ML17333A865: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 72: Line 72:


PART 21 NOTIFICATION MAILINGLIST Issued by:
PART 21 NOTIFICATION MAILINGLIST Issued by:
Rory    e
Rory    e Director Quality Assurance LICENSEES Alabama Power Company Farley Nuclear Plant
                        -
Director Quality Assurance LICENSEES Alabama Power Company Farley Nuclear Plant
: 7. Woodward, Plant Manager Columbia, AL 36319 Alabama Power Company Mgr. Safety Audit & Engr. Review P.O. Box 2641 Birmingham, AL 35291-0431 American Electric Power Service Co.
: 7. Woodward, Plant Manager Columbia, AL 36319 Alabama Power Company Mgr. Safety Audit & Engr. Review P.O. Box 2641 Birmingham, AL 35291-0431 American Electric Power Service Co.
Section Mgr. Audits & Procurement P. O. Box 16631 Columbus, OH 43216 Arizona Public Service Company Department Leader Nuclear Materials Management P. O. Box 52034  - Mail Station 6325 Phoenix, AZ 85072-2034 Arkansas Power & Light Company Arkansas Nuclear One Station Purchasing P. O. Box 551 Little Rock, AR 72203 Arkansas Power & Light Company Operations Assessment Superintendent Route 3, Box 137G Russellville, AK 72801 Revision: 9                          Page1of 32    Dated: April23, 1997
Section Mgr. Audits & Procurement P. O. Box 16631 Columbus, OH 43216 Arizona Public Service Company Department Leader Nuclear Materials Management P. O. Box 52034  - Mail Station 6325 Phoenix, AZ 85072-2034 Arkansas Power & Light Company Arkansas Nuclear One Station Purchasing P. O. Box 551 Little Rock, AR 72203 Arkansas Power & Light Company Operations Assessment Superintendent Route 3, Box 137G Russellville, AK 72801 Revision: 9                          Page1of 32    Dated: April23, 1997

Latest revision as of 01:09, 4 February 2020

Part 21 Rept Re Defective Double Pole Torque Switch.Caused by Missing Spacer.Limitorque Instituted Addl Insp Check of Double Pole Torque Switches During Assembly & Licensees Must Review All Installed & in-stock Torque Switches
ML17333A865
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 04/22/1997
From: Hylton C
LIMITORQUE CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
REF-PT21-97 NUDOCS 9704290072
Download: ML17333A865 (40)


Text

CATEGORY 1 REGULATON INFORMATION DISTRIBUTION 03TEM (RIDE)

ACCESSION NBR:9704290072 DOC.DATE: 97/04/22 NOTARIZED: NO DOCKET

-FACIL:50-315 Donald C. Cook Nuclear Power Plant, Unit 1, Indiana M 05000315 50-316 Donald C. Cook .Nuclear Power Plant, Unit 2, Indiana M 05000316 AUTH. NAME AUTHOR AFFILIATION HYLTON,C.L. Limitorque Corp.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Provides follow-up advisory, of defect in double pole torque switch. List of nuclear utility customers, encl.

DISTRIBUTION CODE: IEZST COPIES RECEIVED:LTR ) ENCL I BISE:

TITLE: Part 21 Rept (50 DKT)

NOTES: E RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD3-3 PD 1 1 HICKMANFJ 1 1 INTERNAL: CENTE 1 1 NRR/DISP/PSIB/B 1 1 NRR/DRPM PECB 1 1 PDR WARD, M. 1 1 RES/DET/EIB 1 1 RGNl 1 1 RGN2 1 1 RGN3 1 1 RGN4 1 1 EXTERNAL: INPO RECORD CTR 1 1 NOAC SILVER,E 1 1 NRC PDR 1 1 NUDOCS FULL TXT 1 1 D

,0 U

~got

~8 ~go N NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR'YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 FULL TEXT CONVERSION REQUIRED TOTAL NUMBER OF COPIES REQUIRED: LTTR 15 ENCL 15

~ I

~ ~

I k

LimitCA1Efae2, 1997 Corporation U.S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION; Document Control Desk

SUBJECT:

Follow-up advisory for 10 CFR Part 21 defect reported by American Electric Power

REFERENCE:

Donald C. Cook Plant, Units 1 and 2 Docket Numbers 50-315 and 50-316 Operating Licenses DPRNS and DPR-74 Pursuant to the requirements of Title 10 Code of Federal Regulations Part 21 herein contained is a follow-up advisory of a defect in a basic component. The initial notification of this has been previously reported by American Electric Power - Donald C. Cook Plant. This advisory is being made to all utility end users and the commission at the same time to expedite the process.

