{{#Wiki_filter:Carolina Po~aer 3 t.:th)>"onoon~AUG 0 5)S85 Mr.Harold R.Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NO.1-DOCKET NO.50-000 LOOSE PARTS MONITORING SYSTEM CALIBRATION SERIAL: NLS-85-238
{{#Wiki_filter:Carolina Po~aer     3 t.:th) >"onoon~
SERIAL: NLS-85-238 AUG 0 5 )S85 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC     20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NO. 1 DOCKET NO. 50-000 LOOSE PARTS MONITORING SYSTEM CALIBRATION


==Dear Mr.Denton:==
==Dear Mr. Denton:==
By letter dated October 28, 1983, Carolina Power R Light Company (CPRL)submitted a detailed description of the Metal Impact Monitoring System (MIMS)used at the Shearon Harris Nuclear Power Plant.The NRC reviewed this submittal and found it to be an acceptable response to the Draft Safety Evaluation Report Open Item No.30, as documented on page 0-30 of the Safety Evaluation Report.In the October 28, 1983 submittal, Section II.A, Items 2 and 3, CPRL described the methods to be used to calibrate the accelerometers and conduct system tests.The calibration described in that submittal involved removing the accelerometers from their installed locations, mounting the accelerometers on a vibration calibrator and observing the output of the accelerometer.
 
