| issue date = 08/24/1990
| issue date = 08/24/1990
| title = Responds to 900725 Ltr Re Commitments Made in Response to Generic Ltr 88-14 on Instrument Air Supply Problems Affecting safety-related Equipment.Simulator Training to Be Provided as Stated
| title = Responds to 900725 Ltr Re Commitments Made in Response to Generic Ltr 88-14 on Instrument Air Supply Problems Affecting safety-related Equipment.Simulator Training to Be Provided as Stated
| author name = ALEXICH M P
| author name = Alexich M
| author affiliation = INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
| author affiliation = INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
| addressee name = MURLEY T E
| addressee name = Murley T
| addressee affiliation = NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
| addressee affiliation = NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
| docket = 05000315, 05000316
| docket = 05000315, 05000316
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:ACCELERATED DISTBJBUTION DEMONSTPWTION SYSTEMREGULATORY INFORMATION DISTRIBUTION YSTEM(RIDS)'A!CESSIONNBR:9008300225 DOC.DATE:
{{#Wiki_filter:ACCELERATED DISTBJBUTION DEMONSTPWTION SYSTEM REGULATORY INFORMATION DISTRIBUTION                       YSTEM (RIDS)
90/08/24NOTARIZED:
A! CESSION  NBR:9008300225                         DOC.DATE: 90/08/24    NOTARIZED: NO        DOCKET FACIL:50-315 Donald C. Cook Nuclear Power Plant, Unit 1, Indiana & 05000315 50-316 Donald C. Cook Nuclear Power Plant, Unit 2, Indiana & 05000316 AUTH. NAME          AUTHOR AFFILIATION ALEXICH,M.P.         Indiana Michigan Power Co. (formerly Indiana & Michigan Ele RECIP.NAME           RECIPIENT AFFILIATION MURLEY,T.E.       'ocument                        Control Branch (Document Control Desk)
NODOCKETFACIL:50-315 DonaldC.CookNuclearPowerPlant,Unit1,Indiana&0500031550-316DonaldC.CookNuclearPowerPlant,Unit2,Indiana&05000316AUTH.NAMEAUTHORAFFILIATION ALEXICH,M.P.
IndianaMichiganPowerCo.(formerly Indiana&MichiganEleRECIP.NAME RECIPIENT AFFILIATION MURLEY,T.E.
'ocumentControlBranch(Document ControlDesk)


==SUBJECT:==
==SUBJECT:==
Respondsto900725ltrre'commitments madeeinresponsetoGenericltr88-014.DISTRIBUTION CODE:R048DCOPIESRECEIVED:LTR 1ENCL0SIZE:TITLE:OR/Licensing Submittal:
Responds      to 900725 ltr                  re'commitments madee in response    to Generic    ltr  88-014.
Equipment Qualification NOTES:RECIPIENT IDCODE/NAME PD3-1LACOLBURN,T.
DISTRIBUTION CODE: R048D TITLE: OR/Licensing Submittal: Equipment COPIES RECEIVED:LTR    1  ENCL Qualification 0  SIZE:
INTERNAL:
NOTES:
NRR/DET/EMEB 9HOC/LFMBILE01EXTERNAL:
RECIPIENT                          COPIES          RECIPIENT         COPIES ID CODE/NAME                        LTTR ENCL      ID CODE/NAME       LTTR ENCL PD3-1 LA                                            PD3-1 PD COLBURN,T.
LPDRNSICCOPIESLTTRENCLRECIPIENT IDCODE/NAME PD3-1PDNRR/DET/ESGB 8DOGC/HDS1'RES/DSIR/EIB NRCPDRCOPIESLTTRENCLNOTETOALL"RIDS"RECIPIENTS'LEASE HELPUSTOREDUCEWASTE!CONTACTTHEDOCUMENTCONTROLDESK,ROOMPI-37(EXT.20079)TOELIMINATE YOURNAMEFROMDISTRIBUTION LISTSFORDOCUMENTS YOUDON'TNEED!TOTALNUMBEROFCOPIESREQUIRED:
INTERNAL: NRR/DET/EMEB 9H                                        NRR/DET/ESGB 8D OC/LFMB                                              OGC/HDS1 ILE        01                                'RES/DSIR/EIB EXTERNAL: LPDR                                                  NRC PDR NSIC NOTE TO ALL "RIDS" RECIPIENTS'LEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM PI-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
LTTR12ENCL ffIIIIfI~~I
TOTAL NUMBER OF COPIES REQUIRED: LTTR                          12  ENCL
~~'r.~~IndianaMichiganPowerCompanyP.O.Box16631Columbus, OH43216IINWAHAS~HCNE6'$!M PQWMAEP:NRC:1075B DonaldC.CookNuclearPlantUnits1and2DocketNos.50-315and50-316LicenseNos.DPR-58andDPR-74INSTRUMENT AIRSUPPLYPROBLEMSAFFECTING SAFETY-RELATED EQUIPMENT (NRCGenericLetter88-14)U.S.NuclearRegulatory Commission Attn:DocumentControlDeskWashington, D.C.20555Attn:T.E.MurleyAugust24,1990


