Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20212C096 | 16 September 1999 | Proposed ITS & Bases Changes Strikeout & Shadowed Text & Revision Bar Format,Increasing Licensed Capacity for Spent Fuel Assembly Storage in SFP & Revising Configuration for Storage of Fresh Fuel | |
ML20211L101 | 2 September 1999 | Proposed Tech Specs Re Once Though SG Tube Surveillance Program,Alternate Repair Criteria (ARC) for Axial Tube End Crack (Tec) Indications | Post Accident Monitoring Operating Basis Earthquake Stress corrosion cracking |
ML20209D297 | 8 July 1999 | Proposed Tech Specs,Changing ITS for CREVS & VFTP & Correcting Typo in ITS Section 5.6.2.12 | Safe Shutdown |
ML20195B809 | 26 May 1999 | Proposed Tech Specs,Revising ITS Bases That Will Update NRC Copies of ITS | Safe Shutdown Boric Acid Ultimate heat sink Offsite Dose Calculation Manual Stroke time Anticipated operational occurrence Qualified Offsite Circuit Tornado Missile Protection Earthquake Power Operated Valves Offsite Circuit Unidentified leakage |
ML20195B708 | 17 May 1999 | Proposed ITS Section 3.3.8, EDG Lops, SR 3.3.8.1,revising Note for Surveillance & Deleting Note for Frequency | |
ML20206S769 | 12 May 1999 | Proposed Improved Tech Specs Pages 3.4-21 Through 3.4-21D | |
ML20206N140 | 10 May 1999 | Proposed ITS Administrative Controls Section 5.8, High Radiation Area | High Radiation Area |
ML20206M096 | 7 May 1999 | Proposed Tech Specs,Revising Wording for SR 3.5.2.5 to Be More Consistent with NUREG-1430,Rev 1 & Clarifying Process of Valve Position Verification | |
ML20206H654 | 5 May 1999 | Proposed Tech Specs,Proposing Alternate Repair Criteria for Axial Tube End crack-like Indications in Upper & Lower Tubesheets of CR-3 OTSGs | Post Accident Monitoring Probabilistic Risk Assessment Operating Basis Earthquake Finite Element Analysis Stress corrosion cracking Eddy Current Testing Operational leakage |
ML20204D921 | 18 March 1999 | Proposed Tech Specs Re OTSG Tubes Surveillance Program,Tube Repair Roll Process | Post Accident Monitoring Operating Basis Earthquake Stress corrosion cracking Exclusive Use Affidavit Eddy-Current Testing |
ML20202E655 | 27 January 1999 | Proposed Tech Specs Re OTSG Tubes Surveillance Program,Insp Interval Extension | Operating Basis Earthquake |
ML20196D676 | 30 November 1998 | Proposed Tech Specs LCO 3.9.3,allowing Both Doors in Personnel Air Locks & Single Door in Oeh to Be Open During Refueling Operations | |
ML20195K455 | 24 November 1998 | Proposed Tech Specs,Installing diesel-driven EFW Pump to Remove Interim ITS & Provide Resolution to EDG Capacity Limitations | |
ML20195K003 | 23 November 1998 | Proposed Tech Specs Re LAR Number 241,rev 0 for High Pressure Injection Sys Mods | |
ML20195H658 | 17 November 1998 | Proposed Improved Tech Specs (Its),Revising 5.7.2 by Changing Type of Structural Integrity Assessment Required from Probabilistic to Deterministic | |
ML20155F450 | 30 October 1998 | Proposed Revised Improved Tech Specs (ITS) Deleting Note Re Number of Required Channels for Degrees of Subcooling Function & Subdividing Core Exit Temp Function Into Two New Functions in ITS Table 3.3.17-1 | Post Accident Monitoring Manual Operator Action |
ML20155F402 | 30 October 1998 | Proposed Revised Improved Tech Specs (ITS) Section 5.6.2.19, ITS Section 3.4.11,Bases 3.4.11 & 3.4.3 Re PTLR & LTOP Limits | Unanalyzed Condition Hydrostatic Pressure and Temperature Limits Report |
