Rev 23 to AR-302, Esb Annunciator Response
ML20195H876
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 11/05/1998
From:
FLORIDA POWER CORP.
To:
References
AR-302, NUDOCS 9811240136
Download: ML20195H876 (66)


Text

{{#Wiki_filter:. . - . - ~ . , . .. -.--... - - . . - ~ . . - . . - . . I' i i l ! Document Transmittal #: 107289 Date: 11/10/98 To: NRC (DC DESK) MAC: N/A Holder #: 1242 i !- Destination:

Description:

l Copy Totals l Document: Revision: Comment: INFO CNTL MSTR

. i AR0302 23 1 0 0 l

l 1 i l

                                                                                                                                   ./

Instructions to the Addressee: Please verify the document (s) received agrees with the above information. Engineering managers are required by NEP-121 to determine if new, revised, or temporary changes to procedures affect job functions of their personnel. Managers will communicate change information appropriately and provide documentation of any training conducted to the Engineering Training Coordinator. Operations department must attach old document (s) or portions of document (s) superseded by the above to this transmittal. The signature indicates acknowledgment of receipt of the above document (s) and that documents have been updated. Return signed and dated transmittal to Document Control within 15 working days of transmittal date to mail code: NA1C D f Florida Power Corporation

i. Document Control, NA1C Crystal River Energy Complex 3

1s76o W. Power Line st. p

  • t' Crystal River, FL 34428-6708
              , ' . - -- (} g ,

[.

  . Signature of Addressee:                                                            Date:

9811240136 981105 '*' 9 PDR-F ADOCK 05000302 pg

l l 1 j-f Rev. 23 l Effective Date //d-I i i i i ANNUNCIATOR RESPONSE l

                                                                                                                                          ]

i AR-302 l FLORIDA POWER CORPORATION l CRYSTAL RIVER UNIT 3 l EES ANNUNCIATOR RESPONSE l l l 1 l t APPROVED BY: Procedure Owner Y ( OGfw08 ust) (SIbNATUR'E DN FIL'E) , , \.s DATE: //!O h l, PROCEDURE OWNER: Manager, Nuclear Plant Operations Support-F

    -   -  -   .-     .   -.      .- ...           .... . -              ..~ - . - . . - _ -                  . - . --                   . . . . -      - . . - .

l'r' TABLE OF CONTENTS I t \ 1 SECTION PAGE 1.0 PURP0SE................................................................. 1 1' l

2.0 REFERENCES

.............................................................. 1 1 2.1 IMPLEMENTING REFERENCEJ............................................. 1 , 2 . 2 DEVE LOPMENTAL REFERENG5. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 l 3.0 PERSONNEL IND0CTRINATIQN................................................ 1 l 4.0 INSTRUCTIONS............................................................ 2 5 . 0 FO L LOW- UP ACTI0N S . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 ENCLOSURE l 1 An n u n ci ato r R e s po n s e . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 l 4 l 1

  }

t

  't l                                                                                                                                                                   l l

l l l l l I 4 i O \ s T v ). I, i l l AR-302 Rev. 23 Page i

                                                                                       -g       r

J 1.0 PURPOSE 1.1 Establish a reference document for each Annunciator Window on the 4 ES (A)-KW2 Lampbox. 1.2 Establish operator actions for valid Annunciator alarms on the , ES (A)-KW2 Lampbox.  ! 1.3 Establish a reference to other. procedures which address operator actions for valid Annunciator alarms on the ES(A)-KW2 Lampbox.

   ~                      ~

f~0 REFERINCES  ! 2.1 IMPLEMENTING REFERENCES 4 , 2.1.1 AP 404, Loss of Decay Heat Removal 2.1.2 OP-608, OTSGs and Main Steam Systems 2.1.3 OP-402, Makeup and Purification Systems 2.1.4 AR-901, DG 'A' Annunciator Response 2.1.5 OP-401, Core F'lood System  ! 2.1.6 AP-770, Emergency Diesel Generator Actuation 2.1.7 OP-707, Operation of the ES Emergency Diesel Generators l 1 2.1.8 OP-703, Plant Distribution System  ; 2.1.9 OP-417, Containment Operating Procedure 2.1.10 EM-308, Post Accident Monitoring of the Reactor Building Atmosphere using the Containment Hydrogen Monitoring System 2.2 DIVELOPMENTAL REFERENCES 2.2.1 INPO 90-021, Good Dractice OP-217, Alarm Response Procedures 2.2.2 Annunciator Window Engraving Drawing E-224-048 l 4

           -2.2.3   MAR 94-07-07-01, CFT Level Setpoint 3.0     PERSONNEL INDOCTRINATION
     . f'%

3.1 The Annunciator Syr. tem is powered from VBDP-5 Breaker 28. AR-302 Rev. 23 Page 1

l I i t. D . 4.0 INSTRUCTIQNS l

i. l l-4.1- l Respond to alarms on the ES(A)-KW2 Lampbox as indicated on Enclosure 1 Annunciator Response.

, ) 5.0 ' FOLLOW-UP ACTIONS 1 None i i l 1 l l 0 t-l l l, I L t-j i I l' l I-t l P i i i i , i I t i= gr AR-302- Rev. 23 Page 2

            -             _ - .        _ _ _ .-._ .~._ .- - -.-_ . _ ._ - -                             ..       _- _. .                          . . . . . . . .        . . . _ . . . _ . . . ,

ENCLOSURE _1 (Page 1 of 61) j l ESB ANNUNCIATOR RESPONSE ESA-KW2-01-01 B-01-01 p_______ l RB SPRAY l ES A l ACTUATION l l l l

                                                                  -EVENT-POINT-0935                             '

INDICATED CONDITION: 1 o REACTOR BUILDING PRESSURE IS E30 PSIG AS SENSED BY WO OUT OF THREE RB PRESSURE SWITCHES (BS-18/19/20-PS) REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o ES STATUS LIGHTS FOR RB SPRAY o BUILDING SPRAY FUMP IS RUNNING IF AN RB SPRAY PERMISSIVE IS PRESENT , O 'o RB PRESSURE CONTROL BOARD INDICATOR BS-90-PI, BS-16-PI

  \   /-        o COMPUTER POINT P-254 OPERATOR ACTIONS FOR A VALID ALARM:

o REFER TO E0P DISCUSSION: o HPI ACTUATION THROUGH BLOCK 6 WILL GIVE A BUILDING SPRAY PERMIT o 30 PSIG RB PRESSURE BI-STABLE WILL TRIP AT 2 24.5 +/- 1.4 PSIG

REFERENCES:

DRAWIl!G 208-028 SHEET ESA-70 SENSING ELEMENT: 63-Z1/RB-4,RB-5,RB-6 ES ACTUATION RELAYS, BS-18-PS, BS-19-PS, AND BS-20-r0 l AR-302 Rev. 23 Page 3

ENCLOSURE 1 (Page 2 of 61) v] [ ESB ANNUNCIATOR RESPONSE ESA-KW2-01-02 B-01-02 RB SPRAY PP A TRIP i EVENT-POINT-0044 I INDICATED CONDITION: o BSP-1A BREAKER IS OPEN WITH CONTROL HANDLE IN THE NORMAL AFTER START

              . POSITION.

REDUNDANT, INDICATION WHICH WILL VERIFY ALARM: o GREEN LIGHT ON WITH A RED FLAG ON BSP-1A CONTROL STATION o ES STATUS LIGHT OPERATOR ACTIONS FOR A VALID ALARM: o DETERMINE CAUSE OF BREAKER TRIP o CHECK BREAKER FOR DROP TARGET INDICATORS DISCUSSION: REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS.

REFERENCES:

DRAWING 208-009 SHEET BS-01

         . SENSING ELEMENT: CS/SC, CS/0 (CONTROL SWITCH CONTACTS) 525, 52H I

A V l JAR-302 Rev. 23 Page 4

l ENCLOSURE 1 ! (Page 3 of 61) l ESB ANNUNCIATOR RESPONSE ESA-KW2-01-03 8-01-03 l 4 RB SPRAY PP A > MOTOR l- OVERLOAD l l EVENT-POINT-0059 I INDICATED CONDITION: o MOTOR AMPS 1115% RATED LOAD REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o HIGH BUILDING SPRAY FLOW AS SEEN ON BS-1-FIl o HIGH MOTOR AMPS

  ~ /N   o BSP-1A TRIP-N.

1 OPERATOR ACTIONS FOR A VALID ALARM: o REDUCE BS FLOW BY THROTTLING BSV-3 CLOSED o HAVE BREAKER CUBICLE CHECKED FOR DROPPED TARGETS o IF LOAD REMAINS HIGH ON BSP-1A CONSIDER TRIPPING BSP-1A DISCUSSION: THIS ALARM INDICATES THAT EITHER THE TIMED OVERCURRENT OR INSTANTANEOUS OVERCURRENT PROTECTIVE DEVICES HAVE ACTUATED. INSTANTANEOUS OVERCURRENT PROTECTIVE RELAY ACTUATION WILL TRIP THE BREAKER. 1 IT IS POSSIBLE TO HAVE THIS ALARM PRIOR TO THE BREAKER TRIP.  ;

REFERENCES:

DRAWING 208-009 SHEET BS-01 SENSING ELEMENT: 51-IOC (INSTANTANEOUS) 51-TOC (TIMED) BREAKER CONTACTS I l v AR-302 Rev. 23 Page 5

ENCLOSURE 1 (Pagn 4 of 61) l

  .gw                    ESB ANNUNCIATOR RESPONSE                  ESA-KW2-01-04              B-01-04
   \

l RB SPRAY PP A OUT OF SERVICE l u- --- - - EVENT-POINT-0043 . INDICATED CONDITION: o BSP-1A BREAKER IS RACKED OUT REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o NO INDICATING LIGHTS ON CONTROL STATION o NO ES STATUS INDICATION

    /*

1 L-OPERATOR ACTIONS FOR A VALID ALARM: o INVESTIGATE THE CAUSE FOR BREAKER BEING RACKED OUT DISCUSSION: ADDRESS TS ADMINISTRATIVE REQUIREMENTS CONCERNING TilIS CONDITION l

REFERENCES:

DRAWING 208-009 SHEET BS-01 SENSING ELEMENT: 52-H BREAKER CONTACT r%. l

           -AR-302                                Rev. 23                                         Page 6 i

(-

l ENCLOSURE 1 1 (Paga 5 of 61) ESB ANNUNCIATOR RESPONSE ESA-KW2-01-04 B-01-04 i 1 RB SPRAY PP A  ; OUT OF SERVICE EVENT-POINT-0061-l INDICATED CONDITION: o BSP-1A BREAKER HAS NO DC CONTROL POWER j REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o NO INDICATING LIGHTS ON CONTROL STATION l o ES STATUS LIGHTS INDICATE BREAKER POSITION OPERATOR ACTIONS FOR A VALID ALARM: o VERIFY BSP-1A BREAKER DC KNIFE SWITCH IS CLOSED o VERIFY DPDP-5A SWITCH 10 IS CLOSED DISCUSSION: l THIS CONDITION DISABLES REMOTE BREAKER OPERATION AND PROTECTIVE RELAYING. REFER TO OP-703 FOR INSTRUCTIONS ON LOCAL BREAKER OPERATION. THIS IS AN EXPECTED ALARM FOR BREAKER TAGGING OPERATIONS. REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS.

