ML19343B364: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:. _
{{#Wiki_filter:. _
                                                                                                                                                            .
O gg                                                OPERATlHC DATA REPORT
O
                                                                                                      .
gg                                                OPERATlHC DATA REPORT
[h                                                                                          DOCKET NO. 50 323 gg                                                                                                    DATE 12 10 80 g)                                                                                        COMPLETED By P.R.        UNDERWOOD gg                                                                                              TELEPHONE ( 912 ) 367-7781 s 203 OPERATINC STATUS                                    e**************eee*****ee******o****ee****eee***e*****e e Hotes                                                                            e
[h                                                                                          DOCKET NO. 50 323 gg                                                                                                    DATE 12 10 80 g)                                                                                        COMPLETED By P.R.        UNDERWOOD gg                                                                                              TELEPHONE ( 912 ) 367-7781 s 203 OPERATINC STATUS                                    e**************eee*****ee******o****ee****eee***e*****e e Hotes                                                                            e
: 1. Unit Hanes E.I. Hatch Nuclear Plant Unit t            e                                                                                  e
: 1. Unit Hanes E.I. Hatch Nuclear Plant Unit t            e                                                                                  e
Line 35: Line 32:
: 8. If Changes Occur in Capacity Patings (Itens Number 3 Through ?) Since Lest Report, Clwe Reesonse                                            b325h
: 8. If Changes Occur in Capacity Patings (Itens Number 3 Through ?) Since Lest Report, Clwe Reesonse                                            b325h
: 9. Power Level To Whoch Restricted, if Any (Net MWe)s 640 MWe                                                                                  (
: 9. Power Level To Whoch Restricted, if Any (Net MWe)s 640 MWe                                                                                  (
<
to. Reasons For Restr6ctsons, It Angs Management Limitation
to. Reasons For Restr6ctsons, It Angs Management Limitation
{gicg)
{gicg)
Line 57: Line 53:
(9/77)
(9/77)


    .                          - ._.  -                                              - .. - . _ _ _ .                    _-                              .
              .
    .
AVERACE DAILY UNIT POWER LEVEL l                                                                                                        DOCKET H0. 50-321 DATE 12-10-80 COMPLETED BY P.l!. 'J HD E R W O O D T ELEPHONE ( 912 ) 367-7781 x 203 M 0 tlT H 11-80 DAi              AVERAGE DAILY POWER LEVEL                                                        DAY        AVERACE DAILY POWER LEVEL (MUe-Net)                                                                                                (MWe-Het) 1                                582                                                            17                                        612 2                                411                                                            18                                        611 3                                591                                                            19                                        614 4                                605                                                            20                                        614 5                                576                                                            21                                        611 6                                612                                                            22                                        611 7                                606                                                            23                                        553
AVERACE DAILY UNIT POWER LEVEL l                                                                                                        DOCKET H0. 50-321 DATE 12-10-80 COMPLETED BY P.l!. 'J HD E R W O O D T ELEPHONE ( 912 ) 367-7781 x 203 M 0 tlT H 11-80 DAi              AVERAGE DAILY POWER LEVEL                                                        DAY        AVERACE DAILY POWER LEVEL (MUe-Net)                                                                                                (MWe-Het) 1                                582                                                            17                                        612 2                                411                                                            18                                        611 3                                591                                                            19                                        614 4                                605                                                            20                                        614 5                                576                                                            21                                        611 6                                612                                                            22                                        611 7                                606                                                            23                                        553
           *8                                  600                                                          24                                          606 9                                608                                                            25                                        616 10                                  189                                                          26                                          610 11                                  332                                                          27                                          612
           *8                                  600                                                          24                                          606 9                                608                                                            25                                        616 10                                  189                                                          26                                          610 11                                  332                                                          27                                          612 12                                  589                                                          28                                          614 13                                  603                                                          29                                          615 14                                  596                                                          30                                          616 15                                  584                                                          31 16                                  607 (9/77) i
  '
12                                  589                                                          28                                          614 13                                  603                                                          29                                          615 14                                  596                                                          30                                          616 15                                  584                                                          31 16                                  607 (9/77)
,
i
      .        . . .                .          . ... ..
        - . . - . - - . . . . . . . - . . -            . . . . . , . . . - - - . . .-                    --    - . . . . . . , . . . . . . . . - . -        -  .. . , . . . - . - . , .


