Category:TECHNICAL SPECIFICATIONS
Jump to navigation
Jump to search
Category Used between: 2 October 1959 to 21 October 1999
Plant
University
Fuel Processing
- BWX Technologies (0)
- Barnwell (0)
- Claiborne (0)
- Consolidated Interim Storage Facility (0)
- Eagle Rock (0)
- Erwin (0)
- Framatome ANP Richland (0)
- Global Nuclear Fuel (0)
- HI-STORE (0)
- Holtec (0)
- Orano USA (0)
- Paducah Gaseous Diffusion Plant (0)
- Portsmouth Gaseous Diffusion Plant (1)
- Triso-X (0)
- West Valley Demonstration Project (0)
- Wood River Junction (0)
Laboratory
- 05000470 (1)
- Battelle Memorial Institute (0)
- Dow Chemical Company (9)
- General Atomics (10)
- Hermes (0)
- Idaho National Laboratory (0)
- Knolls Atomic Power Laboratory (0)
- Los Alamos National Laboratory (0)
- Lynchburg Research Center (2)
- National Bureau of Standards Reactor (4)
- National Institute of Standards and Technology (0)
- National Renewable Energy Lab (0)
- Northwest Medical Isotopes (0)
- Oak Ridge National Laboratory (0)
- PM-1 (0)
- PM-2A (0)
- Pacific Northwest National Laboratory (0)
- Plum Brook (9)
- SHINE Medical Technologies (0)
- SM-1 (0)
- SM-1A (0)
- Sandia National Laboratories (0)
- Tuxedo (0)
- U.S. Geological Survey (3)
- Vanowen (0)
- Waltz Mill (2)
Hospital
- Advocate Illinois (0)
- Avera McKennan Hospital (0)
- Banner Boswell Medical Center (0)
- Bard Brachytherapy (0)
- Dermatology of Seattle and Bellevue (0)
- Fred Hutchinson Cancer Center (0)
- George Washington Hospital (0)
- Karmanos Cancer Institute (0)
- Kennedy Memorial Hospital (0)
- Lincoln Memorial Hospital (0)
- Northwestern Memorial Hospital (0)
- Piedmont Hospital (0)
- UMass Memorial Health Medical Center (0)
- University Hospitals of Cleveland (0)
- West Virginia University Hospital (0)
Manufacturer
- 05200045 (0)
- Braun Intertec Corporation (0)
- Electric Boat (0)
- Martinez Refining Company (0)
- Mistras Group (0)
- Reliable Testing Services (0)
- Sacyr Construction (0)
- Screaming Eagle Coal (0)
- Tilden-Mine (0)
Agency
Pages in category "TECHNICAL SPECIFICATIONS"
The following 200 pages are in this category, out of 15,308 total.
(previous page) (next page)1
2
3
A
- A06214, Proposed Tech Specs,Providing Limiting Conditions for Operation Per Generic Ltr 83-37
- A07433, Proposed Tech Specs Re Leakage Detection Sys
- A14108, Proposed TS 3/4.1.1,3/4.1.2 & 3/4.1.3 Re Reactivity Control Sys,Boration Sys & Movable Control Assemblies,Respectively
- AECM-84-0336, Proposed Tech Specs,Reflecting 840318 Tech Spec Review Program Findings,Including Editorial Changes,Tech Spec/ as-built Plant Consistency & Enhancements Consistent W/ Safety Analyses
- AECM-85-0303, Proposed Tech Specs,Changing Table 3.3.7.4-1, Remote Shutdown Sys Controls by Deleting Item 20, RHR to RCIC Head Spray Line
- AECM-89-0219, Revised marked-up Tech Specs Re Establishment of New Company Called Eoi,As sys-wide Nuclear Operations Company
- AECM-90-0154, Proposed Tech Spec 3/4.5.2 Re Alternate DHR Sys
B
- B11549, Proposed Tech Spec Revs to Sections 5 & 3/4.9,expanding Storage Capacity of Spent Fuel Pool from 667 to 1,112 Storage Locations by Reracking Spent Fuel Pool W/Combination of Poison & Nonpoison Racks in Two Region Arrangement
