Proposed ITS Section 3.3.8, EDG Lops, SR 3.3.8.1,revising Note for Surveillance & Deleting Note for Frequency
ML20195B708
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 05/17/1999
From:
FLORIDA POWER CORP.
To:
Shared Package
ML20195B705 List:
References
NUDOCS 9906020157
Download: ML20195B708 (6)


Text

r 1

FLORIDA POWER CORPORATION CRYSTAL RIVER UNIT 3 DOCKET NUMBER 50 302 / LICENSE NUMBER DPR-72 ATTACHMENT B l

LICENSE AMENDMENT REQUEST #250, REVISION 0 EMERGENCY DIESEL GENERATOR

LOSS OF POWER START INSTRUMENTATION l

l l

l Proposed ITS and ITS Bases Change Pages Strikeout / Shadow Format Strikeout Text indicates deleted text Shadowed text indicates added text 9906020157 990517 PDR ADOCK 05000302 P PDR I

EDG LOPS

, 3.3.8 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.3.8.1 -------------------NOTE--------------------

When EDG LOPS instrumentation is placed in an inoperable status solely for performance of this Surveillance, entry into associated Coaditions and Required Actions may be delayed es follows; (s) up tc 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for 4 the degraded veitsge ranction, and (b) up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for the-loss of voltage ranction, islnotEfequired provided the two l charnels acnitoring-the ranction for the bus are OPERACLE- cr trippeda pplicable Condition (s)Tand Requifed Actions fo'rlthe EDGsmade inoperable <by[EDC' LOPS;.are entered!

m I

___________________________._______________ l Perform CHANNEL FUNCTIONAL TEST. 31 days

)

QB NOTE -- i Not effective after November q 137-199h j 60 dsys SR 3.3.8.2 -------------------NOTE--------------------

Voltage sensors may be excluded from CHANNEL CALIBRATION.

Perform CHANNEL CALIBRATION with setpoint 18 months Allowable Value as follows:

a. Degraded voltage 2 3933 and s 3970 V with a time delay of 5.0 seconds t 0.5 seconds; and I
b. Sudden loss of voltage from full voltage to 0.0 V with a time delay of .

7.8 seconds 0.55 seconds at 0.0 V. j 1

1 4

I il i

Crystal River Unit 3 3.3-21 Amendment No. 157 )

i I

EDG LOPS B 3.3.8 BASES ACTIONS Cd (continued)

Condition C is the default Condition should Required Action A.1 or B.1 not be met within the associated Completion Time.

Required Action C.1 ensures that Required Actions for affected diesel generator inoperabilities are initiated.

Depending on MODE, the Actions specified in LCO 3.8.1, "AC Sources-Operating," or LCO 3.8.2, are required to be entered immediately.

SURVEILLANCE SR 3.3.8.1 REQUIREMENTS A CHANNEL FUNCTIONAL TEST is performed on each required EDG LOPS channel to ensure the entire channel will perform the intended function. This test ensures functionality of each 1 channel to output relays, i The Frequency of 31 days is considered reasonable based on the reliability of the components and on operating experience.

A temperary extensicn cf the frequency has been made-to indicate "31-days or 50 days" as the frequency. This temporary conditica applies tc a one-time performance-of-the surveillance en each diesel generator-end will not be effective after November 23, 1997. The need for this te,,prary extensica of the frequency becs.c evident durir,g replac acnt of the radiator cn the EOCs. This activity-had a-minimum duration of 42 days, which was in excess of the 31 day frequency. i'erformance of the-survei44ence-on One CDC wi-th-the-ether EDG inoperable because of the radiator replacement was considered as not the safest and most prudent course-of-actica. A acte has been added-to-the frequency to indicate-that-the-60-day-frequency is not effective after November 23,199h A Note has been added to allow performance of the SR without taking the ACTIONS for an-inoperable instrumentation channels 1 although during this time period the relay instrumentation  !

cannot initiate a diesel start. This allowance is based on j the assumption that the' EDG is' maintains.$ inoperable during l this functional' testiand the appropriateLactions;for .the I inoperable' EDGiare; entered.4-hours is the average time  !

required tc perfccm channel Surveillance. The-4-hour testing allowance does r.ot-significant4y-reduce-the availabiiity cf-the-ED6:

I J

l (continued) ,

i Crystal River Unit 3 B 3.3-71 AmendmentRevisioh No. 157 i

)

l FLORIDA POWER CORPORATION l l

CRYSTAL RIVF,R UNIT 3 DOCKET NUMBER 50-302 / LICENSE NUMBER DPR-72 ATTACHMENT C l

LICENSE AMENDME.NT REQUEST #250 REVISION 0 ,

EMERGENCY DIESEL GENERATOR I LOSS OF POWER START INSTRUMENTATION Proposed ITS and ITS Bases Change Pages Revision Bar Format

EDG LOPS

.. 3.3.8

! SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.3.8.1 -------------------NOTE--------------------

When EDG LOPS instrumentation is placed in an inoperable status solely for performance of this Surveillance, entry into associated Conditions and Required Actions is not required ~ provided the applicable Condition (s) and Required Actions for the EDG made inoperable by EDG LOPS are entered.

Perform CHANNEL FUNCTIONAL TEST.

31 days 1

SR 3.3.8.2 -------------------NOTE--------------------

Voltage sensors may be excluded from CHANNEL CALIBRATION.

Perform CHANNEL CALIBRATION with setpoint 18 months Allowable Value as follows:

a. Degraded voltage 2 3933 and s 3970 V with a time delay of 5.0 seconds i 0.5 seconds; and
b. Sudden loss of voltage from full i voltage to 0.0 V with a time delay of i 7.8 seconds 2 0.55 seconds at 0.0 V.

Crystal River Unit 3 3.3-21 Amendment No.

, EDG LOPS  !

," 3.3.8 l BASES.

ACTIONS C.d (continued)

Condition C is the default Condition should Required Action A.1 or B.1 not be met within the associated Completion Time.

Required Action C.1 ensures that Required Actions for affected diesel generator inoperabilities are initiated.

Depending on MODE, the Actions specified in LCO 3.8.1, "AC Sources-Operating," or LCO 3.8.2, are required to be entered immediately.

SURVEILLANCE SR 3.3.8.1 REQUIREMENTS A CHANNEL FUNCTIONAL TEST is performed on each required EDG l LOPS channel to ensure the entire channel will perform the I intended function. This test ensures functionality of each channel to output relays.

The Frequency of 31 days is considered reasonable based on the reliability of the components and on operating experience.

l A Note has been added to allow performance of the SR without taking the ACTIONS for inoperable instrumentation channels l although during this time period the relay instrumentation cannot initiate a diesel start. This allowance is based on the assumption that the EDG is maintained inoperable during this functional test and the appropriate actions for the inoperable EDG are entered.

I (continuedl Crystal River' Unit 3 B 3.3-71 Revision No.