_ - _ - _ _ _ _ - - - _ _ _ _ - - _ _ _ - - _ -                                    -    .      __-_
E      O.
                                                                                                                                                                                                          .
* E      O.
UNIT SilUTDOWNS AND P0tVER IIEDUCT1GNS                                                }
UNIT SilUTDOWNS AND P0tVER IIEDUCT1GNS                                                }
DATE        I/-lu-MU November                      COMPLETED BY P R N'"1"' W "I REN)RT MONT11                                                        g g,3g j g l
DATE        I/-lu-MU November                      COMPLETED BY P R N'"1"' W "I REN)RT MONT11                                                        g g,3g j g l
e.
e.
                                                                                                         -    E                              E
                                                                                                         -    E                              E
                                                                                     ,$ E                            Licensee      E*,        {".,                  Cause & Corrective No.          Date
                                                                                     ,$ E                            Licensee      E*,        {".,                  Cause & Corrective No.          Date g        7, g    } .,
                                                                          ,
g        7, g    } .,
                                                                                                         },s5
                                                                                                         },s5
                                                                                                           .E h        Eoent        u?        sq                        Aulon to H
                                                                                                           .E h        Eoent        u?        sq                        Aulon to H
Line 84: Line 67:
21.8      F            5          NA          ZZ      ZZZZZZ      I'anagement limitation of 80% themal 80-66      801101        S power 34.3      F            5          NA          RB      CONROD      Reduced load to perform a rod se-80-67        801101      S quence exchange 801103              56.2      F            5          NA          ZZ      ZZZZZZ      l.tanagement limitation of 80% thermal 80-68                      S power 80-69        801105      F      5.3        H          5            80-116    CB      PUMPX        Load reduced because of "A" recirc pump trip i
21.8      F            5          NA          ZZ      ZZZZZZ      I'anagement limitation of 80% themal 80-66      801101        S power 34.3      F            5          NA          RB      CONROD      Reduced load to perform a rod se-80-67        801101      S quence exchange 801103              56.2      F            5          NA          ZZ      ZZZZZZ      l.tanagement limitation of 80% thermal 80-68                      S power 80-69        801105      F      5.3        H          5            80-116    CB      PUMPX        Load reduced because of "A" recirc pump trip i
75.1      F          5            NA        ZZ l    ZZZZZZ      flanagement limitation of 80% thermal 1
75.1      F          5            NA        ZZ l    ZZZZZZ      flanagement limitation of 80% thermal 1
80-70        801105  ,  S power 1.2        F            5          NA        HE      TURBIN      Reduced load to perform weekly tur-4                                                80-71        801109        S bine test
80-70        801105  ,  S power 1.2        F            5          NA        HE      TURBIN      Reduced load to perform weekly tur-4                                                80-71        801109        S bine test 3                                4                                              i i                    2 Ethibit G Instructions F: Forced            Reason:                                                Method:
                                                                                                                                                                                                      -          .
* 3                                4                                              i i                    2 Ethibit G Instructions F: Forced            Reason:                                                Method:
A-l);mpment Failure (Explain)                            l Manual                          for Preparation of Data S: Sclieduled                                                                                                    Entry Sheeis for Licensee              -'
A-l);mpment Failure (Explain)                            l Manual                          for Preparation of Data S: Sclieduled                                                                                                    Entry Sheeis for Licensee              -'
ItM.iintenance of Test                                  2 Manual Scram.
ItM.iintenance of Test                                  2 Manual Scram.
C. Refueling                                            3 Auterr: 1: Scram.                Event Report (LERI Fife INUREG-D Regulatory Restriction                                1 -Continuations                  016li E Operator Training & Ucens: Enemination              5-Incd Paluction              3 F-Adn.inistrative                                      9-Other (Explain)                  Exlilbli !- Same Source
C. Refueling                                            3 Auterr: 1: Scram.                Event Report (LERI Fife INUREG-D Regulatory Restriction                                1 -Continuations                  016li E Operator Training & Ucens: Enemination              5-Incd Paluction              3 F-Adn.inistrative                                      9-Other (Explain)                  Exlilbli !- Same Source G-Or::ation21 Errut (Explatn)
* G-Or::ation21 Errut (Explatn)
(9/77)                  ll Otti:r(Expls!n)
(9/77)                  ll Otti:r(Expls!n)
                                                                      .


