| {{#Wiki_filter:April 18, 2008 | | {{#Wiki_filter:April 18, 2008 LICENSEE: Indiana Michigan Power Company FACILITY: Donald C. Cook Nuclear Plant |
| | |
| LICENSEE: Indiana Michigan Power Company FACILITY: Donald C. Cook Nuclear Plant | |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
|
| |
|
| ==SUMMARY== | | ==SUMMARY== |
| OF THE APRIL 16, 2008, PUBLIC MEETING TO DISCUSS THE 2007 D.C. COOK UNIT 1 AND UNIT 2 END-OF-CYCLE PERFORMANCE ASSESSMENTS On April 16, 2008, the Nuclear Regulatory Commission (NRC) held a public meeting at the Lake Charter Township Hall in Bridgman, Michigan. The meeting was between NRC Region III management and Indiana Michigan Power Company representatives to discuss the NRC's 2007 End-of-Cycle Assessment of the D.C. Cook Nuclear Plant Unit 1 and 2 safety performances. The results of these assessments were discussed in a letter to the licensee dated March 3, 2008 (ADAMS ML080600289). | | OF THE APRIL 16, 2008, PUBLIC MEETING TO DISCUSS THE 2007 D.C. COOK UNIT 1 AND UNIT 2 END-OF-CYCLE PERFORMANCE ASSESSMENTS On April 16, 2008, the Nuclear Regulatory Commission (NRC) held a public meeting at the Lake Charter Township Hall in Bridgman, Michigan. The meeting was between NRC Region III management and Indiana Michigan Power Company representatives to discuss the NRCs 2007 End-of-Cycle Assessment of the D.C. Cook Nuclear Plant Unit 1 and 2 safety performances. |
| The NRC began the meeting with an overview of the NRC and the nuclear industry, the NRC's Reactor Oversight Process (ROP), and national ROP results. This was followed by a summary of the NRC's assessment of D.C. Cook Unit 1 and Unit 2 performances in 2007. The NRC's meeting presentation slides can be found in ADAMS at ML081070238. A list of principal meeting attendees can be found in the attached enclosure. | | The results of these assessments were discussed in a letter to the licensee dated March 3, 2008 (ADAMS ML080600289). |
| | | The NRC began the meeting with an overview of the NRC and the nuclear industry, the NRCs Reactor Oversight Process (ROP), and national ROP results. This was followed by a summary of the NRCs assessment of D.C. Cook Unit 1 and Unit 2 performances in 2007. The NRCs meeting presentation slides can be found in ADAMS at ML081070238. A list of principal meeting attendees can be found in the attached enclosure. |
| The licensee then provided its perspective on the assessment. In summary, the licensee concurred with the NRC assessment that D.C. Cook Unit 1 and 2 were operated in a manner that preserved the safety of the public and the environment. | | The licensee then provided its perspective on the assessment. In summary, the licensee concurred with the NRC assessment that D.C. Cook Unit 1 and 2 were operated in a manner that preserved the safety of the public and the environment. |
| At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials. | | At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials. |
| /RA/
| | /RA/ |
| | | Christine A. Lipa, Chief Branch 4 Division of Reactor Projects Docket Nos. 50-315 and 50-316 License Nos. DPR-58 and DPR-74 |
| Christine A. Lipa, Chief Branch 4 Division of Reactor Projects Docket Nos. 50-315 and 50-316 License Nos. DPR-58 and DPR-74 | |
|
| |
|
| ==Enclosure:== | | ==Enclosure:== |
| As stated DISTRIBUTION | | As stated DISTRIBUTION: |
| : See next page
| | See next page |
|
| |
|
| LICENSEE: Indiana Michigan Power Company FACILITY: Donald C. Cook Nuclear Plant | | LICENSEE: Indiana Michigan Power Company FACILITY: Donald C. Cook Nuclear Plant |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
|
| |
|
| ==SUMMARY== | | ==SUMMARY== |