REFERENCES:

DRAWING 208-009 SHEET BS-01 SENSING ELEMENT: 27C BREAKER RELAY i i I AR-302' Rev. 23 Page 7

ENCLOSURE 1 (Page 6 of 61) l ESB ANNUNCIATOR RESPONSE ESA-KW2-01-05 B-01-05 l RB SPRAY A FLOW i HIGH/ LOW EVENT-POINT--0047 - l INDICATED CONDITION: l o BUILDING SPRAY FLOW IS 51400 GPM AS MEASURED BY BS-1-FS1 FOR 30 SEC. COINCIDENT WITH AN ES ACTUATION l REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o RB SPRAY FLOW INDICATOR BS-1-FIl OR INDICATOR ON BSV-3 CONTROLLER , OPERATOR ACTIONS FOR A VALID ALARM: o VERIFY PROPER OPERATION OF BSV-3, OPEN BSV-3 AS REQUIRED o VERIFY BSP-1A NOT TRIPPED DISCUSSION: THE NORMAL BUILDING SPRAY PUMP FLOW DURING AN ES ACTUATION IS 1500 GPM. TAKING LOCAL / AUTO CONTROL OF BSV-3 WILL ALLOW THE OPERATOR TO USE THE THUMBWHEEL ON THE VALVE CONTROLLER TO SET THE FLOW RATE. IF THIS DOES NOT WORK, THEN MANUAL CONTROL OF THE VALVE SHOULD BE ATTEMPTED FROM THE CONTROL BOARD STATION.

REFERENCES:

DRAWING 208-009 SHEET BS-11 SENSING ELEMENT: BS-1-FS1 l i b:n

            -AR-302-                                    Rev. 23                                     Page 8

l ENCLOSURE 1 (Page 7 of 61) a ESS ANNUNCIATOR RESPONSE j ESA-KW2-01-05 B-01-05 i 1 l RB SPRAY A FLOW ) HIGH/ LOW l EVENT-POINT-0049 INDICATED CONDITION: o BUILDING SPRAY FLOW IS 1 1700 GPM AS MEASURED BY BS-1-FS1. REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o RB SPRAY. FLOW INDICATOR 85-1-FIl OR INDICATOR ON BSV-3 CONTROLLER OPERATOR ACTIONS FOR A VALID ALARM: o VERIFY PROPER OPERATION OF BSV-3, THROTTLE BSV-3 AS REQUIRED TO REDUCE FLOW DISCUSSION: THE NORMAL BUILDING SPRAY PUMP FLOW DURING AN ES ACTUATION IS 1500 GPM. TAKING LOCAL / AUTO CONTROL OF BSV-3 WILL ALLOW THE OPERATOR TO USE THE THUMBWHEEL ON THE VALVE CONTROLLER TO SET THE FLOW RATE. IF THIS DOES NOT WORK THEN MANUAL CONTROL OF THE VALVE SHOULD BE ATTEMPTED FROM THE CONTROL BOARD STATION.

REFERENCES:

DRAWING 208-009 SHEET BS-11 SENSING ELEMENT; BS-1-FS1 l ' 'O V

       .AR-302                                    Rev 23                                         Page 9

m. 1;NfLOSURE 1 (Page 8 of 61) ESB ANNUNCIATOR RESPONSE ESA-KW2-01-05 B-01-05 v RB SPRAY A FLOW HIGH/ LOW EVENT-POINT-0063 - INDICATED CONDITION: o BUILDING SPRAY FLOW IS 51100 GPM AS MEASLRED BY BS-81-FIS WITH DHV-42 OPEN REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o RB SPRAY FLOW INDICATOR BS-1-FIl OR INDICATOR ON BSV-3 CONTROLLER OPERATOR ACTIONS FOR A VALID ALARM: o VERIFY PROPER OPERATION OF BSV-3, OPEN BSV-3 AS REQUIRED o VERIFY BSP-1A NOT TRIPPED DISCUSSION: i THE NORMAL BUILDING SPRAY PUMP FLOW WHILE TAKING A SUCTION FROM THE RB SUMP ' IS 1200 GPM, THIS IS TO ENSURE ADEQUATE NET POSITIVE SUCTION HEAD FOR THE BUILDING SPRAY PUMP. OPERATION IN THIS MODE IS TAKING LOCAL / AUTO CONTROL OF BSV-3, THIS WILL ALLOW THE OPERATOR TO USE THE THUMBWHEEL ON THE VALVE CONTROLLER TO SET THE FLOW RATE. IF THIS DOES NOT WORK, THEN MANUAL CONTROL OF THE VALVE SHOULD BE ATTEMPTED FROM THE CONTROL BOARD STATION.

REFERENCES:

DRAWING 208-009 SHEET BS-11 SENSING ELEMENT: BS FIS gb d AR-302 Rev. 23 Page 10

ENCLOSURE 1 (Page 9 of 61) ESB ANNUNCIATOR RESPONSE ESA-KW2-01-05 B-01 RB SPRAY A FLOW HIGH/ LOW EVENT-POINT-0065

l. .

l INDICATED CONDITION: o BUILDING SPRAY FLOW IS 21300 GPM AS MEASURED BY BS-81-FIS WITH DHV-42 OPEN REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o RB SPRAY FLOW INDICATOR BS-1-FIl OR INDICATOR ON BSV-3 CONTROLLER 1 OPERATOR ACTIONS FOR A VALID ALARM: o VERIFY PROPER OPERATION OF BSV-3, THROTTLE BSV-3 AS REQUIRED TO REDUCE FLOW DISCUSSION: THE NORMAL BUILDING SPRAY PUMP FLOW WHILE TAKING A SUCTION FROM THE RB SUMP IS 1200 GPM, THIS IS TO INSURE ADEQUATE NET POSITIVE SUCTION HEAD FOR THE BUILDING SPRAY PUMP. OPERATION IN THIS MODE IS TAKING LOCAL / AUTO CONTROL OF BSV-3, THIS WILL ALLOW THE OPERATOR TO USE THE THUMBWHEEL ON THE VALVE

             . CONTROLLER TO SET THE FLOW RATE. IF THIS DOES NOT WORK, THEN MANUAL CONTROL OF THE VALVE SHOULD BE ATTEMPTED FROM THE CONTROL BOARD STATION.

1

REFERENCES:

DRAWING 208-009 SHEET BS-11 SENSING ELEMENT: BS-81-FIS O-QI AR-302 Rev. 23 Page 11

9 ENCLOSURE 1 (Page 10 of 61) ESB ANNUNCIATOR RESPONSE ESA-KW2-02-01 B-02-01

  \,

g g RB FAN A l l HIGH SPEED l l TRIP I I EVENT-POINT-0348 INDICATED CONDITION: o AHF-1A CONTROL HANDLE PUSHED IN, IN NORMAL AFTER START, AND HIGH SPEED WINDINGS NOT ENERGIZED. REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o CREEN HIGH SPEED LIGHT WITH A RED FLAG ON CONTROL STATION, AND CONTROL HANDLE PUSHED IN. OPERATOR ACTIONS FOR A VALID ALARM: 4 o INVESTIGATE CAUSE OF FAN TRIP o ENSURE TWO OPERABLE RB FANS ARE ES SELECTED PER OP-417 o MONITOR RB TEMPERATURE AND PRESSURE DISCUSSION: THIS ALARM WILL OCCUR IF THE FAN IS RUNNING IN HIGH SPEED AND AN ES ACTUATION OCCURS. THIS-WILL TRIP THE FAN IN HIGH SPEED AND START THE ES SELECTED FANS IN SLOW SPEED. SOME THINGS TO CHECK AFTER A FAN TRIP ARE: FAN AND MOTOR TEMPS AS READ ON AH-1003-TIR ON THE BACK OF THE CONTROL BOARD OR FAN VIBRATION ALARMS. ENGINEERING CAN MONITOR FAN VIBRATION AT AN EXTERNAL PANEL IN THE IB 119' ELEVATION.

REFERENCES:

DRAWING 208-005 SHEET AH-28 SENSING ELEMENT: CS/IN, CS/SC, CS/0, 42/1F RELAY

 . i~

AR-302 Rev. 23 Page 12

ENCLOSURE 1 y (Page 11 of 61) ESB ANNUNCIATOR RESPONSE ESA-KW2-02-02 B-02-02 RB FAN A LOW SPEED TRIP l EVENT-POINT-0349 INDICATED CONDITION- i o AHF-1A CONTROL HANDLE PULLED OUT, IN NORMAL AFTER START, AND SLOW SPEED WINDINGS NOT ENERGIZED REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o GREEN LOW SPEED LIGHT WITH A RED F1AG ON CONTROL STATION, AND THE CONTROL HANDLE PULLED OUT (^s, j ' q) OPERATOR ACTIONS FOR A VALID ALARM: o INVESTIGATE CAUSE OF FAN TRIP o ENSURE TWO OPERABLE RB FANS ARE ES SELECTED PER OP-417 o MONITOR RB TEMPERATURE AND PRESSURE DISCUSSION: SOME THINGS TO CHECK AFTER A FAN TRIP ARE: FAN AND MOTOR TEMPS AS READ ON AH-1003-TIR ON THE BACK OF THE CONTROL BOARD OR FAN VIBRATION ALARMS , ENGINEERING CAN MONITOR FAN VIBRATION AT AN EXTERNAL PANEL IN THE l IB 119' ELEVATION i

REFERENCES:

DRAWING 208-005 SHEET AH-28 i SENSING ELEMENT: CS/0UT, CS/SC, CS/0, 42/15 RELAY L AR-302 Rev. 23 Page 13

l l ENCLOSURE 1 (Page 12 of 61) ESB ANNUNCIATOR RESPONSE ESA-KW2-02-03 B-02-03 l I i RB FAN A AIR FLOW l LOW i l l l EVENT-POINT-0350- l l INDICATED CONDITION: o AHF-1A CONTROL HANDLE PUSHED IN AND IN NORMAL AFTER START AND LOW AIR  ! FLOW IS SENSED BY AH-17-DPS. I REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o REACTOR BUILDING TEMPS ARE INCREASING AS SEEN ON AH-536-TIR OPERATOR ACTIONS FOR A VALID ALARM: o IF CONDITION CANNOT BE CORRECTED THEN CONSIDERATION SHOULD BE MADE TO SECURE THE FAN o ENSURE TWO OPERABLE RB FANS ARE ES SELECTED PER OP-417 o MONITOR RB TEMPERATURE AND PRESSURE DISCUSSION: THIS ALARM MAY BE IN WHEN AN ES ACTUATION HAS STARTED A PREVIOUSLY RUNNING FAN IN SLOW SPEED. PLACING THE CONTROL HANDLE IN THE PULL OUT NORMAL AFTER START POSITION SHOULD CLEAR THE ALARM. ALSO IF THE FAN TRIPS THIS ALARM SHOULD ACTUATE.

REFERENCES:

DRAWING 208-005 SHEET AH-28 SENSING ELEMENT: AH-17-DPS pd. AR-302 Rev. 23 Page 14

i ENCLOSURE 1 (Page 13 of 61)

                                      ~
                .l                ESB ANNUNCIATOR RESPONSE                                                 ESA-KW2-02-04      B-02-04 RB FAN A VlBRATION HIGH EVENT-POINT-0351 INDICATED CONDITION:

o AHF-1A HIGH VIBRATION CONDITION IS SENSED BY AH-18-ME1/2 REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o FAN AND MOTOR TEMPS INCREASING ON AH-1003-TIR ON BACK OF CONTROL BOARD o IF FAN IS RUNNING IN SLOW SPEED THEN CURRENT ON THE FAN MAY BE

 ,                        OSCILLATING.