_ _ _ _ _ _ _ _ . _ _ . _ _ _ _ _ _ _ - . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _                                  _ _ _ _ _ _ _
  .
                                                                                                                                                                                                                                      .
DOCKET NO.          50-371            ~
DOCKET NO.          50-371            ~
UNIT SIIUTDOWNS AND POWER REDUCTIONS                                    UNIT N AME - Hafen i DATE        17-10-80 4                                                                                                                                                                                            COMPLETED DY P, R. Undor'.enon RETORT MON 771 flovember                              T ELEPil0NE 917- 3h /- / / H1 l
UNIT SIIUTDOWNS AND POWER REDUCTIONS                                    UNIT N AME - Hafen i DATE        17-10-80 4                                                                                                                                                                                            COMPLETED DY P, R. Undor'.enon RETORT MON 771 flovember                              T ELEPil0NE 917- 3h /- / / H1 l
'
i s
i s
l E
l E
F3,                                  Cause & Corrective Licensee
F3,                                  Cause & Corrective Licensee
                                                                                             -        ,5 g      }: }Y3                                                f'8
                                                                                             -        ,5 g      }: }Y3                                                f'8 Action to l
                                                                                                                                                                            ,
Action to
'
l
     '    N. .                                                                    hte          (
     '    N. .                                                                    hte          (
H
H
Line 113: Line 84:
os5 j(4c Event Report #
os5 j(4c Event Report #
{g so O        g rgU                    Prevent Recurrence b
{g so O        g rgU                    Prevent Recurrence b
F            5                  NA        ZZ      ZZZZZZ        Management limitation of 80% thermal
F            5                  NA        ZZ      ZZZZZZ        Management limitation of 80% thermal 80-72                                                        801109                      S    30 pouer t
'
80-72                                                        801109                      S    30 pouer t
19.2      B              3                NA        CD      VALVEX        Rx auto scram due to MSIV closure 80-73                                                        801110                    F while performing HNP-1-SRV-03005 8                5              NA        CD      VALVEX        Unit on startup ramp from above 80-74                                                          801110                    F    28                                                                            shutdown, #80-73 flA        ZZ      ZZZZZ        ffanagement limitation of 80% thermal 80-75                                                            801112                  S    63.3        F                5 g power RB      CONR00        Reduced load in order to perform a 80-76                                                            801114                  S    6.7        F                5            NA rod pattern adjustment and a weekly                  ,
19.2      B              3                NA        CD      VALVEX        Rx auto scram due to MSIV closure 80-73                                                        801110                    F while performing HNP-1-SRV-03005 8                5              NA        CD      VALVEX        Unit on startup ramp from above 80-74                                                          801110                    F    28                                                                            shutdown, #80-73 flA        ZZ      ZZZZZ        ffanagement limitation of 80% thermal 80-75                                                            801112                  S    63.3        F                5 g power RB      CONR00        Reduced load in order to perform a 80-76                                                            801114                  S    6.7        F                5            NA rod pattern adjustment and a weekly                  ,
turbine test 5
turbine test 5
                                                                                                                                          '
f:A        ZZ      ZZZZZZ      Management limitation of 80% thermal 80-77                                                              801115                S    185.2      F                                                              ,
f:A        ZZ      ZZZZZZ      Management limitation of 80% thermal 80-77                                                              801115                S    185.2      F                                                              ,
.
g poh. r 3                                      4                .
g poh. r 3                                      4                .
i                                                                                2 MethoJ:                                Edibit G. Instructions F: Forced                                                                          Reason:                                                                                              for Preparation of Data A Diuipment failure (Explain)                                  1-Manual S: Sch:Juled                                                                                                                                      2 Manu:1 Scram.                        Entry Sheets for Licensee ll Maintenance or Test                                                                              Event Report (l.E R) File (NUREG-C Refucting                                                  3 Autom: tic Scram.
i                                                                                2 MethoJ:                                Edibit G. Instructions F: Forced                                                                          Reason:                                                                                              for Preparation of Data A Diuipment failure (Explain)                                  1-Manual S: Sch:Juled                                                                                                                                      2 Manu:1 Scram.                        Entry Sheets for Licensee ll Maintenance or Test                                                                              Event Report (l.E R) File (NUREG-C Refucting                                                  3 Autom: tic Scram.
4 -Continuations                      01611 D Regulatory Restiletion E-Operator Trainin; & IJcense Exeminettost                    5-Ioad Rxiuction                  5
4 -Continuations                      01611 D Regulatory Restiletion E-Operator Trainin; & IJcense Exeminettost                    5-Ioad Rxiuction                  5 j                                                                                          F-Administratise                                            9-Oicr (Ibplain)                      Exhibit 1 Ssme Source
,
'
j                                                                                          F-Administratise                                            9-Oicr (Ibplain)                      Exhibit 1 Ssme Source
       -                                                                                          Coperations! Erru:(E::pt:In)                                                  '
       -                                                                                          Coperations! Erru:(E::pt:In)                                                  '
       ,  (9/77)                                                                                  IIOther (Emplain)
       ,  (9/77)                                                                                  IIOther (Emplain)
                                                                                        .


