ML19209A661: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 19: Line 19:
x
x
[
[
Q
Q Wisconsin Elecinc eom coww 231 W. MICHIGAN, P.O. BOX 2046, MILWAUKEE, WI $3201 October 1, 1979 Mr. liarold R. Denton, Dimetor Office of fluclear Reactor Regulation O. S. IlUCLEAR REGULATORY C0tf tISS10ii t    licshington, D. C.            20555 Attention: Mr. A. Schwencer, Chief Operating Reactors Branch 1 Gentlemen:
            '
DOCKET liOS. 50-266 Arid 50-301 MODIFICATI0ii 0F TEQttilCAL SPECIflL&floa CNMGE REQUEST ti0. 46 POIHT ulAOI fluCLLAR PLMIT, UNITS 1 ANO 2 Your letter dated August 21, 1979, and received August 28, 1979, requested that we increase the minimum size of the fire brigade contained in the Technical Specifications for Point Beach Nuclear Plant Unit Hos.1 and 2 to five neobers within 30 days of our receipt of the letter. In accordance with this request, Wisconsin Electric Power Company hereby proposes the enclosed change to the Point Beach Technical Specifications. This change represents a modification i          to facility Operating License llos. DPR-24 and DPR-27 amendment application dated July 28,1977, as subsequently modified by our letters dated October 5,1977 and Decerber 12, 1977.
Wisconsin Elecinc eom coww 231 W. MICHIGAN, P.O. BOX 2046, MILWAUKEE, WI $3201 October 1, 1979
Enclosure 2 of your August 21 letter at Page 3. Item 1, states the NRC opinion that designation of the Shift Supervisor as the fire brigade leader is unacceptable. tio do not agroo with this opinion.                The Shift Supervisor is respon-sible for the overall operation and safety of the plant.                It is his responsibility to investigate all plant emergencies, nake decisions, and direct operating and recovery actions. Regulatory Guide 1.120 Section C.l.d.(1) states that fires need not be postulated to be concurrent with non-fire related failures in safety systet.s, Other plant accidents or the most severe natural phenomena, tle see no reason why the Shift Supervisor would be required to leave the scene of the emergency.
      '
Mr. liarold R. Denton, Dimetor Office of fluclear Reactor Regulation O. S. IlUCLEAR REGULATORY C0tf tISS10ii t    licshington, D. C.            20555 Attention: Mr. A. Schwencer, Chief Operating Reactors Branch 1 Gentlemen:
DOCKET liOS. 50-266 Arid 50-301 MODIFICATI0ii 0F TEQttilCAL SPECIflL&floa CNMGE REQUEST ti0. 46 POIHT ulAOI fluCLLAR PLMIT, UNITS 1 ANO 2 Your letter dated August 21, 1979, and received August 28, 1979, requested that we increase the minimum size of the fire brigade contained in the Technical Specifications for Point Beach Nuclear Plant Unit Hos.1 and 2 to five
    "
neobers within 30 days of our receipt of the letter. In accordance with this request, Wisconsin Electric Power Company hereby proposes the enclosed change to the Point Beach Technical Specifications. This change represents a modification i          to facility Operating License llos. DPR-24 and DPR-27 amendment application dated July 28,1977, as subsequently modified by our letters dated October 5,1977 and Decerber 12, 1977.
Enclosure 2 of your August 21 letter at Page 3. Item 1, states the NRC opinion that designation of the Shift Supervisor as the fire brigade leader is unacceptable. tio do not agroo with this opinion.                The Shift Supervisor is respon-sible for the overall operation and safety of the plant.                It is his responsibility to investigate all plant emergencies, nake decisions, and direct operating and recovery actions. Regulatory Guide 1.120 Section C.l.d.(1) states that fires need not be postulated to be concurrent with non-fire related failures in safety systet.s, Other plant accidents or the most severe natural phenomena, tle see no reason why the Shift Supervisor would be required to leave the scene of the
,
emergency.
Enclosure 1, Table 1, lists the following required actions for the l            fire brigade leader.
Enclosure 1, Table 1, lists the following required actions for the l            fire brigade leader.
