomply-with SR' 3.8.2?11 sThe reason' for^ the lote is't6' preclude' situations'in ihidh the OPERABLE EDG would be paralleled with the offsite power network or rendered inoperable during performance of SRs.
With limited AC sources available, a single event could compromise both r
the required offsite circuit and the EDG.
It is the intent that these SRs must still be capable of being met, but I
actual performance is not required.
Refer to the Bases for LCO 3.8.1 for a discussion of each SR.
Additiohally 7the "mpact of entering the ACTIONS cf this Specification *during Surveillance testing was evaluated as part of ITS implementation and a unique situation was discovered relative to the monthly EDG testing performed as
] art of surveillance procedures SP-354A and SP-354B and the iODES and Conditions addressed by this Specification._ The EDG tear down and inspection is periodically performed during MODES 5 and 6 outages, typically taking in excez cf one month to ccm lete. Thus, it was concluded the probability of CF3 c601d! coincidentally having ha0elonly one OPERABLE EDG'dnd~be4r4 required to perform SP-354 was h49h-This created a concern since certain portions of SP-354 render the EDG inoperable, requiring entry into the ACTIONS of this Specification.
Required Action B.3 requires action be initiated immediately to restore the EDG to OPERABLE status. Thus, a situation-is-established in which SP-354 is performed, the ACTIONS are entered.
SP-354 is immediately termirated (in order to restore OPERABILITY of the EDG).
In this case. SP-354 could never be performed.
The need to perform SP-354 was evaluated in light of this concern.
It was decided that since the periods of inoperability for:: the1performdndb7afnths4 portions:6ffSP;354 associated with!SR-3.8.112~and % 8il:67were*bFief'ahd'the' SRs 3rovi'dsd"corsfidence'in the"0PERABILITY-of the EDG, the SP~siould be aerformed.
Expeditiously performing the
- 6rti.ons?oGS)-354 as~s6diated9ithlSRJ3_.871?2fandf3;811s6 during these MODES satisfies the intent f' Required' Action o
B.3 and is therefore acceptable.
For2 MODE 5Eandf6 suriefilandeitestingberformediih?accordance with,SP 354lto J
meet SR1318?l;3:willL3e 3erformed;at the1: frequency;of;SR"
- 3. 8 (123ionlylwhen ;boths E )G;trai nsfa rej operabl e F
^
-Crystal River Unit 3 B 3.8-29 Amendment No.
1 ATTACHMENT C l
FLORIDA POWER CORPORATION CRYSTAL RIVER UNIT 3 DOCKET NUMBER 50-302 / LICENSE NUMBER DPR-72 REVISED BASES PAGE (REVISION BAR FONT)
ATTACHMENT T0 llCENSE AMDENDMENT NO.
FACILITY OPERATING LICENSE NO. DPR-72 DOCKET NO. 50-302 Replace the following pages of the Appendix "A" Technical Specifications with the attached pages.
The revised pages are identified by amendment number and contain vertical lines indicating-the area of change.
Remove Replace 3.3-21 3.3-21 B 3.3-71 8 3.3-71 B 3.8-17 B 3.8-17 B 3.8-29 B 3.8-29 4
.)
AC Sources-Shutdown B 3.8.2 BAS.ES*
SURVEILLANCE SR 3.8.2.1 (continued) i REQUIREMENTS source to transfer to.
SR 3.8.1.9 and SR 3.8.1.10 are also not required to be met since the ability to respond to ES actuations in other than MODES 1, 2, 3 or 4 is not a requirement for CR-3.
This SR is modified by a Note.
The NOTE indicates SRs 3.8.1.'3, and 3.8.1.11 are not required to be 3.8.1.3 d to comply with SR 3.8.2.1.
performe The reason for the Note is to preclude situations in which the OPERABLE EDG would be paralleled with the offsite power network or rendered inoperable during erformance of SRs.
With limited AC sources available, a sin le event could compromise both the required offsite circui and the EDG.
It is the intent but that these SRs must still be capable of being met, Bases for actual performance is not required.
Refer to the LC0 3.8.1 for a discussion of each SR.
the impact of entering the ACTIONS of this l
Additionally, during Surveillance testing was evaluated as Specification part of ITS implementation and a unique situation was discovered relative to the monthly EDG testing performed as part of surveillance procedures SP-354A and SP-354B and the MODES and Conditions addressed by this Specification.
The EDG tear down and inspection is )eriodically performed T 1us it was concluded CR-3 during MODES 5 and 6 outages.
couldcoincidentallyhaveonlyonedPERABLEEDGandbe required to perform SP 354. This created a concern since certain portions of SP-354 render the EDG inoperable, requiring entry into the ACTIONS of this Srecification.
RequiredActionB.3requiresactionbeinifiatedimmediately to restore the EDG to OPERABLE status.
Thus, a situation is established in which SP-354 is performed,d (in order to the ACTIONS ere
- entered, SP-351 is immediately terminate restore OPERABILITY of the EDG).
In this case, SP 354 could never be perfermed.
The need to perform SP 354 was evaluated in light of this concern.
It was decided that since the periods of inoperability for the performance of the portions of SP-354 associated with SR 3.8.1.2 and 3.8.1.6 were brief and the SRs )rovided confidence in the OPERABILITY of the EDG, the SP siould be performed.
Expeditiously performinc the portions of SP-354 associated with SR 3.8.1.2 anc 3.8.1.6 during these MODES satisfies the intent of Required Action B.3 and is therefore acceptable.
For MODE 5 and 6 surveillance testing
)erformed in accordance with SP-354 to meet SR 3.8.1.3 will )e performed at the frequency of SR 3.8.1.3 only when both EDG trains are operable.
RLFERENCES None.
.-a Crystal River Unit 3 B 3.8-29 Amendment No.
~
.