  - _ _ _ _ _ _ _ _ _ _ _ _ __ _____________ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ - _ _ _ _ _ _ _ _ _ __ __                                                                  _.
                                                                                                                                                                                                                                                              .
DOCKET Flo          50-321          .
DOCKET Flo          50-321          .
UNIT Sl!UIDOWN3 AND POICR FECUCTIONS                    UtilT N A tf /.    !!d_tch 1 DATE      I7-IC-hD j                      Cm!PLETED BY        P. p. Ib@nrond REPOP.T M0fn11 Nom 8'Imy.                        TELEPil0NE        91/- M /- / /H1
UNIT Sl!UIDOWN3 AND POICR FECUCTIONS                    UtilT N A tf /.    !!d_tch 1 DATE      I7-IC-hD j                      Cm!PLETED BY        P. p. Ib@nrond REPOP.T M0fn11 Nom 8'Imy.                        TELEPil0NE        91/- M /- / /H1
                                                                                                                                                                 .    "k                              -
                                                                                                                                                                 .    "k                              -
                                                                                                                                                           "                                          hvb                  Cause & Corressive
                                                                                                                                                           "                                          hvb                  Cause & Corressive
                                                                                                                                               ,$ E                            License:    [v,
                                                                                                                                               ,$ E                            License:    [v, 3,g&Yk                              l'8 No.        D:tc        (
                                                                                                                                    -
3,g&Yk                              l'8 No.        D:tc        (
                                                                                                                                      '-
7; g
7; g
                                                                                                                                               $5          5      ydiy Event Report #
                                                                                                                                               $5          5      ydiy Event Report #
u7 OV          [U Ac. tion to Prevent Recurrence 6
u7 OV          [U Ac. tion to Prevent Recurrence 6
4 ftA    RB        C0!iR00  Reduced load in order to epform a 80-78      801122          S    7.8          F        5
4 ftA    RB        C0!iR00  Reduced load in order to epform a 80-78      801122          S    7.8          F        5 rod pattern adjustment and a weekly turbine test NA. ZZ        ZZZZZZ    Management lisaita*. ion of 80% thermal 80-79      801123          S    138.6        F        5 power IlE      TURBlft  iteduced load to perfonn delta weekly 80-80      801129          S    3.5          F        5            NA turbine test 43.8        F        5            flA    ZZ      ZZZZZZ    ftnagement limitation of 80% themal 80-81        801129          S power 3                                4 I                    3 P.lethod:                        Exhibit G Instructions F: Forced              Reamn:                                                                                f.n Preparation of Dita A b luipment failure (Exp!ala)                      14tanus!
<
rod pattern adjustment and a weekly turbine test NA. ZZ        ZZZZZZ    Management lisaita*. ion of 80% thermal 80-79      801123          S    138.6        F        5 power IlE      TURBlft  iteduced load to perfonn delta weekly 80-80      801129          S    3.5          F        5            NA turbine test 43.8        F        5            flA    ZZ      ZZZZZZ    ftnagement limitation of 80% themal 80-81        801129          S power
.
3                                4 I                    3 P.lethod:                        Exhibit G Instructions F: Forced              Reamn:                                                                                f.n Preparation of Dita A b luipment failure (Exp!ala)                      14tanus!
5: Schedu'eJ                                                              24tanual Scram.                  Entry Sheets for Lkensee            -.
5: Schedu'eJ                                                              24tanual Scram.                  Entry Sheets for Lkensee            -.
B4taintena nce or' Test                                                              Event Report (LE R) File (NUREG-C Refueling                                        3 Auton ati: Scram.
B4taintena nce or' Test                                                              Event Report (LE R) File (NUREG-C Refueling                                        3 Auton ati: Scram.
4 -Cantinuations                  Ot61)
4 -Cantinuations                  Ot61)
D Regulatory Restiktion E-Operator Training Licens: Exa72nstlim            5-Icad F;xluction 5
D Regulatory Restiktion E-Operator Training Licens: Exa72nstlim            5-Icad F;xluction 5
'
  .
F Atiministiatie:                                  9-Other (ibplair.)                Exhibit 1.pame Source G Op:r: lien 21 Error (Erri:la{
F Atiministiatie:                                  9-Other (ibplair.)                Exhibit 1.pame Source G Op:r: lien 21 Error (Erri:la{
(YJ77) 1(Oil.cs (Exphe)
(YJ77) 1(Oil.cs (Exphe) ll
                                                                                                                                .
  '
ll