- B11663, Proposed Tech Specs Changing Max Critical Power Ratio Operating Limits & MAPLHGR Curves for Cycle 10 & Correcting Typos
- B11829, Proposed Tech Spec Change,Allowing Testing of Normally Closed Isolation Valves in post-accident Sampling Sys During Operation Modes 1-4
- B11860, Proposed Tech Specs 3/4.6.5.1,3/4.6.J.1 & 3/4.6.J.3 Providing Option of Resin Replacement for Condensate Demineralizers in Addition to Resin Regeneration
- B11911, Proposed Tech Specs for Cycle 14 Reload
- B11922, Proposed Tech Specs Deleting Requirement for Isolation Condenser Operability for Continued Power Operation When No Offsite 345-kV Power Available
- B11964, Proposed Tech Spec Changes,Revising Table 3.3-9, Remote Shutdown Instrumentation by Deleting Transfer Switches on Valves FWA*AOV-61A,61B,62A & 62B
- B11984, Proposed Tech Spec 4.6.E.5,clarifying Functional Testing Requirements for Safety/Relief Valve Position Indication Sys
- B11987, Proposed Tech Specs,Allowing Installation of Directional Spray Water Suppression Sys in Cable Spreading Area Hallway & Water curtain-type Automatic Directional Spray Sys Around Four Svc Water Pumps to Protect Safe Shutdown Equipment
- B12000, Proposed Tech Spec Revs,Expanding Storage Capacity of Spent Fuel Pool by Storing Consolidated Spent Fuel in Fuel Storage Racks
- B12067, Proposed Tech Specs Allowing Implementation of Measures Approved by NRC as One Element of Response to Previously Addressed Small Break LOCA Issue
- B12096, Proposed Tech Spec Changes Re Fire Protection Audits
- B12228, Proposed Tech Specs,Reducing Allowable Outage Time from 7 Days to 24 H (W/Restriction to Be in Cold Shutdown in Next 24 H) Which Is More Conservative than 50% Reduction in Allowable Outage Time Recommended by NRC
- B12230, Proposed Tech Spec Sections 4.6.6.1,4.7.7 & 4.9.12,replacing 31-day Requirement to Use Certified Fan Curves to Verify Sys Flow Rates W/Direct Flow Rate & Deleting 18-month Requirement to Verify Fan Curves
- B12269, Proposed Rev to Tech Specs 3.7.1, Primary Containment Isolation, Reflecting Plant Mods & Increasing Scope of Table to Include Check Valves
- B12305, Proposed Tech Specs,Revising pressure-temp Limits & Max Allowable Heatup & Cooldown Rates for RCS
- B12310, Proposed Tech Specs Allowing Reduction in RCS Flow Rate from Current Value of 350,000 to 340,000 Gpm & Reducing Total Integrated Radial Peaking Factor
- B12370, Proposed Tech Specs Deleting Control Bldg Inlet Ventilation Radiation Signal from Tables 3.3-6 & 4.3-3 & Corresponding Action Statement 27
- B12389, Proposed Tech Spec,Modifying Tech Spec 3.20, RCS Flow,Temp & Pressure to Include Three Loop Operation Flow Requirement & Tech Spec Figure2.2-2,reflecting Results of Three Loop Flow Measurement
- B12398, Proposed Tech Specs Re Addition of Six Water Suppression Sys to Fire Protection Sys
- B12438, Proposed Tech Specs Re Reactor Trip Bypass Breakers
- B12478, Proposed Tech Spec 3.7.A.5.c Re Containment Sys Oxygen Concentration,Replacing Phrase Important to Safety W/ Necessary to Ensure Safe Plant Operation to Eliminate Ambiguities
- B12486, Proposed Tech Spec Section 4.8.1.1.2 Increasing Emergency Diesel Generator Startup Time of 10 to 11 & Response Time for Item 11.a of Table 3.3-5 from 12 to 13