~Back ouud In February 1997, D. C. Cook Plant notified Limitorque Corporation that an instaHed SMB-00 actuator had failed to operate. At that time D. C. Cook officials identified the double pole torque switch as the root cause of that failure.

Basic Com onent Affected The double pole torque switch shown in Figure 1, installed in SMB, SB, and SBD actuators, has been identified as the defective basic component.

9704290072 970422 r PDR ADQCK 050003i5a, 8 i-,'DR IIIIIIIIIIIIIIIIIIIIIIIIIIII.IIIIIIIIIIII Urnitorque Corporation R 0. Box 11318 5114 Woodall Road Lynchburg, VA 24506-1318 Tel. (804) 5284400 FAX (804) 845.9736

Page 2 April22, 1997 Part 21 Notification Part Numbers:

Unit Size Standard Nuclear 00 11500411 11501-012, 11500-160, 11500412 0 1'1500419 11501-020, 11500-020 1 11500-027 11501Z28, 11500-028 2 11500435 11501-036, 11500436 3 11500443 11501-044, 11500-044 4 11500451 11501-052, 11500452 5 11500459 1150160, 11500-060 identification NOTE: The above part numbers>may not be applicable for Double Pole Torque Switches procured for actuators manufactured prior to 1975. ?n this case, Figure 2, can be used for visual of the torque switch.

Figure 3 depicts the standard torque switch assembly, this is shown below the double pole torque switch. The standard torque switch is not affected, and not subject of this advisory.

Nature of the Defect The defective assemblies are missing a spacer between the torque switches, shown in Figure 2 and shown below the double pole torque swtich in Figure 1. The affected switch is the outboard assembly (i.e. the switch furthest from the lever arm). The torque switch contacts open prematurely resulting in either incorrect indication of output torque delivered or de-energization of the actuator motor prior to the valve achieving full travel. The aforementioned results are dependent upon the electrical control circuit that is utilized.

The malfunction should be detected during initial actuation setup.

It should be noted that the inboard assembly (i. e. the switch closest to the lever arm) is not affected and willfunction properly.

Corrective Action Limitorque has instituted an additional inspection check of double pole torque switches to-detect any assembly error and correct any defect prior to shipment.

Licensee corrective action must include reviewing all installed and in-stock torque switches to determine if any double pole torque switches exist in inventory or are installed. Once identified, the licensee must visually examine each for the presence of the subject spacer, and

Page 3 April22, 1997 Part 21 Notification replace any torque switches which are missing the spacer. Defective torque switches may be returned to Limitorque for repair and replacement. The Limitorque contact for returns is Jim Hammer, Product Reliability Manager, at Ext. 9863.

Any questions regarding the above advisory may be directed to Mr. P. McQuillan, Nuclear and Special Projects Manager at Limitorque (804) 528-4400 Ext. 9714.

Signed:

Charles L. Hylton Vice President - Engineering LIMITORQUECORPORATION CLH/lab cc: Bill Friel Part 21 File Evaluation ¹58

Figure 1 SUBJECI'ollow-up advisory for 10 CFR Part 21 defect reported by American Electric Power

REFERENCE:

Donald C. Cook Plant, Units 1 and 2 Docket Numbers 50-315 and 50-316 Operating Licenses DPR-58 and Figure 2 DPR-74 Figure 3 )

)fg LIMITORQUECORPORATION Part 21 Evaluation NS

L

/ ~

e h

PART 21 NOTIFICATION MAILINGLIST Issued by:

Rory e Director Quality Assurance LICENSEES Alabama Power Company Farley Nuclear Plant

7. Woodward, Plant Manager Columbia, AL 36319 Alabama Power Company Mgr. Safety Audit & Engr. Review P.O. Box 2641 Birmingham, AL 35291-0431 American Electric Power Service Co.

Section Mgr. Audits & Procurement P. O. Box 16631 Columbus, OH 43216 Arizona Public Service Company Department Leader Nuclear Materials Management P. O. Box 52034 - Mail Station 6325 Phoenix, AZ 85072-2034 Arkansas Power & Light Company Arkansas Nuclear One Station Purchasing P. O. Box 551 Little Rock, AR 72203 Arkansas Power & Light Company Operations Assessment Superintendent Route 3, Box 137G Russellville, AK 72801 Revision: 9 Page1of 32 Dated: April23, 1997

Arkansas Power & Light Company Engineering Support Supervisor Route 3, Box 137G Russellville, AK 72801 Baltimore Gas and Electric Company Calvert CliffNuclear Power Plant R. C. L. Olson P. O. Box 1535, 2-NOF Lusby, MD 20657 Baltimore Gas and Electric Company Calvert Clips Nuclear Power Plant Daniel L Geneva Supervisor Vendor Audits Unit Nuclear Quality Assurance Department 1650 Calvert Cliffs Parkway - 3rd Floor, NOF Lusby, MD 20657 Baltimore Gas & Electric Forf Smallwood Road Complex

7. A. Tierman V. P. Nuclear Energy Quality Assurance P. O. Box 1475 Baltimore, MD Boston Edison Company Pilgrim Nuclear Power Edward S. Kraft, 7r.