                                                                  .
  .
NARRATIVE rep 0RT UNIT 1 Nov. 1st  Unit limited to 80% thermal power by m'anagement Nov. 1st  At 21:45 reduced load to perform a rod sequence; returned to management limitations at 08:00 on 801103.
NARRATIVE rep 0RT UNIT 1 Nov. 1st  Unit limited to 80% thermal power by m'anagement Nov. 1st  At 21:45 reduced load to perform a rod sequence; returned to management limitations at 08:00 on 801103.
Nov. 3rd  Unit limited to 80% thermal power by ' man a g e.,e n t Nov. 5th  At 16:10 "A"      recire pump tripped; unit returned to  management      limitation at    21:30 on 801105.
Nov. 3rd  Unit limited to 80% thermal power by ' man a g e.,e n t Nov. 5th  At 16:10 "A"      recire pump tripped; unit returned to  management      limitation at    21:30 on 801105.
Cause and corrective            action  reported    on  LER 50-321/1980-116.
Cause and corrective            action  reported    on  LER 50-321/1980-116.
,
Nov. 5th  Unit limited to 80% thermal power by management Nov. 9th  At 00:35 reduced load in order to perform weekly turbine      test;    unit    returned    to  manageuent limitation at 01:47 on 801109.
Nov. 5th  Unit limited to 80% thermal power by management Nov. 9th  At 00:35 reduced load in order to perform weekly turbine      test;    unit    returned    to  manageuent limitation at 01:47 on 801109.
Nov. 9th  Unit limited to 80% thermal power by management Nov. 10th At 07:50 Rx auto scram due to MSIV closure while performing HNP-1-SRV-03005 Nov. 10th Unit on startup          ramp from above shutdown; Rx critical at 19:50 and generator on line at 03:00 on      801111.      Unit    returned    to  management limitation at 07:00 on 801112.
Nov. 9th  Unit limited to 80% thermal power by management Nov. 10th At 07:50 Rx auto scram due to MSIV closure while performing HNP-1-SRV-03005 Nov. 10th Unit on startup          ramp from above shutdown; Rx critical at 19:50 and generator on line at 03:00 on      801111.      Unit    returned    to  management limitation at 07:00 on 801112.
Line 174: Line 120:
Nov. 29th Unit limited to 80% thermal power by management
Nov. 29th Unit limited to 80% thermal power by management


                . -       _                        _
f HATCH 1 SAFETY - RELATED MAINTENANCE REQUESTS TO BE REPORTED FOR NOVEMBER 1980 No safety related maintenance requests during reporting period.
                                                                              ,
                                                                                    .
  .
      .    .
f
f
    .
HATCH 1 SAFETY - RELATED MAINTENANCE REQUESTS TO BE REPORTED FOR NOVEMBER 1980 No safety related maintenance requests during reporting period.
                                                                      .
f
        .
                                                $
          .
              , - . _        -
                                            ,