: 1. Evaluate the fire (cuergency) situation.
: 1. Evaluate the fire (cuergency) situation.
Line 39: Line 31:
<                                                                                        ,c
<                                                                                        ,c
                                                                                             /
                                                                                             /
  ,
Itr. liarold R. Denton, Director              October 1,1979
Itr. liarold R. Denton, Director              October 1,1979
: 4. Direct fire fighting activities.
: 4. Direct fire fighting activities.
Line 47: Line 38:
The above decisions directly affect plant operation and safety. Such decisions and actions are the responsibility of the Shift Supervisor, who is the shift person most knowledgeable and qualified to make these decisions and inplermint proper actions. Delegation of this responsibility to other personnel would compromise the authority and responsibility of the Shift Supervisor and would increase the potential for erroneous decisions and/or actions. For these reasons, we consider the Shift Supervisor to be the proper designec as fire brigade leader and will continua to have hin so designated. You should further note that the Point Beach iluclear Plant organization structure, which has an operating supervisor (normally SRD licensed) assigned in charge in the control room in the absence of the Shift Supervisor from the control room, provides a sound organization for allowing the Shift Supervisor to be the fire brigade leader.
The above decisions directly affect plant operation and safety. Such decisions and actions are the responsibility of the Shift Supervisor, who is the shift person most knowledgeable and qualified to make these decisions and inplermint proper actions. Delegation of this responsibility to other personnel would compromise the authority and responsibility of the Shift Supervisor and would increase the potential for erroneous decisions and/or actions. For these reasons, we consider the Shift Supervisor to be the proper designec as fire brigade leader and will continua to have hin so designated. You should further note that the Point Beach iluclear Plant organization structure, which has an operating supervisor (normally SRD licensed) assigned in charge in the control room in the absence of the Shift Supervisor from the control room, provides a sound organization for allowing the Shift Supervisor to be the fire brigade leader.
We have enclosed herewith three signed originals of this Technical Specification change request. We will forward under separate cover forty copies of this application. lie trust this change is compatible with your request and will be approved on a timely basis.
We have enclosed herewith three signed originals of this Technical Specification change request. We will forward under separate cover forty copies of this application. lie trust this change is compatible with your request and will be approved on a timely basis.
Very truly yours, n D-          ,f
Very truly yours, n D-          ,f Sol Burstein                                      Exe utive Vice President Subscribed and sworn to before tu This 1st day of October,1979.
                                                                ,
Sol Burstein                                      Exe utive Vice President Subscribed and sworn to before tu This 1st day of October,1979.
c h ?1 h W          -chwa Hotary PubMc, State of Wisconsin Itr Connission expires %3.
c h ?1 h W          -chwa Hotary PubMc, State of Wisconsin Itr Connission expires %3.
                              '
1  4/f 30.
1  4/f 30.
o 1i10 089
o 1i10 089
    ,
                                                                                         ~
                                                                                         ~