600 Rocky HillRd. - PNPS Plymouth, MA 02360 Boston Edison Company R. G. Bird V. P. Nuclear 800 Boylston Street Boston, MA 02199 Revision: 9 Page2of 32 Dated: April 23, 1997

Boston Edison Company Pilgrim Station Frank N. Famulari, Jr.

Manager Quality Assurance Department Rocky HillRoad Plymouth, MA 02360 Carolina Power & Light Company Nuclear Generation R. A. Watson P. O. Box 1551 - CPB-12 Raleigh, NC 27602 Carolina Power & Light Brunswick Nuclear Project Department Manager Box 10429 Southport, NC 28461 Carolina Power & Light Company Roy A Anderson VP Brunswick Nuclear P. O. Box 10429 Southport, NC 28461 Carolina Power & Light Harris Nuclear Proj ect Department Manager Box 165 New Hill, NC 27562 Carolina Power & Light Robinson Nuclear Project Department Manager Box 790 Hartsville, SC 29550 Revision: 9 Page3of 32 Dated: April23, 1997

Cleveland Electric Illuminating Company Perry Nuclear Power Plant Rick Collins, Quality Assurance Manager Mail Zone W110 - 10 Center Road Perry, OH 44081 Comision Federal De Electricidad S. De La Pena Ing. Benito Cuevas Rio Rodano No. 14 Col. Cvauhtemoc 06598 Mexico, DF Commonwealth Edison Walter J. Shewski Manager Quality Assurance P. O. Box 767 Chicago, IL 60690 Connecticut Yankee Atomic Power Co.

Haddem Neck Plant D. B. Miller Station Superintendent P. O. Box 127E East Hampton, CT 06424 Connecticut Yankee Atomic Power Co.

Haddem Neck Plant John P. Stetz, Vice President 362 Injun Hollow Rd.

E. Hampton, CI'6424 Consolidated Edison Company of New York, Inc.

Indian Point Station ¹2 Mr. Stephen E. Quinn Vice President, Nuclear Power Broadway and Bleakley Avenue Buchanan, NY 10511-1099 Revision: 9 Page4of 32 Dated: April 23, 1997

Consolidated Edison Company of New York, Inc.

Regulatory Affairs Manager Broadway & Bleakley Avenues Buchanan, NY 10511 Consumers Power Company Palisades Nuclear Plant J. D. Alderink 27780 Blue Star Highway Covert, MI 49043 Crane-Aloyco, Inc.

Jerry Kurowski P. O. Box 3339 Joliet, IL 60434 Detroit Edison S. E. Kremer, Nuclear Procurement Supv.

6400 North Dixie Highway Newport, MI 48166 Duke Power Company Ernie Cannon, Station Manager P. O. Box 219 Seneca, SC 29679 Duke Power Company M. S. Tuckman, Station Manager Seneca, SC 29679 Duke Power Company Tom Ryan Manager, Operating Experience Assessment P. O. Box 1006 - Mail Code EC05P Charlotte, NC 28201-1006 Duke Power Company C. M. Ballard P. O. Box 1002 Charlotte, NC 28201-1015 Revision: 9 Page5of 32 Dated: April 23, 1997

Duke Power Company McGuire Nuclear Station E. M. Geddie MGO1VP - Station Manager 12700 Hagers Ferry Road Huntersville, NC 28078 Duke Power Company Catawba Purchasing 4800 Concord Road York, SC 29745 Duke Power Company Oconee Purchasing P. O. Box 219 Seneca, SC 29679 Duquesne Light Company Beaver Valley Power Station K. D. Grada Manager Quality Assurance P. O. Box 4, BV-QA Shippingport, PA 15077 Duquesne Light Company Beaver Valley Power Station Manager of Nuclear Safety P. O. Box 4 Shippingport, PA 15077 Duquesne Light Company BVPS-2 Document Control Supervisor P. O. Box 4 Shippingport, PA 15077 Revision: 9 Page6of 32 Dated: April 23, 1997

Enfergy Operations, Inc.

Arkansas Nuclear One Dwight Mims Director - Nuclsear Licensensing 1448 SR 333 Russellville, AR 72801 Entergy Operations, Inc.

Arkansas Nuclear One Supervisor Indushy Events Analysis 1448 SR 333 Russellville, AR 72801 Entergy Operations, Inc.