                                                        .
  ..
REFUELING INFORMATION REQUESTED        ,
REFUELING INFORMATION REQUESTED        ,
: 1. E.I. llatch Nuclear Power Plant Unit 1
: 1. E.I. llatch Nuclear Power Plant Unit 1
                                                  .
: 2. March 1,  1981.
: 2. March 1,  1981.
: 3. May 25, 1981
: 3. May 25, 1981
: 4. Yes, normal reload ancylsis
: 4. Yes, normal reload ancylsis
: 5.  #2 - 1 month
: 5.  #2 - 1 month
    .
: 6. Pre pressurized fuel
: 6. Pre pressurized fuel
: 7.  (a) 560, (b) 550
: 7.  (a) 560, (b) 550

Latest revision as of 07:36, 31 January 2020

Monthly Operating Rept for Nov 1980
ML19343B364
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 12/10/1980
From: Underwood P
GEORGIA POWER CO.
To:
Shared Package
ML19343B363 List:
References
NUDOCS 8012230295
Download: ML19343B364 (8)


Text

. _

O gg OPERATlHC DATA REPORT

[h DOCKET NO. 50 323 gg DATE 12 10 80 g) COMPLETED By P.R. UNDERWOOD gg TELEPHONE ( 912 ) 367-7781 s 203 OPERATINC STATUS e**************eee*****ee******o****ee****eee***e*****e e Hotes e

1. Unit Hanes E.I. Hatch Nuclear Plant Unit t e e

_hg 2. Reporting Periods 11 80 e e

3. Licensed Thernal Power (MUL)B 2436 e e '~Q2)

(f) 4 Hanoplate Reting (Cress .' W e ) 8 809.3

5. Eesegn Electracel Rating (Not Mue): 777.3 e

e e

  • {~-
6. Maximun Dependeble Copecity (Cross MWe)I 196.3 e
  • j
7. Maximun Dependable Cepecity (Not MWe)8 764.3 ese*********************eooe**eeeeeeeeeeeeeeooseeoeoooo (r
8. If Changes Occur in Capacity Patings (Itens Number 3 Through ?) Since Lest Report, Clwe Reesonse b325h
9. Power Level To Whoch Restricted, if Any (Net MWe)s 640 MWe (

to. Reasons For Restr6ctsons, It Angs Management Limitation

{gicg)

This nonth ve..to Det. Cumuiasie. 655iE)

Y l it. Hours In Reporting Per6od ,720 8040 43104

12. Number Of Hours Reactor Was Critical }ggg' d 708.0 7016.3 32814.4 -
13. Reactor Reserve Shutdown Hours 0.0 14 Hours Generator On.Line 700.8 0.0 6530.0 0.0 hljdb) 30798.3 IS. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Cross Thornet Energy Cenerated (MWH) 1324109 14238331 64641586
17. Cross Electrical Energy Generated (MUH) 432870 4656600 20927540
18. Het Electrical Energy Genera ted ( MWH) 412003 4437629 19899562
19. Unit Service Factor 97.3 98.2 71.5
20. Unit Avesleb618tg Factor 97.3 81.2  ?!.5
21. Unit Capecity Factor (Using MDC Net ) 75.0 72.2 fa,4
22. Unit cepecit y Factor (Using DER Het) 73.8 71.0 59.4
23. Unit Forced Outage Rate 2.7 18.8 20.3 24 Shutdowns Scheduled Over Hewt 6 Months ( Type, Dete, and Durat6cn of Each):

REFUELING; MARCH 1, 1981; 13 WEEKS

25. It Shut Down At End of Report Persod, Estameted Date of Startupe i
26. Units in Test Status (Prior to Connerciel Operation)s Forecast Achsewed IHITIAL CRITICHLIII ............... ...............

INITIAL ELECTRIC 11Y ............... . . . . . . . . . . . . . . . .

COMMERCIAL OPERAflCN ............... ...............