ML20155F955 | 30 October 1998 | Proposed Tech Specs Pages to LAR 245,changing Methodology for Sf Pool B Criticality Analysis | |
ML20154P310 | 16 October 1998 | Proposed Tech Specs Resolving USQ by Leaving Valves DHV-34 & DHV-35 Normally Closed | |
ML20154C158 | 30 September 1998 | Proposed Tech Specs Pages Re LAR 238,to Correct RCS Leakage Detection Capability of RB Atmosphere Gaseous Radioactivity Monitor Described in ITS Bases & FSAR | Unidentified leakage |
ML20238F476 | 31 August 1998 | Proposed Tech Specs,Proposing New Repair Process for Plant OTSGs | Post Accident Monitoring Operating Basis Earthquake Stress corrosion cracking Earthquake Eddy-Current Testing |
ML20151X043 | 31 August 1998 | Proposed Tech Specs Adding Three Addl Reg Guide 1.97 Type a Category 1 Pami Variables & One Type B Category 1 Pami Variable to ITS Table 3.3.17-1, Pami | Post Accident Monitoring |
ML20236V883 | 30 July 1998 | Proposed Tech Specs Pages Re CREVS & Ventilation Filter Test Program | Safe Shutdown |
ML20236E985 | 30 June 1998 | Proposed Tech Specs Re Exigent License Amend Request 228,rev 1 for Once Through SG Tube Surveillance Program | Operating Basis Earthquake Stress corrosion cracking |
ML20249B267 | 18 June 1998 | Proposed Tech Specs Pages Re one-time Exigent License Amend to Allow Operation W/Number of Indications Previously Identified as Tube End Anomalies & Multiple Tube End Anomalies in OTSG Tubes | Operating Basis Earthquake Stress corrosion cracking |
ML20247P893 | 22 May 1998 | Proposed Improved Tech Specs 5.2.1 Re Onsite & Offsite Organizations | |
ML20217P518 | 28 April 1998 | Proposed Tech Specs Re Reactor Coolant Pump Motor Flywheel Insp | |
ML20217G012 | 23 April 1998 | Proposed Improved Tech Specs Section 5.7.2, Special Repts, Clarifying That Complete Results of OTSG Tube Inservice Insp Shall Be Submitted to NRC 90 Days After Startup (Breaker Closure) | Post Accident Monitoring Operating Basis Earthquake |
ML20217C634 | 20 March 1998 | Proposed Tech Specs Re Editorial Changes to Improved TS Saftey Limits & Administrative Controls to Replace Titles of Senior Vice President,Nuclear Operations & Vice President, Nuclear Production W/Position of Chief Nuclear Officer | Unanalyzed Condition |
ML20217C493 | 20 March 1998 | Proposed Improved Tech Specs 5.6.2.8.c Re Reactor Coolant Pump Motor Flywheel Insp | |
ML20203D161 | 20 February 1998 | Proposed Tech Specs,Providing Revs to CR-3 Improved TS Bases That Update NRC Copies of Improved TS | Safe Shutdown Boric Acid Reactor Vessel Water Level High Radiation Area Ultimate heat sink Stroke time Anticipated operational occurrence Post Accident Monitoring Qualified Offsite Circuit Tornado Missile Protection Earthquake Pressure Boundary Leakage Offsite Circuit Power change Unidentified leakage Manual Operator Action Operational leakage |
ML20198S915 | 22 January 1998 | Proposed Tech Specs Consisting of Rev 1 to TS Change Request 210,correction of Typo & Addition of Footnotes | Ultimate heat sink Earthquake Offsite Circuit Power change Manual Operator Action |
ML20202G851 | 5 December 1997 | Proposed Tech Specs Establishing New Improved TSs (ITS) Surveillance Requirement for Performance of Periodic Integrated Leak Test of Cche Boundary & Revising ITS Bases 3.7.12 to Define Operability of Cche | Safe Shutdown Loop seal |