| OF THE APRIL 16, 2008, PUBLIC MEETING TO DISCUSS THE 2007 D.C. COOK UNIT 1 AND UNIT 2 END-OF-CYCLE PERFORMANCE ASSESSMENTS On April 16, 2008, the Nuclear Regulatory Commission (NRC) held a public meeting at the Lake Charter Township Hall in Bridgman, Michigan. The meeting was between NRC Region III management and Indiana Michigan Power Company representatives to discuss the NRC's 2007 End-of-Cycle Assessment of the D.C. Cook Nuclear Plant Unit 1 and 2 safety performances. The results of these assessments were discussed in a letter to the licensee dated March 3, 2008 (ADAMS ML080600289). | | OF THE APRIL 16, 2008, PUBLIC MEETING TO DISCUSS THE 2007 D.C. COOK UNIT 1 AND UNIT 2 END-OF-CYCLE PERFORMANCE ASSESSMENTS On April 16, 2008, the Nuclear Regulatory Commission (NRC) held a public meeting at the Lake Charter Township Hall in Bridgman, Michigan. The meeting was between NRC Region III management and Indiana Michigan Power Company representatives to discuss the NRCs 2007 End-of-Cycle Assessment of the D.C. Cook Nuclear Plant Unit 1 and 2 safety performances. |
| The NRC began the meeting with an overview of the NRC and the nuclear industry, the NRC's Reactor Oversight Process (ROP), and national ROP results. This was followed by a summary of the NRC's assessment of D.C. Cook Unit 1 and Unit 2 performances in 2007. The NRC's meeting presentation slides can be found in ADAMS at ML081070238. A list of principal meeting attendees can be found in the attached enclosure. | | The results of these assessments were discussed in a letter to the licensee dated March 3, 2008 (ADAMS ML080600289). |
| | The NRC began the meeting with an overview of the NRC and the nuclear industry, the NRCs Reactor Oversight Process (ROP), and national ROP results. This was followed by a summary of the NRCs assessment of D.C. Cook Unit 1 and Unit 2 performances in 2007. The NRCs meeting presentation slides can be found in ADAMS at ML081070238. A list of principal meeting attendees can be found in the attached enclosure. |
| The licensee then provided its perspective on the assessment. In summary, the licensee concurred with the NRC assessment that D.C. Cook Unit 1 and 2 were operated in a manner that preserved the safety of the public and the environment. | | The licensee then provided its perspective on the assessment. In summary, the licensee concurred with the NRC assessment that D.C. Cook Unit 1 and 2 were operated in a manner that preserved the safety of the public and the environment. |
| At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials. | | At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials. |
| | | Christine A. Lipa, Chief Branch 4 Division of Reactor Projects Docket Nos. 50-315 and 50-316 License Nos. DPR-58 and DPR-74 |
| Christine A. Lipa, Chief Branch 4 Division of Reactor Projects | |
| | |
| Docket Nos. 50-315 and 50-316 License Nos. DPR-58 and DPR-74 | |
|
| |
|
| ==Enclosure:== | | ==Enclosure:== |
| As stated | | As stated DISTRIBUTION: |
| | | See next page DOCUMENT NAME: G:\Branch TSS\All EOC\EOC Cy 2007\Meeting Notices - Letters/ |
| DISTRIBUTION | | Cook EOC Meeting Summary 04-16-08.doc G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME FTran:dpt CLipa DATE 04/18/08 04/18/08 OFFICIAL RECORD COPY |
| : See next page DOCUMENT NAME: G:\Branch TSS\All EOC\EOC Cy 2007\Meeting Notices - Letters/
| |
| Cook EOC Meeting Summary 04-16-08.doc G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME FTran:dpt CLipa DATE 04/18/08 04/18/08 OFFICIAL RECORD COPY | |
|
| |
|
| Letter to Indiana Michigan Power Company from C. Lipa dated April 18, 2008 | | Letter to Indiana Michigan Power Company from C. Lipa dated April 18, 2008 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