OPERATOR ACTIONS FOR A VALID ALARM: o ATTEMPT TO RESET ALARM BY DEPRESSING RESET PUSHBUTTON ON CONTROL BOARD o IF CONDITION CANNOT BE CORRECTED THEN CONSIDERATION SHOULD BE MADE TO SECURE THE FAN o ENSURE TWO OPERABLE RB FANS ARE ES SELECTED PER OP-417 DISCUSSION: ENGINEERING CAN MONITOR FAN VIBRATION AT AN EXTERNAL PANEL IN THE IB 119' ELEVATION.

REFERENCES:

DRAWING 208-005 SHEET AH-132 SENSING ELEMENT: AH-18-MEl, AH-18-ME2 . Ci J l AR-302 Rev. 23 .. Page 15 l

ENCLOSURE'l (Page 14 of 61) l

.g ESB ANNUNCIATOR RESPONSE ESA-KW2-02-05 B-02-05 l

l

   \

RB FAN A CONDENSATE'

          -                                                                    HIGH                       l l

EVENT-POINT-1697 l INDICATED CONDITION: o AHF-1A CONDENSATE FLOW IS 21133 CC PER MINUTE AS SENSED BY AH-656-FIS REDUNDANT INDICATION WHICH WILL VERIFY ALARM: I o REACTOR BUILDING SUMP RATE OF RISE IS INCREASING AS SEEN ON BS-93-PIR O OPERATOR ACTIONS FOR A VALID ALARM: o INVESTIGATE SOURCE OF CONDENSATE DISCUSSION: l SOME SOURCES OF HIGH CONDENSATION ARE: RCS LEAK IN CONTAINMENT - CHECK PZR LEVEL AND MAKE UP TANK LEVEL TRENDS; FEEDWATER/ MAIN STEAM LEAK IN CONTAINMENT - CHECK FEEDWATER FLOWRATES; RB FAN COOLER SW LEAKS - CHECK SW SURGE TANK LEVEL IF ON SW, OR CI SURGE TANK LEVELS IF ON CI.

REFERENCES:

DRAWING 208-005 SHEET AH-131 SENSING ELEMENT: AH-656-FIS i

 . s.j
         -AR-302                                     .Rev. 23                                Page 16 i

ENCLOSURE 1 (Page 15 of 61) ESB ANNUNCIATOR RESPONSE ESA-KW2-02-05 B-02-05 THIS AR IS ONLY USED WH_EN COLD LEG N0ZZLE DAMS ARE INSTALLED PER MP-1IOC RCSG 1 A g NOZZLE DAM l PROBLEM i EVENT-POINT-1697 INDICATED CONDITION: o "A" SIDE N0ZZLE DAM CONTROL CONSOLE IS IN ALARM REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o N0ZZLE DAM PRESSURE 29 PSIG ON EITHER SEAL o N0ZZLE DAM PRESSURE 56.5 PSIG.ON EITHER SEAL

     /'~T    o N0ZZLE DAM AIR FLOW 19 SCFH

() o LOSS OF POWER TO THE CONTROL PANEL OPERATOR ACTIONS FOR A VALID ALARM: l s o IMMEDIATELY INVESTIGATE SOURCE OF ALARM o REFER TO AP-404, LOSS OF DECAY HEAT REMOVAL DISCUSSION: THIS ALARM INDICATES POSSIBLE N0ZZLE DAM SEAL DEGRADATION. IF THE SEAL FAILS, A REACTOR COOLANT LEAK WOULD DEVELOP, FLOODING THE PRIMARY SIDE OF THE STEAM GENERATORS WHERE PERSONNEL MAY BE AT WORK. i THIS EVENT POINT IS ONLY IN USE ON A TEMPORARY BASIS WHEN N0ZZLE DAMS ARE INSTALLED. THE WINDOW "RB FAN A CONDENSATE HIGH" IS REMOVED FROM THE ANNUNCIATOR PANEL WHEN THIS EVENT POINT IS IN EFFECT.

REFERENCES:

MP-110C l SENSING ELEMENT: INTERNAL ALARM CIRCUITS INSIDE N0ZZLE DAM CONTROL CONSOLE p i, l AR-302 Rev. 23 , Page 17

ENCLOSURE 1 (Page 16 of 61) fN ESB ANNUNCIATOR RESPONSE ESA-KW2-02-06 B-02-06 l O l ES A ACTUATION , TROUBLE EVENT-POINT-1-230 INDICATED CONDITION: o "A" ES ACTUATION SIGNAL ON ONE OR MORE ES CHANNELS i REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o ES STATUS LIGHTS s o ES BISTABLE TRIP INDICATORS OPERATOR ACTIONS FOR A VALID ALARM: o REFER TO E0P DISCUSSION: THIS ALARM INDICATES THAT AT LEAST ONE OF THREE CHANNELS OF "A" ES HAS ACTUATED. ANY HPI OR LPI BISTABLE TRIPPED WITH ES NOT BYPASSED, OR ANY 4 PSIG ES PRESSURE SWITCH ACTUATED WILL GIVE THIS ALARM. PLACING THE RC PRESSURE TEST MODULE IN " TEST" DEFEATS THIS ALARM FROM LPI OR HPI. WHEN THE 4 PSIG TEST SWITCHES ARE IN THE " TEST" POSITION THIS ALARM IS DEFEATED FROM A 4 PSIG ACTUATION.

REFERENCES:

DRAWING 208-028 SHEET ES-AB-05 SENSING ELEMENT: VARIOUS ES ACTUATION CONTACTS l h

 ' (j -

i AR-302 Rev. 23 Page 18

ENCLOSURE 1 I (Page 17 of 61)  ! [ ESB ANNUNCIATOR RESPONSE ESA-KW2-03-01 B-03-01 t._

             = P'F = = = =                                                                                                       1 g        g                                                                RB FAN C l        [                                                               HIGH SPEED l        l                                                                       TRIP l        I l

EVENT-POINT-0356 INDICATED CONDITION: o AHF-1C CONTROL HANDLE PUSHED IN, IN NORMAL AFTER START WITH THE FAST SPEED WINDINGS NOT ENERGIZED t REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o GREEN HIGH SPEED LIGHT ON WITH A RED Fl.AG ON CONTROL STATION AND CONTROL HANDLE PUSHED IN OPERATOR ACTIONS FOR A VALID ALARM: o INVESTIGATE CAUSE OF FAN TRIP o ENSURE TWO OPERABLE RB FANS ARE ES SELECTED PER OP-417

o. MONITOR RB TEMPERATURE AND PRESSURE DISCUSSION:

THIS ALARM WILL OCCUR IF THE FAN IS RUNNING IN HIGH SPEED AND AN ES ACTUATION OCCURS. THIS WILL TRIP THE FAN IN HIGH SPEED AND START THE ES SELECTED FANS IN SLOW SPEED. SOME THINGS TO CHECK AFTER A FAN TRIP ARE: FAN AND MOTOR TEMPS AS READ ON AH-1003-TIR ON THE BACK OF THE CONTROL BOARD OR FAN VIBRATION ALARMS. ENGINEERING CAN MONITOR FAN VIBRATION AT AN EXTERNAL PANEL IN THE IB 119' ELEVATION.

REFERENCES:

DRAWING 208-005 SHEET AH-30 SENSING ELEMENT: CS/IN, CS/SC, CS/0, 42/1F ( AR-302 Rev. 23 Page 19

l l ENCLOSURE 1 (Page 18 of 61) ESB ANNUNCIATOR RESPONSE ESA-KW2-03-02 B-03-02 1 1 RB FAN C LOW SPEED TRIP EVENT-POINT-0357 INDICATED CONDITION: o AHF-1C CONTROL HANDLE PULLED OUT, IN NORMAL AFTER START, AND THE SLOW SPEED WINDINGS ARE NOT ENERGIZED REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o GREEN LOW SPEED LIGHT ON WITH A RED FLAG ON CONTROL STATION, AND CONTROL HANDLE PULLED OUT D k OPERATOR ACTIONS FOR A VALID ALARM: o INVESTIGATE CAUSE OF FAN TRIP o ENSURE TWO OPERABLE RB FANS ARE ES SELECTED PER OP-417 o MONITOR RB TEMPERATURE AND PRESSURE DISCUSSION: SOME THINGS TO CHECK AFTER A FAN TRIP ARE: FAN AND MOTOR TEMPS AS READ ON AH-1003-TIR ON THE BACK OF THE CONTROL BOARD OR FAN VIBRATION ALARMS. ENGINEERING CAN MONITOR FAN VIBRATION AT AN EXTERNAL PANEL IN THE IB 119' ELEVATION.

REFERENCES:

DRAWING 208-005 SHEET AH-30 SENSING ELEMENT: CS/0UT, CS/SC, CS/0, 42/15 RELAY O

            .AR-302                                 Rev. 23                                         Page 20 f

ENCLOSURE 1 (Page 19 of 61) p ESB ANNUNCIATOR RESPONSE ESA-KW2-03-03 B-03-03 RB FAN C AIR FLOW LOW EVENT-POINT-0358 INDICATED CONDITION: o AHF-1C CONTROL HANDLE PUSHED IN, IN NORMAL AFTER START AND LOW AIR FLOW AS SENSED BY AH-21-DPS. REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o REACTOR BUILDING TEMPS ARE INCREASING AS SEEN ON AH-536-TIR (')

   '   '    OPERATOR ACTIONS FOR A VALID ALARM:

o IF CONDITION CANNOT BE CORRECTED THEN CONSIDERATION SHOULD BE MADE TO SECURE THE FAN o ENSURE TWO OPERABLE RB FANS ARE ES SELECTED PER OP-417 o MONITOR RB TEMPERATURE AND PRESSURE DISCUSSION: THIS ALARM MAY BE IN WHEN AN ES ACTUATION HAS STARTED A PREVIOUSLY RUNNING FAN IN SLOW SPEED. PLACING THE CONTROL HANDLE IN THE PULL OUT NORMAL AFTER START POSITION SHOULD CLEAR THE ALARM. ALSO IF THE FAN TRIPS THIS ALARM SHOULD ACTUATE. l i l

REFERENCES:

DRAWING 208-005 SHEET AH-30 ! SENSING ELEMENT: AH-21-DPS, CS/00T, CS/SC, CS/0, 42/15 RELAY .G n l [

         'AR-302                                        Rev. 23                                    Page 21

l^ !- ENCLOSURE 1 l (Page 20 of 61) [ r ESB ANNUNCIATOR RESPONSE ESA-KW2-03-04 B-03-04 t. l RB FAN C l VIBRATION l l HIGH l EVENT-POINT-0359 INDICATED CONDITION: l o AHF-1C HIGH VIBRATION CONDITION IS SENSED BY AH-22-NE1/2 l REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o FAN AND MOTOR TEMPS INCREASING ON AH-1003-TIR ON BACK OF CONTROL BOARD o IF FAN IS RUNNING IN SLOW SPEED THEN CURRENT ON THE FAN MAY BE ( s OSCILLATING. OPERATOR ACTIONS FOR A VALID ALARM: o ATTEMPT TO RESET ALARM BY DEPRESSING RESET PUSHBUTTON ON CONTROL BOARD o IF CONDITION CANNOT BE CORRECTED THEN CONSIDERATION SHOULD BE MADE TO SECURE THE FAN o ENSURE WO OPERABLE RB FANS ARE ES SELECTED PER OP-417 DISCUSSION: ENGINEERING CAN MONITOR FAN VIBRATION AT AN EXTERNAL PANEL IN THE IB 119' ELEVATION.