    -
e 15.6.2.2.f A Fire Brigade of at least 5 members shall be maintained onsite at all times. This excludes 3 rnorrbers of the minimum shift crew necessary for safe shutdown of the plant and any personnel required for other essential functions during a fire emergency.
e
.
15.6.2.2.f A Fire Brigade of at least 5 members shall be maintained onsite at all times. This excludes 3 rnorrbers of the minimum shift crew necessary for safe shutdown of the plant and any personnel required for other essential functions during a fire emergency.
                                                .
1110 090 15.6.2-2                                    l
1110 090 15.6.2-2                                    l
                                                                                   !}}
                                                                                   !}}

Latest revision as of 05:38, 2 February 2020

Proposes Changes to Tech Specs of Licenses DPR-24 & DPR-27 Re Fire Brigade Size,In Reponse to NRC 790821 Request.Change Modifies Tech Spec Change Request 46
ML19209A661
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 10/01/1979
From: Burstein S
WISCONSIN ELECTRIC POWER CO.
To: Harold Denton, Schwencer A
Office of Nuclear Reactor Regulation
References
NUDOCS 7910050144
Download: ML19209A661 (3)


Text

'

x

[

Q Wisconsin Elecinc eom coww 231 W. MICHIGAN, P.O. BOX 2046, MILWAUKEE, WI $3201 October 1, 1979 Mr. liarold R. Denton, Dimetor Office of fluclear Reactor Regulation O. S. IlUCLEAR REGULATORY C0tf tISS10ii t licshington, D. C. 20555 Attention: Mr. A. Schwencer, Chief Operating Reactors Branch 1 Gentlemen:

DOCKET liOS. 50-266 Arid 50-301 MODIFICATI0ii 0F TEQttilCAL SPECIflL&floa CNMGE REQUEST ti0. 46 POIHT ulAOI fluCLLAR PLMIT, UNITS 1 ANO 2 Your letter dated August 21, 1979, and received August 28, 1979, requested that we increase the minimum size of the fire brigade contained in the Technical Specifications for Point Beach Nuclear Plant Unit Hos.1 and 2 to five neobers within 30 days of our receipt of the letter. In accordance with this request, Wisconsin Electric Power Company hereby proposes the enclosed change to the Point Beach Technical Specifications. This change represents a modification i to facility Operating License llos. DPR-24 and DPR-27 amendment application dated July 28,1977, as subsequently modified by our letters dated October 5,1977 and Decerber 12, 1977.

Enclosure 2 of your August 21 letter at Page 3. Item 1, states the NRC opinion that designation of the Shift Supervisor as the fire brigade leader is unacceptable. tio do not agroo with this opinion. The Shift Supervisor is respon-sible for the overall operation and safety of the plant. It is his responsibility to investigate all plant emergencies, nake decisions, and direct operating and recovery actions. Regulatory Guide 1.120 Section C.l.d.(1) states that fires need not be postulated to be concurrent with non-fire related failures in safety systet.s, Other plant accidents or the most severe natural phenomena, tle see no reason why the Shift Supervisor would be required to leave the scene of the emergency.

Enclosure 1, Table 1, lists the following required actions for the l fire brigade leader.

1. Evaluate the fire (cuergency) situation.
2. Determine the effective actions to be taken.
3. liaintain conraunication with the control room. 110 088 7910050 %

p I m

M

< ,c

/

Itr. liarold R. Denton, Director October 1,1979

4. Direct fire fighting activities.
5. Judge effectiveness and safety.
6. Consider alternative actions, such as need for offsite assistance.
7. Consider irpact on plant safe shutdown capability, such as equipment which may be disabled.

The above decisions directly affect plant operation and safety. Such decisions and actions are the responsibility of the Shift Supervisor, who is the shift person most knowledgeable and qualified to make these decisions and inplermint proper actions. Delegation of this responsibility to other personnel would compromise the authority and responsibility of the Shift Supervisor and would increase the potential for erroneous decisions and/or actions. For these reasons, we consider the Shift Supervisor to be the proper designec as fire brigade leader and will continua to have hin so designated. You should further note that the Point Beach iluclear Plant organization structure, which has an operating supervisor (normally SRD licensed) assigned in charge in the control room in the absence of the Shift Supervisor from the control room, provides a sound organization for allowing the Shift Supervisor to be the fire brigade leader.

We have enclosed herewith three signed originals of this Technical Specification change request. We will forward under separate cover forty copies of this application. lie trust this change is compatible with your request and will be approved on a timely basis.

Very truly yours, n D- ,f Sol Burstein Exe utive Vice President Subscribed and sworn to before tu This 1st day of October,1979.

c h ?1 h W -chwa Hotary PubMc, State of Wisconsin Itr Connission expires %3.

1 4/f 30.

o 1i10 089

~

e 15.6.2.2.f A Fire Brigade of at least 5 members shall be maintained onsite at all times. This excludes 3 rnorrbers of the minimum shift crew necessary for safe shutdown of the plant and any personnel required for other essential functions during a fire emergency.

1110 090 15.6.2-2 l

!