- B12520, Proposed Tech Specs,Deleting safety-related Hydraulic & Mechanical Snubbers from Tech Spec Tables 3.6.1.a & 3.6.1.b
- B12531, Proposed Tech Specs,Amending Current Min Critical Power Ratio,Lhgr & MAPLHGR Operating Limits to Reflect Cycle 12 Operation.Affidavit Encl
- B12537, Proposed Tech Specs Supporting Cycle 15 Operation & Reflecting Upgraded Methods for Analysis of non-LOCA Events
- B12539, Proposed Tech Specs,Authorizing Storage of Up to 10 Consolidated Spent Fuel Assemblies in Spent Fuel Pool
- B12542, Proposed Tech Specs,Incorporating long-term Acceptance Criteria for Steam Generator Tubes W/Defects in Rolled Region
- B12543, Proposed Tech Specs 3.19 & 4.13 Re Snubber Testing & Surveillance
- B12544, Proposed Tech Specs,Incorporating Guarantee That New motor-operated Valves Scheduled for Installation During 1987 Refueling Outage Remain in Respective Positions,Causing No Adverse Effects to ECCS
- B12550, Proposed Tech Spec 4.3.4.2a,increasing Main Turbine Control Valve Testing Interval from Weekly to Monthly
- B12552, Proposed Tech Specs,Deleting Tables 3.7-1a & 3.7-1b Re Hydraulic & Mechanical Snubbers & Making Other Changes to Section 3.7.8 to Support Removal of Specific Snubber Listings
- B12560, Proposed Tech Specs,Adding New Section Re Main Feedwater Isolation Valves
- B12588, Proposed Tech Specs Providing Limiting Conditions for Operation & Surveillance Requirements Per Generic Ltr 83-37 (NUREG-0737)
- B12601, Proposed Tech Spec 5.4, Containment, Deleting General Statements Made About Containment Penetrations & Associated Basis
- B12604, Proposed Tech Spec Changes Supporting Cycle 15 Operation
- B12605, Proposed Tech Specs,Modifying Calibr Requirements for Power Range Nuclear Instrumentation When Plant Operated at steady- State Reduced Power & Channels Adjusted to Provide Enhanced Overpower Protection
- B12616, Proposed Tech Specs,Deleting Reject Line on Sample Plan 2 from Section 4.7.10.e.(2) Re Functional Tests & Figure 4.7-1 Re Sample Plan 2 for Snubber Functional Test
- B12620, Proposed Tech Specs,Revising Page 6-19 to Add or Reclose to Requirements for Submittal of Annual Repts
- B12628, Proposed Tech Specs Re Coolant Chemistry & Annual Repts
- B12630, Proposed Tech Specs,Adding New Surveillance Requirement Re Control Room Habitability
- B12639, Proposed Tech Specs Change Request Re Control Rod Drive Mechanism Removal
- B12648, Proposed Tech Specs,Changing Limiting Condition for Operation 3.4.6.2(c) on Page 3/4 4-9 from 0.5 Gpm to 0.15 Gpm for Any One Steam Generator
- B12658, Proposed Tech Specs,Specifying Limit for How Long Radioactive Monitoring Instrumentation May Be Out of Svc for Maint,Required Tests,Checks & Calibr Purposes
- B12661, Proposed Tech Specs,Allowing Positive Moderator Temp Coefficient at Reactor Power Levels Less than 100% to Support Cycle 2 Reload
- B12670, Proposed Tech Specs,Revising Tech Spec 3.7.A.3, to Delete Permission to Perform Open Vessel Reactivity Tests
- B12686, Proposed Tech Specs,Deleting Instrument Error Analysis Criteria Applicable to manual-type Integrated Leak Rate Test Data acquisition-reduction Processing