REFERENCES:

DRAWING 208-005 SHEET AH-132 SENSING ELEMENT: AH-22-ME1, AH-22-ME2

rh r

AR-302 Rev. 23 Page 22

l ENCLOSURE 1 I (Page 21 of 61) i i >. L pg ESB ANNUNCIATOR RESPONSE ESA-KW2-03-05 B-03-05

   '%)

l \ i RB FAN C CONDENSATE l HIGH l l EVENT-POINT-1699 I INDICATED CONDITION: l o AHF-1C CONDENSATE FLOW IS 21133 CC PER MINUTE AS SENSED BY AH-658-FIS REDUNDANT INDICATION WHICH WILL VERIFY ALARM: , 1 o REACTOR BUILDING SUMP RATE OF RISE IS INCREASING AS SEEN ON BS-93-PIR i l V OPERATOR ACTIONS FOR A VALID ALARM: o INVESTIGATE SOURCE OF CONDENSATE DISCUSSION: SOME SOURCES OF HIGH CONDENSATION ARE: RCS LEAK IN CONTAINMENT - CHECK PZR LEVEL AND MAKE UP TANK LEVEL TRENDS; FEEDWATER/ MAIN STEAM LEAK IN CONTAINMENT - CHECK FEEDWATER FLOWRATES; RB FAN COOLER SW LEAKS - CHECK SW SURGE TANK LEVEL IF ON SW, OR CI SURGE TANK LEVELS IF ON CI.

REFERENCES:

DRAWING 208-005 SHEET AH-131 SENSING ELEMENT: AH-658-FIS l l ' ?) l'%) I' AR-302 Rev. 23 Page 23

        -..                      .        .       . _       . . . .    ..  ..        . .    . .       ~ . .

I-ENCLOSURE 1 (Page 22 of 61) ESB ANNUNCIATOR RESPONSE ESA-KW2-03-06 B-03-06 l RB FAN C POWER SUPPLY MISALIGN EVENT-POINT-0799 l INDICATED CONDITION: o AHF-1C SELECTED FOR "A" ES START AND ESMCC-3AB IS BEING POWERED FROM ES 480V. BUS 3B REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o SWITCH IN ES ACTUATION RELAY CABINET 4D IS SELECTED TO "AHF-1C" o ESMCC-3AB POWER SOURCE STATUS LAMP INDICATES ABT IS SELECTED TO ES 480V BUS-3B

  -k OPERATOR ACTIONS FOR A VALID ALARM:

o SELECT AHF-1A FOR ES START ON ES "A" ACTUATION OR o SELECT ESMCC-3AB TO 480V ES BUS 3A POWER SOURCE DISCUSSION: THIS CONDITION VIOLATES REQUIREMENTS FOR ES TRAIN SEPARATION. OPERABILITY CONCERNS MUST BE ADDRESSED WHILE THIS CONDITION EXISTS. REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS.

REFERENCES:

DRAWING 208-005 SHEET AH-30 SENSING ELEMENT: MTXS-1, SS-BY l ( . a j AR-302 Rev. 23 Page 24

ENCLOSURE 1 (Page 23 of 61) l '. ESB ANNUNCIATOR RESPONSE ESA-KW2-03-06 B-03-06 l 1 RB FAN C POWER SUPPLY MISALIGN EVENT-POINT-0801 INDICATED CONDITION: I c AHF-1C SELECTED FOR "B" ES START, AND ES-MCC-3AB IS BEING POWERED FROM ES 480V BUS 3A REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o SWITCH IN ES ACTUATION RELAY CABINET SD IS SELECTED TO "AHF-1C" i o ES-MCC-3AB POWER SOURCE STATUS LAMP INDICATES ABT IS SELECTED TO ES 480V l BUS 3A OPERATOR ACTIONS FOR A VALID ALARM: o SELECT AHF-1B FOR ES START ON ES "B" ACTUATION OR o SELECT ES-MCC-3AB TO 480V ES BUS 3B POWER SOURCE I DISCUSSION: THIS CONDITION VIOLATES REQUIREMENTS FOR ES TRAIN SEPARATION. OPERABILITY CONCERNS MUST BE ADDRESSED WHILE THIS CONDITION EXISTS.

REFERENCES:

DRAWING 208-005 SHEET AH-30 SENSING ELEMENT: MTXS-1, SS-BY

   -AR-302                                   Rev. 23                                Page 25 i

ENCLOSURE 1 (Page 24 of 61)  !

 . ,f     .

ESB ANNUNCIATOR RESPONSE ESA-KW2-04-01 B-04-01 i v i l g MAKEUP PP A l TRIP 1 I EVENT-POINT-1035 INDICATED CONDITION: o BREAKER IS OPEN WITH CONTROL HANDLE IN THE NORMAL AFTER START POSITION REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o GREEN LIGHT WITH A RED FLAG ON CONTROL STATION o ES STATUS LIGHT OPERATOR ACTIONS FOR A VALID ALARM: o REFER TO OP-402 FOR RESTORATION OF RCP SERVICES PRIOR TO STARTING ANOTHER MVP o CONSIDERING MINIMIZING LETDOWN FLCd o INVESTICATE .MVP-1A BREAKER FOR DROPPED TARGETS o START ANOTHER MAKE-UP PUMP PER OP-402 IF CAUSE OF THIS TRIP WILL NOT TRIP ANOTHER PUMP JISCUSSION:

                 . EXERCISE CARE WHEN STARTING ALTERNATE MU PUMPS. ENSURE ANY FAILURES SUCH AS IMPROPER FLOWPATH, WHICH MAY HAVE DIRECTLY OR INDIRECTLY HAVE CAUSED THIS PUMP TO TRIP DO NOT CAUSE ALTERNATE PUMPS TO TRIP AFTER THEV ARE STARTED.

REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS.

                                                                                            ~

REFERENCES:

DRAWING 208-041 SHEET MU-01 l ' SENSING ELEMENT: CS/SC, CS/0, 52H/B, 52S/B D) L. l AR-302 Rev. 23 Page 26

i ENCLOSURE 1 (Page 25 of 61) ESB ANNUNCIATOR RESPONSE ESA-KW2-04-02 B-04-02 i MAKEUP PP A , GEAR OIL PRESS

    ,                                                                                                    LOW I

EVENT-POINT-1057 L INDICATED CONDITION: o MVP-1A BREAKER CLOSED E2 SECONDS WITH GEAR OIL PRESS 57 PSIG AS SENSED BY MU-88-PS REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o MVP-5A dACK UP GEAR OIL PUMP AUTO STARTS o COMPUTER POINT X-067 OPERATOR ACTIONS FOR A VALID ALARM: o VERIFY MVP-SA DC BACK UP GEAR OIL PUMP STARTED o MONITOR MVP-1A VIA COMPUTER GROUP 70 DISCUSSION: CONSIDERATION SHOULD !!E GIVEN TO SWAPPING MAKE UP PUMPS PER'OP-402

REFERENCES:

DRAWING 208-041 SHEET MU-49 SENSING ELEMENT: MU-88-PS, CS/SC, CS/0, 52H/B, 525/B AR-302~ Rev. 23 Page 27

I' ) l

ENCLOSURE 1 (Page 26 of 61) l ESB ANNUNCIATOR RESPONSE ESA-KW2-04-03 B-04-03 l

l MAKEUP PP A l MOTOR OVERLOAD l l i EVENT-POINT-1033 ' INDICATED CONDITION: I o MOTOR AMPS t 115% RATED LOAD  ! REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o HIGH MOTOR AMPS o MVP-1A TRIP o HIGH FLOWRATES THROUGH MVP-1A OPERATOR ACTIONS FOR A VALID ALARM: o TRIP MUP-1A l o HAVE BREAKER CUBICLE CHECKED FOP, DROPPED TARGETS I i 1 DISCUSSION: THIS ALARM INDICATES THAT EITHER THE TIMED OVERCURRENT OR INSTANTANEOUS OVERCURRENT PROTECTIVE DEVICES HAVE ACTUATED. INSTANTANEOUS OVERCURRENT PROTECTIVE RELAY ACTUATION WILL TRIP THE BREAKER. IT IS POSSIBLE TO HAVE THIS ALARM PRIOR TO THE BREAKER TRIP.

REFERENCES:

DRAWING 208-041 SHEET MU-01 SENSING-ELEMENT: 51 RELAY INSIDE BREAKER CUBICLE i (D [V AR-302 Rev. 23 Page 28

ENCLOSURE _.1 (Page 27 of 61) (~] 5 v ESB ANNUNCIATOR RESPONSE ESA-XW2-04-04 B-04-04 MAKEUP PP A LUBE OIL PUMP TRIP EVENT-POINT-1048 INDICATED CONDITION: o MVP-2A CONTROL HANDLE IN NORMAL AFTER START POSITION AND MOTOR NOT ENERGIZED i REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o GREEN LIGHT WITH A RED FLAG ON CONTROL STATION o LOW LUBE OIL PRESSURE ALARM o MVP-3A BACK-UP LUBE OIL PUMP AUTO START OPERATOR ACTIONS FOR A VALID ALARM: o ENSURE MVP-3A BACK-UP LUBE OIL PUMP STARTED DISCUSSION: THIS ALARM IS'AN INDICATION OF INADEQUATE LUBRICATION TO THE MAKE-UP PUMP. MONITOR THE MAKE-UP PUMP VIA COMPUTER GROUP 70. CONSIDERATION SHOULD BE CIVEN TO SWAPPING MAKE-UP PUMPS.

REFERENCES:

' DRAWING 208-041 SHEET MU-05 SENSING ELEMENT: CS/SC, CS/0, 428
  . !"\

V. f' AR-302 Rev. 23 f Page 29 _.:u___

                     . _ . . u_  :...._...........
       . . - .          . - .    .    -   -    -.-   -. _ . _ - . - . . , ~ . . - .                   . . ~ _ .-_.- _

i ENC 1,05URE 1 (Page 28 of 61) ESB ANNUNCIATOR RESPONSE ESA-KW2-04-04 B-04-04 I MAKEUP PP A LUBE OIL PUMP TRIP l i EVENT-POINT-1052 INDICATED CONDITION: o MVP-3A CONTROL HANDLE IN THE NORMAL AFTER START POSITION AND MOTOR IS NOT l ENERGIZED REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o GREEN LIGHT WITH A RED FLAG ON CONTROL STATION o MAKEUP PUMP OIL PRESSURE LOW ALARM b O. o COMPUTER POINT X070 l OPERATOR ACTIONS FOR A VALID ALARM: o MONr!OR MVP-1A BEARING OIL TEMPERATURES DISCUSSION: THIS ALARM IS AN INDICATION OF INADEQUATE LUBRICATION TO THE MAKE-UP PUMP. MONITOR THE MAKE-UP PUMP VIA COMPUTER GROUP 70. CONSIDERATION SHOULD BE GIVEN TO SWAPPING MAKE-UP PUMPS.

