O gg OPERATlHC DATA REPORT
[h DOCKET NO. 50 323 gg DATE 12 10 80 g)
COMPLETED By P.R.
UNDERWOOD gg TELEPHONE ( 912 ) 367-7781 s 203 OPERATINC STATUS e**************eee*****ee******o****ee****eee***e*****e e Hotes e
- 1. Unit Hanes E.I. Hatch Nuclear Plant Unit t e
e
_hg 2.
Reporting Periods 11 80 e
e
- 3. Licensed Thernal Power (MUL)B 2436 e
'~Q2) e (f) 4 Hanoplate Reting (Cress.' W e ) 8 809.3 e
{~-
e 5.
Eesegn Electracel Rating (Not Mue): 777.3 e
6.
Maximun Dependeble Copecity (Cross MWe)I 196.3 e
(r j
7.
Maximun Dependable Cepecity (Not MWe)8 764.3 ese*********************eooe**eeeeeeeeeeeeeeooseeoeoooo b325h
- 8. If Changes Occur in Capacity Patings (Itens Number 3 Through ?) Since Lest Report, Clwe Reesonse 9.
Power Level To Whoch Restricted, if Any (Net MWe)s 640 MWe
(
to. Reasons For Restr6ctsons, It Angs Management Limitation
{gicg) 655iE)
This nonth ve..to Det.
Cumuiasie.
Y l
it. Hours In Reporting Per6od
,720 8040 43104
}ggg' d
- 12. Number Of Hours Reactor Was Critical 708.0 7016.3 32814.4
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0 hl db) j 14 Hours Generator On.Line 700.8 6530.0 30798.3 IS. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Cross Thornet Energy Cenerated (MWH) 1324109 14238331 64641586
- 17. Cross Electrical Energy Generated (MUH) 432870 4656600 20927540
- 18. Het Electrical Energy Genera ted ( MWH) 412003 4437629 19899562
- 19. Unit Service Factor 97.3 98.2 71.5
- 20. Unit Avesleb618tg Factor 97.3 81.2
?!.5
- 21. Unit Capecity Factor (Using MDC Net )
75.0 72.2 fa,4
- 22. Unit cepecit y Factor (Using DER Het) 73.8 71.0 59.4
- 23. Unit Forced Outage Rate 2.7 18.8 20.3 24 Shutdowns Scheduled Over Hewt 6 Months ( Type, Dete, and Durat6cn of Each):
REFUELING; MARCH 1, 1981; 13 WEEKS i
- 25. It Shut Down At End of Report Persod, Estameted Date of Startupe
- 26. Units in Test Status (Prior to Connerciel Operation)s Forecast Achsewed IHITIAL CRITICHLIII INITIAL ELECTRIC 11Y COMMERCIAL OPERAflCN (9/77)
AVERACE DAILY UNIT POWER LEVEL l
DOCKET H0. 50-321 DATE 12-10-80 COMPLETED BY P.l!.
'J HD E R W O O D T ELEPHONE ( 912 ) 367-7781 x 203 M 0 tlT H 11-80 DAi AVERAGE DAILY POWER LEVEL DAY AVERACE DAILY POWER LEVEL (MUe-Net)
(MWe-Het) 1 582 17 612 2
411 18 611 3
591 19 614 4
605 20 614 5
576 21 611 6
612 22 611 7
606 23 553
- 8 600 24 606 9
608 25 616 10 189 26 610 11 332 27 612 12 589 28 614 13 603 29 615 14 596 30 616 15 584 31 16 607 (9/77) i
E O.
UNIT SilUTDOWNS AND P0tVER IIEDUCT1GNS
}
DATE I/-lu-MU COMPLETED BY P R N'"1"' W "I November g g,3g j g REN)RT MONT11 l
e.
E E
Licensee E*
{".,
Cause & Corrective
,$ E
}
}.E h
,s5 Eoent u?
sq Aulon to No.
Date g
7, g dE U
jgiy P.eport #
iN U yO Prevent Recurrence H
b 80-66 801101 S
21.8 F
5 NA ZZ ZZZZZZ I'anagement limitation of 80% themal power 80-67 801101 S
34.3 F
5 NA RB CONROD Reduced load to perform a rod se-quence exchange 80-68 801103 S
56.2 F
5 NA ZZ ZZZZZZ l.tanagement limitation of 80% thermal power 80-69 801105 F
5.3 H
5 80-116 CB PUMPX Load reduced because of "A" recirc pump trip i
1 80-70 801105 S
75.1 F
5 NA ZZ l ZZZZZZ flanagement limitation of 80% thermal power 80-71 801109 S
1.2 F
5 NA HE TURBIN Reduced load to perform weekly tur-4 bine test i
2 3
4 i
F: Forced Reason:
Method:
Ethibit G Instructions S: Sclieduled A-l);mpment Failure (Explain) l Manual for Preparation of Data ItM.iintenance of Test 2 Manual Scram.
Entry Sheeis for Licensee C. Refueling 3 Auterr: 1: Scram.
Event Report (LERI Fife INUREG-D Regulatory Restriction 1 -Continuations 016li E Operator Training & Ucens: Enemination 5-Incd Paluction 3
F-Adn.inistrative 9-Other (Explain)
Exlilbli !- Same Source G-Or::ation21 Errut (Explatn)
(9/77) ll Otti:r(Expls!n)
DOCKET NO.
50-371
~
UNIT SIIUTDOWNS AND POWER REDUCTIONS UNIT N AME - Hafen i DATE 17-10-80 COMPLETED DY P, R.
