O gg OPERATlHC DATA REPORT | |||
O | |||
gg OPERATlHC DATA REPORT | |||
[h DOCKET NO. 50 323 gg DATE 12 10 80 g) COMPLETED By P.R. UNDERWOOD gg TELEPHONE ( 912 ) 367-7781 s 203 OPERATINC STATUS e**************eee*****ee******o****ee****eee***e*****e e Hotes e | [h DOCKET NO. 50 323 gg DATE 12 10 80 g) COMPLETED By P.R. UNDERWOOD gg TELEPHONE ( 912 ) 367-7781 s 203 OPERATINC STATUS e**************eee*****ee******o****ee****eee***e*****e e Hotes e | ||
: 1. Unit Hanes E.I. Hatch Nuclear Plant Unit t e e | : 1. Unit Hanes E.I. Hatch Nuclear Plant Unit t e e | ||
Line 35: | Line 32: | ||
: 8. If Changes Occur in Capacity Patings (Itens Number 3 Through ?) Since Lest Report, Clwe Reesonse b325h | : 8. If Changes Occur in Capacity Patings (Itens Number 3 Through ?) Since Lest Report, Clwe Reesonse b325h | ||
: 9. Power Level To Whoch Restricted, if Any (Net MWe)s 640 MWe ( | : 9. Power Level To Whoch Restricted, if Any (Net MWe)s 640 MWe ( | ||
to. Reasons For Restr6ctsons, It Angs Management Limitation | to. Reasons For Restr6ctsons, It Angs Management Limitation | ||
{gicg) | {gicg) | ||
Line 57: | Line 53: | ||
(9/77) | (9/77) | ||
AVERACE DAILY UNIT POWER LEVEL l DOCKET H0. 50-321 DATE 12-10-80 COMPLETED BY P.l!. 'J HD E R W O O D T ELEPHONE ( 912 ) 367-7781 x 203 M 0 tlT H 11-80 DAi AVERAGE DAILY POWER LEVEL DAY AVERACE DAILY POWER LEVEL (MUe-Net) (MWe-Het) 1 582 17 612 2 411 18 611 3 591 19 614 4 605 20 614 5 576 21 611 6 612 22 611 7 606 23 553 | AVERACE DAILY UNIT POWER LEVEL l DOCKET H0. 50-321 DATE 12-10-80 COMPLETED BY P.l!. 'J HD E R W O O D T ELEPHONE ( 912 ) 367-7781 x 203 M 0 tlT H 11-80 DAi AVERAGE DAILY POWER LEVEL DAY AVERACE DAILY POWER LEVEL (MUe-Net) (MWe-Het) 1 582 17 612 2 411 18 611 3 591 19 614 4 605 20 614 5 576 21 611 6 612 22 611 7 606 23 553 | ||
*8 600 24 606 9 608 25 616 10 189 26 610 11 332 27 612 | *8 600 24 606 9 608 25 616 10 189 26 610 11 332 27 612 12 589 28 614 13 603 29 615 14 596 30 616 15 584 31 16 607 (9/77) i | ||
12 589 28 614 13 603 29 615 14 596 30 616 15 584 31 16 607 (9/77) | |||
i | |||
E O. | |||
UNIT SilUTDOWNS AND P0tVER IIEDUCT1GNS } | UNIT SilUTDOWNS AND P0tVER IIEDUCT1GNS } | ||
DATE I/-lu-MU November COMPLETED BY P R N'"1"' W "I REN)RT MONT11 g g,3g j g l | DATE I/-lu-MU November COMPLETED BY P R N'"1"' W "I REN)RT MONT11 g g,3g j g l | ||
e. | e. | ||
- E E | - E E | ||
,$ E Licensee E*, {"., Cause & Corrective No. Date | ,$ E Licensee E*, {"., Cause & Corrective No. Date g 7, g } ., | ||
g 7, g } ., | |||
},s5 | },s5 | ||
.E h Eoent u? sq Aulon to H | .E h Eoent u? sq Aulon to H | ||
Line 84: | Line 67: | ||
21.8 F 5 NA ZZ ZZZZZZ I'anagement limitation of 80% themal 80-66 801101 S power 34.3 F 5 NA RB CONROD Reduced load to perform a rod se-80-67 801101 S quence exchange 801103 56.2 F 5 NA ZZ ZZZZZZ l.tanagement limitation of 80% thermal 80-68 S power 80-69 801105 F 5.3 H 5 80-116 CB PUMPX Load reduced because of "A" recirc pump trip i | 21.8 F 5 NA ZZ ZZZZZZ I'anagement limitation of 80% themal 80-66 801101 S power 34.3 F 5 NA RB CONROD Reduced load to perform a rod se-80-67 801101 S quence exchange 801103 56.2 F 5 NA ZZ ZZZZZZ l.tanagement limitation of 80% thermal 80-68 S power 80-69 801105 F 5.3 H 5 80-116 CB PUMPX Load reduced because of "A" recirc pump trip i | ||