Waterford 3 SES Vice President - Nuclear P. O. Box B Killona, LA 70066-0751 Entergy Operations, Inc.

Director - Nuclear Licensing P. O. Box 220 St Francisville, LA 70775 Entergy Operations, Inc.

Grand GulfNuclear Station M. J. Meisner Director, Nuclear Safety and Regulatory Affairs P. O. Box 756 Port Gibson, MS 39150 Entergy Operations, Inc.

Arkansas Nuclear One Supervisor - Engineering Databases 1448 SR 333 Russellille, AR 72801 Revision: 9 Page7of 32 Dated: April 23, 1997

Entergy Operations, Inc.

Arkansas Nuclsear One Dale E. James, Supervision, Licensing Route 3, Box 137G Russellville, AR 72801 Entergy Operations, Inc.

Licensing L. W. LaugMin, Manager P. O. Box B - Waterford 3 Killona, LA 70066 Entergy Operations, Inc.

Arkansas Nuclear One Manager, Industry Events Review 1448 S. R. 333 Russellville, AR 72801 Florida Power & Light Turkey Point Station C. J. Baker, Plant Manager P. O. Box 4332 Princeton, FL 33032 Horida Power & Light Co.

St. Lucie Plt, Site Purchasing Supervisor.

P. O. Box 1200 Jensen Beach, FL 34958-1200 Horida Power & Light Co.

Turkey Point Nuclear Plt P. O. Box 3088 Florida City, FL 33034 Horida Power and Light Company R. A. Symes JNA/JB Quality Manager P. O. Box 14000 Juno Beach, FL 33408 Revision: 9 Page 8 of 32 Dated: April 23, 1997

Florida Power Corporation G. R. Westafer Director Quality Programs P. O. Box 14042 St Petersburg, FL 33733 Florida Power Corporation Legal Department P. O. Box 14042 St Petersburg, FL 33733 Horida Power Corporation George Oberndorfer Manager, Procurement and Materials QA 15760 West Power Line Street MAC SA2D Crystal River, FL 34428-6708 Horida Power Corporation Crystal River Energy J. E. Colby Manager, Procurement Engineering Services 15760 West Power Line Street MAC SA2G Crystal River, FL 34428-6708 GPU Nuclear Corporation Three Mile Island Nuclear Station Sam Turns, Technical Analyst Route 441 South P. O. Box 480 Middletown, PA 17057 GPU Nuclear Corporation Three Mile Island Nuclear Station Procurement QA Manager Vendor Document Control P. O. Box 480 Middletown, PA 17057 Revision: 9 Page 9 of 32 Dated: April 23, 1997

Georgia Power Company L Otis Berkham Vice President Procurement & Materials P. O. Box 4545 Atlanta, GA 30302 Georgia Power Company Vogtle Project Manager-Nuclear Engineering and Licensing P. O. Box 1295 Birmingham, AL 35201 Georgia Power Company General Manager, Nuclear Operations P. O. Box 1600 Waynesboro, GA 30830 Georgia Power Company Vogie Electric Generafing Plant J. B. Beasley General Manager P. O. Box 1600 Waynesboro, GA 30830 Georgia Power Company Procutemenf and Contracts Deparb>rent Buyer of Record 8th Floor, 333 Piedmont Ave.

P.O. Box 4545 Atlanta, GA 30302 Georgia Power Company G. Eatl Spell, Jr.

Repair Shop Bin 50090 62 Lake Mirror Road Bldg. 9 Forest Park, GA 30050 Revision: 9 Page10 of 32 Dated: April 23, 1997

GPU Nudear Anthony A. Cavallo, Jr./VDC P. O. Box 388- Trailer 300C Forked River, NJ 08731 GPU Nuclear Corporation G. W. Busch Licensing Manager P. O. Box 388 Forked River, NJ 08731 Gulf States Utilities Company River Bend Station L. L. Dietrich P. O. Box 220 MA3 St Francisville, LA 70775 Gulf States Utilities Company River Bend Station Philip D. Graham Vice President - River Bend Nuclear Group P. O. Box 220 St. Francisville, LA 70775 Houston Lighting 8x, Power Company South Texas Plant Samuel D. Phillips, VETIP Coordinator P. O. Box 289 Wadsworth, TX 77483 Houston Lighting and Power Co.