|
| |
|
| ==SUMMARY== | | ==SUMMARY== |
| OF THE APRIL 16, 2008, PUBLIC MEETING TO DISCUSS THE 2007 D.C. COOK UNIT 1 AND UNIT 2 END-OF-CYCLE PERFORMANCE ASSESSMENTS | | OF THE APRIL 16, 2008, PUBLIC MEETING TO DISCUSS THE 2007 D.C. COOK UNIT 1 AND UNIT 2 END-OF-CYCLE PERFORMANCE ASSESSMENTS cc w/encl: M. Peifer, Site Vice President J. Gebbie, Plant Manager G. White, Michigan Public Service Commission L. Brandon, Michigan Department of Environmental Quality - |
| | | Waste and Hazardous Materials Division Emergency Management Division MI Department of State Police T. Strong, Chief, State Liaison Officer, State of Michigan Berrien County Board Chairman Berrien County Coordinator Berrien County Sheriff EMA Coordinator, Berrien County Emergency Management Agency Mayor of Benton Harbor City Manager of Benton Harbor Mayor of St. Joseph City Manager of St. Joseph Mayor of Bridgman City Manager of Bridgman Mayor of Buchanan City Manager of Buchanan President, Village of Stevensville President, Village of Berrien Springs President, Village of Shoreham G. Mortensen, INPO |
| cc w/encl: M. Peifer, Site Vice President J. Gebbie, Plant Manager G. White, Michigan Public Service Commission L. Brandon, Michigan Department of Environmental Quality - Waste and Hazardous Materials Division Emergency Management Division MI Department of State Police T. Strong, Chief, State Liaison Officer, State of Michigan Berrien County Board Chairman Berrien County Coordinator Berrien County Sheriff EMA Coordinator, Berrien County Emergency Management Agency Mayor of Benton Harbor City Manager of Benton Harbor Mayor of St. Joseph City Manager of St. Joseph Mayor of Bridgman City Manager of Bridgman Mayor of Buchanan City Manager of Buchanan President, Village of Stevensville President, Village of Berrien Springs President, Village of Shoreham G. Mortensen, INPO | |
|
| |
|
| Letter to Indiana Michigan Power Company from C. Lipa dated April 18, 2008 | | Letter to Indiana Michigan Power Company from C. Lipa dated April 18, 2008 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
|
| |
|
| ==SUMMARY== | | ==SUMMARY== |
| OF THE APRIL 16, 2008, PUBLIC MEETING TO DISCUSS THE 2007 D.C. COOK UNIT 1 AND UNIT 2 END-OF-CYCLE PERFORMANCE ASSESSMENTS | | OF THE APRIL 16, 2008, PUBLIC MEETING TO DISCUSS THE 2007 D.C. COOK UNIT 1 AND UNIT 2 END-OF-CYCLE PERFORMANCE ASSESSMENTS DISTRIBUTION: |
| | | JTA TEB RidsNrrDirslpab JLC1 MAS KGO RML2 SRI Cook DRPIII DRSIII PLB1 TXN |
| DISTRIBUTION | |
| : JTA TEB RidsNrrDirslpab
| |
| | |
| JLC1 MAS KGO RML2 SRI Cook DRPIII DRSIII PLB1 TXN | |
| | |
| PUBLIC MEETING PRINCIPAL ATTENDEES April 16, 2008
| |
| | |
| Indiana Michigan Power Company M. Rencheck, Senior Vice President and Chief Nuclear Officer M. Peifer, Site Vice President J. Gebbie, Plant Manager C. Hutchinson, Emergency Planning Manager J. Petro, Regulatory Affairs Manager B. Schalk, Cook Information Center Manager H. Etheridge, Senior Licensing Activity Coordinator Nuclear Regulatory Commission M. Satorius, Deputy Regional Administrator, Region III C. Lipa, Chief, Branch 4, Division of Reactor Projects B. Kemker, Senior Resident Inspector, D.C. Cook J. Lennartz, Senior Resident Inspector, D. C. Cook J. Ellegood, Senior Resident Inspector, Palisades P. LaFlamme, Resident Inspector, D.C. Cook A. Garmoe, Reactor Engineer, Region III C. Hernandez, Secretary, D.C. Cook Other Attendees
| |
| | |
| Paul L. Bailey, Sheriff, Berrien County Sheriff's Department Gary Ruhl, Chief, Baroda-Lake Police Department
| |
|
| |
|