REFERENCES:

DRAWING 208-041 SHEET MU-30 SENSING ELEMENT: CS/SC, CS/0, CR1 !O j AR-302- Rev. 23 Page 30 i

      . .-         ,   ...         . . _ . - - _ _ . . .  . _ _  _ . _ ~ . .        . _ _ . . . . . _ _ _ _ _ . . _ _ _ . _ .

I l- ENCLOSURE 1 (Page 29 of 61) l ESB ANNUNCIATOR RESPONSE ESA-KW2-04-06 B-04-06 t-l AUX STEAM ISO l (ASV-195) BYPASSED j ___ . E

                                                                    -EVENT-POINT-1960 INDICATED CONDITION:

[ o CONTROL SWITCH FOR ASV-195 AUX STEAM SDLEN0ID VALVE IS IN THE OPEN/ BYPASS POSITION REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o ASV-195 SELECTOR SWITCH POSITION

   /O                                                                                                                           !

i OPERATOR ACTIONS FOR A VALID ALARM: i o REFER TO OP-608 I l l DISCUSSION: THIS ALARM INDICATES THAT THE AUTOMATIC CLOSURE OF ASV-195 ON HIGH OR LOW l AUX STEAM PRESSURE IS DISABLED. THIS IS A HIGH ENERGY LINE BREAK CONCERN.

REFERENCES:

DRAWING 208-008 SHEET AS-05 l SENSING ELEMENT: CS/NC

  -O.

I l- AR-302 Rev. 23 Page 31 i

t ENCLOSURE 1 (Page 30 of 61) I l l '~' l ESB ANNUNCIATOR RESPONSE ESA-KW2-05-02 B-05-02 ! \ l l MAKEUP PP A LUBE OIL PRESS LOVV l I EVENT-POINT-1031 INDICATF0 CONDITION: o LUBE OIL PRESS AS SENSED BY MU-42-PS3 IS $3 PSIG i l REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o MVP-3A BACK UP LUBE OIL PUMP AUTO STARTS l OPERATOR ACTIONS FOR A VALID ALARM: L o ENSURE MVP-3A HAS STARTED i l DISCUSSION: THIS ALARM INDICATES THAT THERE IS INADEQUATE LUBRICATION FOR MVP-1A. IF THE PUMP IS RUNNING THEN IT SHOULD BE SECURED AND AN ALTERNATE MAKEUP PUMP STARTED, REFER TO OP-402 FOR DIRECTIONS ON STARTING MAKEUP PUMPS.

REFERENCES:

DRAWING 208-041 SHEET MU-01 SENSING ELEMENT: CS/3A, MU-42-PS3 i 1 l AR-302 Rev. 23 Page 32 l

             -   ~ ~ . . .- - . _ . - -.                   . . . - - . .-           .-                 .        . . - . .

ENCLOSURE 1 (Page 31 of 61) ESB ANNUNCIATOR RESPONSE ESA-KW2-05-03 B-05-03 l MAKEUP PP A l LUBE OlL PUMP l AUTO START EVENT-POINT-1051

INDICATED CONDITION

l o MVP-3A CONTROL HANDLE IN THE NORMAL AFTER STOP POSITION AND MOTOR IS l ENERGIZED REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o RED LIGHT ON WITH A GREEN FLAG ON MVP-3A CONTROL STATION o COMPUTER POINT X071 ~'%.) O OPERATOR ACTIONS FOR A VALID ALARM: o ENSURE MVP-3A IS RUNNING l l l DISCUSSION: THIS ALARM IS AN INDICATION OF INADEQUATE LUBRICATION TO THE MAKE-UP PUMP. l l MONITOR THE MAKE-UP PUMP VIA COMPUTER GROUP 70. CONSIDERATION SHOULD BE GIVEN TO SWAPPING MAKE-UP PUMPS.

REFERENCES:

DRAWING 208-041 SHEET MU-30 SENSING ELEMENT: CS/ST, CS/ST, CS/0, CR1 l' L t T

      'w)

L AR-302 Rev. 23 Page 33 L '

ENCLOSURE 1 (Page 32 of 61) ESB ANNUNCIATOR RESPONSE ESA-KW2-05-04 B-05-04 MAKEUP PP A OUT OF SERVICE EVENT-POINT-1032-- -j l INDICATED CONDITION: o MUP-1A BREAKER HAS NO DC CONTROL POWER REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o NO RED OR GREEN INDICATING LIGHTS ON CONTROL STATION

 .         o ES STATUS LIGHTS SHOW BREAKER POSITION OPERATOR ACTIONS FOR A VALID ALARM:

o VERIFY CLOSED DPDP-5A SWITCH 10 o VERIFY DC KNIFE SWITCH FOR MVP-1A BREAKER CLOSED DISCUSSION: THIS CONDITION DISABLES REMOTE BREAKER OPERATION AND PROTECTIVE RELAYING. REFER TO OP-703 FOR INSTRUCTIONS ON LOCAL BREAKER OPERATION. REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS.

REFERENCES:

DRAWING 208-041 SHEET MU-01 SENSING ELEMENT: RELAY 27C LOCATED INSIDE BREAKER CUBICLE FOR MVP-1A O AR-302 Rev. 23 Page 34

      .         . .     . . .      ._    .   .-   - _ = - . _ _ -    ._ -._ - -.-.             . . _ -     . . . - _ _ . . . .

l ENCLOSURE 1 , (Page 33 of 61) ( - ESB ANNUNCIATOR RESPONSE ESA-KW2-05-04 B-05-04 I h MAKEUP PP A OUT OF SERVICE l __. -EVENT-POINT-1034- ---- INDICATED CONDITION: o MVP-1A BREAKER IS RACKED OUT AND IS SELECTED FOR ES START REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o NO INDICATING LIGHTS ON CONTROL STATION o NO ES STATUS INDICATION l OPERATOR ACTIONS FOR A VALID ALARM: o INVESTIGATE THE CAUSE FOR BREAKER BEING RACKED OUT DISCUSSION: TWO PUMPS SHOULD BE SELECTED FOR ES START. REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS.

REFERENCES:

DRAWING 208-041 SHEET MU-01 SENSING ELEMENT: 43/3A CUBICLE 3A9, 51H/b CUBICLE 3A9 FOR MVP-1A O ud AR-302' Rev. 23 Page 35 i . ._

ENCLOSURE 1 (Page 34.of 61) n ESB ANNUNCIATOR RESPONSE ESA-KW2-05-06 B-05-06 l AUX STEAM ISO (ASV-195) AUTO CLOSED r - M M EVENT-POINT-1815 -- INDICATED CONDITION: o CONTROL SWITCH FOR ASV-195 AUX STEAM SOLEN 0ID VALVE IS IN THE AUTO POSITION AND THE VALVE IS CLOSED REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o ASV-195 SELECTOR SWITCH IN AUTO o GREEN INDICATOR LIGHT ON SELECTOR SWITCH OPERATOR ACTIONS FOR A VALID ALARM: o REFER TO OP-608 DISCUSSION: THIS ALARM INDICATES THAT THE AUTOMATIC CLOSURE OF ASV-195 ON EITHER LOW AUX STEAM PRESSURE OR HIGH AUX STEAM PRESSURE HAS OCCURRED. A LOW PRESSURE ACTUATION OCCURS AT <100 PSIG AND A HIGH PRESSURE ISOLATION OCCURS AT >250 PSIG AUX STEAM HEADER PRESSURE IN THE AUX BUILDING.

REFERENCES:

DRAWING 208-008 SHEET AS-05 SENSING ELEMEPR: 3ASV-195-SV-1,-33C/ASV-195-SV, AS-36-PSI.AS-36-PS-3 i )

%J AR-302                                           Rev. 23                                                Page 36

l { l ERCLQ10RE 1 i (Page 35 of 61) l ESB ANNUNCIATOR RESPONSE ESA-KW2-06-01 B-06-01 l MAKEUP PP B g TRIP I I EVENT-POINT-1041 - INDICATED CONDITION: ' o MVP-18 BREAKER IS OPEN WITH CONTROL HANDLE IN NORMAL AFTER START POSITION REDUNDANT INDICATION WHICH wit.L VERIFY ALARM: o GREEN LIGHT ON WITH A RED FLAG ON MVP-1B CONTROL STATION o ES STATUS LIGHT

O OPERATOR ACTIONS FOR A VALID ALARM:

o REFER TO OP-402 FOR RESTORATION OF RCP SERVICES PRIOR TO STARTING ANOTHER MVP o CONSIDER MINIMIZING LETDOWN FLOW o INVESTIGATE MVP-1B BREAKER FOR DROPPED TARGETS o START ANOTHER MAKE-UP PUMP PER OP-402 IF CAUSE OF THIS TRIP WILL NOT TRIP ANOTHER PUMP DISCUSSION: EXERCISE CARE WHEN STARTING ALTERNATE-MU PUMPS. ENSURE ANY FAILURES SUCH AS IMPROPER FLOWPATH, WHICH MAY HAVE DIRECTLY OR INDIRECTLY HAVE CAUSED THIS PUMP TO TRIP DO NOT CAUSE ALTERNATE PUMPS TO TRIP AFTER THEY ARE STARTED. REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS.

REFERENCES:

DRAWING 208-041 SHEET MU-02 i

i. SENSING ELEMENT: CS/SC, CS/0, 52H/B, 525/B AR-302- Rev. 23 Page 37
           ..       .                  . _ =         -.     -.   .   ..         -         .- ..- . _.

l ENCLOSURE 1 (Paga 36 of 61) ESB ANNUNCIATOR RESPONSE ESA-KW2-06-02 B-06-02 MAKEUP PP B GEAR OIL PRESS LOW l EVENT-POINT-1058 l INDICATED CONDITION: o MUP-1B BREAKER CLOSED E2 SECONDS WITH GEAR OIL PRESS $7 PSIG AS SENSED BY MU-89-PS REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o MVP-5B BACK UP GEAR OIL PUMP AUTO STARTS o COMPUTER POINT X068 (s/ OPERATOR ACTIONS FOR A VALID ALARM: o VERIFY MVP-5B BACK UP GEAR OIL PUMP STARTED  ! o MONITOR MVP-18 VIA COMPUTER GROUP 71 l l DISCUSSION: THIS ALARM INDICATES THAT THERE MAY BE INADEQUATE LUBRICATION FOR THE SPEED !- INCREASER GEAR BOX, CONSIDERATION SHOULD BE GIVEN TO TRANSFERRING TO ANOTHER !' MAKEUP PUMP PER OP-402. l

REFERENCES:

DRAWING 208-041 SHEET MU-50 SENSING ELEMENT: CS/SC, CS/0, 52H/B, 525/A, MU-89-PS O i l l .AR-302 Rev. 23 Page 38

t ENCLOSURE _1 (Paga 37 of 61) ESB ANNUNCIATOR RESPONSE ESA-KW2-06-03 B-06-03 MAKEUP PP B MOTOR OVERLOAD

                                                               - EVENT-POINT-1039 -----

INDICATED CONDITION: o MOTOR AMPS >IIS% RATED LOAD REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o HIGH MOTOR AMPS o >540 GPM TOTAL INDICATED FLOW THROUGH MVP-1B o MUP-1B TRIP

    %)

OPERATOR ACTIONS FOR A \ ALID ALARM: o TRIP MVP-1B o HAVE BREAKER CUBICLE CHEOtFD FOR DROPPED TARGETS i l DISCUSSION: THIS ALARM INDICATES THAT EITNER THE TIMED OVERCURRENT OR INSTANTANEOUS OVERCURRENT PROTECTIVE DEVICE 5 HAVE ACTUATED. INSTANTANEOUS OVERCURRENT PROTECTIVE RELAY ACTUATION WKL TRIP THE BREAKER. IT IS POSSIBLE TO HAVE THIS ALARM PRIOR TO THE BREAKER TRIP.