==DearDr.Murley:==
ff    II I  If I ~
ThepurposeofthisletteristoprovidearesponsetoyourletterofJuly25,1990regarding commitments wehadmadeinresponsetoGenericLetter88-14.Specifically, itwasrequested thatweconfirmthestaff'sunderstanding oftwocommitments thathadbeenmadeinourlettersofFebruary24,1989(AEP:NRC:1075) andMarch23,1989(AEP:NRC:1075A).
  ~ I
Thetwocommitments identified inyourletterandourresponsetoeachareasfollows:(1)NRCPosition"Youhavecommitted toestablish aformalairdryerperformance monitoring programfromtheinformalprocedure beingdeveloped atthetimeofyourinitialresponse.
 
Thisprogramisintendedtochangetheemphasisofyourprogramfromacceptance testingtowardreliability enhancement."
Indiana Michigan Power Company
CommentWeconfirmouragreement withtheabovestatement.
    'r. ~ ~
O."0299008300225 900824PDRADQCK05000315PFNU Dr.T.E.Murley-2-AEP:NRC:1075B (2)NRCPosition"Youhavestatedthatsimulator trainingincorporating loss-of-air scenarios wastobesuppliedtoalllicensedandnon-licensed plantoperators beginning in1989.Thistrainingisintendedtosupplement classroom trainingbegunin1988."CommentTheintentofourstatement isthatwewillprovidesimulator trainingtoalllicensedoperators undertherequalification programandaspartofourreplacement programtonon-licensed operators preparing totaketheNRClicensing examination.
P.O. Box 16631
Weaffirmthatwewillprovidesimulator trainingasdescribed underitem(2)below.Basedonisgivenourcommitments, thestatusofthesetwoprogramupgradesbelowforyourinformation:
~ ~
AirDrerPerformance Monitorin ProramIndianaMichiganPower,DonaldC.CookNuclearPlantprocedure
Columbus, OH 43216 IINWAHA S~HCNE6'$!M PQWM AEP:NRC:1075B Donald C. Cook Nuclear Plant Units        1 and 2 Docket Nos. 50-315 and 50-316 License Nos. DPR-58 and DPR-74 INSTRUMENT AIR SUPPLY PROBLEMS AFFECTING SAFETY-RELATED EQUIPMENT (NRC Generic Letter 88-14)
+*12THP6040PER.005,"ControlAirPerformance Tests,"Revision4,wasrevisedonJune1,1989toestablish aperformance monitoring program.Revision5,underthenewtitle"ControlAirPerformance Monitoring" changedthefocusofthepreviousrevisionfromperforming requiredmaintenance tocoordinating neededpreventative maintenance throughMHI5030,"Preventative Maintenance andEnvironmental Qualification Program,"
U.S. Nuclear Regulatory Commission Attn:    Document    Control Desk Washington, D. C. 20555 Attn: T.        E. Murley August 24, 1990
bydocumentation andinspection duringroutinetours.Thesechangeswerealsomadeinaccordance withrecommendations ofINPOSOER88-01.(2)0eratorSimulator TraininIncororatinLoss-ofAirScenarios Aspartofourlicensedoperatorrequalification program,LessenPlanRQ-S-1474, "LossofPlant/Control Air,"wasfirstconducted duringarequalification trainingcyclebeginning onOctober12,1989.Thisincludedsimulator trainingonapartialandcompletelossofplantandcontrolair.Theloss-of-air simulator scenarios arealsoplannedforthetrainingcyclebeginning onNovember26,1990.Additional simulator trainingforlicensedoperators willbedetermined basedonaneedsanalysis.  
 
~~0~~0~\Dr.T.E.Murley-3-AEP:NRC:1075B LessonPlanRO-S-0702, "LossofPlant/Control Air,PTS,"waspresented toourlicensedoperatorreplacement class(non-licensed operators preparing totaketheNRClicensing exam)duringtheperiodApril11throughApril25,1989,andisaregularpartofourreplacement program.Thislessonplanalsoincludessimulator trainingonapartialandcompletelossofplantandcontrolair.Pleasenotethatnon-licensed operators donoreceivesimulator trainingunlessenrolledinareplacement class.Thisdocumenthasbeenpreparedfollowing Corporate procedures thatincorporate areasonable setofcontrolstoensureitsaccuracyandcompleteness priortosignature bytheundersigned.
==Dear Dr. Murley:==
Sincerely, M.P.AlxichVicePresident dfwcc:D.H.Williams, Jr.A.A.Blind-BridgmanJ.R.PadgettG.CharnoffA.B.Davis-RegionIIINRCResidentInspector
 