75.1 F 5 NA ZZ l ZZZZZZ flanagement limitation of 80% thermal 1 | 75.1 F 5 NA ZZ l ZZZZZZ flanagement limitation of 80% thermal 1 | ||
80-70 801105 , S power 1.2 F 5 NA HE TURBIN Reduced load to perform weekly tur-4 80-71 801109 S bine test | 80-70 801105 , S power 1.2 F 5 NA HE TURBIN Reduced load to perform weekly tur-4 80-71 801109 S bine test 3 4 i i 2 Ethibit G Instructions F: Forced Reason: Method: | ||
A-l);mpment Failure (Explain) l Manual for Preparation of Data S: Sclieduled Entry Sheeis for Licensee -' | A-l);mpment Failure (Explain) l Manual for Preparation of Data S: Sclieduled Entry Sheeis for Licensee -' | ||
ItM.iintenance of Test 2 Manual Scram. | ItM.iintenance of Test 2 Manual Scram. | ||
C. Refueling 3 Auterr: 1: Scram. Event Report (LERI Fife INUREG-D Regulatory Restriction 1 -Continuations 016li E Operator Training & Ucens: Enemination 5-Incd Paluction 3 F-Adn.inistrative 9-Other (Explain) Exlilbli !- Same Source | C. Refueling 3 Auterr: 1: Scram. Event Report (LERI Fife INUREG-D Regulatory Restriction 1 -Continuations 016li E Operator Training & Ucens: Enemination 5-Incd Paluction 3 F-Adn.inistrative 9-Other (Explain) Exlilbli !- Same Source G-Or::ation21 Errut (Explatn) | ||
(9/77) ll Otti:r(Expls!n) | (9/77) ll Otti:r(Expls!n) | ||
DOCKET NO. 50-371 ~ | DOCKET NO. 50-371 ~ | ||
UNIT SIIUTDOWNS AND POWER REDUCTIONS UNIT N AME - Hafen i DATE 17-10-80 4 COMPLETED DY P, R. Undor'.enon RETORT MON 771 flovember T ELEPil0NE 917- 3h /- / / H1 l | UNIT SIIUTDOWNS AND POWER REDUCTIONS UNIT N AME - Hafen i DATE 17-10-80 4 COMPLETED DY P, R. Undor'.enon RETORT MON 771 flovember T ELEPil0NE 917- 3h /- / / H1 l | ||
i s | i s | ||
l E | l E | ||
F3, Cause & Corrective Licensee | F3, Cause & Corrective Licensee | ||
- ,5 g }: }Y3 f'8 | - ,5 g }: }Y3 f'8 Action to l | ||
Action to | |||
l | |||
' N. . hte ( | ' N. . hte ( | ||
H | H | ||
Line 113: | Line 84: | ||
os5 j(4c Event Report # | os5 j(4c Event Report # | ||
{g so O g rgU Prevent Recurrence b | {g so O g rgU Prevent Recurrence b | ||
F 5 NA ZZ ZZZZZZ Management limitation of 80% thermal | F 5 NA ZZ ZZZZZZ Management limitation of 80% thermal 80-72 801109 S 30 pouer t | ||
80-72 801109 S 30 pouer t | |||
19.2 B 3 NA CD VALVEX Rx auto scram due to MSIV closure 80-73 801110 F while performing HNP-1-SRV-03005 8 5 NA CD VALVEX Unit on startup ramp from above 80-74 801110 F 28 shutdown, #80-73 flA ZZ ZZZZZ ffanagement limitation of 80% thermal 80-75 801112 S 63.3 F 5 g power RB CONR00 Reduced load in order to perform a 80-76 801114 S 6.7 F 5 NA rod pattern adjustment and a weekly , | 19.2 B 3 NA CD VALVEX Rx auto scram due to MSIV closure 80-73 801110 F while performing HNP-1-SRV-03005 8 5 NA CD VALVEX Unit on startup ramp from above 80-74 801110 F 28 shutdown, #80-73 flA ZZ ZZZZZ ffanagement limitation of 80% thermal 80-75 801112 S 63.3 F 5 g power RB CONR00 Reduced load in order to perform a 80-76 801114 S 6.7 F 5 NA rod pattern adjustment and a weekly , | ||