The system test consisted of impacting the reactor vessel or steam generator in the vicinity of the accelerometer and observing the response of the system.In lieu of these tests, CPRL will perform testing and calibration using a tool , that provides a calibrated impact (e.g., 0.5 ft.-lbs.).
By letter dated October 28, 1983, Carolina Power R Light Company (CPRL) submitted a detailed description of the Metal Impact Monitoring System (MIMS) used at the Shearon Harris Nuclear Power Plant. The NRC reviewed this submittal and found it to be an acceptable response to the Draft Safety Evaluation Report Open Item No. 30, as documented on page 0-30 of the Safety Evaluation Report. In the October 28, 1983 submittal, Section II.A, Items 2 and 3, CPRL described the methods to be used to calibrate the accelerometers and conduct system tests. The calibration described in that submittal involved removing the accelerometers from their installed locations, mounting the accelerometers on a vibration calibrator and observing the output of the accelerometer. The system test consisted of impacting the reactor vessel or steam generator in the vicinity of the accelerometer and observing the response of the system. In lieu of these tests, CPRL will perform testing and calibration using a tool that provides a calibrated impact (e.g., 0.5 ft.-lbs.). The tool will be used to verify that each channel alarms upon an impact within a specified distance (e.g., 0.5 ft.-lbs. at a distance of 3 ft.). Such a test conforms with the recommendations of Regulatory Guide 1.133 Position C.a.(3) and provides a means to calibrate the accelerometers without removal of the monitors. We find that this change is acceptable because it provides the same level of assurance that the MIMS is operating properly and it provides a test which is in conformance with the recommendations of Regulatory Guide 1.133.
The tool will be used to verify that each channel alarms upon an impact within a specified distance (e.g., 0.5 ft.-lbs.at a distance of 3 ft.).Such a test conforms with the recommendations of Regulatory Guide 1.133 Position C.a.(3)and provides a means to calibrate the accelerometers without removal of the monitors.We find that this change is acceptable because it provides the same level of assurance that the MIMS is operating properly and it provides a test which is in conformance with the recommendations of Regulatory Guide 1.133.If you have any questions, please contact me.Yours very truly,, 3HE/ccc (1672GAS)S..Zim erman M ger Nuclear Licensing Section Cct Mr.B.C.Buckley (NRC)Mr.G.F.Maxwell (NRC-SHNPP)
If you have any questions, please contact me.
Dr.3.Nelson Grace (NRC-RII)Mr.G.A.Schwenk (NRC-CPB)Mr.Travis Payne (KUDZU)Mr.Daniel F.Read (CHANGE/ELP)
Yours very truly,,
Wake County Public Library 8508080+gf 850805@DR*DOCg 0500040 E Mr.Wells Eddleman Mr.3ohn D.Runkle Dr.Richard D.Wilson Mr.G.O.Bright (ASLB)Dr.3.H.Carpenter (ASLB)Mr.3.L.Kelley (ASLB)411 Fayetteville Street~P.O.Box 1551~Saic>r~'t,"
S.. Zim erman M     ger Nuclear Licensing Section 3HE/ccc (1672GAS)
REGULATO INFORMATION DISTRIBUTION STEM (RIDS)AGCOECS ION NBR N 8508080461 OOC~DATK'5/08/05 NOTARIZED:
Cct     Mr. B. C. Buckley (NRC)                                   Mr. Wells Eddleman Mr. G. F. Maxwell (NRC-SHNPP)                             Mr. 3ohn D. Runkle Dr. 3. Nelson Grace (NRC-RII)                             Dr. Richard D. Wilson Mr. G. A. Schwenk (NRC-CPB)                               Mr. G. O. Bright (ASLB)
NO DOCKET FACIL:50 400 Shear on Harris Nuclear Power Plantr Unit it Carolina 05000400'AUTrt,NAME AUTHOR Af FILIATION ZIHMKRMANr S,R, Car ol ina Power 8 Light Co~REC IP~NAME:,REC IP IEN T AF F IL I ATION OENTON<H~RQ Office of Nuclear Reactor Regulationr Dir'ector'UBJECT:
Mr. Travis Payne (KUDZU)                                   Dr. 3. H. Carpenter (ASLB)
Advises that calibr of accelerometers will be per'formed using tool which verifies channel alarms upon impact within specified distancerper Reg Guide 1~33'ctions'cceptablei to resolve SER Open f.tern 30+DISTRIBUTION CODE'!800 1 0'OPIES RECEIVED t LTR ENCL SIZE~-'o,./TITLKi Licensing.Submittal:
Mr. Daniel F. Read (CHANGE/ELP)                            Mr. 3. L. Kelley (ASLB)
PSAR/FSAR Amdts.8 elated Gorr espondence-NOTES;RECIPIENT IO CODE/NAME NRR/OL/ADL NRR L83 LA INTERNAL: ACRS 41 ELO/HOS1 IE/OEPER/KPB 36 NRR ROKpM,L NRR/DE/CKB il NRR/OK/EQB 13 NRR/DE/MKB 18 NRR/OK/SAB 24 NRR/OHFS/HFEB40 NRR/OHFS/PSRB NRR/OS I/AEB 26 NRR/OS I/CPB 10, NRR/DSI/ICSB 16 NRR/DSI/PSB 19 NRR/DSI/RSB 23.RGN2 EXTERNAL;24X OMB/OSS (AMOTS)NRC PDR'2 PNL GRUELgR COPIES LTTR KNC 1 1 6.1 1 1 1 2 1 1 1 1 1 1 1 1 1 3 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME NRR L83 BC BUCKLKYrB 01 IE/DQAVT/QA821 NRR/DE/AEAB NRR/DF/EHEB NRR/OK/GB 28 NRR/OE/MTEB 17 NRR/DE/SGEB 25 NRR/OHFS/LQB 32 NRR/DL/SSPB NRR/OS I/ASB NRR/DS I/CSB 09 NRR/OSI/METB 12 NRR/DS I/RAB 22 REG FILE 04 RM/DDAMI/MI 8 BNL(AMOTS ONLY)LPDR 03'JS I C 05 COPIES LTTR EN 1 1 l.l.0'2 1-1~TOTAL NURSER OF COPIES REQUIRED: LTTR 58 ENCL I REGULAT INFORMATION DISTRIBUTION STEM (RIDS)A C GE3 S I ON N 8 R~8 5 0 8 0 8 0 4 6 1 0 0 C~D A T E 8 5/0 8/0 5 N 0 T A R'I Z E 0 I<0 FACIL!50 400 Shearon Harris Nuclear Power Plantr Unit,]~Carol:ina'AUTH;NAME AUTHOR AFF IL'I ATION ZIMMERMANi8,R, Car ol ina Power" 5 Light Co~RECIP,NAME)
Wake County Public Library 8508080+gf 850805
RECIPIENT AFFILIATION DENTONrHiRe Office of Nuclear Reactor Regulatianr Director  
          @DR   *DOCg 0500040 E
411 Fayetteville Street ~ P. O. Box 1551 ~ Saic>r~ 't, "
 
