|
---|
Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20212C1121999-09-16016 September 1999 Criticality Safety Analysis of W Spent Fuel Storage Racks in Pool B of Crystal River Unit 3 ML20212C0961999-09-16016 September 1999 Proposed ITS & Bases Changes Strikeout & Shadowed Text & Revision Bar Format,Increasing Licensed Capacity for Spent Fuel Assembly Storage in SFP & Revising Configuration for Storage of Fresh Fuel ML20211L1011999-09-0202 September 1999 Proposed Tech Specs Re Once Though SG Tube Surveillance Program,Alternate Repair Criteria (ARC) for Axial Tube End Crack (Tec) Indications ML20212C0991999-08-31031 August 1999 Criticality Safety Analysis of Crystal River Unit 3 Pool a for Storage of 5% Enriched Mark B-11 Fuel in Checkerboard Arrangement with Water Holes ML20209D2971999-07-0808 July 1999 Proposed Tech Specs,Changing ITS for CREVS & VFTP & Correcting Typo in ITS Section 5.6.2.12 ML20195B8091999-05-26026 May 1999 Proposed Tech Specs,Revising ITS Bases That Will Update NRC Copies of ITS ML20195B7081999-05-17017 May 1999 Proposed ITS Section 3.3.8, EDG Lops, SR 3.3.8.1,revising Note for Surveillance & Deleting Note for Frequency ML20206S7691999-05-12012 May 1999 Proposed Improved Tech Specs Pages 3.4-21 Through 3.4-21D ML20206N1401999-05-10010 May 1999 Proposed ITS Administrative Controls Section 5.8, High Radiation Area ML20206M0961999-05-0707 May 1999 Proposed Tech Specs,Revising Wording for SR 3.5.2.5 to Be More Consistent with NUREG-1430,Rev 1 & Clarifying Process of Valve Position Verification ML20206H6541999-05-0505 May 1999 Proposed Tech Specs,Proposing Alternate Repair Criteria for Axial Tube End crack-like Indications in Upper & Lower Tubesheets of CR-3 OTSGs ML20204D9211999-03-18018 March 1999 Proposed Tech Specs Re OTSG Tubes Surveillance Program,Tube Repair Roll Process ML20205A7651999-03-18018 March 1999 Rev 29 to AR-305, Es E Annunciator Response ML20205A7961999-03-15015 March 1999 Rev 22 to AR-301, ESA Annunciator Response ML20205A8051999-03-15015 March 1999 Rev 33 to AR-303, ESC Annunciator Response ML20205A8211999-03-15015 March 1999 Rev 35 to AR-403, PSA H Annunciator Response ML20205A3441999-03-12012 March 1999 Rev 25 to AR-402, PSA G Annunciator Response ML20204D5781999-03-0909 March 1999 Rev 10 to AP-513, Toxic Gas ML20204D5821999-03-0808 March 1999 Rev 22 to AR-603, Tgf O Annunciator Response ML20207H7741999-03-0303 March 1999 Rev 15 to AR-602, Tgf N Annunciator Response ML20207J6591999-03-0202 March 1999 Rev 18 to AR-504, ICS L Annunciator Response ML20207J6461999-03-0202 March 1999 Rev 21 to AR-301, ESA Annunciator Response ML20206S7561999-02-28028 February 1999 Rev 2 to Pressure/Temp Limits Rept, Dtd Feb 1999 ML20203C7461999-02-0303 February 1999 Rev 2 to AR-801, FSA Annunciator Response ML20202E6551999-01-27027 January 1999 Proposed Tech Specs Re OTSG Tubes Surveillance Program,Insp Interval Extension ML20202B1411999-01-22022 January 1999 Rev 22 to AR-401, PSA F Annunciator Response ML20199G5201999-01-15015 January 1999 Rev 11 to AP-961, Earthquake ML20199G5581999-01-12012 January 1999 Rev 4 to AP-404, Loss of Decay Heat Removal ML20199G5691999-01-12012 January 1999 Rev 4 to AP-604, Waterbox Tube Failure ML20198T2411999-01-0606 January 1999 Rev 19 to AR-701, Ssf P Annunciator Response ML20196G6771998-12-0101 