turbine test 5 | turbine test 5 | ||
f:A ZZ ZZZZZZ Management limitation of 80% thermal 80-77 801115 S 185.2 F , | f:A ZZ ZZZZZZ Management limitation of 80% thermal 80-77 801115 S 185.2 F , | ||
g poh. r 3 4 . | g poh. r 3 4 . | ||
i 2 MethoJ: Edibit G. Instructions F: Forced Reason: for Preparation of Data A Diuipment failure (Explain) 1-Manual S: Sch:Juled 2 Manu:1 Scram. Entry Sheets for Licensee ll Maintenance or Test Event Report (l.E R) File (NUREG-C Refucting 3 Autom: tic Scram. | i 2 MethoJ: Edibit G. Instructions F: Forced Reason: for Preparation of Data A Diuipment failure (Explain) 1-Manual S: Sch:Juled 2 Manu:1 Scram. Entry Sheets for Licensee ll Maintenance or Test Event Report (l.E R) File (NUREG-C Refucting 3 Autom: tic Scram. | ||
4 -Continuations 01611 D Regulatory Restiletion E-Operator Trainin; & IJcense Exeminettost 5-Ioad Rxiuction 5 | 4 -Continuations 01611 D Regulatory Restiletion E-Operator Trainin; & IJcense Exeminettost 5-Ioad Rxiuction 5 j F-Administratise 9-Oicr (Ibplain) Exhibit 1 Ssme Source | ||
j F-Administratise 9-Oicr (Ibplain) Exhibit 1 Ssme Source | |||
- Coperations! Erru:(E::pt:In) ' | - Coperations! Erru:(E::pt:In) ' | ||
, (9/77) IIOther (Emplain) | , (9/77) IIOther (Emplain) | ||
DOCKET Flo 50-321 . | DOCKET Flo 50-321 . | ||
UNIT Sl!UIDOWN3 AND POICR FECUCTIONS UtilT N A tf /. !!d_tch 1 DATE I7-IC-hD j Cm!PLETED BY P. p. Ib@nrond REPOP.T M0fn11 Nom 8'Imy. TELEPil0NE 91/- M /- / /H1 | UNIT Sl!UIDOWN3 AND POICR FECUCTIONS UtilT N A tf /. !!d_tch 1 DATE I7-IC-hD j Cm!PLETED BY P. p. Ib@nrond REPOP.T M0fn11 Nom 8'Imy. TELEPil0NE 91/- M /- / /H1 | ||
. "k - | . "k - | ||
" hvb Cause & Corressive | " hvb Cause & Corressive | ||
,$ E License: [v, | ,$ E License: [v, 3,g&Yk l'8 No. D:tc ( | ||
3,g&Yk l'8 No. D:tc ( | |||
7; g | 7; g | ||
$5 5 ydiy Event Report # | $5 5 ydiy Event Report # | ||
u7 OV [U Ac. tion to Prevent Recurrence 6 | u7 OV [U Ac. tion to Prevent Recurrence 6 | ||
4 ftA RB C0!iR00 Reduced load in order to epform a 80-78 801122 S 7.8 F 5 | 4 ftA RB C0!iR00 Reduced load in order to epform a 80-78 801122 S 7.8 F 5 rod pattern adjustment and a weekly turbine test NA. ZZ ZZZZZZ Management lisaita*. ion of 80% thermal 80-79 801123 S 138.6 F 5 power IlE TURBlft iteduced load to perfonn delta weekly 80-80 801129 S 3.5 F 5 NA turbine test 43.8 F 5 flA ZZ ZZZZZZ ftnagement limitation of 80% themal 80-81 801129 S power 3 4 I 3 P.lethod: Exhibit G Instructions F: Forced Reamn: f.n Preparation of Dita A b luipment failure (Exp!ala) 14tanus! | ||
rod pattern adjustment and a weekly turbine test NA. ZZ ZZZZZZ Management lisaita*. ion of 80% thermal 80-79 801123 S 138.6 F 5 power IlE TURBlft iteduced load to perfonn delta weekly 80-80 801129 S 3.5 F 5 NA turbine test 43.8 F 5 flA ZZ ZZZZZZ ftnagement limitation of 80% themal 80-81 801129 S power | |||