REGULATO     INFORMATION DISTRIBUTION         STEM                 (RIDS)
AGCOECS ION NBR 8508080461         OOC ~ DATK'5/08/05       NOTARIZED: NO                               DOCKET it N
FACIL:50 400 Shear on Harris Nuclear Power Plantr Unit                                   Carolina       05000400
    'AUTrt,NAME           AUTHOR Af FILIATION ZIHMKRMANrS,R,       Car ol ina Power 8 Light Co ~
REC IP ~ NAME:,REC IP IEN T AF F IL I ATION OENTON<H ~ RQ         Office of Nuclear Reactor Regulationr Dir'ector'UBJECT:
Advises that calibr of accelerometers will be per'formed using tool which verifies channel alarms upon impact within specified distancerper Reg Guide 1 ~ 33 'ctions'cceptablei to resolve   SER Open f.tern 30+
DISTRIBUTION CODE'! 800     1 0'OPIES   RECEIVED t LTR       ENCL                       SIZE ~ -'o,.   /
TITLKi Licensing .Submittal:       PSAR/FSAR Amdts .8       elated Gorr espondence-NOTES; RECIPIENT           COPIES            RECIPIENT                            COPIES IO CODE/NAME         LTTR KNC        ID CODE/NAME                          LTTR EN NRR/OL/ADL               1          NRR L83 BC                                1 NRR L83 LA               1          BUCKLKYrB          01                      1 INTERNAL: ACRS               41       6.
ELO/HOS1                 1                                                                l.
IE/OEPER/KPB 36         1          IE/DQAVT/QA821                                      l.
NRR ROKpM,L                         NRR/DE/AEAB                                          0' NRR/DE/CKB NRR/OK/EQB il 13 1
1 2
NRR/DF/EHEB NRR/OK/GB          28                                2 NRR/DE/MKB     18       1          NRR/OE/MTEB        17                                1-NRR/OK/SAB     24       1          NRR/DE/SGEB        25                                1 ~
NRR/OHFS/HFEB40         1          NRR/OHFS/LQB      32 NRR/OHFS/PSRB           1          NRR/DL/SSPB NRR/OS I/AEB 26         1          NRR/OS    I/ASB NRR/OS I/CPB 10,         1          NRR/DS    I/CSB    09 NRR/DSI/ICSB 16         1          NRR/OSI/METB 12 NRR/DSI/PSB     19       1          NRR/DS I/RAB 22 NRR/DSI/RSB     23.     1          REG    FILE      04 RGN2                     3          RM/DDAMI/MI8 EXTERNAL; 24X OMB/OSS NRC PDR   '2 (AMOTS)
PNL GRUELgR 1
1 1
1 1
1 1
1 BNL(AMOTS ONLY)
LPDR
                                                    'JS I C 03 05 TOTAL NURSER OF COPIES       REQUIRED: LTTR     58     ENCL I
 
REGULAT           INFORMATION DISTRIBUTION                       STEM       (RIDS)
A C GE3 S I ON N8 R ~ 8 5 0 8 0 8 0 4 6 1   0 0 C ~ D ATE    / /
85 08 05      N 0 T A R 'I Z E 0       I< 0                       DOCKET FACIL!50     400   Shearon         Harris   Nuclear     Power   Plantr     Unit,         ]~ Carol:ina                       05000400
  'AUTH;NAME                     AUTHOR AFF IL'IATION ZIMMERMANi8,R,               Car ol ina Power" 5 Light Co ~
RECIP,NAME)                 RECIPIENT AFFILIATION DENTONrHiRe                 Office of Nuclear Reactor Regulatianr Director