December 1998 Rev 17 to Annunciator Response AR-702, Ssf Q Annunciator Response ML20196D6761998-11-30030 November 1998 Proposed Tech Specs LCO 3.9.3,allowing Both Doors in Personnel Air Locks & Single Door in Oeh to Be Open During Refueling Operations ML20196G5851998-11-25025 November 1998 Rev 32 to AR-303, ESC Annunciator Response ML20196G3371998-11-25025 November 1998 Reissued Rev 15 to AR-702, Ssf Q Annunciator Response ML20195K4551998-11-24024 November 1998 Proposed Tech Specs,Installing diesel-driven EFW Pump to Remove Interim ITS & Provide Resolution to EDG Capacity Limitations ML20196F6691998-11-24024 November 1998 Rev 11 to AP-330, Loss of Nuclear Svc Cooling ML20195K0031998-11-23023 November 1998 Proposed Tech Specs Re LAR Number 241,rev 0 for High Pressure Injection Sys Mods ML20196F7721998-11-23023 November 1998 Rev 3 to EOP-12, Station Blackout ML20196F7031998-11-23023 November 1998 Rev 3 to AP-404, Loss of Decay Heat Removal ML20196F7541998-11-23023 November 1998 Rev 7 to EOP-08, LOCA Cooldown ML20196F7461998-11-23023 November 1998 Rev 6 to EOP-07, Inadequate Core Cooling ML20196F7241998-11-23023 November 1998 Rev 2 to AP-510, Rapid Power Reduction ML20196F7161998-11-23023 November 1998 Rev 9 to AP-470, Loss of Instrument Air ML20196F8711998-11-23023 November 1998 Rev 28 to AR-305, Es E Annunciator Response ML20196F9451998-11-19019 November 1998 Rev 7 to AP-1080, Refueling Canal Level Lowering ML20196F9381998-11-19019 November 1998 Rev 27 to AP-770, Emergency Diesel Generator Actuation ML20195H6581998-11-17017 November 1998 Proposed Improved Tech Specs (Its),Revising 5.7.2 by Changing Type of Structural Integrity Assessment Required from Probabilistic to Deterministic ML20196D8321998-11-13013 November 1998 Rev 1 to Crystal River Unit 3 ASME Section Xi,Isi Program Interval 3 & Ten Yr NDE Program ML20195H8761998-11-0505 November 1998 Rev 23 to AR-302, Esb Annunciator Response ML20155F4021998-10-30030 October 1998 Proposed Revised Improved Tech Specs (ITS) Section 5.6.2.19, ITS Section 3.4.11,Bases 3.4.11 & 3.4.3 Re PTLR & LTOP Limits 1999-09-02
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20205A7651999-03-18018 March 1999 Rev 29 to AR-305, Es E Annunciator Response ML20205A8051999-03-15015 March 1999 Rev 33 to AR-303, ESC Annunciator Response ML20205A7961999-03-15015 March 1999 Rev 22 to AR-301, ESA Annunciator Response ML20205A8211999-03-15015 March 1999 Rev 35 to AR-403, PSA H Annunciator Response ML20205A3441999-03-12012 March 1999 Rev 25 to AR-402, PSA G Annunciator Response ML20204D5781999-03-0909 March 1999 Rev 10 to AP-513, Toxic Gas ML20204D5821999-03-0808 March 1999 Rev 22 to AR-603, Tgf O Annunciator Response ML20207H7741999-03-0303 March 1999 Rev 15 to AR-602, Tgf N Annunciator Response ML20207J6591999-03-0202 March 1999 Rev 18 to AR-504, ICS L Annunciator Response ML20207J6461999-03-0202 March 1999 Rev 21 to AR-301, ESA Annunciator Response ML20203C7461999-02-0303 February 1999 Rev 2 to AR-801, FSA Annunciator Response ML20202B1411999-01-22022 January 1999 Rev 22 to AR-401, PSA F Annunciator Response ML20199G5201999-01-15015 January 1999 Rev 11 to AP-961, Earthquake ML20199G5581999-01-12012 January 1999 Rev 4 to AP-404, Loss of Decay Heat Removal ML20199G5691999-01-12012 January 1999 Rev 4 to AP-604, Waterbox