3 4 I 3 P.lethod: Exhibit G Instructions F: Forced Reamn: f.n Preparation of Dita A b luipment failure (Exp!ala) 14tanus! | |||
5: Schedu'eJ 24tanual Scram. Entry Sheets for Lkensee -. | 5: Schedu'eJ 24tanual Scram. Entry Sheets for Lkensee -. | ||
B4taintena nce or' Test Event Report (LE R) File (NUREG-C Refueling 3 Auton ati: Scram. | B4taintena nce or' Test Event Report (LE R) File (NUREG-C Refueling 3 Auton ati: Scram. | ||
4 -Cantinuations Ot61) | 4 -Cantinuations Ot61) | ||
D Regulatory Restiktion E-Operator Training Licens: Exa72nstlim 5-Icad F;xluction 5 | D Regulatory Restiktion E-Operator Training Licens: Exa72nstlim 5-Icad F;xluction 5 | ||
F Atiministiatie: 9-Other (ibplair.) Exhibit 1.pame Source G Op:r: lien 21 Error (Erri:la{ | F Atiministiatie: 9-Other (ibplair.) Exhibit 1.pame Source G Op:r: lien 21 Error (Erri:la{ | ||
(YJ77) 1(Oil.cs (Exphe) | (YJ77) 1(Oil.cs (Exphe) ll | ||
ll | |||
NARRATIVE rep 0RT UNIT 1 Nov. 1st Unit limited to 80% thermal power by m'anagement Nov. 1st At 21:45 reduced load to perform a rod sequence; returned to management limitations at 08:00 on 801103. | NARRATIVE rep 0RT UNIT 1 Nov. 1st Unit limited to 80% thermal power by m'anagement Nov. 1st At 21:45 reduced load to perform a rod sequence; returned to management limitations at 08:00 on 801103. | ||
Nov. 3rd Unit limited to 80% thermal power by ' man a g e.,e n t Nov. 5th At 16:10 "A" recire pump tripped; unit returned to management limitation at 21:30 on 801105. | Nov. 3rd Unit limited to 80% thermal power by ' man a g e.,e n t Nov. 5th At 16:10 "A" recire pump tripped; unit returned to management limitation at 21:30 on 801105. | ||
Cause and corrective action reported on LER 50-321/1980-116. | Cause and corrective action reported on LER 50-321/1980-116. | ||
Nov. 5th Unit limited to 80% thermal power by management Nov. 9th At 00:35 reduced load in order to perform weekly turbine test; unit returned to manageuent limitation at 01:47 on 801109. | Nov. 5th Unit limited to 80% thermal power by management Nov. 9th At 00:35 reduced load in order to perform weekly turbine test; unit returned to manageuent limitation at 01:47 on 801109. | ||
Nov. 9th Unit limited to 80% thermal power by management Nov. 10th At 07:50 Rx auto scram due to MSIV closure while performing HNP-1-SRV-03005 Nov. 10th Unit on startup ramp from above shutdown; Rx critical at 19:50 and generator on line at 03:00 on 801111. Unit returned to management limitation at 07:00 on 801112. | Nov. 9th Unit limited to 80% thermal power by management Nov. 10th At 07:50 Rx auto scram due to MSIV closure while performing HNP-1-SRV-03005 Nov. 10th Unit on startup ramp from above shutdown; Rx critical at 19:50 and generator on line at 03:00 on 801111. Unit returned to management limitation at 07:00 on 801112. | ||
Line 174: | Line 120: | ||
Nov. 29th Unit limited to 80% thermal power by management | Nov. 29th Unit limited to 80% thermal power by management | ||