==SUBJECT:==
==SUBJECT:==
Advises that" calibr of,accelerometers will be performed using tool which verifies channel alarms upon.impact.withip specified distancegper Reg Guide]e33 Actions'cceptable'o resolve SER Open Item 30, DOCKET 05000400 DISTRIBUTION CODE!80010 COPIES RECEIVED:LTR ENCL SIZf e: 'ITLEi Licensing Submittal:.PSAR/FSAR Amdts 8 elated Cor r espondence'OTES; REC IP IENT=IO CODE/NAME~
Advises that" calibr of,accelerometers will be performed using tool which verifies channel alarms upon. impact.withip specified distancegper Reg Guide ]e33 Actions'cceptable'o resolve SER Open Item 30, DISTRIBUTION CODE! 80010                   COPIES RECEIVED:LTR               ENCL                 SIZf e:
NRR/OL/AOL NRR L83 LA COPIES LTTR ENC 1 1 RECIPIENT ID CODE/NAME NRR L83-BC BUCKLEYrB 01 COPIES'TTR'N 1 INTERNAL!ACRS 41 ELD/HDS]IE/OEPER/EPB NRR ROErM~L NRR/DE/CEB 11 NRR/DE/EQB 13 NRR/OE/MEB 18 NRR/OE/SAB 24 NRR/DHFS/HFE840.
Licensing         Submittal: .PSAR/FSAR Amdts 8             elated             Cor r espondence'OTES;
NRR/OHFS/PSRB NRR/OS I'/AEB.26 NRR/DS I/CPB 10, NRR/OSI/ICSB 16 NRR/OS I/PSB 19 NRR/DSI/RSB 23 RGN2 EXTERNAL)24X DMB/OSS (AMDTS)NRC PDR 02, PNL.GRUELtR 6 1 1 1 1 2 1 1-1 1 1.1 1 1 1 3 ADM/LFMB IE FILE IE/DQAVT/QABR]>>
                                                                                                                        'ITLEi REC IP IENT=             COPIES              RECIPIENT                        COPIES'TTR'N IO CODE/NAME~               LTTR ENC            ID CODE/NAME NRR/OL/AOL                       1             NRR L83- BC NRR L83 LA                      1              BUCKLEYrB             01                             1 INTERNAL! ACRS                         41       6              ADM/LFMB ELD/HDS]                         1              IE FILE                                              1-IE/OEPER/EPB                     1              IE/DQAVT/QABR]>>                                      1    ]r NRR ROErM ~ L                                   NRR/DE/AEAB                                          1    0-'
NRR/DE/AEAB NRR/DE/EHEB NRR/DE/GB 28 NRR/OE/I'1TEB 17 NRR/DE/SGEB 25 NRR/DHFS/LQB 32 NRR/DL/SSPB NRR/DS I/ASB NRR/DS I/CSB 09 NRR/DSI/METB 12 RAB 22 R G FIL 04 I/MI8 BNL(AMDTS ONLY)LPDR.03'SIC 05'-1-1 1 1 2 1 1 1 1 1 1 1 1 1 1 1~1]r 0-'2~]>>]1>>TOTAL NUMBER OF COPIES REQUIRED: LTTR 52 ENCL 4  
1 NRR/DE/CEB             11       1              NRR/DE/EHEB                                          1 NRR/DE/EQB             13       2              NRR/DE/GB            28                          2    2      ~
~I vhS X)gl)X))),I f lAX)'I'')X)v X,<<))f)>tv E$xl'll)I III P II',"x x.>).,f>f)IIV t~')C II r<<rr SX'fr)tf'1 t I',, f f-)lite>1 I i)v),ii VV>ggr 8.yt'"v 3>,l v;I)I fli f'0"v)iv<;).+ilv,.;x~j>'Ig X>),)v>ltd X PQP>~tt X'$I'jf>VI,)'>yq)'1>"-I)cv X rex."'s<<f,)x>>'~X f)'>""v f'>>I')3'$" jvt'k~>jf f'l f X I'I 0 tl X"a>0 vgt'I'i I')I f i'~>'tT, X tl~v)R'tv x")%,v)0)tt f rent vj>I I~I, I I>Iii, f>>i.'x'o f g lt,)l x>xt,hv list vvf1 g f,ll o)If g f ,"I, kf T J'l'<>>>1vl f)tt'$~i,, ll)C tl I'tg Kl fbi I l haft.X<<a'x)),1 I tvl)>x Carolina Power&Light Company AUG 0 5)985 Mr.Harold R.Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NO.1-DOCKET NO.50-000 LOOSE PARTS MONITORING SYSTEM CALIBRATION SERIAL: NLS-85-238
NRR/OE/MEB             18       1              NRR/OE/I'1TEB 17                                    1    ]>>
NRR/OE/SAB             24       1-            NRR/DE/SGEB 25                                      1      ]
NRR/DHFS/HFE840.                 1              NRR/DHFS/LQB 32 NRR/OHFS/PSRB                   1              NRR/DL/SSPB                                          1 NRR/OS I'/AEB. 26               1.            NRR/DS  I/ASB                                        1 NRR/DS I/CPB 10,                 1              NRR/DS I/CSB          09                            1 NRR/OSI/ICSB 16                 1              NRR/DSI/METB 12                                      1 NRR/OS   I/PSB NRR/DSI/RSB RGN2 19 23 1
1 3
R G FIL RAB I/MI8 05'-
22 04 1
1 1
EXTERNAL) 24X                                                  BNL(AMDTS ONLY)                                     1 DMB/OSS (AMDTS)                                LPDR.                                               1 ~
1>>
03'SIC NRC PDR                02,                                                                          1 PNL. GRUELtR TOTAL NUMBER OF COPIES                   REQUIRED: LTTR       52   ENCL         4
 