Project Manager P. O. Box 289 Wadsworth, TX 77483 Revision: 9 Page11 of 32 Dated: April 23, 1997

Illinois Power Company Clinton Power Station R. E. Campbell Director of Licensing - MC-V920 P. O. Box 678 Clinton, IL 61727 Indiana+Schigan Power Company Donald C. Cook Nuclear Plant W. G. Smith, Jr., Plant Manager P. O. Box 458 Bridgman, MI 49106 Iowa Electric Light & Power Company General Once Ken Peveler, Manager Quality Assurance Cedar Rapids, IA 51406 Korea Electric Power Company Lee, Gil Gu Yongdong P. O. Box 40.167 Samsong-Dong Kangnam-Gu Seoul, Korea 135-791 Long Island Lighting Company Shoremam W. E. Steiger, Plant Manager P. O. Box 618 Wading River, NY 11792 Long Island Lighting Company Corporate Services John D. Leonard Vice President - Nuclear Operations P. O. Box 618 - North Country Road Wading River, NY 11792 Revision: 9 Page12of 32 Dated: April 23, 1997

Louisiana Power & Light Company Waterford Nuclear Station N. S. Cams, Plant Manager P. O. Box B, Highway 18 Killona, LA 70066 Maine Yankee Atomic Power Company C. D. Frizzle Vice President Manager of Operations Edison Drive Augusta, ME 04336 Maine Yankee Atomic Power Company NUC Engineering & Licensing Steven E. Nichols Manager Licensing & Engineering Support 83 Edison Drive Augusta, ME 04330 Metalka Commerce Lj ubjlana A, Mateljan 61000 Ljubljana Dalmatinova 2 Slovenia Nebraska Public Power District Cooper Power Plant G. R. Horn Division Manager Nuclear Operations P. O. Box 98 Brownville, NE 68321 Nebraska Public Power District David A. Whitman Div. Mgr. of Nuclear Support 1414 15th Street Columbus, NE 68602 Revision: 9 Page13 of 32 Dated: April 23, 1997

New. Hampshire Yankee B. L. Drawbridge Executive Director - Nuclear Production P. O. Box 300 Seabrook, NH 03874 New Hampshire Yankee R. J. DeLoach Executive Director - Engineering and Licensing P. O. Box 300 Seabrook, NH 03874 North Atlantic Energy Service Corporation Bill Hinton Materials Requirments Department Supervisor P. O. Box 300 Seabrook, NH 03874 New York Power Authority James A. Fitzpatrick Plant Site Executive Officer P. O. Box 41 Lycoming, NY 13093 New York Power Authority Gerald C. Goldstein Assistant General Counsel 1633 Broadway New York, NY 10019 New York Power Authority Indian Point Unit ¹3 Resident Manager P. O. Box 215 Buchanan, NY 10511 Revision: 9 Page14of 32 Dated: April 23, 1997

New York Power Authority Indian Point Unit 03 Director of Nuclear Licensing P. O. Box 215 Buchanan, NY 10511 New York Power Authority Indian Point 3NPS L. Quaquil, QA Superintendent P. O. Box 215.

Buchanan, NY 10511 Niagara Mohawk Power Corporation Gary D. Wilson, ESQ Managing Counsel 300 Erie Blvd. West Syracuse, NY 13202 Niagara Mohawk Power Corporation Nine Mile Point Nuclear Station, Unit 2 A, E. Winegard P. O. Box 63 Lycoming, NY 13093-0063 Northeast Utilities Service Company Nuclear Operations Executive Officer P. O. Box 270 Hartford, CT 06141 Northeast Utilities Service Company Millstone Nuclear Power Station Michael J. Makowicz Manager, Nuclear Safety Engineering (NSE)

Mail Stop: 437/1 P. O. Box 128 Waterford, CT 06385 Revision: 9 Page15 of 32 Dated: April 23, 1997

Northeast Utilities Supervisor, Procurement QA P. O. Box 270 Hartford, CT 06140-0270 Northern States Power Monticello Nuclear Generating Plant Superintendent, Materials Engineering 2807 West County Road 75 Monticello, MN 55362 Northern States Power Prarie Island Nuclear Station E. Watzi, Plant Manager 1717 Wakouada Drive, East Welch, MN 55089 Northern States Power Company Prairie Island NPS M. B. Sellman, Plant Manager 1717 Wakonade Drive East Welch, MN 55089 Northern States Power Company Prairie Island NPS Superintendent, Materials Engineering 1717 Wakonade Drive East Welch, MN 55089 Omaha Public Power District Manager, Nuclear Licensing Mail Stop FC-2-4 Administration Building Box 399 Highway 75 North of Fort Calhoun Fort Calhoun, NE 68023 Omaha Public Power District Manager, Nuclear Licensing &

Industry Affairs, 8E/EP4 444 South 16th Street Mall Omaha, NE 68102-2247 Revision: 9 Page16of 32 Dated: April 23, 1997