Undor'.enon 4
RETORT MON 771 flovember T ELEPil0NE 917-3h /- / / H1 l
i E
l s
Cause & Corrective f'8 Licensee F3,
,5 g
}
}Y3 l
Action to rgU os5 Event
{g N..
hte
(
- 7. g Prevent Recurrence jE j(4c Report #
so O g
H b
80-72 801109 S
30 F
5 NA ZZ ZZZZZZ Management limitation of 80% thermal pouer t
80-73 801110 F
19.2 B
3 NA CD VALVEX Rx auto scram due to MSIV closure while performing HNP-1-SRV-03005 80-74 801110 F
28 8
5 NA CD VALVEX Unit on startup ramp from above shutdown, #80-73 80-75 801112 S
63.3 F
5 flA ZZ ZZZZZ ffanagement limitation of 80% thermal g power 80-76 801114 S
6.7 F
5 NA RB CONR00 Reduced load in order to perform a rod pattern adjustment and a weekly turbine test 80-77 801115 S
185.2 F
5 f:A ZZ ZZZZZZ Management limitation of 80% thermal g poh. r 3
4 i
2 MethoJ:
Edibit G. Instructions F: Forced Reason:
S: Sch:Juled A Diuipment failure (Explain) 1-Manual for Preparation of Data ll Maintenance or Test 2 Manu:1 Scram.
Entry Sheets for Licensee 3 Autom: tic Scram.
Event Report (l.E R) File (NUREG-C Refucting D Regulatory Restiletion 4 -Continuations 01611 E-Operator Trainin; & IJcense Exeminettost 5-Ioad Rxiuction 5
F-Administratise 9-Oicr (Ibplain)
Exhibit 1 Ssme Source j
Coperations! Erru:(E::pt:In)
(9/77)
IIOther (Emplain)
50-321 DOCKET Flo UNIT Sl!UIDOWN3 AND POICR FECUCTIONS UtilT N A tf /.
!!d_tch 1 DATE I7-IC-hD j
Cm!PLETED BY P.
- p. Ib@nrond REPOP.T M0fn11 Nom 8'Imy.
TELEPil0NE 91/- M /- / /H1 "k
License:
[v, hvb
,$ E 3, Y k Cause & Corressive g&
Event u7 l'8 Ac. tion to No.
D:tc
(
7; g
$5 5
ydiy Report #
[U Prevent Recurrence 6
4 80-78 801122 S
7.8 F
5 ftA RB C0!iR00 Reduced load in order to epform a rod pattern adjustment and a weekly turbine test 80-79 801123 S
138.6 F
5 NA.
ZZ ZZZZZZ Management lisaita*. ion of 80% thermal power 80-80 801129 S
3.5 F
5 NA IlE TURBlft iteduced load to perfonn delta weekly turbine test 80-81 801129 S
43.8 F
5 flA ZZ ZZZZZZ ftnagement limitation of 80% themal power I
3 3
4 P.lethod:
Exhibit G Instructions F: Forced Reamn:
A b uipment failure (Exp!ala) 14tanus!
f.n Preparation of Dita 5: Schedu'eJ B4taintena nce or' Test 24tanual Scram.
Entry Sheets for Lkensee l
3 Auton ati: Scram.
Event Report (LE R) File (NUREG-C Refueling D Regulatory Restiktion 4 -Cantinuations Ot61)
E-Operator Training Licens: Exa72nstlim 5-Icad F;xluction 5
F Atiministiatie:
9-Other (ibplair.)
Exhibit 1.pame Source G Op:r: lien 21 Error (Erri:la{
(YJ77) 1(Oil.cs (Exphe) ll
NARRATIVE rep 0RT UNIT 1 Nov. 1st Unit limited to 80% thermal power by m'anagement Nov. 1st At 21:45 reduced load to perform a rod sequence; returned to management limitations at 08:00 on 801103.
Nov. 3rd Unit limited to 80% thermal power by ' man a g e.,e n t Nov. 5th At 16:10 "A"
recire pump tripped; unit returned to management limitation at 21:30 on 801105.
Cause and corrective action reported on LER 50-321/1980-116.
Nov. 5th Unit limited to 80% thermal power by management Nov. 9th At 00:35 reduced load in order to perform weekly turbine test; unit returned to manageuent limitation at 01:47 on 801109.
Nov. 9th Unit limited to 80% thermal power by management Nov. 10th At 07:50 Rx auto scram due to MSIV closure while performing HNP-1-SRV-03005 Nov. 10th Unit on startup ramp from above shutdown; Rx critical at 19:50 and generator on line at 03:00 on 801111.
Unit returned to management limitation at 07:00 on 801112.
Nov. 12th Unit limited to 80% thermal power by management Nov. 14th At 22:20 reduced load in order to perform a rod pattern adjustment and a weekly turbine rest; unit returned to management limitations at 05:00 on 801115.
Nov. 15th U r.i t limited to 80% thermal power by management Nov. 22nd Lt 22:10 reduced load to perform a rod pattern adjustnent and a
weekly turbine rest; unit returned to management limitation at 06:00 on f.0112 3.
Nov. 23rd Unit limited to 80% thermal power by management Nov. 29th At 01:20 reduced load in order to perform an weekly turbine rest; unit returned to management limitation at 04:00 on 801129.
Nov. 29th Unit limited to 80% thermal power by management
f HATCH 1 SAFETY - RELATED MAINTENANCE REQUESTS TO BE REPORTED FOR NOVEMBER 1980 No safety related maintenance requests during reporting period.
f
REFUELING INFORMATION REQUESTED 1.
E.I. llatch Nuclear Power Plant Unit 1 2.
March 1, 1981.
3.
May 25, 1981 4.
Yes, normal reload ancylsis 5.
- 2 - 1 month Pre pressurized fuel 6.
7.
(a) 560, (b) 550 8.
840 present,-3181 licensed 9.
1999 i
..,.