X)glvhS)X))),I
                    ~  I f
                                                                                                      ',"x
                                                                                        )       f   )>tv             E   $ xl           'll   )I III P                                                                                           II II                              x.>)       .
                                                                                                                            ,f lAX    )'I'      '          )X)v      X,        <<)                                      >
f )IIV             t~         ') C                                       r
          'fr)tf'1   t       I   ',,   f f   -
                                                          ) lite   >
1 I i) v),ii VV>     ggr         8.yt'                                                   rex          ." 's
                                                                                                                                                                                            <<f,
<<rr SX                        "v   3>,l   v; I   )I     fli       f'0 "v)iv     <;)   .+ ilv,.;   x   ~ j>'Ig                 " -I                              )
I'jf>VI ,          '
x>>'~X
                  ),)                                                                                                                                             f )'>
X >          v   >ltd X PQP>     ~ tt   X'     $                         )             >
yq   )'1>       )cv   X
                                                                                                                                                      ""v f'>>
I' tl~v)R'tv x")   %,v
                              )3
                                    ) 0)tt f rent       vj>I
                                                              " jvt I~ I,
                                                                      'k I
                                                                          ~>jf I>
f  'l f X Iii, f>>
I'I  0 tl
: i. 'x X"a>0
                                                                                                                  'o   fg vgt'I' lt,)l x     >xt,hv i  I')I i'~
list         vvf1 f
g f,ll   o
                                                                                                                                                                                            >'tT,
                                                                                                                                                                                            )
X If g f tt'$
                                                                                                                                                                                          ,"I, kf T       J'l'           <>>>
1vl f
            )
tl
                                                                                                                                ~i,, ll)
I'tg Kl fbi I l haft C                .X
                                                                                                                                                        <<a'x)
I   tvl)
                                                                >x
                              ),1
 
Carolina Power & Light Company
                                                          )985                      SERIAL: NLS-85-238 AUG 0 5 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NO. 1 - DOCKET NO. 50-000 LOOSE PARTS MONITORING SYSTEM CALIBRATION
 
==Dear Mr. Denton:==
 
By letter dated October 28, 1983, Carolina Power k Light Company (CPRL) submitted a detailed description of the Metal Impact Monitoring System (MIMS) used at the Shearon Harris Nuclear Power Plant. The NRC reviewed this submittal and found it to be an acceptable response to the Draft Safety Evaluation Report Open Item No. 30, as documented on page 0-30 of the Safety Evaluation Report. In the October 28, 1983 submittal, Section II.A, Items 2 and 3, CPRL described the methods to be used to calibrate the accelerometers and conduct system tests. The calibration described in that submittal involved removing the accelerometers from their installed locations, mounting the accelerometers on a vibration calibrator and observing the output of the accelerometer. The system test consisted of impacting the reactor vessel or steam generator in the vicinity of the accelerometer and observing the response of the system. In lieu of these tests, CPRL will perform testing and calibration using a tool that provides a calibrated impact (e.g., 0.5 ft.-lbs.). The tool will be used to verify that each channel alarms upon an impact within a specified distance (e.g., 0.5 ft.-lbs. at a distance of 3 ft.). Such a test conforms with the recommendations of Regulatory Guide 1.133 Position C.a.(3) and provides a means to calibrate the accelerometers without removal of the monitors. We find that this change is acceptable because it provides the same level of assurance that the MIMS is operating properly and it provides a test which is in conformance with the recommendations of Regulatory Guide 1.133.
If you have any questions, please contact me.
Yours very truly, S.. Zim erman M      ger Nuclear Licensing Section 3HE/ccc (1672GAS)
CC:     Mr. B. C. Buckley (NRC)                                Mr. Wells Eddleman Mr. G. F. Maxwell (NRC-SHNPP)                          Mr. 3ohn D. Runkle Dr. 3. Nelson Grace (NRC-RII)                          Dr. Richard D. Wilson Mr. G. A. Schwenk (NRC-CPB)                            Mr. G. O. Bright (ASLB)
Mr. Travis Payne (KUDZU)                                Dr. J. H. Carpenter (ASLB)
Mr. Daniel F. Read (CHANGE/ELP)                        Mr. 3. L. Kelley (ASLB)
Wake County Public Library 850S0804Si 850805                                                                      ggi pDR ADocg, 05000400    PDR                                                              itg E
411 Fayettevilte Street o P. O. Box 1551 o Raleigh, N. C. 27602


