l l

FLORIDA POWER CORPORATION CRYSTAL RIVER UNIT 3 i

DOCKET NO. 50-302/ LICENSE NO. DPR-72 l

l l

ATTACIBIENT B l

EXIGENT LICENSE AMENDMENT REQUEST #228, REVISION 1 ONCE THROUGH STEAM GENERATOR TUBE SURVEILLANCE PROGRAM Proposed Technical Specification Change Page (Shaded) l l

l 1

l

)

i 9007010322 980630 PDR ADOCK 05000302 P

PDR t

Procedures, Programs and Manuals 5.6 5.6 Procedures, Programs and Manuals 5.6.2.10 OTSG Tube Surveillance Program (continued) 8.

Plugging / Sleeving Limit means the extent of degradation beyond which the tube shall be restored to serviceability by the installation of a sleeve or removed from service because it may become unserviceable prior to the next inspection and is equal to 40% of the nominal tube or sleeve wall thickness.

No more than five thousand sleeves may be installed in each OTSG.

9.

Unserviceable describes the condition of a tube if it leaks or contains a defect large enough to affect its structural integrity in the event of an Operating Basis Earthquake, a loss-of-coolant accident, or a main steam line or feedwater line break, as specified in 5.6.2.10.3.c, above.

10.

Tube Inspection means an inspection of the entire OTSG tube as far as possible.

b.

The OTSG shall be determined OPERABLE after completing the corresponding actions exceeding the plugging /slee(plug or sleeve all tubes vin limit and all tubes containing through-wall cracks required by Table 5.6.2-2 (and Table 5.6.2-3 if he provisions of Specification 5.6.2.10.2.d are utilized).

Defective tubes may be repaired in accordance with the B&W process (or method) equivalent to the method described in report BAW-2120P.

l There7are aTnumberTof;0TSG4tubss thatiha elthe potentialf to exceed: thel tube; plugging /sleevingiliinit"as a resultLofstube end/ anomalies. DefectiveltubesJwill be repaired or. plugged during:the.next outage;of'.

sufficient' duration.s -An evaluation hasLbeen performed which! confirms that-operability of_the CR-310TSGs will not befimpacted with those tubes inservice.

c 5.6.2.11 Secondary Water Chemistry Program This program provides controls for monitoring secondary water chemistry to inhibit steam generator tube degradation and low pressure turbine disc stress corrosion cracking.

The program shall include:

a.

Identification of a sampling schedule for the critical variables and control points for these variables; b.

Identification of the procedures used to measure the values of the critical variables; (continued)

Crystal River Unit 3 5.0-17 Amendment No. MB l

l FLORIDA POWER CORPORATION CRYSTAL RIVER UNIT 3 l

DOCKET NO. 50-302/ LICENSE NO. DPR-72 l

l

\\

i ATTACHMENT C l

EXIGENT LICENSE AMENDMENT REQUEST #228, REVISION 1 l

ONCE THROUGH STEAM GENERATOR TUBE SURVEILLANCE PROGRAM Proposed Technical Specification Change Page (Revision Bar)

Procedures, Programs and Manuals 5.6 5.6 Procedures, Programs and Manuals 5.6.2.10 OTSG Tube Surveillance Program (continued) 8.

Plugging / Sleeving Limit means the extent of degradation beyond which the tube shall be restored to serviceability by the installation of a sleeve or removed from service because it may become unserviceable prior to the next inspection and is equal to 40% of the nominal tube or sleeve wall thickness.

No more than five thousand sleeves may be installed in each OTSG.

9.

Unserviceable describes the condition of a tube if it leaks or contains a defect large enough to affect its structural integrity in the event of an Operating Basis Earthquake a loss-of-coolant accident, or a main steam line or feedwater line break, as specified in 5.6.2.10.3.c, above.

10.

Tube Inspection means an inspection of the entire OTSG tube as far as possible.

b.

The OTSG shall be determined OPERABLE after completing the corresponding actions exceeding the plugging /slee(plug or sleeve all tubes vin limit and all tubes containing through-wall cracks required by Table Specifica(and Table 5.6.2-3 if 5.6.2-2 he provisions of tion 5.6.2.10.2.d are utilized).

Defective tubes may be repaired in accordance with the B&W process (or method) equivalent to the method described in report BAW-2120P.

There are a number of OTSG tubes that have the potential to exceed the tube plugging / sleeving limit as a result of tube end anomalies. Defective tubes will be repaired or plugged during the next outage of sufficient duration. An evaluation has been performed which confirms that operability of the CR-3 OTSGs will not be impacted with those tubes inservice.

)

5.6.2.11 Secondary Water Chemistry Program This program provides controls for monitoring secondary water chemistry to inhibit steam generator tube degradation and low pressure turbine disc stress corrosion cracking.

The program shall include:

a.

Identification of a sampling schedule for the critical variables and control points for these variables; b.

Identification of the roc of the critical variab$es;edures used to measure the values (continued)

Crystal River Unit 3 5.0-17 Amendment No.

e+

FLORIDA POWER CORPORATION CRYSTAL RIVER UNIT 3 DOCKET NO. 50-302/ LICENSE NO. DPR-72

?

ATTACHMENT D EXIGENT LICENSE AMENDMENT REQUEST #228, REVISION 1 i

ONCE THROUGH STEAM GENERATOR TUBE SURVEILLANCE PROGRAM List of Regulatory Commitments

U.S. Nuclear Regulatory Commission Attachment D 3F0698-33 Page 1 of1 LIST OF COMMITMENTS The following table identifies those actions committed to by Florida Power Corporat%n in this document 'Any other actions discussed in the submittal represent intended or plannc i actions by Florida Power Corporation. They are described to the NRC for the NRC's information and are not regulatory commitments. Please notify the Manager, Nuclear Licensing of any questions regarding this document or any associated regulatory commitments.

I Commitment Due Date l.

There are a number of OTSG tubes that have the potential to During the next outage of l

exceed the tube plugging / sleeving limit as a result of tube end sufficient duration.

anomalies. Defective tubes will be repaired or plugged.

l-The results of a study originally requested by the B&W Owners The analytical work is Group will determine if any of the tubes with tube end anomalies scheduled to be performed (TEAS) or multiple end anomalies (MEAS) need to be reclassified this summer with as defective. The analytical work is scheduled to be performed this confirmatory laboratory summer with confirmatory laboratory testing to be conducted testing to be conducted L

through the remainder of 1998, through the remainder of l-1998.

l t