Procedures, Programs and Manuals 5.6 5.6 Procedures, Programs and Manuals 5.6.2.10 OTSG Tube Surveillance Program (continued) 3.
The above-required inservice inspections of OTSG tubes shall be performed at the following frequencies except,._Lple-time shanae_fpr_CysledLisatanteLto_ modify _the_sIheduled ins putioLfreq u.ency_fata_calend ar..h as ed_intenaLttan intenaLoLutto_2L6_nonths_oLop_etating_ time _ata Iempnatureaf_100. Lor _abne_0neasxced_a.t_thelat_les_sid.eb IhiLwilLallotthemsG_ tube _ iAsReraioalo_solacidl.with RefueLOutage_118:
a.
Inservice inspections shall be performed at intervals of not less than 12 nor more than 24 calendar months after the previous inspection.
If two consecutive inspections following service under all volatile treatment (AVT) conditions, not including the preservice inspection, result in all inspection results falling into the C-1 category, or if two consecutive inspections demonstrate that previously observed degradation has not continued and no additional degradation has occurred, the inspection interval may be extended to a maximum of once per 40 months.
b.
If the inservice inspection of an OTSG, conducted in accordance with Table 5.6.2-2 or Table 5.6.2-3 requires a third sample inspection whose results fall in Category C-3, the inspection frequency shall be reduced to at least once per 20 months.
The reduction in inspection frequency shall apply until a subsequent inspection demonstrates that a third sample inspection is not required.
c.
Additional unscheduled inservice inspections shall be performed on each OTSG in accordance with the first sample inspection specified in Table 5.6.2-2 or Table 5.6.2-3 during the shutdown subsequent to any of the following conditions:
1.
Primary-to-secondary tube leaks (not including leaks originating from tube-to-tube sheet welds) in excess of the limits of Specification 3.4.12, 2.
A seismic occurrence greater than the Operating Basis Earthquake, 3.
A loss-of-coolant accident requiring actuation of the engineered safeguards, or 4.
A main steam line or feedwater line break.
~
9902030114 990127 PDR ADOCK 05000302 (continued)
P PDR Crystal River Unit 3 5.0-15 Amendment No. 149
l l
FLORIDA POWER CORPORATION i
CRYSTAL RIVER UNIT 3 DOCKET NUMBER 50-302/ LICENSE NUMBER DPR-72 l
i ATTACHMENT C 1
LICENSE AMENDMENT REQUEST #243, REVISION 0 L
ONCE THROUGH STEAM GENERATOR TUBE SURVEILLANCE PROGRAM, INSPECTION INTERVAL EXTENSION Proposed Technical Specification Change Page, Revision Bars L
l
- - - ~
j l-Procedures, Programs and Manuals
[
5.6 5.6 Procedures, Programs and Manuals l
5.6.2.10 OTSG Tube Surveillance Program (continued) l' 3.
The above-required inservice inspections of OTSG tubes shall be performed at the following frequencies except, a one-time change for Cycle 11 is granted to modify the scheduled inspection frequency from a calendar-based interval to an
. interval of up to 21.6 months of operating time at a l
temperature of 500 F or above (measured at the hot leg side).
This will allow the OTSG tube inspection to coincide with Refuel Outage 11R:
a.
Inservice inspections shall be performed at intervals of not less than 12 nor more than 24 calendar months after the previous inspection. If two consecutive inspections following service under all volatile treatment (AVT) condit9ns, not including the preservice inspection result in all inspection results falling into the C jory, or if two consecutive
~
inspections demonstru
' tat previously observed degradation has not continued and no additional degradation has occurred, the inspection interval may be extended to a maximum of once per 40 months, b.
If the inservice inspection of an OTSG, conducted in accordance with Table 5.6.2-2 or Table 5.6.2-3 requires a third sample inspection whose results fall in Category C-3, the inspection frequency shall be reduced to at least once per 20 months. The reduction in inspection frequency shall apply until a subsequent inspection demonstrates that a third sample inspection is not required, c.
Additional unscheduled inservice inspections shall be performed on each OTSG in accordance with the first sample inspection specified in Table 5.6.2-2 or Table 5.6.2-3 during the shutdown subsequent to any of the following conditions:
1.
Primary-to-secondary tube leaks (not including leaks originating from tube-to-tube sheet welds) in excess of the limits of Specification 3.4.12, 2.
A seismic occurrence greater than the Operating Basis Earthquake, 3.
A loss-of-coolant accident requiring actuation of the engineered safeguards, or l
4.
A main steam line or feedwater line break.
(continued)
Crystal River Unit 3 5.0-15 Amendment No.
s FLORIDA POWER CORPORATION CRYSTAL RIVER UNIT 3 DOCKET NUMBER 50-302/ LICENSE NUMBER DPR-72 ATTACHMENT D LICENSE AMENDMENT REQUEST #243, REVISION 0 ONCE THROUGH STEAM GENERATOR TUBE SURVEILLANCE PROGRAM, INSPECTION INTERVAL EXTENSION FPC Calculation M-99-0017, Deterministic Operational Assessment for Freespan ODSCC Degradation at Crystal River Unit 3 i