-BridgmanNFEMSectionChief}}
The purpose        of this letter is to provide a response  to your  letter of July      25, 1990 regarding commitments we had made    in response  to Generic Letter 88-14. Specifically,         it was requested that  we confirm the staff's understanding of two commitments that had been made in our letters of February 24, 1989 (AEP:NRC:1075) and March 23, 1989 (AEP:NRC:1075A).
The two commitments identified       in your letter and our response    to each are as follows:
(1)   NRC  Position "You have committed to establish a formal air dryer performance monitoring program from the informal procedure being developed at the time of your initial response. This program is intended to change the emphasis of your program from acceptance testing toward reliability enhancement."
Comment We  confirm our agreement with the above statement.
O."029 9008300225 900824 PDR  ADQCK 05000315 P                  FNU
 
Dr. T. E. Murley                                               AEP:NRC:1075B (2) NRC  Position "You have  stated that simulator training incorporating loss-of-air scenarios   was to be supplied to all licensed and non-licensed plant operators beginning in 1989.
This training is intended to supplement classroom training  begun  in 1988."
Comment The  intent of our statement is that    we will provide simulator training to    all  licensed operators under the requalification program and as part of our replacement program to non-licensed operators preparing to take the NRC  licensing examination.
We  affirm that we will provide simulator training as described under item (2) below.
Based on our commitments,     the status of these two program upgrades is given below for your information:
Air Dr er    Performance Monitorin Pro ram Indiana Michigan Power, Donald C. Cook Nuclear Plant procedure +*12 THP 6040 PER.005, "Control Air Performance Tests," Revision 4, was revised on June 1, 1989 to establish a performance monitoring program.
Revision 5, under the new title "Control Air Performance Monitoring" changed the focus of the previous revision from performing required maintenance to coordinating needed preventative maintenance through MHI 5030, "Preventative Maintenance and Environmental Qualification Program," by documentation and inspection during routine tours.     These changes  were also made  in accordance with recommendations      of INPO SOER  88-01.
(2) 0  erator Simulator Trainin Incor oratin Loss-of Air Scenarios As  part of our licensed operator requalification program, Lessen Plan RQ-S-1474, "Loss of Plant/Control Air," was first conducted during a requalification training cycle beginning on October 12, 1989. This included simulator training on a partial and complete loss of plant and control air. The loss-of-air simulator scenarios are also planned for the training cycle beginning on November 26, 1990. Additional simulator training for licensed operators will be determined based on a needs analysis.
 
      ~ ~ 0 ~
0
~
  ~
    \
Dr. T. E. Murley                                               AEP:NRC:1075B Lesson Plan RO-S-0702,     "Loss of Plant/Control Air, PTS,"
was  presented to our licensed operator replacement class (non-licensed operators preparing to take the NRC licensing exam) during the period April 11 through April 25, 1989, and is a regular part of our replacement program. This lesson plan also includes simulator training on a partial and complete loss of plant and control air. Please note that non-licensed operators do no receive simulator training unless enrolled in a replacement class.
This document has been prepared following Corporate procedures that incorporate a reasonable set of controls to ensure its accuracy and completeness prior to signature by the undersigned.
Sincerely, M. P. Al xich Vice President dfw cc:   D. H. Williams, Jr.
A. A. Blind - Bridgman J. R. Padgett G. Charnoff A. B. Davis - Region    III-NRC Resident    Inspector    Bridgman NFEM Section  Chief}}

Latest revision as of 00:51, 4 February 2020

Responds to 900725 Ltr Re Commitments Made in Response to Generic Ltr 88-14 on Instrument Air Supply Problems Affecting safety-related Equipment.Simulator Training to Be Provided as Stated
ML17328A400
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 08/24/1990
From: Alexich M
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: Murley T
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
AEP:NRC:1075B, GL-88-14, NUDOCS 9008300225
Download: ML17328A400 (5)


Text

ACCELERATED DISTBJBUTION DEMONSTPWTION SYSTEM REGULATORY INFORMATION DISTRIBUTION YSTEM (RIDS)

A! CESSION NBR:9008300225 DOC.DATE: 90/08/24 NOTARIZED: NO DOCKET FACIL:50-315 Donald C. Cook Nuclear Power Plant, Unit 1, Indiana & 05000315 50-316 Donald C. Cook Nuclear Power Plant, Unit 2, Indiana & 05000316 AUTH. NAME AUTHOR AFFILIATION ALEXICH,M.P. Indiana Michigan Power Co. (formerly Indiana & Michigan Ele RECIP.NAME RECIPIENT AFFILIATION MURLEY,T.E. 'ocument Control Branch (Document Control Desk)

SUBJECT:

Responds to 900725 ltr re'commitments madee in response to Generic ltr 88-014.