- B12692, Proposed Tech Spec Pages 3/4 4-8,3/4 9-1,3/4 9-1a,5-5 & B 3/4 9-1,changing Requirements for Cycle 2 Operation.Safety Evaluation Encl
- B12699, Proposed Tech Spec Pages 3/4 8-1 & 3/4 8-6 Re Radioactive Liquid/Gaseous Effluent Instrumentation
- B12727, Proposed Tech Spec 3.12 Adding Operability Requirements on Offsite & Onsite Power Sources W/Limiting Conditions for Operation & Time Requirements for Corrective Actions
- B12738, Proposed Tech Specs,Eliminating Control Bldg Ventilation Chlorine Detectors
- B12784, Proposed Tech Specs,Revising Integrated Leak Rate Test
- B12792, Proposed Tech Specs Re RCS Leakage Detection Sys
- B12813, Proposed Tech Specs Re Halon 1301 Sys & Fire Detection Equipment
- B12814, Proposed Tech Specs,Revising Voltage for Primary Side of Emergency Station Svcs Transformer
- B12815, Proposed Tech Specs,Changing Tech Specs Section 3.4.9.3 to Change Min RCS Vent Area Required for Cold Overpressure Protection from 7.0 to 5.4 Square Inches
- B12820, Proposed Tech Spec 4.7.6.1.e.3 Re Test Method for Control Room Air in-leakage
- B12828, Proposed Tech Specs,Renumbering Manual High Pressure Safety Injection Throttle Valves for Consistency W/Plant Loop Numbering Scheme
- B12879, Proposed Rev to Tech Specs Re Primary Sys Boundary Monitoring Locations
- B12888, Proposed Tech Specs,Allowing Startup of Plant While Utilizing Provisions of Tech Spec 3.6.3
- B12913, Proposed Tech Specs Re Diesel Fuel Oil Surveillance Requirements
- B12915, Proposed Tech Specs Re Administrative controls-reporting Requirements
- B12931, Proposed Tech Specs Re Electrical Power Sys
- B12967, Proposed Tech Spec Changes Incorporating New Section of Sprinkler Protection in Turbine Bldg & Reduction in Number of Smoke Detectors Available in Containment from 23 to 22
- B12979, Proposed Tech Specs 3.12 & 4.2 Re Addition of Operability Requirements for Offsite & Onsite Power Sources W/Limiting Conditions for Operations & Time Requirements for Corrective Actions to Station Service Power,Respectively
- B12981, Proposed Tech Specs 4.3-2 Re ESF Actuation Sys Instrumentation Surveillance Requirements
- B12985, Proposed Tech Specs Re Containment Isolation Valves
- B12987, Proposed Tech Specs,Adding Alternate Means of Analyzing Containment Integrated Leakage Rate Test Results
- B13007, Proposed Tech Spec Changes Stating That Penalty for Undetected Fouling of Feedwater Venturis of 0.1% Is Added to Flow Measurement Uncertainty Values If Venturis Not Cleaned at Least Once Per 18 Months
- B13013, Proposed Tech Specs,Allowing Operation Beyond Projected End of Core Life for Current Cycle 9
- B13017, Proposed Tech Specs Clarifying Intent of Tech Spec 4.4.5.1.4.a.8 Re Extent & Origination Point of Steam Generator Tube Exams
- B13032, Proposed Tech Specs Pages 3/4 4-7,3/4 4-9,B 3/4 4-2a & B 3/4 4-3 Re Surveillance Requirements for RCS Leakage
- B13048, Proposed Tech Specs Adding Sections 3/4.7.11 & 3/4.7.12 That Will Define Mechanical Structural Aspects of Seismic Qualification Requirements for Plant Piping Sys & Provide Actions to Be Taken for Listed Events
- B13056, Proposed Tech Specs Amending Sections 1.0,3/4.2,3/4.9, 3/4.10,3/4.11,5.0 & 6.0