ML20202G799 | 5 December 1997 | Proposed Tech Specs Revising Description of Starting Logic for RB Recirculation Sys Fan Coolers to Ensure That Only One RB Fan Starts on Es RB Isolation & Cooling Signal | |
ML20199G846 | 21 November 1997 | Proposed Tech Specs Pages Involving Additional Restrictions, Editorial Clarifications & Typos | |
ML20212F274 | 31 October 1997 | Proposed Tech Specs Pages Re Decay Heat Removal Requirements in Mode 4 | |
ML20212C980 | 25 October 1997 | Proposed Tech Specs Re Power Operated Relief Valve Lift Setpoint TS Limit That Has Been Revised for Instrument Uncertainty | |
ML20217F523 | 4 October 1997 | Proposed Tech Specs Pages Addressing Revision to Description of Electrical Controls for Operating Reactor Building (RB) Recirculation Sys fan/cooler,AHF-IC,as Discussed in FSAR & Improved TS | |
ML20217D274 | 1 October 1997 | Proposed Tech Specs Adding Methodology to Monitor first-span Intergranular Attack (Iga) Indications & Disposition Growth During Future B OTSG Eddy Current Exams | Post Accident Monitoring Operating Basis Earthquake Stress corrosion cracking |
ML20210T977 | 12 September 1997 | Proposed Tech Specs Replacement Pages Re New Improved TS 3.4.11 Re Low Temp Overpressure Protection Sys | Anticipated operational occurrence |
ML20216F848 | 9 September 1997 | Proposed Tech Specs Re Analysis Rev for Makeup Sys Letdown Line Failure Accident as Discussed in FSAR | |
ML20217Q212 | 26 August 1997 | Proposed Tech Specs Changing Design Basis of EDG Air Handling Sys | Anticipated operational occurrence Overspeed trip |
ML20217N250 | 20 August 1997 | Proposed Improved Tech Specs 5.6.2.10 Re Tube Surveillance | |
ML20210K892 | 16 August 1997 | Proposed Tech Specs 3.8.1.3,requesting one-time Outage on Each EDG to Perform Necessary Mod & Maint | Offsite Circuit |
ML20151L754 | 4 August 1997 | Proposed Tech Specs Extending Frequency of EDG Surveillances During Period of Time CR-3 EDGs Are Being Modified | |
ML20196J143 | 29 July 1997 | Proposed Tech Specs Adding EDG Kilowatt Indication to post- Accident Monitoring Instrumentation to Support CR-3 Restart Issue of EDG Load Mgt | Safe Shutdown Earthquake Post Accident Monitoring |
ML20196H028 | 18 July 1997 | Proposed Tech Specs Changes Establishing Requirements for Low Temperature Overpressure Protection Sys | |
ML20148K781 | 14 June 1997 | Proposed Tech Specs Re Efw,Hpi,Emergency Feedwater Initiation & Control Sys | Safe Shutdown Anticipated operational occurrence Earthquake Offsite Circuit Power change Overspeed trip Manual Operator Action |
ML20138H878 | 1 May 1997 | Proposed Tech Specs Replacing Prescriptive Requirements of 10CFR50,App J,Option a w/performance-based Approach to Leakage Testing Contained in 10CFR50,App J,Option B | High Radiation Area Stroke time |
ML20137X536 | 18 April 1997 | Proposed Tech Specs,Providing Revs to CR-3 Improved TS Bases That Update NRC Copies of Improved TS | Safe Shutdown Unanalyzed Condition Boric Acid Reactor Vessel Water Level High Radiation Area Stroke time Anticipated operational occurrence Post Accident Monitoring Fuel cladding Pressure Boundary Leakage Power change Unidentified leakage Manual Operator Action Operational leakage Loss of condenser vacuum |