Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20212C09616 September 1999Proposed ITS & Bases Changes Strikeout & Shadowed Text & Revision Bar Format,Increasing Licensed Capacity for Spent Fuel Assembly Storage in SFP & Revising Configuration for Storage of Fresh Fuel
ML20211L1012 September 1999Proposed Tech Specs Re Once Though SG Tube Surveillance Program,Alternate Repair Criteria (ARC) for Axial Tube End Crack (Tec) IndicationsPost Accident Monitoring
Operating Basis Earthquake
Stress corrosion cracking
ML20209D2978 July 1999Proposed Tech Specs,Changing ITS for CREVS & VFTP & Correcting Typo in ITS Section 5.6.2.12Safe Shutdown
ML20195B80926 May 1999Proposed Tech Specs,Revising ITS Bases That Will Update NRC Copies of ITSSafe Shutdown
Boric Acid
Ultimate heat sink
Offsite Dose Calculation Manual
Stroke time
Anticipated operational occurrence
Qualified Offsite Circuit
Tornado Missile Protection
Earthquake
Power Operated Valves
Offsite Circuit
Unidentified leakage
ML20195B70817 May 1999Proposed ITS Section 3.3.8, EDG Lops, SR 3.3.8.1,revising Note for Surveillance & Deleting Note for Frequency
ML20206S76912 May 1999Proposed Improved Tech Specs Pages 3.4-21 Through 3.4-21D
ML20206N14010 May 1999Proposed ITS Administrative Controls Section 5.8, High Radiation AreaHigh Radiation Area
ML20206M0967 May 1999Proposed Tech Specs,Revising Wording for SR 3.5.2.5 to Be More Consistent with NUREG-1430,Rev 1 & Clarifying Process of Valve Position Verification
ML20206H6545 May 1999Proposed Tech Specs,Proposing Alternate Repair Criteria for Axial Tube End crack-like Indications in Upper & Lower Tubesheets of CR-3 OTSGsPost Accident Monitoring
Probabilistic Risk Assessment
Operating Basis Earthquake
Finite Element Analysis
Stress corrosion cracking
Eddy Current Testing
Operational leakage
ML20204D92118 March 1999Proposed Tech Specs Re OTSG Tubes Surveillance Program,Tube Repair Roll ProcessPost Accident Monitoring
Operating Basis Earthquake
Stress corrosion cracking
Exclusive Use
Affidavit
Eddy-Current Testing
ML20202E65527 January 1999Proposed Tech Specs Re OTSG Tubes Surveillance Program,Insp Interval ExtensionOperating Basis Earthquake
ML20196D67630 November 1998Proposed Tech Specs LCO 3.9.3,allowing Both Doors in Personnel Air Locks & Single Door in Oeh to Be Open During Refueling Operations
ML20195K45524 November 1998Proposed Tech Specs,Installing diesel-driven EFW Pump to Remove Interim ITS & Provide Resolution to EDG Capacity Limitations
ML20195K00323 November 1998Proposed Tech Specs Re LAR Number 241,rev 0 for High Pressure Injection Sys Mods
ML20195H65817 November 1998Proposed Improved Tech Specs (Its),Revising 5.7.2 by Changing Type of Structural Integrity Assessment Required from Probabilistic to Deterministic
ML20155F45030 October 1998Proposed Revised Improved Tech Specs (ITS) Deleting Note Re Number of Required Channels for Degrees of Subcooling Function & Subdividing Core Exit Temp Function Into Two New Functions in ITS Table 3.3.17-1Post Accident Monitoring
Manual Operator Action
ML20155F40230 October 1998Proposed Revised Improved Tech Specs (ITS) Section 5.6.2.19, ITS Section 3.4.11,Bases 3.4.11 & 3.4.3 Re PTLR & LTOP LimitsUnanalyzed Condition
Hydrostatic
Pressure and Temperature Limits Report
ML20155F95530 October 1998Proposed Tech Specs Pages to LAR 245,changing Methodology for Sf Pool B Criticality Analysis
ML20154P31016 October 1998Proposed Tech Specs Resolving USQ by Leaving Valves DHV-34 & DHV-35 Normally Closed
ML20154C15830 September 1998Proposed Tech Specs Pages Re LAR 238,to Correct RCS Leakage Detection Capability of RB Atmosphere Gaseous Radioactivity Monitor Described in ITS Bases & FSARUnidentified leakage
ML20238F47631 August 1998Proposed Tech Specs,Proposing New Repair Process for Plant OTSGsPost Accident Monitoring
Operating Basis Earthquake
Stress corrosion cracking
Earthquake
Eddy-Current Testing
ML20151X04331 August 1998Proposed Tech Specs Adding Three Addl Reg Guide 1.97 Type a Category 1 Pami Variables & One Type B Category 1 Pami Variable to ITS Table 3.3.17-1, PamiPost Accident Monitoring
ML20236V88330 July 1998Proposed Tech Specs Pages Re CREVS & Ventilation Filter Test ProgramSafe Shutdown
ML20236E98530 June 1998Proposed Tech Specs Re Exigent License Amend Request 228,rev 1 for Once Through SG Tube Surveillance ProgramOperating Basis Earthquake
Stress corrosion cracking
ML20249B26718 June 1998Proposed Tech Specs Pages Re one-time Exigent License Amend to Allow Operation W/Number of Indications Previously Identified as Tube End Anomalies & Multiple Tube End Anomalies in OTSG TubesOperating Basis Earthquake
Stress corrosion cracking
ML20247P89322 May 1998Proposed Improved Tech Specs 5.2.1 Re Onsite & Offsite Organizations