- B13079, Proposed Tech Specs Changes Per Generic Ltr 87-09
- B13089, Proposed Tech Specs,Providing for New Limiting Conditions for Operation,Surveillance Requirements & Nominal Setpoints for New 4160 Volt Bus Undervoltage/Timing Relay Input Circuits & loss-of-normal Power Actuation Circuits Mods
- B13098, Proposed Tech Specs Re Administrative Controls & Organizational Charts
- B13127, Proposed Tech Specs,Revising Info on Core Exit Thermocouples,Main Stack wide-range Noble Gas Monitor, Reactor Vessel Water Level & RCS Subcooling Margin Monitor, Per Generic Ltr 83-37
- B13151, Proposed Tech Specs 3/4.1, Reactivity Control Sys
- B13164, Proposed Tech Specs Allowing Storage of Fuel W/Max Enrichment Up to 5.05 Weight Percent U-235 Fuel in Safe & Subcritical Configuration During All Normal & Abnormal Conditions
- B13169, Proposed Tech Specs,Revising Sections 3.6, Core Cooling Sys, 3.7, Min Water Vol & Boron Concentration in Refueling Water Storage Tank & 4.3, Core Cooling Sys-Periodic Testing, to Combine Into New Section 3.6, Eccs
- B13181, Proposed Tech Spec Sections 3/4.4,3/4.6 & 3/4.7 Re RCS
- B13201, Proposed Tech Specs Re Containment Integrity,Internal Pressure & Air Recirculation Sys to Allow Four Containment Air Recirculation Fan Motor HXs to Be Cleaned or Replaced While at Power
- B13208, Proposed Tech Specs Supporting Operation of Cycle 15
- B13221, Proposed Tech Specs Re Inservice Insp of Steam Generator Tubes & Acceptance Criteria for Tubes
- B13256, Proposed Tech Specs,Revising Administrative Controls for Radiological Effluent Monitoring Manual
- B13269, Proposed Tech Specs Sections 2.0 & 3/4.3 Re Safety Limits & Limiting Safety Sys Settings & Instrumentation
- B13284, Proposed Tech Spec 3.6 Re ECCS
- B13289, Proposed Tech Specs Re Containment Water Level Monitor,Per Generic Ltr 83-36
- B13292, Proposed Tech Specs,Supporting Cycle 16
- B13295, Proposed Tech Specs Re Limiting Conditions for Operation & Surveillance Requirements & RCS Operational Leakage
- B13298, Proposed Tech Specs Re Noble Gas Effluent Monitors
- B13299, Proposed Tech Specs,Decreasing Reactor Trip Set Point & Allowable Value for Reactor Coolant Pump Low Shaft Speed from 97.8 to 95.8% Rated Speed & from 94.6 to 92.5% Rated Speed,Respectively
- B13314, Proposed Tech Specs 1.37,3/4.3.1,3.3.3.9,3/4 9.2,Bases 2.2.1,3/4.3.3.9 & 3/4.3.4 & Tables 2.2-1,3.3-1,3.3-1a,4.3-1, 3.3-2,4.3-2,3.3-7 & 4.3-6 Re Reactor Protection Sys & Nuclear Instrumentation Sys
- B13327, Proposed Tech Specs Incorporating Proposed Changes Agreed to During 890330 NRC Meeting & Subsequent Conference Calls, Proposed Changes Necessitated by New Switchgear Bldg Mods & Clarification of Level 1 Undervoltage Surveillance Tests
- B13350, Proposed Tech Specs Changing Allowable Min Capacity of Condensate Demineralizer Capacity to 5 Ibs as Chlorine Ion Prior to Replacement of Resin Charge,Increasing Usage of Each Bed by Approx 14%
- B13380, Proposed Tech Specs Re Semiannual Radioactive Effluent Release Rept,Monthly Operating Repts,Technical Repts Supporting Cycle Operation,Special Repts & Record Retention.Pages Omitted from 890728 Submittal