f HATCH 1 SAFETY - RELATED MAINTENANCE REQUESTS TO BE REPORTED FOR NOVEMBER 1980 No safety related maintenance requests during reporting period. | |||
f | f | ||
REFUELING INFORMATION REQUESTED , | REFUELING INFORMATION REQUESTED , | ||
: 1. E.I. llatch Nuclear Power Plant Unit 1 | : 1. E.I. llatch Nuclear Power Plant Unit 1 | ||
: 2. March 1, 1981. | : 2. March 1, 1981. | ||
: 3. May 25, 1981 | : 3. May 25, 1981 | ||
: 4. Yes, normal reload ancylsis | : 4. Yes, normal reload ancylsis | ||
: 5. #2 - 1 month | : 5. #2 - 1 month | ||
: 6. Pre pressurized fuel | : 6. Pre pressurized fuel | ||
: 7. (a) 560, (b) 550 | : 7. (a) 560, (b) 550 |
Latest revision as of 07:36, 31 January 2020
ML19343B364 | |
Person / Time | |
---|---|
Site: | Hatch |
Issue date: | 12/10/1980 |
From: | Underwood P GEORGIA POWER CO. |
To: | |
Shared Package | |
ML19343B363 | List: |
References | |
NUDOCS 8012230295 | |
Download: ML19343B364 (8) | |
Text
. _
O gg OPERATlHC DATA REPORT
[h DOCKET NO. 50 323 gg DATE 12 10 80 g) COMPLETED By P.R. UNDERWOOD gg TELEPHONE ( 912 ) 367-7781 s 203 OPERATINC STATUS e**************eee*****ee******o****ee****eee***e*****e e Hotes e
- 1. Unit Hanes E.I. Hatch Nuclear Plant Unit t e e
_hg 2. Reporting Periods 11 80 e e
- 3. Licensed Thernal Power (MUL)B 2436 e e '~Q2)
(f) 4 Hanoplate Reting (Cress .' W e ) 8 809.3
- 5. Eesegn Electracel Rating (Not Mue): 777.3 e
e e
- {~-
- 6. Maximun Dependeble Copecity (Cross MWe)I 196.3 e
- j
- 7. Maximun Dependable Cepecity (Not MWe)8 764.3 ese*********************eooe**eeeeeeeeeeeeeeooseeoeoooo (r
- 8. If Changes Occur in Capacity Patings (Itens Number 3 Through ?) Since Lest Report, Clwe Reesonse b325h
- 9. Power Level To Whoch Restricted, if Any (Net MWe)s 640 MWe (
to. Reasons For Restr6ctsons, It Angs Management Limitation
{gicg)
This nonth ve..to Det. Cumuiasie. 655iE)
Y l it. Hours In Reporting Per6od ,720 8040 43104
- 12. Number Of Hours Reactor Was Critical }ggg' d 708.0 7016.3 32814.4 -
- 13. Reactor Reserve Shutdown Hours 0.0 14 Hours Generator On.Line 700.8 0.0 6530.0 0.0 hljdb) 30798.3 IS. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Cross Thornet Energy Cenerated (MWH) 1324109 14238331 64641586
- 17. Cross Electrical Energy Generated (MUH) 432870 4656600 20927540
- 18. Het Electrical Energy Genera ted ( MWH) 412003 4437629 19899562
- 19. Unit Service Factor 97.3 98.2 71.5
- 20. Unit Avesleb618tg Factor 97.3 81.2 ?!.5
- 21. Unit Capecity Factor (Using MDC Net ) 75.0 72.2 fa,4
- 22. Unit cepecit y Factor (Using DER Het) 73.8 71.0 59.4
- 23. Unit Forced Outage Rate 2.7 18.8 20.3 24 Shutdowns Scheduled Over Hewt 6 Months ( Type, Dete, and Durat6cn of Each):
REFUELING; MARCH 1, 1981; 13 WEEKS
- 25. It Shut Down At End of Report Persod, Estameted Date of Startupe i
- 26. Units in Test Status (Prior to Connerciel Operation)s Forecast Achsewed IHITIAL CRITICHLIII ............... ...............
INITIAL ELECTRIC 11Y ............... . . . . . . . . . . . . . . . .
COMMERCIAL OPERAflCN ............... ...............