Tube Failure ML20198T2411999-01-0606 January 1999 Rev 19 to AR-701, Ssf P Annunciator Response ML20196G6771998-12-0101 December 1998 Rev 17 to Annunciator Response AR-702, Ssf Q Annunciator Response ML20196G3371998-11-25025 November 1998 Reissued Rev 15 to AR-702, Ssf Q Annunciator Response ML20196G5851998-11-25025 November 1998 Rev 32 to AR-303, ESC Annunciator Response ML20196F6691998-11-24024 November 1998 Rev 11 to AP-330, Loss of Nuclear Svc Cooling ML20196F7161998-11-23023 November 1998 Rev 9 to AP-470, Loss of Instrument Air ML20196F7031998-11-23023 November 1998 Rev 3 to AP-404, Loss of Decay Heat Removal ML20196F8711998-11-23023 November 1998 Rev 28 to AR-305, Es E Annunciator Response ML20196F7541998-11-23023 November 1998 Rev 7 to EOP-08, LOCA Cooldown ML20196F7241998-11-23023 November 1998 Rev 2 to AP-510, Rapid Power Reduction ML20196F7461998-11-23023 November 1998 Rev 6 to EOP-07, Inadequate Core Cooling ML20196F7721998-11-23023 November 1998 Rev 3 to EOP-12, Station Blackout ML20196F9451998-11-19019 November 1998 Rev 7 to AP-1080, Refueling Canal Level Lowering ML20196F9381998-11-19019 November 1998 Rev 27 to AP-770, Emergency Diesel Generator Actuation ML20196D8321998-11-13013 November 1998 Rev 1 to Crystal River Unit 3 ASME Section Xi,Isi Program Interval 3 & Ten Yr NDE Program ML20195H8761998-11-0505 November 1998 Rev 23 to AR-302, Esb Annunciator Response ML20154E5161998-10-0101 October 1998 Rev 10 to AP-961, Earthquake ML20154C2691998-09-29029 September 1998 Rev 19 to AR-304, ESD Annunciator Response ML20154C2751998-09-29029 September 1998 Rev 18 to AR-701, Ssf P Annunciator Response ML20154E5361998-09-28028 September 1998 Rev 34 to AR-403, PSA H Annunciator Response ML20154F0841998-09-28028 September 1998 Rev 21 to AR-503, ICS K Annunciator Response ML20154E5271998-09-28028 September 1998 Rev 20 to AR-301, ESA Annunciator Response ML20154Q0061998-09-24024 September 1998 Rev 8-0 to Crystal River Unit 3 Security Training & Qualification Plan ML20237B4431998-08-10010 August 1998 Rev 14 to AR-703, Ssf R Annunciator Response ML20236W9711998-07-30030 July 1998 Rev 24 to AR-402, PSA G Annunciator Response ML20236P9891998-07-13013 July 1998 Rev 22 to AR-501, ICS I Annunciator Response ML20249C1531998-06-20020 June 1998 Rev 4 to EOP-14, Emergency Operating Procedure Enclosures ML20249A3341998-06-0505 June 1998 Rev 10 to AP-330, Loss of Nuclear Service Cooling ML20247E6861998-05-0606 May 1998 Rev 20 to AR-603, Tgf O Annunciator Response ML20217Q4621998-04-30030 April 1998 Rev 15 to Crystal River Unit 3 ASME Section XI Pump & Valve Program Inservice Testing Program ML20247E6621998-04-30030 April 1998 Rev 10 to AP-250, Radiation Monitor Actuation ML20216A9981998-04-24024 April 1998 Rev 30 to AR-303, ESC Annunciator Response ML20217E1481998-04-20020 April 1998 Rev 21 to AR-302, Esb Annunciator Response ML20217C1441998-04-17017 April 1998 Rev 20 to ICS K Annunciator Response ML20217C2631998-04-17017 April 1998 Rev 13 to AR-703, Ssf R Annunciator Response 1999-03-09
[Table view] |
Text
TG REV 10 AP-513 x
T0XIC GAS 1.0 ENTRY CONDITIONS JF any of the following conditions exist:
- Toxic gas is detected at CR-3
- Toxic gas is detected at Units 1 and 2 Notified by Fossil Unit of toxic gas that may affect CR-3 THEN use this procedure.