REFERENCES:

DRAWING 208-041 SHEET MU-02 SENSING ELEMENT: 51 RELAY INSIDE BREAKER CUBICLE

    %./
        .AR-302-                                   Rev. 23                                  Page 39 h-

ENCLOSURE 1 (Page 38 of 61) ESB ANNUNCIATOR RESPONSE ESA-KW2-06-04 B-06-04 !~ MAKEUP PP B LUBE OIL PUMP TRIP i-EVENT-POINT-1049~ -- INDICATED CONDITION: l ' o MVP-28 MOTOR IS NOT ENERGIZED WITH THE CONTROL HANDLE IN NORMAL AFTER START POSITION REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o GREEN LIGHT WITH A RED FLAG ON CONTROL STATION o LOW LUBE OIL PRESSURE. ALARM o-MUP-3B BACK-UPtVBE-0IL PUMP-AUTO START-OPERATOR ACTIONS.FOR A VALID ALARM: o ENSURE MVP-3B BACK-UP LUBE OIL PUMP STARTED DISCUSSION: THIS ALARM IS AN INDICATION OF INADEQUATE LUBRICATION TO THE MAKE-UP PUMP. MONITOR THE MAKE-UP PUMP VIA COMPUTER GROUP 71. CONSIDERATION SHOULD BE GIVEN TO SWAPPING MAKE-UP PUMPS.

REFERENCES:

DRAWING 208-041 SHEET MU-06 SENSING ELEMENT: CS/SC, CS/0, 42B AR-302 Rev. 23 Page 40

 . _-              -        ---.-       .-- . - - . - . - = .      . _ _ _ . _         . _ . .    .    . .. .

ENCLOSURE 1 (Page 39 of 61) (

    \

ESB ANNUNCIATOR RESPONSE ESA-KW2-06-04 B-06-04 l MAKEUP PP B LUBE OlL PUMP TRIP EVENT-POINT-1054 INDICATED CONDITION: o MVP-3B MOTOR IS NOT ENERGIZED WITH THE CONTROL HANDLE IN THE NORMAL AFTER

             . START POSITION REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o GREEN LIGHT WITH A RED FLAG ON CONTROL STATION o MAKEUP PUMP OIL PRESSURE LOW ALARM o COMPUTER POINT X071 l

   ~(

OPERATOR ACTIONS FOR A VALID ALARM: o MONITOR MVP-1B PUMP TEMPS DISCUSSION: THIS ALARM IS AN INDICATION OF INADEQUATE LUBRICATION TO THE MAKE-UP PUMP. MONITOR THE MAKE-UP PUMP VIA COMPUTER GROUP 71. CONSIDERATION SHOULD BE GIVEN TO SWAPPING MAKE-UP PUMPS.

REFERENCES:

DRAWING 208-041 SHEET MU-31 SENSING ELEMENT: CS/SC, CS/0, CR1 l: L

   -{

AR-302 Rev. 23 Page 41 l - .

ENCLOSURE 1 l (Page 40 of 61) l 77 ESB ANNUNCIATOR RESPONSE ESA-KW2-07-02 B-07-02 U MAKEUP PP B LUBE OIL PRESS LOW l EVENT-POINT-1037 l

                                                                                                          'l INDICATED CONDITION:

o LUBE OIL PRESS AS SENSED BY MU-45-PS3 IS $3 PSIG l l REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o MVP-3B BACK UP LUBE OIL PUMP AUTO STARTS l O OPERATOR ACTIONS FOR A VALID ALARM: o ENSURE MVP-3B HAS STARTED DISCUSSION: THIS ALARM INDICATES THAT THERE IS INADEQUATE LUBRICATION FOR MVP-18. IF MVP-1B IS RUNNING THEN IT SHOULD BE SECURED AND AN ALTERNATE MAKEUP PUMP STARTED PER OP-402.

REFERENCES:

DRAWING 208-041 SHEET MU-02 SENSING ELEMENT: 43CS/387-3B, MU-45-PS3 O AR-302 Rev. 23 Page 42

_.- .- .= 1 ENCLOSURE 1 (Page 41 of 61)

    /S               ESB ANNUNCIATOR RESPONSE               ESA-KW2-07-03           B-07-03   l V                                                                                             i l

MAKEUP PP B l LUBE OIL PUMP l AbTO START l EVENT-POINT-1053 INDICATED CONDITION: o MVP-38 CONTROL HANDLE IN THE NORMAL AFTER STOP POSITION AND MOTOR IS ENERGIZED l REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o RED LIGHT ON WITH A GREEN FLAG ON MVP-38 CONTROL STATION o COMPUTER POINT X071

  -g OPERATOR ACTIONS FOR A VALID ALARM:

o ENSURE MVP-3B IS RUNNING DISCUSSION: THIS ALARM IS AN INDICATION OF INADEQUATE LUBRICATION TO THE MAKE-UP PUMP. MONITOR THE MAKE-UP PUMP VIA COMPUTER GROUP 71. CONSIDERATION SHOULD BE GIVEN TO STARTING ANOTHER MAKE-UP PUMP.

REFERENCES:

DRAWING 208-041 SHEET MU-31 SENSING ELEMENT: CS/ST, CS/ST, CS/0, CR1 l' t

   -k/

r l l AR-302 Rev. 23 Page 43 i

1 ENCLOSURE 1 (Page 42 of 61) ESB ANNUNCIATOR RESPONSE ESA-KW2-07-04 B-07-04 iO 1

                                                                                                    ~ MAKEUP PP B OUT OF SERVICE I

EVENT-POINT-1038 INDICATED CONDITION: I o MVP-1B BREAKER HAS NO DC CONTROL POWER I l l REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o NO INDICATING LIGHTS ON CONTROL STATION o ES STATUS LIGHTS INDICATE BREAKER POSITION

O OPERATOR ACTIONS FOR A VALID ALARM

o VERIFY CLOSED DPDP-5B SWITCH 10 o VERIFY DC KNIFE SWITCH FOR MUP-1B BREAKER CLOSED l DISCUSSION: THIS CONDITION DISABLES REMOTE BREAKER OPERATI0' WD PROTECTIVE RELAYING REFER TO OP-703 FOR LOCAL BREAKER OPERATION. THIS IS AN EXPECTED ALARM FOR BREAKER TAGGING OPERATIONS. REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS.

REFERENCES:

DRAWING 208-041 SHEET MU-02 SENSING ELEMENT: RELAY 27C LOCATED INSIDE BREAKER CUBICLE FOR MVP-1B [p) l AR-302 Rev. 23 Page 44 (  :. . .-

_ . _ m - _ _ _ _ _ _ . _ _ _ . . . _ . _ _ _ . . . ___._. _ _._. ._ - ENCLOSURE 1 ) (Page 43 of 61) l I ( ESB ANNUNCIATOR RESPONSE ESA-KW2-07-04 B-07-04 l MAKEUP PP B 1 OUT OF SERVICE  ! EVENT-POINT-1040 - l INDICATED CONDITION: o MVP-1B BREAKER IS RACKED OUT AND MVP-1B IS SELECTED FOR ES START REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o NO INDICATING LIGHTS ON CONTROL STATION o NO ES STATUS INDICATION OPERATOR ACTIONS FOR A VALID ALARM: o INVESTIGATE THE CAUSE FOR BREAKER BEING RACKED OUT l l DISCUSSION: h o PUMPS SHOULD BE SELECTED FOR ES START. REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS.

REFERENCES:

DRAWING 208-041 SHEET MU-02 SENSING ELEMENT: 43/3B ON CUBICLE 3A10, 52H/b IN CUBICLE 3A9 FOR MVP-1B AR-302 Rev. 23 Page 45

ENCLOSURE 1 (Page 44 of 61) c ESB ANNUNCIATOR RESPONSE ESA-KW2-07-06 B-07-06 H2 SAMPLING PANEL A TROUBLE EVENT-POINT-0080 INDICATED CONDITION: o PASS RB H2 ANALYZER "A" MALFUNCTION o HIGH RB H2 CONCENTRATION REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o LOSS OF POWER TO PANEL o OVERPRESSURE TO PANEL AT 14 PSIG

 ,m o LOW FLOW TO PANEL AT 51 SCFH

(' o THERM 0 ELECTRIC COOLER 50.1 AMPS o RB H2 CONCENTRATION 23% OPERATOR ACTIONS FOR A' VALID ALARM: o NOTIFY NSS/NSM AND EC OF HYDROGEN CONCENTRATION o IE RB H2 23%, It!EN GO TO EM-225A o QB NOTIFY I&C SUPERVISION OF H2 ANALYZER MALFUNCTION DISCUSSION: THIS ALARM INDICATES EITHER THE POST ACCIDENT H2 CONCENTRATION INSIDE THE RB IS HIGH,'OR THE PASS H2 ANALYZER IS MALFUNCTIONING. E0P-14 PROVIDES GUIDANCE FOR PLACING THE HYDROGEN MONITORS IN SERVICE AND FOR TRENDING HYDROGEN LEVELS DURING A LOCA. EM-225A PROVIDES GUIDANCE TO TREND THIS DATA AND HOW TO PURGE THE REACTOR BUILDING.

REFERENCES:

DRAWING 208-062 SHEET WS-04 SENSING ELEMENT: VARIOUS FLOW / PRESSURE / CURRENT SWITCHES INSIDE THE SAMPLER p i I

    'AR-302                                  Rev. 23                               Page 46

I i l ENCLOSURE 1 (Page 45 of 61) ESB ANNUNCIATOR RESPONSE ESA-KW2-08-01 B-08-01 l l l j ZZZZZZZ% g g DIESEL GEN A FAILED l l g TO START r i 4 EVENT-POINT 4204 l l INDICATED CONDITION: o "A" EGDG HAS A START COMMAND AND LUBE OIL PRESSURE AS SENSED BY DL-9-PS IS $6 PSIG AFTER 7 SECONDS QB o "A" EGDG HAS A START COMMAND AND ENGINE SPEED AS SENSED BY EG-19-SS IS

         $250 RPM AFTER 7 SECONDS                                                               ,

REDUNDANT INDICATION WHICH WILL VERIFY ALARM: m o EGDG-1A TRIPS , o CONTROL BOARD " CRANK" LIGHT COES OUT AND WHITE " READY" LIGHT DOES NOT COME ON o ECDG-1A STARTING AIR PRESSURE LOW ALARM ANNUNCIATES OPERATOR ACTIONS FOR A VALID ALARM: o INSPECT EGDG-1A FOR CAUSE OF FAILURE TO START o RESET PUSHBUTTON MUST BE DEPRESSED ON EGDG GAUGE BOARD PRIOP. TO EGDG RESTART DISCUSSION: THIS ALARM INDICATES THE DIESEL TRIED TO START AND DID NOT. SOME POSSIBLE CAUSES OF THIS ARE: PROBLEMS WITH DIESEL FUEL SYSTEM, LUBE OIL SYSTEM PROBLEMS OR DIESEL SPEED SENSOR PROBLEMS. THIS ALARM IS STILL ACTIVE WITH AN ES SIGNAL PRESENT BUT WILL NOT DE-ENERGIZE THE STARTING AIR SOLEN 0 IDS, 50 THE DIESEL WILL CRANK UNTIL IT EITHER STARTS OR RUNS OUT OF AIR.