(9/77)
AVERACE DAILY UNIT POWER LEVEL l DOCKET H0. 50-321 DATE 12-10-80 COMPLETED BY P.l!. 'J HD E R W O O D T ELEPHONE ( 912 ) 367-7781 x 203 M 0 tlT H 11-80 DAi AVERAGE DAILY POWER LEVEL DAY AVERACE DAILY POWER LEVEL (MUe-Net) (MWe-Het) 1 582 17 612 2 411 18 611 3 591 19 614 4 605 20 614 5 576 21 611 6 612 22 611 7 606 23 553
- 8 600 24 606 9 608 25 616 10 189 26 610 11 332 27 612 12 589 28 614 13 603 29 615 14 596 30 616 15 584 31 16 607 (9/77) i
E O.
UNIT SilUTDOWNS AND P0tVER IIEDUCT1GNS }
DATE I/-lu-MU November COMPLETED BY P R N'"1"' W "I REN)RT MONT11 g g,3g j g l
e.
- E E
,$ E Licensee E*, {"., Cause & Corrective No. Date g 7, g } .,
},s5
.E h Eoent u? sq Aulon to H
dE U jgiy P.eport # iN U yO Prevent Recurrence b
21.8 F 5 NA ZZ ZZZZZZ I'anagement limitation of 80% themal 80-66 801101 S power 34.3 F 5 NA RB CONROD Reduced load to perform a rod se-80-67 801101 S quence exchange 801103 56.2 F 5 NA ZZ ZZZZZZ l.tanagement limitation of 80% thermal 80-68 S power 80-69 801105 F 5.3 H 5 80-116 CB PUMPX Load reduced because of "A" recirc pump trip i
75.1 F 5 NA ZZ l ZZZZZZ flanagement limitation of 80% thermal 1
80-70 801105 , S power 1.2 F 5 NA HE TURBIN Reduced load to perform weekly tur-4 80-71 801109 S bine test 3 4 i i 2 Ethibit G Instructions F: Forced Reason: Method:
A-l);mpment Failure (Explain) l Manual for Preparation of Data S: Sclieduled Entry Sheeis for Licensee -'
ItM.iintenance of Test 2 Manual Scram.
C. Refueling 3 Auterr: 1: Scram. Event Report (LERI Fife INUREG-D Regulatory Restriction 1 -Continuations 016li E Operator Training & Ucens: Enemination 5-Incd Paluction 3 F-Adn.inistrative 9-Other (Explain) Exlilbli !- Same Source G-Or::ation21 Errut (Explatn)
(9/77) ll Otti:r(Expls!n)
DOCKET NO. 50-371 ~
UNIT SIIUTDOWNS AND POWER REDUCTIONS UNIT N AME - Hafen i DATE 17-10-80 4 COMPLETED DY P, R. Undor'.enon RETORT MON 771 flovember T ELEPil0NE 917- 3h /- / / H1 l
i s
l E
F3, Cause & Corrective Licensee
- ,5 g }: }Y3 f'8 Action to l
' N. . hte (
H
- 7. g jE $
os5 j(4c Event Report #
{g so O g rgU Prevent Recurrence b
F 5 NA ZZ ZZZZZZ Management limitation of 80% thermal 80-72 801109 S 30 pouer t
19.2 B 3 NA CD VALVEX Rx auto scram due to MSIV closure 80-73 801110 F while performing HNP-1-SRV-03005 8 5 NA CD VALVEX Unit on startup ramp from above 80-74 801110 F 28 shutdown, #80-73 flA ZZ ZZZZZ ffanagement limitation of 80% thermal 80-75 801112 S 63.3 F 5 g power RB CONR00 Reduced load in order to perform a 80-76 801114 S 6.7 F 5 NA rod pattern adjustment and a weekly ,
turbine test 5
f:A ZZ ZZZZZZ Management limitation of 80% thermal 80-77 801115 S 185.2 F ,
g poh. r 3 4 .
i 2 MethoJ: Edibit G. Instructions F: Forced Reason: for Preparation of Data A Diuipment failure (Explain) 1-Manual S: Sch:Juled 2 Manu:1 Scram. Entry Sheets for Licensee ll Maintenance or Test Event Report (l.E R) File (NUREG-C Refucting 3 Autom: tic Scram.
4 -Continuations 01611 D Regulatory Restiletion E-Operator Trainin; & IJcense Exeminettost 5-Ioad Rxiuction 5 j F-Administratise 9-Oicr (Ibplain) Exhibit 1 Ssme Source
- Coperations! Erru:(E::pt:In) '
, (9/77) IIOther (Emplain)
DOCKET Flo 50-321 .