- B13391, Proposed Tech Specs 3.3.3.6 & 3.6.4.1 Re Accident Monitoring Instrumentation & Containment Hydrogen Monitors
- B13401, Proposed Tech Specs Re Surveillance Requirements for Hydrogen Recombiners
- B13410, Proposed Tech Specs,Revising Section 3/4.8.1 Re Electrical Power Sys
- B13429, Proposed Tech Specs Re Containment Airlocks & Pressure,Air Temp,Containment Structural Integrity & Containment Ventilation Sys
- B13435, Proposed Tech Specs Re cycle-specific Parameter Limits
- B13450, Proposed Tech Specs,Relocating Table 4.4-5, Reactor Vessel Matl Surveillance Program-Withdrawal Schedule & Changing Figures 3.4-3,4 & 5 Re Thermal Shields
- B13462, Proposed Tech Specs Clarifying Sections 4.6.2.1,4.6.2.2 & 3/4.9.1 to Correct Inconsistency Between as Built Conditions & Tech Specs
- B13470, Proposed Tech Specs Re ESF Actuation Sys Instrumentation Trip Setpoints
- B13476, Proposed Tech Specs Re Limiting Condition for Operation & Surveillance Requirements for Safety Valves in RCS & Plant Sys
- B13503, Proposed Tech Specs Re Fire Detection Sys,Spray &/Or Sprinkler Sys & CO2 Sys
- B13510, Proposed Tech Specs Removing ACI Function from Facility RHR Sys Suction Valves
- B13520, Proposed Tech Specs Supporting Cycle 16 Operation
- B13528, Proposed Tech Spec 4.0.2,deleting Requirement That Combined Time Interval for Any Three Consecutive Surveillance Intervals Not to Exceed 3.25 Times Specific Surveillance Interval
- B13551, Proposed Tech Specs Re Core Alteration,Shutdown Margin, Identified/Unidentified Leakage,Pressure Boundary Leakage & Controlled Leakage
- B13552, Proposed Tech Specs Re Feedwater Coolant Injection Sys Surveillance Testing
- B13555, Proposed Tech Specs Re Establishment of Limit of 160 Failed Fuel Rods for Cycle 16 Operation
- B13557, Proposed Tech Specs Revising Surveillance Requirement in Tech Spec 4.0.2 by Deleting Requirement That Combined Time Interval for Any Three Consecutive Surveillance Intervals
- B13558, Proposed Rev to Tech Specs Reactor Coolant Specific Activity
- B13570, Proposed Tech Specs Revising Sections 3.4.6.2.f,4.4.6.2.1.g & 4.4.6.2.1.h Re RCS Leakage & Low Temp Overpressurization Protection Sys Bases
- B13576, Proposed Tech Specs Re Control Room Emergency Ventilation Sys
- B13577, Proposed Tech Specs Re Refueling Operations
- B13578, Proposed Rev to Tech Specs Re Removal of 3.25 Limit on Extending Surveillance Intervals
- B13591, Proposed Tech Specs Revs to Supplementary Leak Collection & Release Sys
- B13597, Proposed Tech Spec Page 3/4 7-3 Re Auxiliary Feedwater Sys Operability
- B13598, Proposed Tech Specs Re Removal of cycle-specific Parameter Limits
- B13627, Proposed Tech Specs Supporting Cycle 4
- B13630, Proposed Tech Specs Re Containment Spray Interlock
- B13645, Proposed Tech Specs Re Fire Detection Instruments & Fire Hose Stations
- B13690, Proposed Tech Specs Re Surveillance Requirements for Hydrogen Recombiners
- B13747, Proposed Tech Specs Section 3.3.3.6 Re Accident Monitoring instrumentation--reactor Vessel Monitoring
- B13751, Proposed Tech Specs Re Steam Generator Overfill Protection
- B13759, Proposed Tech Specs Re Reactor High Water Level Feedwater Pump Trip Instrumentation
- B13794, Proposed Tech Specs Re Surveillance Requirements for Hydrogen Recombiners