==Dear Mr.Denton:==
    's I y~ I}}
By letter dated October 28, 1983, Carolina Power k Light Company (CPRL)submitted a detailed description of the Metal Impact Monitoring System (MIMS)used at the Shearon Harris Nuclear Power Plant.The NRC reviewed this submittal and found it to be an acceptable response to the Draft Safety Evaluation Report Open Item No.30, as documented on page 0-30 of the Safety Evaluation Report.In the October 28, 1983 submittal, Section II.A, Items 2 and 3, CPRL described the methods to be used to calibrate the accelerometers and conduct system tests.The calibration described in that submittal involved removing the accelerometers from their installed locations, mounting the accelerometers on a vibration calibrator and observing the output of the accelerometer.
The system test consisted of impacting the reactor vessel or steam generator in the vicinity of the accelerometer and observing the response of the system.In lieu of these tests, CPRL will perform testing and calibration using a tool that provides a calibrated impact (e.g., 0.5 ft.-lbs.).
The tool will be used to verify that each channel alarms upon an impact within a specified distance (e.g., 0.5 ft.-lbs.at a distance of 3 ft.).Such a test conforms with the recommendations of Regulatory Guide 1.133 Position C.a.(3)and provides a means to calibrate the accelerometers without removal of the monitors.We find that this change is acceptable because it provides the same level of assurance that the MIMS is operating properly and it provides a test which is in conformance with the recommendations of Regulatory Guide 1.133.If you have any questions, please contact me.Yours very truly, 3HE/ccc (1672GAS)S..Zim erman M ger Nuclear Licensing Section CC: Mr.B.C.Buckley (NRC)Mr.G.F.Maxwell (NRC-SHNPP)
Dr.3.Nelson Grace (NRC-RII)Mr.G.A.Schwenk (NRC-CPB)Mr.Travis Payne (KUDZU)Mr.Daniel F.Read (CHANGE/ELP)
Wake County Public Library 850S0804Si 850805 pDR ADocg, 05000400 E PDR Mr.Wells Eddleman Mr.3ohn D.Runkle Dr.Richard D.Wilson Mr.G.O.Bright (ASLB)Dr.J.H.Carpenter (ASLB)Mr.3.L.Kelley (ASLB)ggi itg 411 Fayettevilte Street o P.O.Box 1551 o Raleigh, N.C.27602
's I y~I}}

Latest revision as of 19:22, 3 February 2020

Advises That Calibr of Accelerometers Will Be Performed Using Tool Which Verifies Channel Alarms Upon Impact within Specified Distance,Per Reg Guide 1.33.Actions Acceptable to Resolve SER Open Item 30
ML18019A301
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 08/05/1985
From: Zimmerman S
CAROLINA POWER & LIGHT CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
RTR-REGGD-01.133, RTR-REGGD-1.133 NLS-85-238, NUDOCS 8508080461
Download: ML18019A301 (6)


Text

Carolina Po~aer 3 t.:th) >"onoon~

SERIAL: NLS-85-238 AUG 0 5 )S85 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NO. 1 DOCKET NO.50-000 LOOSE PARTS MONITORING SYSTEM CALIBRATION

Dear Mr. Denton:

By letter dated October 28, 1983, Carolina Power R Light Company (CPRL) submitted a detailed description of the Metal Impact Monitoring System (MIMS) used at the Shearon Harris Nuclear Power Plant. The NRC reviewed this submittal and found it to be an acceptable response to the Draft Safety Evaluation Report Open Item No. 30, as documented on page 0-30 of the Safety Evaluation Report. In the October 28, 1983 submittal,Section II.A, Items 2 and 3, CPRL described the methods to be used to calibrate the accelerometers and conduct system tests. The calibration described in that submittal involved removing the accelerometers from their installed locations, mounting the accelerometers on a vibration calibrator and observing the output of the accelerometer. The system test consisted of impacting the reactor vessel or steam generator in the vicinity of the accelerometer and observing the response of the system. In lieu of these tests, CPRL will perform testing and calibration using a tool that provides a calibrated impact (e.g., 0.5 ft.-lbs.). The tool will be used to verify that each channel alarms upon an impact within a specified distance (e.g., 0.5 ft.-lbs. at a distance of 3 ft.). Such a test conforms with the recommendations of Regulatory Guide 1.133 Position C.a.(3) and provides a means to calibrate the accelerometers without removal of the monitors. We find that this change is acceptable because it provides the same level of assurance that the MIMS is operating properly and it provides a test which is in conformance with the recommendations of Regulatory Guide 1.133.

If you have any questions, please contact me.

Yours very truly,,

S.. Zim erman M ger Nuclear Licensing Section 3HE/ccc (1672GAS)

Cct Mr. B. C. Buckley (NRC) Mr. Wells Eddleman Mr. G. F. Maxwell (NRC-SHNPP) Mr. 3ohn D. Runkle Dr. 3. Nelson Grace (NRC-RII) Dr. Richard D. Wilson Mr. G. A. Schwenk (NRC-CPB) Mr. G. O. Bright (ASLB)

Mr. Travis Payne (KUDZU) Dr. 3. H. Carpenter (ASLB)

Mr. Daniel F. Read (CHANGE/ELP) Mr. 3. L. Kelley (ASLB)

Wake County Public Library 8508080+gf 850805

@DR *DOCg 0500040 E

411 Fayetteville Street ~ P. O. Box 1551 ~ Saic>r~ 't, "

REGULATO INFORMATION DISTRIBUTION STEM (RIDS)