2.0 IMMEDIATE ACTIONS NOTE 1
( There are no immediate actions for this procedure.
l 9903240245 990310 PDR ADOCK 05000302 Y~
F PM ,
-. A. /
Approved by MNP -
8/[4N/fo~ Date fd-ff
~'(SIGNATURE ON FILE)
AP-513 PAGE 1 of 15 TG
- s. 3 O
BLANK PAGE O
AP-513 REV 10 PAGE 2 of 15 TG J
w 3.0 FOLLOW UP ACTIONS ACTIONS DETAILS 3.1 Select both" CONTROL COMPLEX l'VAC I.SOLATE/ RESET" switches to
.IS0" 3.2 Notify personnel of plant
- NSM (evaluate plant conditions for potential entry into Emergency Plan)
- Fossil Units TSC (if activated) l
[)
v CAUTION With all CC ventilation stopped, the CC may reach its design limit of 95*F in as little as 30 minutes.
3.3 Verify all CC dampers are i properly aligned. AHD-12 closed i AHD-12D closed AHD-2C closed AHD-2E closed i l
AHD-1C closed j AHD-1E closed AHD-3 open i
L rm U '
AP-513 REV 10 PAGE 3 of 15 TG I i
l 1
O l
1 1
l 1
l i
l BLANK PAGE g
i 0'
AP-513 REV 10 PAGE 4 of 15 TG i
i I
J
+. 3.0 FOLLOW UP ACTIONS (CONT *D)
-ACTIONS DETAILS.
3.4 2 at any time, toxic gas
- Stop all CC supply and return fans:
'evels in Control Room un t$be AHF-17A AHF-17B E"
a ons AHF-18A AHF-18B AHF-19A _ _ AHF-19B 1
NOTE Chemistry Lab exhaust fans can operate while toxic gas is actuated when CC exhaust fan is running in slow speed.
3.5 JE CC exhaust fans are A sto) ped. AHF-30 V TH 9 ensure Chemistry Lab fans are stopped. AHF-44B AHF-44A i
l l
O AP-513 REV 10 PAGE 5 of 15 TG
~
Applicable carry-over steps:
3.4 If toxic gas levels in the Control Room become uncomfortable..
h !
O 1
O.
AP-513 REV 10 PAGE 6 of 15 TG
r,-
, 3.0 FOLLOW UP ACTIONS (CONT *D)
ACTIONS DETAILS 3.6 Determine the source of
- Notify PPO to report local toxic gas toxic gas actuation. monitor indications (164 ft CC south wall):
AH-648-CE AH-652-CE AH-649-CE AH-653-CE a
Review the following computer points (group 9):
S263 Train A C1 2 '
S297 Train B Cl 2 S298 Train A S02 S299 Train B S02 Notify Health Physics to sample the following areas for toxic gas:
Control Complex Berm Area l
l 1
O AP-513 REV 10 PAGE 7 of 15 TG
Applicable carry-over steps: '
3.4 JF toxic gas levels in the Control Room become uncomfortable.
O 1
O AP-513 REV 10 PAGE 8 of 15 TG i
T:
"4 3.0 FOLLOW UP ACTIONS (CONT'D)
ACTIONS DETAILS 3.7 Evacuate affected areas as 1 Determine area evacuation based on required. the following:
Source of toxic gas Atmospheric conditions Inhabited or not
' Evacuation route 2 .I_E evacuation is required.