- B13800, Proposed Tech Spec Figure 3.6-2 Re Hydrogen Recombiner Acceptance Criteria,Flow Vs Containment Pressure
- B13837, Proposed Tech Specs Change Definitions Page 1-6 & Tech Specs 3.2.3,4.2.3.2,4.2.3.3,4.2.3.4,3.2.4,3.3.3.2 & 4.3.3.2 to Remove Requirement for Explicit Tilt Correction in Total Unrodded Integrated Radial Peaking Factor
- B13973, Proposed Tech Specs Changes Per Generic Ltr 90-09, Snubber Visual Insp Intervals
- B14014, Proposed TS Table 3.6-2 Re Containment Isolation Valves
- B14078, Proposed TS Deleting License Conditions 2.C(5) Re Inservice Insp Program & 2.C(10) Re Initial Test Program
- B14087, Proposed Tech Specs Re Steam Generator Repair Criteria
- B14203, Proposed Tech Specs Re Flood Protection Consistent at Plant for Each Unit
- B14256, Proposed TS Sections 3.8.1.2 Re Electrical Power Sys, 3.8.2.2 Re Ac Sources & Dc Sources & 3.8.2.3 Re Onsite Power Distribution for Shutdown Conditions (Modes 5 & 6)
- B14290, Proposed Tech Specs Re Operability of Charging Pump
- B14291, Proposed TS 3/4 6-3.d Increasing Type B & C Surveillance Testing Intervals from 24 Months to 34 Months for Cycle 4 Only
- B14340, Proposed TS Table 3.3.3, Reactor Protection Sys (Scram) Instrumentation Requirements
- B14356, Proposed Tech Specs Revising Placement of Footnote to TS 4.8.1.1.2(a) & 4.8.1.1.2(b) Whereby Footnote Would Be Relocated to Main Heading Spec 4.8.1.1.2
- B14372, Proposed Tech Specs Changes to 3.2.3.1.a & Table 2.2-1, Increasing Acceptance Criterion for Measured RCS
- B14376, Proposed TSs to Increase Max Stroke Time for RWCU Sys Isolation Valves CU-2,3.5 & 28 from 18 to 20 Seconds in Table 3.7.1
- B14391, Proposed TS 4.6.1.2 Re Calculating Containment Integrated Leakage Rates During Surveillance Testing
- B14396, Proposed TS 3.7.A.2 Re Drywell to Suppression Chamber Differential Pressure
- B14408, Proposed,Deleted TS 3.12 Re Fire Suppression Water Sys, Spray &/Or Sprinker Sys,Carbon Dioxide & Halon 1308 Sys,Fire Hose Stations,Fire Protection Instrumentation & Penetration Fire Barriers
- B14430, Proposed TS 4.4.3.5(a) Re Insp Frequencies for SG Tubes
- B14445, Proposed TS Figure 3.4-2 Re RCS Pressure/Temp Limitations for 12 EFPYs
- B14450, Proposed Tech Specs Page 3/4 4-17 Re RCS Pressurizer Code Safeties Lift Tolerences
- B14461, Proposed TS 3/4.7.1 Re self-actuation & Remote Actuation Function of Safety Valves & Table 3.7-1, Steam Line Safety Valves Per Loop
- B14462, Proposed Tech Specs 3.4.4 & 3.4.9.3 Addressing Issues in GL-90-06
- B14464, Proposed TS Table 3.1.1, RPS (Scram) Instrumentation Requirement & Table 4.1.1, Scram Instrumentation Functional Tests,Min Functional Test Frequencies for Safety Instruments & Control Circuits
- B14491, Proposed TS Figure 3.6.1, P-T Curves for Pressure Tests & Figure 3.6.2, P-T Curves for Non-Nuclear Heatup/Cooldown for 32 Efpys
- B14513, Proposed Tech Specs Changing Bases Sections 3.5.A,3.5.B & 3.5.C to Provide long-term post-accident Core & Containment Cooling & to Clarify Basis & Identify Components Comprising FWCI Subsystem
- B14542, Proposed Tech Specs Permanently Removing Ability for Plant to Operate W/Three Loops While in Modes 1 or 2
