a FLONDA POWER CORPORATION CRYSTAL RIVER UNIT 3 DOCKET NUMBER 50-302/ LICENSE N: UMBER DPR-72 ATTACHMENT B Replacement ITS Pages 3.4-21 through 3.4-21D gr= ary;

E. *

( .

LTOP Systsm

., 3 4.11 3.4. REACTOR COOLANT. SYSTEM (RCS)

-3.4.11 Low Temperature 0verpressure ?rotection (LTOP) System LCO 3.4.11 An LTOP System shall be OPERABLE with a maximum of one makeup pump capable of injecting into the RCS, high pressure injection (HPI) deactivated, the core flood tanks (CFTs) isolated and:

a. Pressurizer level s 155 inches and an CPERAGLE power l operated relief valve (PORV) with a lift setpoint of s 454 psig; or l
b. .The RCS depressurized and an RCS vent of 2 0.75 square inch.

APPLICABILITY: MODE 4 when. RCS temperature is s 264*F, l MODE 5, MODE 6 when the reactor vessel head is not completely detensioned.


NOTE---------------------------------

CFT isolation is only required when CFT pressure is greater than or equal to the maximum RCS pressure for the existing RCS temperature allowed by the pressure and temperature limit curves provided in the PTLR.

l E.

Crystal River Unit 3 3.4-21 Amendment No.

l LTOP System i

, 3.4.11 ACTIONS -

CONDITION REQUIRED ACTION COMPLETION TIME A. More than one makeup A.1 --------NOTE-----------

pump capable of Two makeup pumps may be injecting into the capable of injecting RCS. into the RCS during pump swap operation for s 15 minutes.  ;

Initiate action to Immediately verify only one makeup pump is capable of injecting into the RCS.

B. HPI capable of B.1 Initiate action to Immediately actuation. verify HPI deactivated.

C. A CFT not isolated C.1 Isolate affected CFT. 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> when CFT pressure is greater than or equal to the maximum RCS pressure for existing temperature allowed in the PTLR.

l D. Required Action C.1 D.1 Increase RCS 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> l not met within the temperature to > 208 F. l required Completion .

Time. gg j D.2 Depressurize affected CFT to < 454 psig. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> l E. Pressurizer level E.1 Restore pressurizer 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />

> 155 inches. level to s 155 inches. l .l (continued)

Crystal River Unit 3 3.4-21A Amendment No.

p-

[: '

LTOP System 3.4.11

[-

' ACTIONS -(continued)

CONDITION REQUIRED ACTION COMPLETION TIME F._ Required Action E.1- F.1 Close and maintain 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />

~not met within.the closed the makeup required Completion control valve and its.

Time. associated isolation valve.

ANQ F.2 Stop RCS heatup. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> G. PORV inoperable. G.1 Restore'PORV to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> OPERABLE status.

H. Required Action G.1 H.1 Reduce makeup tank 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> not met within the level tn s 88 inches.

required Completion-Time. AND H.2 Deactivate low low 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />

- makeup tank level interlock to the borated water storage tank suction valves.

I. Pressurizer level I.1 Restore LTOP System to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />

> 155 inches. OPERABLE status. l ANQ QB

.PORV' inoperable. I.2 Depressurize RCS and 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> establish RCS vent of QB 2 0.75 square inch.

LTOP. System inoperable for any reason other than Condition A l through Condition H. l

)

l l

l 1

Crystal River Unit 3 3.4-21B Amendment No.

I

i F.

  • L.

LTOP System

_, 3.4.11 l 1

i l

SURVEILLANCE REQUIREMENTS  !

i SURVEILLANCE FREQUENCY l SR 3.4.11.1 Verify a maximum of one makeup pump is 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> l capable of injecting into the RCS. I 4

SR 3.4.11.2 Verify HPI is deactivated. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> l SR 3.4.11.3 --------------NOTE-------------- l only required to be performed l when CFT isolation is required j i

I Verify each CFT isolation 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> valve is closed and deactivated.

SR 3.4.11.4 --------------NOTE-------------- 30 minutes l Not required to be performed during RCS when complying with LCO 3.4.11.b heatup and )

cooldown' I Verify pressurizer level is AND s 155 inches. l 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> i

SR 3.4.11.5 --------------NOTE--------------

Not required to be performed when complying with LCO 3.4.11.b l Verify PORV block valve is open. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SR 3.4.11.6 --------------NOTE--------------

Only required when complying with LCO 3.4.11.b.

Verify RCS vent 2 0.75 square inch 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> for is open. unlocked vent opening (s)

AND 31 days for locked vent opening (s)

(continued)

Crystal River Unit 3 3.4-21C Amendment No. I

LTOP System l _ ,'

3.4.11 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.4.11.7 Perform CHANNEL FUNCTIONAL TEST for Within 12 PORV. hours before or after decreasing RCS temperature to s 264 F l AND 31 days thereafter SR 3.4.11.8 Perform CHANNEL CALIBRATION for PORV. 24 months SR 3.4.11.9 --------------NOTE----------------

Not required to be performed when-

-complying with LCO 3.4.11.b Verify PORV is selected to the low range 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> setpoint.

Crystal River Unit 3 3.4-21D Amendment No.