Omaha Public Power Dishict Ft.'Calhoun Nuclear Station L. T. Kusek Supervisor Operation P. O. Box 399 Ft Calhoun, NE 68023 Omaha Public Power District Nuclear Operations T. L. Patterson P. O. Box 399 Omaha, NE 68023 Ontario Hydro Bruce Nuclear Station B Tom Ferguson P.O. Box 4000 Tiverton, Ontario Canada NOG 2TO Paci6c Gas 8c Electric Company Richard F. Locke P. O. Box 7442 San Francisco, CA 94120 Paci6c Gas 8r. Electric Greg M. Rueger 77 Beale Street - Room F 14451800 San Francisco, CA 94106-94105 PECO Energy Company George Hunger, Director, Licensing 965 Chesterbrook Blvd., 62A-I Wayne, PA 19087 Revision: 9 Page17of 32 Dated: April 23, 1997

Pennsylvania Power &, Light NQA-Procurement A2-2 A. R. Sabel Manager Nuclear Quality Assurance Two North Ninth Street Allentown, PA 18101 Pennsylvania Power & Light Company Licensing T. G. Barman Two North Ninth St A2-4 Allentown, PA 18101 Philadelphia Electric Limerick Station Brian Curry P. O. Box A, Sanatoga Branch Pottstown, PA 19464 PECO Energy Company Tom Niessen, Jr.

Director, Nuclear Quality Assurance 965 Chesterbrook Blvd., 63C-3 Wayne, PA 19087 Portland General Electric Company General Manager, Nuclear Plant Engineering 71760 Columbia River Hwy.

Ranier, OR 97048 Public Service Company of Colorado Ft. St. Vrain Generating Station C. H. Fullers, Plant Manager 16805 Weld County Road - 19 1/2 Platteville, CO 80651 Public Service Company of Colorado P. O. Box 840 Denver, CO 80201 Revision: 9 Page18 of 32 Dated: April 23, 1997

Public Service Company of Colorado Nuclear Licensing Department 16805 Weld County Road 19 1/2 Platteville, CO 80651 Public Service Electric & Gas Company

~C &04 Matthew Maredeo Material & Supplier Plant Support Supervisor P. O. Box 236 Hancocks Bridge, NJ 08038 Ringhals Nuclear Power Plant Mats Olsson S-43022 Varabacka SWEDEN Rochester Gas & Electric Corporation Nuclear Production Robert C. Mecredy, Plant Manager 89 East Avenue Rochester, NY 14649 Rochester Gas & Electric Corporation Richard Morrill Operations Assessment 89 East Avenue Rochester, NY 14649 Rochester Gas & Electric Corporation Robert E. Ginna Plant Director, Operating Experience 1503 Lake Road Ontario, NY 14519 Sacramento Municipal UtilityDistrict Rancho Seco Nuclear Plant Director of Quality Assurance 14440 Twin Cities Road Herald, CA 95638-9799 Revision: 9 Page19of 32 Dated: April 23, 1997

Southern California Edison San OnoPe Nuclear Generafing Station Ken Slagle.

Manager, Nuclear Oversight Division P. O. Box 128 San Clemente, CA 92674-0128 Southern Nuclear Operating Company Farley Nuclear Plant Material Supervisor P. 0; Drawer 470 Ashfor, AL 36312 Southern California Edison San OnoPe Nuclear Generating Station Brian Katz Manager, Nuclear Oversight Division P. O. Box 128 San Clemente, CA 92674-0128 South Carolina Electric 8c Gas Company V. C. Summer Nuclear Sfafion A. R. Koon Manager Nuclear Licensing (830)

P. O. Box 88 Jenkinsville, SC 29065 Southern Company Services, Inc.

Nuclear Procurement Organization D. M. Varner P. O. Box 1295, Bldg. 40 Iverness Bin B001 Birmingham, AL 35201 Southern Company Services, Inc.

J. O. Patrick 18th Floor, 333 Piedmont Avenue P.O. Box 4545 Atlanta, GA 30302 Revision: 9 Page20of 32 Dated: April23, 1997

'L I System Energy Resources, Inc.