AGCOECS ION NBR 8508080461 OOC ~ DATK'5/08/05 NOTARIZED: NO DOCKET it N

FACIL:50 400 Shear on Harris Nuclear Power Plantr Unit Carolina 05000400

'AUTrt,NAME AUTHOR Af FILIATION ZIHMKRMANrS,R, Car ol ina Power 8 Light Co ~

REC IP ~ NAME:,REC IP IEN T AF F IL I ATION OENTON<H ~ RQ Office of Nuclear Reactor Regulationr Dir'ector'UBJECT:

Advises that calibr of accelerometers will be per'formed using tool which verifies channel alarms upon impact within specified distancerper Reg Guide 1 ~ 33 'ctions'cceptablei to resolve SER Open f.tern 30+

DISTRIBUTION CODE'! 800 1 0'OPIES RECEIVED t LTR ENCL SIZE ~ -'o,. /

TITLKi Licensing .Submittal: PSAR/FSAR Amdts .8 elated Gorr espondence-NOTES; RECIPIENT COPIES RECIPIENT COPIES IO CODE/NAME LTTR KNC ID CODE/NAME LTTR EN NRR/OL/ADL 1 NRR L83 BC 1 NRR L83 LA 1 BUCKLKYrB 01 1 INTERNAL: ACRS 41 6.

ELO/HOS1 1 l.

IE/OEPER/KPB 36 1 IE/DQAVT/QA821 l.

NRR ROKpM,L NRR/DE/AEAB 0' NRR/DE/CKB NRR/OK/EQB il 13 1

1 2

NRR/DF/EHEB NRR/OK/GB 28 2 NRR/DE/MKB 18 1 NRR/OE/MTEB 17 1-NRR/OK/SAB 24 1 NRR/DE/SGEB 25 1 ~

NRR/OHFS/HFEB40 1 NRR/OHFS/LQB 32 NRR/OHFS/PSRB 1 NRR/DL/SSPB NRR/OS I/AEB 26 1 NRR/OS I/ASB NRR/OS I/CPB 10, 1 NRR/DS I/CSB 09 NRR/DSI/ICSB 16 1 NRR/OSI/METB 12 NRR/DSI/PSB 19 1 NRR/DS I/RAB 22 NRR/DSI/RSB 23. 1 REG FILE 04 RGN2 3 RM/DDAMI/MI8 EXTERNAL; 24X OMB/OSS NRC PDR '2 (AMOTS)

PNL GRUELgR 1

1 1

1 1

1 1

1 BNL(AMOTS ONLY)

LPDR

'JS I C 03 05 TOTAL NURSER OF COPIES REQUIRED: LTTR 58 ENCL I

REGULAT INFORMATION DISTRIBUTION STEM (RIDS)

A C GE3 S I ON N8 R ~ 8 5 0 8 0 8 0 4 6 1 0 0 C ~ D ATE / /

85 08 05 N 0 T A R 'I Z E 0 I< 0 DOCKET FACIL!50 400 Shearon Harris Nuclear Power Plantr Unit, ]~ Carol:ina 05000400

'AUTH;NAME AUTHOR AFF IL'IATION ZIMMERMANi8,R, Car ol ina Power" 5 Light Co ~

RECIP,NAME) RECIPIENT AFFILIATION DENTONrHiRe Office of Nuclear Reactor Regulatianr Director

SUBJECT:

Advises that" calibr of,accelerometers will be performed using tool which verifies channel alarms upon. impact.withip specified distancegper Reg Guide ]e33 Actions'cceptable'o resolve SER Open Item 30, DISTRIBUTION CODE! 80010 COPIES RECEIVED:LTR ENCL SIZf e:

Licensing Submittal: .PSAR/FSAR Amdts 8 elated Cor r espondence'OTES;

'ITLEi REC IP IENT= COPIES RECIPIENT COPIES'TTR'N IO CODE/NAME~ LTTR ENC ID CODE/NAME NRR/OL/AOL 1 NRR L83- BC NRR L83 LA 1 BUCKLEYrB 01 1 INTERNAL! ACRS 41 6 ADM/LFMB ELD/HDS] 1 IE FILE 1-IE/OEPER/EPB 1 IE/DQAVT/QABR]>> 1 ]r NRR ROErM ~ L NRR/DE/AEAB 1 0-'

1 NRR/DE/CEB 11 1 NRR/DE/EHEB 1 NRR/DE/EQB 13 2 NRR/DE/GB 28 2 2 ~

NRR/OE/MEB 18 1 NRR/OE/I'1TEB 17 1 ]>>

NRR/OE/SAB 24 1- NRR/DE/SGEB 25 1 ]