| Enclosure}} | | PUBLIC MEETING PRINCIPAL ATTENDEES April 16, 2008 Indiana Michigan Power Company M. Rencheck, Senior Vice President and Chief Nuclear Officer M. Peifer, Site Vice President J. Gebbie, Plant Manager C. Hutchinson, Emergency Planning Manager J. Petro, Regulatory Affairs Manager B. Schalk, Cook Information Center Manager H. Etheridge, Senior Licensing Activity Coordinator Nuclear Regulatory Commission M. Satorius, Deputy Regional Administrator, Region III C. Lipa, Chief, Branch 4, Division of Reactor Projects B. Kemker, Senior Resident Inspector, D.C. Cook J. Lennartz, Senior Resident Inspector, D. C. Cook J. Ellegood, Senior Resident Inspector, Palisades P. LaFlamme, Resident Inspector, D.C. Cook A. Garmoe, Reactor Engineer, Region III C. Hernandez, Secretary, D.C. Cook Other Attendees Paul L. Bailey, Sheriff, Berrien County Sheriff's Department Gary Ruhl, Chief, Baroda-Lake Police Department Enclosure}} |
Similar Documents at Cook |
---|
Category:Letter
MONTHYEARIR 05000315/20240032024-10-31031 October 2024 Integrated Inspection Report 05000315/2024003 05000316/2024003 07200072/2024001 and Exercise of Enforcement Discretion AEP-NRC-2024-77, U2C28 Steam Generator Tube Inspection Report2024-10-21021 October 2024 U2C28 Steam Generator Tube Inspection Report AEP-NRC-2024-80, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask2024-10-15015 October 2024 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-79, Unit 2, Independent Spent Fuel Storage Installation - Registration of Dry Spent Storage Cask2024-09-26026 September 2024 Unit 2, Independent Spent Fuel Storage Installation - Registration of Dry Spent Storage Cask AEP-NRC-2024-78, Reply to a Notice of Violation: EA-24-0472024-09-23023 September 2024 Reply to a Notice of Violation: EA-24-047 05000316/LER-2024-002-01, Manual Reactor Trip Following Rapid Downpower for Steam Leak2024-09-12012 September 2024 Manual Reactor Trip Following Rapid Downpower for Steam Leak IR 05000315/20244022024-09-10010 September 2024 Security Baseline Inspection Report 05000315/2024402 and 05000316/2024402, Independent Spent Fuel Storage Installation Security Inspection Report 07200072/2024401 AEP-NRC-2024-69, Core Operating Limits Report2024-09-0909 September 2024 Core Operating Limits Report IR 05000315/20243012024-09-0505 September 2024 NRC Initial License Examination Report 05000315/2024301 and 05000316/2024301 ML24225A0022024-09-0303 September 2024 Issuance of Amendment Nos. 363 and 344 Revising Technical Specifications Section 3.8.1, AC Sources-Operating, for a One-Time Extension of a Completion Time IR 05000315/20240112024-08-30030 August 2024 NRC Inspection Report 05000315/2024011 and 05000316/2024011 and Notice of Violation AEP-NRC-2024-76, Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-08-28028 August 2024 Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating AEP-NRC-2024-51, Annual Report of Loss-Of-Coolant Accident Evaluation Model Changes2024-08-28028 August 2024 Annual Report of Loss-Of-Coolant Accident Evaluation Model Changes 05000316/LER-2024-003, Plant Shutdown Required by Technical Specifications Due to Reactor Coolant System Identified Leakage2024-08-22022 August 2024 Plant Shutdown Required by Technical Specifications Due to Reactor Coolant System Identified Leakage IR 05000315/20240052024-08-21021 August 2024 Updated Inspection Plan for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2024005 and 05000316/2024005) AEP-NRC-2024-61, Unit 2 - Response to Request for Additional Information for Neutron Flux Instrumentation License Amendment Request2024-08-15015 August 2024 Unit 2 - Response to Request for Additional Information for Neutron Flux Instrumentation License Amendment Request ML24221A2702024-08-0808 August 2024 Unit 2 