Grand Gulf1 &2 W. E. Edge Manager Programs Quality Assurance P. O. Box 756 PortGibson, MS 39150 Tennessee Valley Authority - Nuclear Power Operating Experience Manager BR 4J 1101 Market Street Chattanooga, TN 37402 Tennessee Valley Authority Nuclear Power O. D. Kingsley 1101 Market Street Lookout Pl. - 6N38A Chattanooga, TN 37402 TU Electric Nuclear Licensing Library Gayle Deck, Licensing Secretary 400 N. Olive St. LB 81 Dallas, TX 75201 TU Electric Company - Production Division Skyway Tower Group Vice President Nuclear Engeering & Operations 400 N. Olive St, L.B. 81 Dallas, TX 75201 TU Electric Company Procurement QA Manager P. O. Box 1002 Glen Rose, TX 76043 Revision: 9 Page21 of 32 Dated: April 23, 1997

Toledo Edison Company L. Ramsett Director Quality Assurance 5501 N. State Rt 2 Oak Harbor, OH 43449 Toledo Edison Company Davis-Besse Mail Stop 3043 Manager - Design Engineering 5501 N. State Route 2 Oak Harbor, OH 43449 Toledo Edison Company Davis-Besse Mail Stop 1056 Plant Engineering Manager 5501 N. State Route 2 Oak Harbor, OH 43449 Toledo Edison Company Davis-Besse Mail Stop 2101 Plant Manager 5501 N. State Route 2 Oak Harbor, OH 43449 Toledo Edison Company Davis-Besse Mail Stop 3387 QA Director - Nuclear Assurance 5501 N. State Route 2 Oak Harbor, OH 43449 Union Electric Company D. F. Schnell Sr. Vice President - Nuclear P. O. Box 149 St Louis, MO 63166 Revision: 9 Page22of 32 Dated: April 23, 1997

Union Electric Company Callaway Plant VETIP Coordinator P. O. Box 620 Fulton, MO 65251 Union Electric Company A. P. Neuhalfen Manager Quality Assurance P. O. Box 149 Sk Louis, MO 63166 Vermont Yankee Nuclear Power Corporation J. G. Weigand, President Route 5, Box 169 Brattleboro, VT 05301 Vermont Yankee Nuclear Power Corp.

Pat Deangelo P. O. Box 157 Vernon, VT 05354 Virginia Power Company W. L. Stewart Vice President Nuclear Operations P. O. Box 26666 Richmond, VA 23261 Virginia Power Innsbrook Technical Center M. L. Bowling Manager of Nuclear Licensing and Programs 5000 Dominion Boulevard Glen Allen, VA 23060 Revision: 9 Page23of 32 Dated: April 23, 1997

Washington Public Power Supply System P. L. Ledford Specialist, Nuclear Safety Engineering Mail Drop PE21 P. O. Box 968 Richlan, WA 99342 Westinghouse Electric Energy Systems Business Unit Chris Delsignore P. O. Box 355 Pittsburgh, PA 15230 Westinghouse Electric Corporation Nuclear and Adv. Technology W. C. Gangloff Manager Strategic Marketing P. O. Box 355 Pittsburgh, FA 15230 Wisconsin Electric Power Company Point Beach Nuclear Plant G. J. Maxfield Manager 6610 Nuclear Road Two Rivers, WI 54241 Wisconsin Electric Power Company Manager, Quality Assurance P. O. Box 2046 Milwaukee, WI 53201 Wisconsin Public Service Corporation Superintendent, Nuclear Licensing and Systems P. O. Box 19002 Green Bay, WI 54307-9002 Revision: 9 Page24of 32 Dated: April 23, 1997

WolfCreek Nuclear Operating Corp.

Manager Document Services (WC-DS)

P. O. Box 411 Burlington, KS 66839 Wolf Creek Nuclear Operating Corporation Neil S. Cains, President P. O. Box 411 Burlington, KS 66839 Yankee Atomic Electric Company Yankee Rowe 580 Main Sueet Bolton, MA 01740 Boston Edison Company Manager, Systems and Safety Analysis Division Pilgrim Nuclear Power Station 600 Rocky HillRoad Plymouth, MA 02360-5599 Omaha Public Power District Eric Davis Mail Stop FC-1-5 P.O. Box 399 Ft Ca'lhoun, NE 68023 Entergy Operations, Inc.

Arkansas Nuclear One Manager, Industry Events Review Rt. 3, Box 137G Russellville, AR 72801 Arizona Public Service Company Palo Verde Nuclear Generating Station Dale R. Leech - Mail Station 7965 5801 S. Wintersburg Road Tonopah, AZ 85354-7529 Revision: 9 Page25of 32 Dated: April 23, 1997

Public Service Electric and Gas Company Manager - Nuclear Engineering Design P.O. Box 236, M/C N29 Hancocks Bridge, NJ 08038 New York Power Authority Pat Conroy 123 Main Street White Plains, NY 10601 James A. Fitzpatrick Nuclear Power Plant Terry Herrmann P.O. Box 41 Lycoming, NY 13093 New York Power Authority Quality Assurance Deparhnent John Cirilli- Quality Manager Procurement 123 Main Street White Plains, NY 10601 Crane Aloyco Denise Risberg, Quality Specialist 104 N. Chicago Sk P.O. Box 3339 Joliet, IL 60434 Arizona Public Service Co.