UNIT Sl!UIDOWN3 AND POICR FECUCTIONS UtilT N A tf /. !!d_tch 1 DATE I7-IC-hD j Cm!PLETED BY P. p. Ib@nrond REPOP.T M0fn11 Nom 8'Imy. TELEPil0NE 91/- M /- / /H1
. "k -
" hvb Cause & Corressive
,$ E License: [v, 3,g&Yk l'8 No. D:tc (
7; g
$5 5 ydiy Event Report #
u7 OV [U Ac. tion to Prevent Recurrence 6
4 ftA RB C0!iR00 Reduced load in order to epform a 80-78 801122 S 7.8 F 5 rod pattern adjustment and a weekly turbine test NA. ZZ ZZZZZZ Management lisaita*. ion of 80% thermal 80-79 801123 S 138.6 F 5 power IlE TURBlft iteduced load to perfonn delta weekly 80-80 801129 S 3.5 F 5 NA turbine test 43.8 F 5 flA ZZ ZZZZZZ ftnagement limitation of 80% themal 80-81 801129 S power 3 4 I 3 P.lethod: Exhibit G Instructions F: Forced Reamn: f.n Preparation of Dita A b luipment failure (Exp!ala) 14tanus!
5: Schedu'eJ 24tanual Scram. Entry Sheets for Lkensee -.
B4taintena nce or' Test Event Report (LE R) File (NUREG-C Refueling 3 Auton ati: Scram.
4 -Cantinuations Ot61)
D Regulatory Restiktion E-Operator Training Licens: Exa72nstlim 5-Icad F;xluction 5
F Atiministiatie: 9-Other (ibplair.) Exhibit 1.pame Source G Op:r: lien 21 Error (Erri:la{
(YJ77) 1(Oil.cs (Exphe) ll
NARRATIVE rep 0RT UNIT 1 Nov. 1st Unit limited to 80% thermal power by m'anagement Nov. 1st At 21:45 reduced load to perform a rod sequence; returned to management limitations at 08:00 on 801103.
Nov. 3rd Unit limited to 80% thermal power by ' man a g e.,e n t Nov. 5th At 16:10 "A" recire pump tripped; unit returned to management limitation at 21:30 on 801105.
Cause and corrective action reported on LER 50-321/1980-116.
Nov. 5th Unit limited to 80% thermal power by management Nov. 9th At 00:35 reduced load in order to perform weekly turbine test; unit returned to manageuent limitation at 01:47 on 801109.
Nov. 9th Unit limited to 80% thermal power by management Nov. 10th At 07:50 Rx auto scram due to MSIV closure while performing HNP-1-SRV-03005 Nov. 10th Unit on startup ramp from above shutdown; Rx critical at 19:50 and generator on line at 03:00 on 801111. Unit returned to management limitation at 07:00 on 801112.
Nov. 12th Unit limited to 80% thermal power by management Nov. 14th At 22:20 reduced load in order to perform a rod pattern adjustment and a weekly turbine rest; unit returned to management limitations at 05:00 on 801115.
Nov. 15th U r.i t limited to 80% thermal power by management Nov. 22nd Lt 22:10 reduced load to perform a rod pattern adjustnent and a weekly turbine rest; unit returned to management limitation at 06:00 on f.0112 3.
Nov. 23rd Unit limited to 80% thermal power by management Nov. 29th At 01:20 reduced load in order to perform an weekly turbine rest; unit returned to management limitation at 04:00 on 801129.
Nov. 29th Unit limited to 80% thermal power by management
f HATCH 1 SAFETY - RELATED MAINTENANCE REQUESTS TO BE REPORTED FOR NOVEMBER 1980 No safety related maintenance requests during reporting period.
f
REFUELING INFORMATION REQUESTED ,
- 1. E.I. llatch Nuclear Power Plant Unit 1
- 2. March 1, 1981.
- 3. May 25, 1981
- 4. Yes, normal reload ancylsis
- 5. #2 - 1 month
- 6. Pre pressurized fuel
- 7. (a) 560, (b) 550
- 8. 840 present,-3181 licensed
- 9. 1999 i
,, , -. . . , .