REFERENCES:

DRAWING 208-027 SHEET EG-17, EG-03, EG-01, EG-05 SENSING ELEMENT: DL-9-PS, EG-19-SS, START FAIL RELAY AR-302 Rev. 23 Page 47

l ENCLOSURE 1 (Paga 46 of 61) ESB ANNUNCIATOR RESPONSE ESA-KW2-08-01 B-08-01 rrrrrrm l DIESEL GEN A FAILED l l TO START I _1 EVENT-POINT-1-2-14 l INDICATED CONDITION: o "A" EGDG HAS TRIPPED ITS PHASE DIFFERENTIAL CURRENT RELAY o "A" EGDG TRIPS AND BREAKER 3209 OPENS l o "'A" ECDG 86 DG LOCK 0UT RELAY HAS ACTUATED REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o ES 4160V BUS 3A DE-ENERGIZES o CONTROL BOARD "RUN" LIGHT GOES OUT l OPERATOR ACTIONS FOR A VALID ALARM: o REFER TO AP-770 o-INSPECT EGDG-1A FOR CAUSE OF DIFFERENTIAL CURRENT CONDITION , _o LOCK 0UT RELAY MUST BE MANUALLY RESET ONCE PROBLEM IS RESOLYED. DISCUSSION:

THIS ALARM INDICATES THE DIESEL GENERATOR HAS EITHER, A PHASE TO PHASE SHORT L OR A PHASE TO GROUND SHORT. THIS CONDITION WILL TRIP THE DIESEL AND PREVENT IT FROM STARTING. THE CAUSE OF THIS PROBLEM MUST BE RESOLVED PRIOR TO ANY l

ATTEMPT BEING MADE TO RESTART AND RELOAD THE DIESEL GENERATOR.

REFERENCES:

DRAWING 208-027 SHEET EG-15 I i SENSING ELEMENT: 86-DG-3A, 87A, 87B, 87C DIFFERENTIAL CURRENT RELAYS i i l l h A R-302- Rev. 23 Page 48

i l ENCLOSURE 1 l (Page 47 of 61) ESB ANNUNCIATOR RESPONSE ESA-KW2-08-02 B-08-02 DIESEL GEN A TROUBLE EVENT-POINT-1-202- , INDICATED CONDITION: o "A" ECDG LUBE OIL TEMP AS SENSED BY DL-11-TS IS 3115* F QB o "A" EGDG JACKET COOLANT TEMP AS SENSED BY DJ-28-TS s130' F REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

  /'\         o LOCAL TEMP INDICATION FOR LUBE OIL OR JACKET COOLANT TEMPS LOW o DIESEL GENERATOR ALARM PANEL DROP TARGET FOR LOW LUBE OIL /]ACKET COOLANT TEMP.

OPERATOR ACTIONS FOR A VALID ALARM: o INSURE PROPER OPERATION OF LUBE OIL HEATERS DLHE-3 o INSURE PROPER OPERATION OF 3ACKET COOLANT HEATER DJHE-1 o REFER TO OP-707 DISCUSSION: E JDG LUBE OIL TEMP MUST BE MAINTAINED >110 F i i1EFER TO TS FOR ADMINISTRATIVE REQUIREMENTS

REFERENCES:

DRAWING 208-027 SHEET EG-07 j SENSING ELEMENT: DL-11-TS, DJ-28-TS 1 O l1 AR-302 Rev. 23 Page 49

      - .   ..     .. -, .        .   . .    = .  . - . . -    .-.    .   .-           . .  - . . . . .

ENCLOSURE 1 l (Page 48 of 61) l ESB ANNUNCIATOR RESPONSE ESA-KW2-08-02 B-08-02 l I DIESEL GEN A TROUBLE EVENT-POINT-1205---- INDICATED CONDITION: o "A" EGDG LOCAL ALARM PANEL HAS A DROPPED TARGET REDUNDANT. INDICATION WHICH WILL VERIFY ALARM: o INFORMED BY THE PRIMARY PLANT OPERATOR OF ECDG-1A LOCAL ALARM ?ANEL

                . DROP TARGET.

OPERATOR ACTIONS FOR A VALID ALARM: o NOTIFY PRIMARY PLANT OPERATOR TO INVESTIGATE CAUSE OF DROP TARGET. o REFER TO AR-901 DISCUSSION: THIS ALARM INDICATES A DIESEL GENERATOR LOCAL ANNUNCIATOR DROP TARGET HAS DROPPED. IMMEDIATE INVESTIGATION OF ALARM CAUSE SHOULD BE INITIATED. !' REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS. DRAWING 208-027 SHEET EG-17

REFERENCES:

SENSING ELEMENT: VARIOUS SENSORS ASSOCIATED WITH LOCAL ALARM PANEL (/

} AR-302 Rev. 23 Page 50
     .__    _      ___._     -.. _ __._    _      _ _ __-___,__.___.. _ _ _ ~ _                                  . ___   m.

ENCLOSURE 1 (Page 49 of 61) ESB ANNUNCIATOR RESPONSE ESA-KW2-08-03 8-08-03 DIESEL GEN A OUT OF SERVICE EVENT-POINT-1195 l i INDICATED CONDITION: o "A" EGDG HAS HAD A LOSS OF DC CONTROL POWER REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o ECDG-1A STARTS WITH NO AUTO START SIGNAL o EGDG-1A CONTROL' CIRCUIT INDICATOR LIGHTS ON MAIN CONTROL BOARD OR INSIDE THE DIESEL GENERATOR ROOM ARE OFF l OPERATOR ACTIONS FOR A VALID ALARM: o VERIFY DPDP-6A SWITCHES 12 AND 14 ARE CLOSED o CHECK ECDG-1A CONTROL POWER FUSES o REFER TO OP-707 DISCUSSION: A LOSS OF DC CONTROL POWER WILL EFFECT THE DIESEL DIFFERENTLY DEPENDING ON WHICH CIRCUIT. LOSES POWER. IF ALL DC POWER IS LOST THE DIESEL WILL START AND YOU WILL ONLY BE ABLE TO SHUT IT DOWN LOCALLY BY TRIPPING THE FUEL RACKS. IF OTHER FUSES ARE BLOWN THE EFFECT WILL VARY FROM LOSS OF GOVERNOR CONTROL TO A LOSS OF PROTECTIVE RELAYING ASSGCIATED WITH THE DIESEL. THE CAUSE OF THIS ALARM SHOULD BE INVESTIGATED IMMdOIATELY. REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS.

REFERENCES:

DRAWING 208-027 SHEET EG-17, EG-03, EG-09 EG-05, EG-15 SENSING ELEMENT: A,B,C,D,E, LOSS OF POWER RELAYS lO I

          'AR-302                                               Rev. 23-                                  Page 51

l ENCLOSURE 1  ! (Page 50 of 61)

s ESB ANNUNCIATOR RESPONSE ESA-KW2-08-03 B-08-03 DIESEL GEN A I OUT OF SERVICE l l  ;

1 l EVENT-POINT-1206- - INDICATED CONDITION: t o "A" EGDG START AIR AS SENSED BY EG-11-PS IS <225 PSIG i REDUNDANT INDICATION WHICH WILL VERIFY ALARM: , i l l OPERATOR ACTIONS FOR A VALID ALARM: o INVESTIGATE CAUSE OF LOW AIR PRESSURE

      -o VERIFY ECDG-1A AIR COMPRESSOR, EGP-1A RUNNING o CHECK EGDC-1A FOR AIR LEAKS l

l DISCUSSION: l A LOSS OF STARTING AIR WILL EVENTUALLY CAUSE THE DIESEL TO START WHEN PRESSURE IS NO LONGER llIGH ENOUGH TO HOLD THE AUTO START VALVES CLOSED. IF EGP-1A IS OUT OF SERVICE THEN CONSIDERATION SHOULD BE GIVEN TO CROSS l CONNECTING THE DIESEL START AIR SYSTEMS BY OPENING EGV-25 AND EGV-26. REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS.

REFERENCES:

DRAWING 208-027 SHEET EG-17, EG-07 l SENSING ELEMENT: EG-11-PS ( l-l l AR-302 Rev. 23 Page 52

ENCLOSURE 1 (Page 51 of 61) ) l i l (3 , A ESB ANNUNCIATOR RESPONSE ESA-KW2-08-03 B-08-03 l l l l DIESEL GEN A OUT OF SERVICE l

 ,                                                                                                l
                                                             - EVENT-POINT-1207 INDICATED CONDITION:

o ANY "A" ECDG AUT0/ MANUAL CONTROL SWITCH NOT IN THE AUTO POSITION i REDUNDANT INDICATION WHICH WILL VERIFY ALARM: I o NOTIFIED BY PRIMARY PLANT OPERATOR EGDG-1A CONTROL SWITCH NOT IN AUTO OPERATOR ACTIONS FOR A VALID ALARM: o NOTIFY PRIMARY PLANT OPERATOR TO RETURN CONTROL SWITCH TO AUTO DISCUSSION: THE FOLLOWING SWITCHES NOT IN AUTO WILL GIVE YOU THIS ALARM: 3ACKET COOLING PUMP JACKET COOLANT HEATER STANDBY LUBE OIL PUMP DC FUEL OIL PUMP DC FUEL OIL XFER PUMP AC FUEL OIL XFER PUMP AC AIR COMPRESSOR DIESEL AUT0/ MAN (MCB) NORMAL /AT ENGINE SWITCH ON DIESEL GAUGE BOARD IN "AT ENGINE" REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS.

REFERENCES:

DRAWING 208-027 SHEET EG-17, EG-07 SENSING ELEMENT: VARIOUS EGDG-1A CONTROL SWITCH CONTACTS i p C AR-302 Rev. 23 Page 53

ENCLOSURE 1 (Page 52 of 61) 1 - /~3 ESB ANNUNCIATOR RESPONSE ESA-KW2-083-04 B-08-04 V [ l CF TANK A LEVEL  ! HIGHiiOW l I EVENT-POINT-0109 l INDICATED CONDITION: I o CFT-1A LEVEL AS SENSED BY CF-2-LS1 IS 2I3'4" 4 j REDUNDANT INDICATION WHICH WILL VERIFY ALARM: l o CONTROL BOARD INDICATORS CF-2-LIl OR CF-2-LI2 o COMPUTER POINT P200 g, ( - OPERATOR ACTIONS FOR A VALID ALARM: o DETERMINE CAUSE AND RETURN CORE FLOOD TANK TO NORMAL LEVEL o REFER TO OP-401 FOR THIS CONDITION DISCUSSION: A HIGH CORE FLOOD TANK LEVEL MAY INDICATE CORE FLOOD CHECK VALVES OR CORE FLOOD ADDITION VALVES ARE LEAKING BY. OBSERVE MAKEUP TANK LEVEL AND PRESSURIZER LEVEL TO VERIFY. REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS.