DISTRIBUTION CODE: R048D TITLE: OR/Licensing Submittal: Equipment COPIES RECEIVED:LTR 1 ENCL Qualification 0 SIZE:

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD3-1 LA PD3-1 PD COLBURN,T.

INTERNAL: NRR/DET/EMEB 9H NRR/DET/ESGB 8D OC/LFMB OGC/HDS1 ILE 01 'RES/DSIR/EIB EXTERNAL: LPDR NRC PDR NSIC NOTE TO ALL "RIDS" RECIPIENTS'LEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM PI-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 12 ENCL

ff II I If I ~

~ I

Indiana Michigan Power Company

'r. ~ ~

P.O. Box 16631

~ ~

Columbus, OH 43216 IINWAHA S~HCNE6'$!M PQWM AEP:NRC:1075B Donald C. Cook Nuclear Plant Units 1 and 2 Docket Nos. 50-315 and 50-316 License Nos. DPR-58 and DPR-74 INSTRUMENT AIR SUPPLY PROBLEMS AFFECTING SAFETY-RELATED EQUIPMENT (NRC Generic Letter 88-14)

U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Attn: T. E. Murley August 24, 1990

Dear Dr. Murley:

The purpose of this letter is to provide a response to your letter of July 25, 1990 regarding commitments we had made in response to Generic Letter 88-14. Specifically, it was requested that we confirm the staff's understanding of two commitments that had been made in our letters of February 24, 1989 (AEP:NRC:1075) and March 23, 1989 (AEP:NRC:1075A).

The two commitments identified in your letter and our response to each are as follows:

(1) NRC Position "You have committed to establish a formal air dryer performance monitoring program from the informal procedure being developed at the time of your initial response. This program is intended to change the emphasis of your program from acceptance testing toward reliability enhancement."

Comment We confirm our agreement with the above statement.

O."029 9008300225 900824 PDR ADQCK 05000315 P FNU

Dr. T. E. Murley AEP:NRC:1075B (2) NRC Position "You have stated that simulator training incorporating loss-of-air scenarios was to be supplied to all licensed and non-licensed plant operators beginning in 1989.

This training is intended to supplement classroom training begun in 1988."

Comment The intent of our statement is that we will provide simulator training to all licensed operators under the requalification program and as part of our replacement program to non-licensed operators preparing to take the NRC licensing examination.

We affirm that we will provide simulator training as described under item (2) below.

Based on our commitments, the status of these two program upgrades is given below for your information:

Air Dr er Performance Monitorin Pro ram Indiana Michigan Power, Donald C. Cook Nuclear Plant procedure +*12 THP 6040 PER.005, "Control Air Performance Tests," Revision 4, was revised on June 1, 1989 to establish a performance monitoring program.

Revision 5, under the new title "Control Air Performance Monitoring" changed the focus of the previous revision from performing required maintenance to coordinating needed preventative maintenance through MHI 5030, "Preventative Maintenance and Environmental Qualification Program," by documentation and inspection during routine tours. These changes were also made in accordance with recommendations of INPO SOER 88-01.

(2) 0 erator Simulator Trainin Incor oratin Loss-of Air Scenarios As part of our licensed operator requalification program, Lessen Plan RQ-S-1474, "Loss of Plant/Control Air," was first conducted during a requalification training cycle beginning on October 12, 1989. This included simulator training on a partial and complete loss of plant and control air. The loss-of-air simulator scenarios are also planned for the training cycle beginning on November 26, 1990. Additional simulator training for licensed operators will be determined based on a needs analysis.

~ ~ 0 ~

0

~

~

\

Dr. T. E. Murley AEP:NRC:1075B Lesson Plan RO-S-0702, "Loss of Plant/Control Air, PTS,"

was presented to our licensed operator replacement class (non-licensed operators preparing to take the NRC licensing exam) during the period April 11 through April 25, 1989, and is a regular part of our replacement program. This lesson plan also includes simulator training on a partial and complete loss of plant and control air. Please note that non-licensed operators do no receive simulator training unless enrolled in a replacement class.

This document has been prepared following Corporate procedures that incorporate a reasonable set of controls to ensure its accuracy and completeness prior to signature by the undersigned.

Sincerely, M. P. Al xich Vice President dfw cc: D. H. Williams, Jr.

A. A. Blind - Bridgman J. R. Padgett G. Charnoff A. B. Davis - Region III-NRC Resident Inspector Bridgman NFEM Section Chief