ML20217P51828 April 1998Proposed Tech Specs Re Reactor Coolant Pump Motor Flywheel Insp
ML20217G01223 April 1998Proposed Improved Tech Specs Section 5.7.2, Special Repts, Clarifying That Complete Results of OTSG Tube Inservice Insp Shall Be Submitted to NRC 90 Days After Startup (Breaker Closure)Post Accident Monitoring
Operating Basis Earthquake
ML20217C63420 March 1998Proposed Tech Specs Re Editorial Changes to Improved TS Saftey Limits & Administrative Controls to Replace Titles of Senior Vice President,Nuclear Operations & Vice President, Nuclear Production W/Position of Chief Nuclear OfficerUnanalyzed Condition
ML20217C49320 March 1998Proposed Improved Tech Specs 5.6.2.8.c Re Reactor Coolant Pump Motor Flywheel Insp
ML20203D16120 February 1998Proposed Tech Specs,Providing Revs to CR-3 Improved TS Bases That Update NRC Copies of Improved TSSafe Shutdown
Boric Acid
Reactor Vessel Water Level
High Radiation Area
Ultimate heat sink
Stroke time
Anticipated operational occurrence
Post Accident Monitoring
Qualified Offsite Circuit
Tornado Missile Protection
Earthquake
Pressure Boundary Leakage
Offsite Circuit
Power change
Unidentified leakage
Manual Operator Action
Operational leakage
ML20198S91522 January 1998Proposed Tech Specs Consisting of Rev 1 to TS Change Request 210,correction of Typo & Addition of FootnotesUltimate heat sink
Earthquake
Offsite Circuit
Power change
Manual Operator Action
ML20202G8515 December 1997Proposed Tech Specs Establishing New Improved TSs (ITS) Surveillance Requirement for Performance of Periodic Integrated Leak Test of Cche Boundary & Revising ITS Bases 3.7.12 to Define Operability of CcheSafe Shutdown
Loop seal
ML20202G7995 December 1997Proposed Tech Specs Revising Description of Starting Logic for RB Recirculation Sys Fan Coolers to Ensure That Only One RB Fan Starts on Es RB Isolation & Cooling Signal
ML20199G84621 November 1997Proposed Tech Specs Pages Involving Additional Restrictions, Editorial Clarifications & Typos
ML20212F27431 October 1997Proposed Tech Specs Pages Re Decay Heat Removal Requirements in Mode 4
ML20212C98025 October 1997Proposed Tech Specs Re Power Operated Relief Valve Lift Setpoint TS Limit That Has Been Revised for Instrument Uncertainty
ML20217F5234 October 1997Proposed Tech Specs Pages Addressing Revision to Description of Electrical Controls for Operating Reactor Building (RB) Recirculation Sys fan/cooler,AHF-IC,as Discussed in FSAR & Improved TS
ML20217D2741 October 1997Proposed Tech Specs Adding Methodology to Monitor first-span Intergranular Attack (Iga) Indications & Disposition Growth During Future B OTSG Eddy Current ExamsPost Accident Monitoring
Operating Basis Earthquake
Stress corrosion cracking
ML20210T97712 September 1997Proposed Tech Specs Replacement Pages Re New Improved TS 3.4.11 Re Low Temp Overpressure Protection SysAnticipated operational occurrence
ML20216F8489 September 1997Proposed Tech Specs Re Analysis Rev for Makeup Sys Letdown Line Failure Accident as Discussed in FSAR
ML20217Q21226 August 1997Proposed Tech Specs Changing Design Basis of EDG Air Handling SysAnticipated operational occurrence
Overspeed trip
ML20217N25020 August 1997Proposed Improved Tech Specs 5.6.2.10 Re Tube Surveillance
ML20210K89216 August 1997Proposed Tech Specs 3.8.1.3,requesting one-time Outage on Each EDG to Perform Necessary Mod & MaintOffsite Circuit
ML20151L7544 August 1997Proposed Tech Specs Extending Frequency of EDG Surveillances During Period of Time CR-3 EDGs Are Being Modified
ML20196J14329 July 1997Proposed Tech Specs Adding EDG Kilowatt Indication to post- Accident Monitoring Instrumentation to Support CR-3 Restart Issue of EDG Load MgtSafe Shutdown Earthquake
Post Accident Monitoring
ML20196H02818 July 1997Proposed Tech Specs Changes Establishing Requirements for Low Temperature Overpressure Protection Sys
ML20148K78114 June 1997Proposed Tech Specs Re Efw,Hpi,Emergency Feedwater Initiation & Control SysSafe Shutdown
Anticipated operational occurrence
Earthquake
Offsite Circuit
Power change
Overspeed trip
Manual Operator Action
ML20138H8781 May 1997Proposed Tech Specs Replacing Prescriptive Requirements of 10CFR50,App J,Option a w/performance-based Approach to Leakage Testing Contained in 10CFR50,App J,Option BHigh Radiation Area
Stroke time
ML20137X53618 April 1997Proposed Tech Specs,Providing Revs to CR-3 Improved TS Bases That Update NRC Copies of Improved TSSafe Shutdown
Unanalyzed Condition
Boric Acid
Reactor Vessel Water Level
High Radiation Area
Stroke time
Anticipated operational occurrence
Post Accident Monitoring
Fuel cladding
Pressure Boundary Leakage
Power change
Unidentified leakage
Manual Operator Action
Operational leakage
Loss of condenser vacuum