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-62, Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask2024-08-0707 August 2024 Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask ML24256A1482024-08-0202 August 2024 2024 Post Examination Submittal Letter AEP-NRC-2024-47, Form OAR-1, Owners Activity Report2024-07-30030 July 2024 Form OAR-1, Owners Activity Report ML24183A0162024-07-25025 July 2024 Review of Reactor Vessel Material Surveillance Program Capsule W Technical Report ML24169A2142024-07-25025 July 2024 Issuance of Amendment No. 362 Regarding Change to Technical Specification 3.4.12, Low Temperature Overpressure Protection System IR 05000315/20240022024-07-24024 July 2024 Integrated Inspection Report 05000315/2024002 and 05000316/2024002 05000316/LER-2024-002, Manual Reactor Trip Following Rapid Downpower for Steam Leak2024-07-15015 July 2024 Manual Reactor Trip Following Rapid Downpower for Steam Leak ML24197A1262024-07-15015 July 2024 Unit 2 - Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating ML24191A0692024-07-0909 July 2024 Operator Licensing Examination Approval - Donald C. Cook Nuclear Power Plant, July 2024 AEP-NRC-2024-56, Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask2024-07-0808 July 2024 Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-48, Response to Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-07-0202 July 2024 Response to Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating ML24176A1012024-06-21021 June 2024 57143-EN 57143 - Paragon Energy Solutions - Update 1 (Final) - 10CFR Part 21 Final Notification: P21-05242024-FN, Rev. 0 AEP-NRC-2024-45, Report Per Technical Specification 5.6.6 for Inoperability of Post Accident Monitoring Neutron Flux Monitoring2024-06-13013 June 2024 Report Per Technical Specification 5.6.6 for Inoperability of Post Accident Monitoring Neutron Flux Monitoring ML24163A0132024-06-12012 June 2024 Request for Information for the NRC Age-Related Degradation Inspection: Inspection Report 05000315/2024012 and 05000316/2024012 ML24159A2522024-05-30030 May 2024 10 CFR 50.71(e) Update and Related Site Change Reports AEP-NRC-2024-23, Core Operating Limits Report2024-05-23023 May 2024 Core Operating Limits Report 05000316/LER-2024-001, Reactor Trip Due to Main Turbine Trip from a High-High Thrust Bearing Position Trip2024-05-20020 May 2024 Reactor Trip Due to Main Turbine Trip from a High-High Thrust Bearing Position Trip ML24141A2162024-05-20020 May 2024 —Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection AEP-NRC-2024-40, Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-05-16016 May 2024 Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating AEP-NRC-2024-41, Annual Radiological Environmental Operating Report2024-05-15015 May 2024 Annual Radiological Environmental Operating Report AEP-NRC-2024-07, Unit 2 - Transmittal of Report of Changes to the Emergency Plan2024-05-14014 May 2024 Unit 2 - Transmittal of Report of Changes to the Emergency Plan AEP-NRC-2024-26, Transmittal of Donald C. Cook Nuclear Plant, Emergency Plan Revision 492024-05-14014 May 2024 Transmittal of Donald C. Cook Nuclear Plant, Emergency Plan Revision 49 IR 05000315/20240012024-05-14014 May 2024 Integrated Inspection Report 05000315/2024001 and 05000316/2024001 IR 05000315/20244012024-05-14014 May 2024 – Security Baseline Inspection Report 05000315/2024401 and 05000316/2024401 AEP-NRC-2024-24, Form OAR-1, Owners Activity Report2024-05-0707 May 2024 Form OAR-1, Owners Activity Report ML24115A2152024-05-0707 May 2024 LTR: CNP Non-Acceptance with Opportunity TS 3-8-1 ML24256A1472024-05-0606 May 2024 DC Cook 2024 NRC Examination Submittal Letter: Submittal ML24116A0002024-05-0202 May 2024 – Regulatory Audit in