- B14543, Proposed Tech Specs 3/4 6-7,15,16,17,17a & 20 Revising Visual Surveillance Requirements for Snubbers
- B14554, Proposed Tech Spec 3/4.4.1 Re Reactor Coolant Loops & Coolant Circulation
- B14558, Proposed Tech Specs Re App J Local Leak Rate Testing
- B14562, Proposed Tech Specs Adding Requirement 4.8.1.1.2.C.8,items A,B, & C to EDG Surveillance Requirements Section to TS Section 3/4.8, Electrical Power Sys
- B14563, Proposed Tech Specs Increasing Volume Requirements of Boric Acid Storage Sys of TS 3.1.2.6 in Order to Meet Requirements of Redesigned Core for Cycle 5 Operation
- B14619, Proposed Tech Specs Increasing AOT for Charging Pump from 72 Hours to Seven Days
- B14624, Proposed Tech Specs Modifying Operating License Condition 2.C(3), Fire Protection by Deleting Existing Wording & Replacing W/Standard Wording Provided in GL 86-10
- B14647, Proposed Tech Specs 4.6.6.1.d.3 & 3.6.1.2.a Re Suppl Leak Collection & Release Sys
- B14653, Proposed Tech Specs Revising Unit 3 TS Re Pressurizer Safety Valves & Main Steam Safety Valves Lift Setting Tolerance Change
- B14655, Proposed Tech Specs Incorporating Changes Related to SLCRS & Abfs
- B14668, Proposed Tech Specs Related to SLCRS & Auxiliary Bldg Filtration Sys
- B14696, Proposed Tech Specs Rewriting Action Statements for LCO
- B14770, Proposed Tech Specs Supporting one-time Extension to 18- Month Surveillances
- B14784, Proposed Tech Spec Table 3.7-6,creating Two Zones for Main Steam Valve Bldg & Increasing Max Normal Excursion Temp Limit for Area from 120 F to 140 F
- B14826, Proposed Tech Specs Re Carbon Sample Testing
- B14846, Proposed Tech Specs Re GL 93-05 & Various Administrative Changes marked-up Pages
- B14888, Proposed Tech Specs Re EDG Fuel Oil Storage Capacity
- B14930, Proposed Tech Specs Increasing Time That RHR Pump May Be out-of-svc Before Plant Shutdown Is Required to Be Initiated
- B14946, Proposed Tech Specs Re Proposed Rev to License Condition & TSs FP
- B15135, Proposed Tech Specs Re Feedwater Isolation
- B15155, Proposed Tech Specs,Incorporating Change to Fq Surveillances to Account for Changes in Fq Which Can Exceed 2%
- B15159, Proposed Tech Spec 3.10.5,allowing More than One Control Bank to Be Fully Withdrawn from Core Simultaneously for Rod Drop Time Response Testing
- B15501, Proposed Tech Specs,Allowing Use of performanced-based Containment Leakage Testing Requirements Described in 10CFR50,App J,Option B
- B15736, Proposed Tech Specs Table 3.3-1 Re Action Statement
- B15865, Proposed Tech Specs 3.1.2.3,changing Wording of Charging Pump - Shutdown TS
- B16471, Proposed Tech Specs Modifying Definition 1.8 Re Containment Integrity
- B16559, Proposed Tech Specs Revising TS 4.6.1.1,3/4.6.1.2 & 3/4.6.1.3 & Bases Sections 3/4.6.1.1,3/4.6.1.2 & 3/4.6.1.3 Modifying List of Valves That Can Be Opened in Modes 1 Through 4 & Adding Footnote on Procedure Controls
- B16669, Proposed Tech Specs Adding Time Delay,Including Allowance,To Portion of ESFAS Undervoltage Trip TS
- B16809, Proposed Tech Specs Re Reactor Coolant Sys Heatup/Cooldown Limits & Low Temp Overpressure Protection
- B17056, Proposed Tech Specs Replacing Pages 2-4,B 2-3,B 2-3, 3/4 3-15,B 3/4 3-1 & B 3/4 3-2