(9/77)

AVERACE DAILY UNIT POWER LEVEL l DOCKET H0. 50-321 DATE 12-10-80 COMPLETED BY P.l!. 'J HD E R W O O D T ELEPHONE ( 912 ) 367-7781 x 203 M 0 tlT H 11-80 DAi AVERAGE DAILY POWER LEVEL DAY AVERACE DAILY POWER LEVEL (MUe-Net) (MWe-Het) 1 582 17 612 2 411 18 611 3 591 19 614 4 605 20 614 5 576 21 611 6 612 22 611 7 606 23 553

  • 8 600 24 606 9 608 25 616 10 189 26 610 11 332 27 612 12 589 28 614 13 603 29 615 14 596 30 616 15 584 31 16 607 (9/77) i

E O.

UNIT SilUTDOWNS AND P0tVER IIEDUCT1GNS }

DATE I/-lu-MU November COMPLETED BY P R N'"1"' W "I REN)RT MONT11 g g,3g j g l

e.

- E E

,$ E Licensee E*, {"., Cause & Corrective No. Date g 7, g } .,

},s5

.E h Eoent u? sq Aulon to H

dE U jgiy P.eport # iN U yO Prevent Recurrence b

21.8 F 5 NA ZZ ZZZZZZ I'anagement limitation of 80% themal 80-66 801101 S power 34.3 F 5 NA RB CONROD Reduced load to perform a rod se-80-67 801101 S quence exchange 801103 56.2 F 5 NA ZZ ZZZZZZ l.tanagement limitation of 80% thermal 80-68 S power 80-69 801105 F 5.3 H 5 80-116 CB PUMPX Load reduced because of "A" recirc pump trip i

75.1 F 5 NA ZZ l ZZZZZZ flanagement limitation of 80% thermal 1

80-70 801105 , S power 1.2 F 5 NA HE TURBIN Reduced load to perform weekly tur-4 80-71 801109 S bine test 3 4 i i 2 Ethibit G Instructions F: Forced Reason: Method:

A-l);mpment Failure (Explain) l Manual for Preparation of Data S: Sclieduled Entry Sheeis for Licensee -'

ItM.iintenance of Test 2 Manual Scram.

C. Refueling 3 Auterr: 1: Scram. Event Report (LERI Fife INUREG-D Regulatory Restriction 1 -Continuations 016li E Operator Training & Ucens: Enemination 5-Incd Paluction 3 F-Adn.inistrative 9-Other (Explain) Exlilbli !- Same Source G-Or::ation21 Errut (Explatn)

(9/77) ll Otti:r(Expls!n)

DOCKET NO. 50-371 ~

UNIT SIIUTDOWNS AND POWER REDUCTIONS UNIT N AME - Hafen i DATE 17-10-80 4 COMPLETED DY P, R. Undor'.enon RETORT MON 771 flovember T ELEPil0NE 917- 3h /- / / H1 l

i s

l E

F3, Cause & Corrective Licensee

- ,5 g }: }Y3 f'8 Action to l

' N. . hte (

H

7. g jE $

os5 j(4c Event Report #

{g so O g rgU Prevent Recurrence b

F 5 NA ZZ ZZZZZZ Management limitation of 80% thermal 80-72 801109 S 30 pouer t

19.2 B 3 NA CD VALVEX Rx auto scram due to MSIV closure 80-73 801110 F while performing HNP-1-SRV-03005 8 5 NA CD VALVEX Unit on startup ramp from above 80-74 801110 F 28 shutdown, #80-73 flA ZZ ZZZZZ ffanagement limitation of 80% thermal 80-75 801112 S 63.3 F 5 g power RB CONR00 Reduced load in order to perform a 80-76 801114 S 6.7 F 5 NA rod pattern adjustment and a weekly ,

turbine test 5

f:A ZZ ZZZZZZ Management limitation of 80% thermal 80-77 801115 S 185.2 F ,

g poh. r 3 4 .

i 2 MethoJ: Edibit G. Instructions F: Forced Reason: for Preparation of Data A Diuipment failure (Explain) 1-Manual S: Sch:Juled 2 Manu:1 Scram. Entry Sheets for Licensee ll Maintenance or Test Event Report (l.E R) File (NUREG-C Refucting 3 Autom: tic Scram.

4 -Continuations 01611 D Regulatory Restiletion E-Operator Trainin; & IJcense Exeminettost 5-Ioad Rxiuction 5 j F-Administratise 9-Oicr (Ibplain) Exhibit 1 Ssme Source

- Coperations! Erru:(E::pt:In) '

, (9/77) IIOther (Emplain)

DOCKET Flo 50-321 .