THEN perform the following in order:
Depress appropriate evacuation alarm push button as required. J Notify plant personnel over PA.
Repeat PA announcement.
[V3 3.8 -WHEN Health Physics reports toxic gas concentration in outside atmosphere has lowered to safe levels.
THEN continue in this procedure.
i O
AP-513 REV 10 PAGE 9 of 15 TG
- r. I O I l
l BLANK PAGE O
AP-513 REV 10 PAGE 10 of 15 TG
5,.
.e h 3.0 FOLLOW UP ACTIONS (CONT'D) l Ll :- ACTIONS DETAILS l 3.9 IE toxic gas monitors'are 1 Ensure 1 CC supply fan is running:
in valid alarm.
THEN purge toxic gas from AHF-17A intake duct.
AHF-17B AHF-18A AHF-188 2 Ensure l'CC return fan is running:
AHF-19A AHF-19B 3 Ensure AH-193-FC "CNTRL COMPLEX RECIRC DMPR" is set to "0" (AHD-3 full open).
4 Select " DAMPER OVERRIDE" switch to "0N".
O 5 Adjust AH-193-FC "CNTRL COMPLEX RECIRC DMPR" to "10" (AHD-3 60' open).
3.10 WHEN toxic gas monitor alarms reset, THEN continue in this procedure.
3.11 'IF " DAMPER OVERRIDE" 1 ~~ Adjust AH-193-FC "CNTRL COMPLEX Eitch is "0N". RECIRC DMPR" to "0" (AHD-3 full THEN' restore CC recirc- open) ..
damper to normal.
2 Select " DAMPER OVERRIDE" switch to "0FF".
L ,
AP-513 REV 10 PAGE'11 of 15 TG
Q
.~
O BLANK PAGE O
AP-513 REV 10 PAGE 12 of 15 TG
s- 3.0 FOLLOW UP ACTIONS (CONT'0)
-ACTIONS DEIAILS 3.12 Align-CC ventilation to-
- Select both " CONTROL COMPLEX HVAC normal. ISOLATE / RESET" switches to " RESET".
A Train l B Train 1
3.13 Restore'CC ventilation. 1 Ensure 1 CC supply fan is running:
AHF-17A AHF-17B AHF-18A AHF-18B 2 Ensure 1 CC return fan is running:
AHF-19A AHF-19B l l
3.14 Verify CC dampers are properly positioned. Closed AHD-2C Open AHD-2E AHD-1C 1
AHD-1E AHD-3 t
i O
AP-513 REV 10 PAGE 13 of 15 TG
S O
"l O
i l
i l
I l
l l
1 c
BLANK PAGE l
O\
AP-513 REV 10 PAGE 14 of 15 TG
o 3.0 FOLLOW UP ACTIONS (CONT'D)
. 'd - ACTIONS DETAILS 3.15 Restore CC area exhaust 1 Ensure 1 CC exhaust fan is running:
. fans.
AHF-20A
'AHF-20B 2 Ensure 1 Chemistry Lab exhaust fan is running:
AHF-44A AHF-44B 3 Start AHF-30 1
3.16 Verify CC 95 ft supply '
dampers are open. AHD-12 AHD-12D 3.17 Ensure AH-032-FIR. Channel A indicates approximately 35,000 cfm.
3.18 EXIT this procedure.
1 i
I AP-513 REV 10. PAGE 15 of 15 (LAST PAGE) TG