NRR/DHFS/HFE840. 1 NRR/DHFS/LQB 32 NRR/OHFS/PSRB 1 NRR/DL/SSPB 1 NRR/OS I'/AEB. 26 1. NRR/DS I/ASB 1 NRR/DS I/CPB 10, 1 NRR/DS I/CSB 09 1 NRR/OSI/ICSB 16 1 NRR/DSI/METB 12 1 NRR/OS I/PSB NRR/DSI/RSB RGN2 19 23 1

1 3

R G FIL RAB I/MI8 05'-

22 04 1

1 1

EXTERNAL) 24X BNL(AMDTS ONLY) 1 DMB/OSS (AMDTS) LPDR. 1 ~

1>>

03'SIC NRC PDR 02, 1 PNL. GRUELtR TOTAL NUMBER OF COPIES REQUIRED: LTTR 52 ENCL 4

X)glvhS)X))),I

~ I f

',"x

) f )>tv E $ xl 'll )I III P II II x.>) .

,f lAX )'I' ' )X)v X, <<) >

f )IIV t~ ') C r

'fr)tf'1 t I ',, f f -

) lite >

1 I i) v),ii VV> ggr 8.yt' rex ." 's

<<f,

<<rr SX "v 3>,l v; I )I fli f'0 "v)iv <;) .+ ilv,.; x ~ j>'Ig " -I )

I'jf>VI , '

x>>'~X

),) f )'>

X > v >ltd X PQP> ~ tt X' $ ) >

yq )'1> )cv X

""v f'>>

I' tl~v)R'tv x")  %,v

)3

) 0)tt f rent vj>I

" jvt I~ I,

'k I

~>jf I>

f 'l f X Iii, f>>

I'I 0 tl

i. 'x X"a>0

'o fg vgt'I' lt,)l x >xt,hv i I')I i'~

list vvf1 f

g f,ll o

>'tT,

)

X If g f tt'$

,"I, kf T J'l' <>>>

1vl f

)

tl

~i,, ll)

I'tg Kl fbi I l haft C .X

<<a'x)

I tvl)

>x

),1

Carolina Power & Light Company

)985 SERIAL: NLS-85-238 AUG 0 5 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NO. 1 - DOCKET NO.50-000 LOOSE PARTS MONITORING SYSTEM CALIBRATION

Dear Mr. Denton:

By letter dated October 28, 1983, Carolina Power k Light Company (CPRL) submitted a detailed description of the Metal Impact Monitoring System (MIMS) used at the Shearon Harris Nuclear Power Plant. The NRC reviewed this submittal and found it to be an acceptable response to the Draft Safety Evaluation Report Open Item No. 30, as documented on page 0-30 of the Safety Evaluation Report. In the October 28, 1983 submittal,Section II.A, Items 2 and 3, CPRL described the methods to be used to calibrate the accelerometers and conduct system tests. The calibration described in that submittal involved removing the accelerometers from their installed locations, mounting the accelerometers on a vibration calibrator and observing the output of the accelerometer. The system test consisted of impacting the reactor vessel or steam generator in the vicinity of the accelerometer and observing the response of the system. In lieu of these tests, CPRL will perform testing and calibration using a tool that provides a calibrated impact (e.g., 0.5 ft.-lbs.). The tool will be used to verify that each channel alarms upon an impact within a specified distance (e.g., 0.5 ft.-lbs. at a distance of 3 ft.). Such a test conforms with the recommendations of Regulatory Guide 1.133 Position C.a.(3) and provides a means to calibrate the accelerometers without removal of the monitors. We find that this change is acceptable because it provides the same level of assurance that the MIMS is operating properly and it provides a test which is in conformance with the recommendations of Regulatory Guide 1.133.

If you have any questions, please contact me.

Yours very truly, S.. Zim erman M ger Nuclear Licensing Section 3HE/ccc (1672GAS)

CC: Mr. B. C. Buckley (NRC) Mr. Wells Eddleman Mr. G. F. Maxwell (NRC-SHNPP) Mr. 3ohn D. Runkle Dr. 3. Nelson Grace (NRC-RII) Dr. Richard D. Wilson Mr. G. A. Schwenk (NRC-CPB) Mr. G. O. Bright (ASLB)

Mr. Travis Payne (KUDZU) Dr. J. H. Carpenter (ASLB)

Mr. Daniel F. Read (CHANGE/ELP) Mr. 3. L. Kelley (ASLB)

Wake County Public Library 850S0804Si 850805 ggi pDR ADocg, 05000400 PDR itg E

411 Fayettevilte Street o P. O. Box 1551 o Raleigh, N. C. 27602