REFERENCES:

DRAWING 208-013 SHEET CF-13 SENSING ELEMENT: CF-2-LS1

{
     'AR-302-                                Rev. 23                             Page 54

ENCLOSUSE_1 (Page 53 of 61)

    ..(                   ESB ANNUNCIATOR RESPONSE              ESA-KW2-08-04      B-08-04 CF TANK A LEVEL HIGH/ LOW EVENT-POINT- 0110-----
             . INDICATED CONDITION:

l o CFT-1A LEVEL AS SENSED BY CF-2-LS2 IS ;t13'4" l REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o CONTROL BOARD INDICATORS CF-2-LIl OR CF-2-LI2 I o COMPUTER POINT P200 OPERATOR ACTIONS FOR A VALID ALARM: o DETERMINE CAUSE AND RETURN CORE FLOOD TANK TO NORMAL LEVEL o REFER TO OP-401 FOR THIS CONDITION DISCUSSION: HIGH CORE FLOOD TANK LEVEL MAY INDICATE CORE FLOOD CHECK VALVES OR CORc FLOOD ADDITION VALVES LEAKING BY. OBSERVE MAKEUP TANK LEVEL AND PRESSURIZER LEVEL TO VERIFY. REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS.

REFERENCES:

DRAWIK. 208-013 SHEET CF-13 SENSING ELEMENT: CF-2-LS2 , I3 i, /.' AR-302 ' Rev. 23 Page 55 mJ

l ENCLOSURE 1 (Pagn 54 of 61) ESB ANNUNCIATOR RESPONSE ESA-KW2-08-04 B-08-04 CF TANK A LEVEL HIGH/ LOW

                                                                  - EVENT-POINT-01214-                   - 1 INDICATED CONDITION:

o CFT-1A LEVEL AS SENSED BY CF-2-LS1 IS 512'3" REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

 ',       o CONTROL BOARD INDICATORS CF-2-LIl OR CF-2-LI2

( o COMPUTER POINT P200 OPEPATOR ACTIONS FOR A VALID ALARM: o DETERMINE CAUSE AND RETURN CORE FLOOD TANK TO NORMAL LEVEL o REFER TO OP-401 FOR THIS CONDITION DISCUSSION: A LOW CORE FLOOD TANK LEVEL MAY INDICATE CORE FLOOD ISOLATION VALVES OR CFT SAMPLE ISOLATION VALVES ARE LEAKING BY. OBSERVE MAKEUP TANK LEVEL AND PRESSURIZER LEVEL TO VERIFY. REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS.

REFERENCES:

DRAWING 208-013 SHEET CF-13 SENSING ELEMENT: CF-2-LS1 (. AR-302 Rev. 23 Page 56

l l. ENCLO3URE 2 (Page 55 of el) l f') ESB ANNUNCIATOR RESPONSE ESA-KW2-08-04 B-08-04

   %)

CF TANK A LEVEL HIGH/ LOW

                                                                       -EVENT-POINT-0112 INDICATED CONDITION:

o CFT-1A LEVEL AS SENSED BY CF-2-LS2 IS $12'3" REDUNDANT INDICATION WHICH WILL VERIFY ALARM: O V o CONTROL BOARD INDICATORS CF-2-LIl OR CF-2-LI2 o COMPUTER POINT P200 OPERATOR ACTIONS FOR A VALID ALARM: o DETERMINE CAUSE AND RETURN CORE FLOOD TANK TO NORMAL LEVEL DISCUSSION: A LOW CORE FLOOD TANK LEVEL MAY INDICATE CORE FLOOD ISOLATION VALVES OR CFT SAMPLE ISOLATION VALVES ARE LEAKING BY. OBSERVE MAKEUP TANK LEVEL AND PRESSURIZER LEVEL TO VERIFY. REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS.

REFERENCES:

DRAWING 208-013 SHEET CF-13 SENSING ELEMENT: CF-2-LS2

  .V.

f) . AR-302 Rev. 23 Page 57-

        .            .      .. -                .   . . - _ -         _. . .     . . ~ .               . . .             . - ,

ENCLOSURE 1 (Paga 56 of 61) d ESB ANNUNCIATOR

  • ESPONSE ESA-KW2-08-05 B-08-05
     .V s,.

CF TANK A PRESS HIGH/ LOW l EVENT-POINT-0105 INDICATED CONDITION: o CFT-1A PRESSURE AS SENSED BY CF-1-PS1 IS 1615 PSIG REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

l. o'CONTROLBOARDINDICATORSCF-1-PI$ORCF-1-PI2
     .i OPERATOR ACTIONS FOR A VALID ALARM:

o DETERMINE CAU3E AND RETURN CCRE FLOOD TANK TO NORMAL PRESSURE o REFER TO OP-401 FOR THIS CONDITION DISCUSSION: INCREASING REACTOR BUILDING TEMPERATURES, NITROGEN VALVE LEAKBY FROM N2 BOTTLES, OR INCREASING CFT WATER-LEVEL MAY CAUSE CORE FLOOD TANK PRESSURES TO RISE. PRESSURE LIMITS ARE ESTABLISHED PER TS, REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS. l

REFERENCES:

DRAWING 208-012 SHEET CF-13 SENSING ELEMENT: CF-1-PS1

              ~AR-302                                         Rev. 23                                            Page 58
                                                                                                              -m v
     ..       -.-. ...-. -                _          -   .     .- _.-       . - .       .     ....~._.- -      . .

ENCLOSURE 1 ! (Pagn 57 of 61) ESB ANNUNCIATOR RESPONSE ESA-KW2-08-05 B-08-05 l l CF TANK A PRESS HIGH/ LOW

                                                                                                                   )

EVENT-POINT-0106 INDICATED CONDITION: o CFT-1A PRESSURE AS SENSED BY CF-1-PS2 IS E615 PSIG REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o CONTROL BOARD INDICATORS CF-1-PIl OR CF-1-PI2 1. OPERATOR ACTIONS FOR A VALID ALARM: o DETERMINE CAUSE AND RETURN CORE FLOOD TANK TO NORMAL PRESSURE o REFER TO OP-401 FOR THIS CONDITION DISCUSSION: INCREASING REACTOR BUILDING TEMPERATURES, NITROGEN VALVE LEAKBY FROM N2 BOTTLES OR INCREASING CFT WATEP. LEVEL MAY CAUSE CORE FLOOD TANK PRESSURES TO RISE. PRESSUf LIMITS ARE ESTABLISHED PER TS,. REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS.

REFERENCES:

DRAWING 208-013 SHEET CF-13 SENSING ELEMENT: CF-1-PS2 g-f AR-302 Rev. 23 Page 59

ENCLOSURE 1 (Page 58 of 61)

        /T                   ESB ANNUNCIATOR RESPONSE                  ESA-KW2-08-05      B-08-05
     =V 6

CF TANK A PRESS HIGH/ LOW EVENT-POINT-0107 - - INDICATED CONDITION: o CFT-1A PRESSURE AS SENSED BY CF-1-PS1 IS 5585 PSIG REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o' CONTROL BOARD INDICATORS CF-1-PIl OR CF-1-PI2

     ;f l'             OPERATOR ACTIONS FOR A VALID ALARM:

l o DETERMINE CAUSE AND RETURN CORE FLOOD TANK TO NORMAL PRESSURE t-, o REFER TO OP-401 FOR THIS CONDITION f- DISCUSSION: l DECREASING REACf0R BUILDING TEMPERATURES OR DECREASING CORE FLOOD TANK LEVELS MAY CAUSE CORE FLOOD TANK PRESSURE TO DECREASE.

PRESSURE . LIMITS ARE ESTABLISHED PER TS, REFER TO TS FOR ADMINISTRATIVE
l. REQUIREMENTS.

l I i

REFERENCES:

DRAWING 208-013 SHEET CF-13 SENSING ELEMENT: CF-1-PS1

e. .

4

         /

AR-302 Rev. 23 Page 60

  ..- .     ,     _ -     -     . - .         -_   - . . . - . - .. .               .    --.    . . . .        . ~.

ENCLOSURE 1 (Page 59 of 61)

j. 'ESB ANNUNCIATOR RESPONSE ESA-KW2-08-05 P. 08-05 1

CF TANK A PRESS HIGH/ LOW l idVENT-POINT-0108

l. INDICATED CONDITION:

o CFT-1A PRESSURE AS SENSED BY CF-1-PS2 IS $585 PSIG REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o CONTROL BOARD INDICATORS CF-1-PIl OR CF-1-PI2  ; OPERATOR ACTIONS FOR A VALID ALARM: o DETERMINE CAUSE AND RETURN CORE FLOOD TANK TO NORMAL PRESSURE  ! o REFER TO OP-401 FOR THIS CONDITION  ; l l DISCUSSION: DECREASING REACTOR BUILDING TEMPERATURES OR DECREASING CORE FLOOD TANK LEVELS MAY CAUSE CORE FLOOD TANK PRESSURE TO DECREASE. PRESSURE LIMITS ARE ESTABLISHED PER TS, REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS.

REFERENCES:

DRAWING 208-013 SHEET CF-13 l SENSING ELEMENT: CF-1-PS2 i o 4 AR-302 , Rev 23 Page 61

    ~  .. -      ..        .     . . - . . - . . .    - - - .       .     - . . - ~ .        - .  - - . -       - - - . -

l ENCLOSURE 1 l (Page 60 of 61) l l ESB ANNUNCIATOR RESPONSE ESA-KW2-08-06 B-08-06 ,x) l' t I

CF TANK A DISCH VALVE OPEN/ CLOSED EVENT-POINT-0101 INDICATED CONDITION

o RCS PRESSURE AS SENSED BY RC-3A-PS3 IS $690 PSIG AND CFV-5 IS NOT FULL CLOSED REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o CONTROL BOARD INDICATOR RC-158-PI2 AND CFV-5 POSITION INDICATION ! OPERATOR ACTIONS FOR A VALID ALARM: o CLOSE CFV-5 OR STOP RCS PRESSURE DECREASE ! DISCUSSION: CFV-5 MOTOR IS NORMALLY DE-ENERGIZED. THE BREAKER WILL HAVE TO BE CLOSED AT l ES MCC 3AB PRIOR TO VALVE OPERATION. I l i _ l l

REFERENCES:

DRAWING 208-013 SHEET CF-13 , SENSING ELEMENT: RC-3A-PS3, 33C VALVE CLOSED CONTACT ] r i w, AR-302 Rev. 23 Page 62

1 ENCLOSURE 1  ! (Page 61 of 61) I ESB ANNUNCIATOR RESPONSE ESA-KW2-08-06 B-08-06 CF TANK A l DISCH VALVE OPEN/ CLOSED I EVENT-POINT-0102-INDICATED CONDITION: o RCS PRESSURE AS SENSED BY RC-3A-PS3 IS 2702.5 PSIG AND CFV-5 IS NOT FULL OPEN. REDUNDANT INDICATION WHICH WILL VERIFY ALARM: [] . o CONTROL BOARD INDICATOR RC-158-PI2 AND CFV-5 POSITION INDICATION  :

 %)                                                                                                                    !

OPERATOR' ACTIONS FOR A VALID ALARM: o OPEN CFV-5 OR STOP RCS PRESSURE INCREASE DISCUSSION: CFV-5 MOTOR IS NORMALLY DE-ENERGIZED. TrlE BREAKER WILL HAVE TO BE CLOSED AT ES MCC 3AB PRIOR TO VALVE OPERATION.

REFERENCES:

DRAWING 208-013 SHEET CF-13 SENSING ELEMENT: RC-3A-PS3, 33 VALVE OPEN CONTACT l (M - (f l AR-302 Rev. - 23 Page 63 (LAST PAGE) I}}