UNIT Sl!UIDOWN3 AND POICR FECUCTIONS UtilT N A tf /.  !!d_tch 1 DATE I7-IC-hD j Cm!PLETED BY P. p. Ib@nrond REPOP.T M0fn11 Nom 8'Imy. TELEPil0NE 91/- M /- / /H1

. "k -

" hvb Cause & Corressive

,$ E License: [v, 3,g&Yk l'8 No. D:tc (

7; g

$5 5 ydiy Event Report #

u7 OV [U Ac. tion to Prevent Recurrence 6

4 ftA RB C0!iR00 Reduced load in order to epform a 80-78 801122 S 7.8 F 5 rod pattern adjustment and a weekly turbine test NA. ZZ ZZZZZZ Management lisaita*. ion of 80% thermal 80-79 801123 S 138.6 F 5 power IlE TURBlft iteduced load to perfonn delta weekly 80-80 801129 S 3.5 F 5 NA turbine test 43.8 F 5 flA ZZ ZZZZZZ ftnagement limitation of 80% themal 80-81 801129 S power 3 4 I 3 P.lethod: Exhibit G Instructions F: Forced Reamn: f.n Preparation of Dita A b luipment failure (Exp!ala) 14tanus!

5: Schedu'eJ 24tanual Scram. Entry Sheets for Lkensee -.

B4taintena nce or' Test Event Report (LE R) File (NUREG-C Refueling 3 Auton ati: Scram.

4 -Cantinuations Ot61)

D Regulatory Restiktion E-Operator Training Licens: Exa72nstlim 5-Icad F;xluction 5

F Atiministiatie: 9-Other (ibplair.) Exhibit 1.pame Source G Op:r: lien 21 Error (Erri:la{

(YJ77) 1(Oil.cs (Exphe) ll

NARRATIVE rep 0RT UNIT 1 Nov. 1st Unit limited to 80% thermal power by m'anagement Nov. 1st At 21:45 reduced load to perform a rod sequence; returned to management limitations at 08:00 on 801103.

Nov. 3rd Unit limited to 80% thermal power by ' man a g e.,e n t Nov. 5th At 16:10 "A" recire pump tripped; unit returned to management limitation at 21:30 on 801105.

Cause and corrective action reported on LER 50-321/1980-116.

Nov. 5th Unit limited to 80% thermal power by management Nov. 9th At 00:35 reduced load in order to perform weekly turbine test; unit returned to manageuent limitation at 01:47 on 801109.

Nov. 9th Unit limited to 80% thermal power by management Nov. 10th At 07:50 Rx auto scram due to MSIV closure while performing HNP-1-SRV-03005 Nov. 10th Unit on startup ramp from above shutdown; Rx critical at 19:50 and generator on line at 03:00 on 801111. Unit returned to management limitation at 07:00 on 801112.

Nov. 12th Unit limited to 80% thermal power by management Nov. 14th At 22:20 reduced load in order to perform a rod pattern adjustment and a weekly turbine rest; unit returned to management limitations at 05:00 on 801115.

Nov. 15th U r.i t limited to 80% thermal power by management Nov. 22nd Lt 22:10 reduced load to perform a rod pattern adjustnent and a weekly turbine rest; unit returned to management limitation at 06:00 on f.0112 3.

Nov. 23rd Unit limited to 80% thermal power by management Nov. 29th At 01:20 reduced load in order to perform an weekly turbine rest; unit returned to management limitation at 04:00 on 801129.

Nov. 29th Unit limited to 80% thermal power by management

f HATCH 1 SAFETY - RELATED MAINTENANCE REQUESTS TO BE REPORTED FOR NOVEMBER 1980 No safety related maintenance requests during reporting period.

f

REFUELING INFORMATION REQUESTED ,

1. E.I. llatch Nuclear Power Plant Unit 1
2. March 1, 1981.
3. May 25, 1981
4. Yes, normal reload ancylsis
5. #2 - 1 month
6. Pre pressurized fuel
7. (a) 560, (b) 550
8. 840 present,-3181 licensed
9. 1999 i

,, , -. . . , .