Vendor Quality Supervisor M/S 6792 P.O. Box 52034 Phoenix, AZ 85072-2034 Southern California Edison Company San OnoPe Nuclear Generating Station R. J. McWey P.O. Box 128 San Clemente, CA 92674-0128 Revision: 9 Page26 of 32 Dated: April 23, 1997

Enfergy Operatons Inc.

River Bend Station Director Nuclear Licensing P.O. Box 220 St Francisville, LA 70775 Niagara Mohawk Power Corp.

Nine Mile Point Nuclear Station, Unit 2 Allen E. Winegard P.O. Box 63 Lycoming, NY 13093-0063 IES Utilities Inc.

3277 DAEC Road M/S Whse-2QA David J. Jantosik Palo, IA 52324 Entergy Operations Vice President, Operations Box 756 Port Gibson, MS 39150 Pennsylvania Power & Light Co.

Dr. William E. Burchill Manager NQA 2 N. 9th Street, Mail Code A2-5 Allentown, PA 18101 Pennsylvania Power 8c Light Co.

Mr. Terence G. Bannon Nuclear Listing 2 N. 9th Street, Mail Code A2-4 Allentown, PA 18101 Revision: 9 Page27of 32 Dated: April 23, 1997

PART 21 NOTIFICATION MAILINGLIST NON LICENSEES Anchor Darling Valve Company George Knieser Quality Assurance Manager 701 First Street Williamsport, PA 17701 B &W Nuclear Technologies Audits, Frograms, & OFR Operations Emily Mayhew Manager, BWNT QA P. O. Box 19035 (OF55)

Lynchburg, Va 24506 B &W Nuclear Technologies Richard B. Gill, Manager B & W Quality Assurance 155 MillRidge Road (MR9)

Lynchburg, VA 24502 B &W Owners Group Projectssss Mr. R. J. (Bob) Schomaker Project Manager P. O. Box 10935 (OF57)

Lynchburg, Va 24506 BWR Owners'roup GE Nuclear Energy George Levy M/C 753 175 Curtner Ave.

San Jose, CA 95125 Revision: 9 Page28of 32 Dated: April 23, 1997

Contramatics Jim Sylvester, Quality Assurance Specialist 38 Power St Milford, NH 03055 Edwards Valve Inc.

Rafiq Bandukwala Quality Assurance Manager 1900 S. Saunders Street Raleigh, NC 27603 Henzy Pratt Company Bruce Cummins, Quality Assurance Manager 401 S. Highland Avenue Aurora, IL 60507 Vel'an Valve Edwazy Francois, V.P. of Quality Assurance Avenue C - Griswold Industrial Park Williston, VT 05495 Westinghouse Electric Corporation Energy Systems Box 2728 Pittsburgh, PA 15230 Revision: 9 Page29of 32 Dated: April23, 1997

PART 21 NOTIFICATION MAILINGLIST LIMITORQUEREGIONAL SALES MANAGERS Limitorque Corporation Dave Culp 2600 E. Miroloma Way Anaheim, CA 92806 Limitorque Corporation Don Lindberg P. O. Box 430 Walnut Creek, CA 94597-0430 Limitorque of Canada Ltd.

Jean Gratton 100 Alexis Nihon Blvd., Suite 208 St. Laurent, Quebec H4M 2N7 CANADA Limitorque Corporation Barry Moyer P. O. Box 671287 Marietta, GA 30066-0139 Limitorque Corporation Ed Harper 477 E. Butterfield Road, Suite 311 Lombard, IL 60148 Limitorque Corporation Bill Breitmayer P. O. Box 14007 Lenexa, KS 66215 Limitorque Corporation Dave Odom 47 Harrington Way Shrewsbury, MA 01545 Revision: 9 Page30of 32 Dated: April 23, 1997

Limitorque Corporation Mike Balkun 432 Elwood Street Piscataway, NJ 08854 Limitorque Corporation Bob Derr 726 E. Main Street, Suite F Lebanon, OH 45036 Limitorque Corporation Walt Denkowski P. O. Box 507 Gilbertsville, PA 19525 Limitorque Corporation Sterling Adams 8901 Jameel Road, Suite 180 Houston, TX 77040 Limitorque Corporation Woody Lawman 589-B Southlake Blvd.

Richmond, VA 23236 Limitorque International Tom May Limitorque Asia Dan Warsing Control Engineering Nippon Gear c/o Dan Warsing Limitorque Asia Limitorque Corporation Revision: 9 Page31of 32 Dated: April 23, 1997

Dave Skidmore Lynchburg, VA Limitorque International Arthur Reynolds Revision: 9 Page 32 of 32 Dated: April 23, 1997