Support of Review of the Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors AEP-NRC-2024-35, Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations2024-04-30030 April 2024 Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations AEP-NRC-2024-28, 2023 Annual Radioactive Effluent Release Report2024-04-29029 April 2024 2023 Annual Radioactive Effluent Release Report AEP-NRC-2024-31, Annual Report of Individual Monitoring2024-04-24024 April 2024 Annual Report of Individual Monitoring AEP-NRC-2024-02, Unit 2 License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-04-0303 April 2024 Unit 2 License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating AEP-NRC-2024-29, (CNP) Unit 2 - Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-072024-04-0303 April 2024 (CNP) Unit 2 - Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-07 2024-09-09
[Table view] Category:Meeting Summary
MONTHYEARML24183A2292024-07-0101 July 2024 Summary of Public Outreach to Discuss the NRC 2023 End-Of-Cycle Plant Performance Assessment of Donald C. Cook Nuclear Plant, Units 1 and 2 ML24103A1872024-04-16016 April 2024 Summary of Meeting with Indiana Michigan Power Co., Regarding Surveillance Capsule Program for DC Cook Nuclear Plant, Unit 2 ML24031A5872024-02-0202 February 2024 Summary of Meeting with Indiana Michigan Power Company Regarding Neutron Flux Instrumentation for Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML23215A1662023-08-17017 August 2023 Summary of July 31, 2023, Meeting with Indiana Michigan Power Company Regarding Operating Power Sources for Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML23199A2402023-07-19019 July 2023 Summary of the July 13, 2023, Public Outreach to Discuss the NRC 2022 End-of-Cycle Plant Performance Assessment of Donald C. Cook Nuclear Plant, Units 1 and 2 ML22355A6022023-01-0303 January 2023 Summary of December 14, 2022, with Indiana Michigan Power Company to Discuss Potential Changes to the Emergency Plan for Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML22318A1992022-11-21021 November 2022 Summary of November 7, 2022, Meeting with Indiana Michigan Power Company Regarding Neutron Flux Instrumentation for Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML22154A5342022-06-0909 June 2022 Summary of the June 1, 2022, Public Outreach to Discuss the NRC 2021 End-Of-Cycle Plant Performance Assessment of Donald C. Cook Nuclear Plant ML22011A2732022-01-13013 January 2022 Summary of Meeting with Indiana Michigan Power Company to Discuss Planned Final Response to Generic Letter 2004-02 for Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML21349B3092022-01-0303 January 2022 Summary of Meeting with Indiana Michigan Power Company to Discuss Potential Changes to the Quality Assurance Program for Donald C. Cook Nuclear Plant, Units 1 and 2 ML21202A1072021-07-23023 July 2021 Summary of July 20, 2021, with Indiana Michigan Power Company to Discuss Potential Changes to the Emergency Plan for Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML21196A5182021-07-15015 July 2021 July 8, 2021, Summary of Public Webinar to Discuss the NRC 2020 End-Of-Cycle Plant Performance Assessment of the Donald C. Cook Nuclear Plant ML21082A0052021-03-24024 March 2021 Summary of March 19, 2021, with Indiana Michigan Power Company Regarding Containment Water Level Channels for Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML20349A0152020-12-17017 December 2020 Summary of November 30, 2020, Teleconference with Indiana Michigan Power Company Regarding a Planned License Amendment Request to Extend the Containment Integrated Leak Rate Testing Interval for Donald C. Cook Nuclear Plant, Unit No. 2 ML20282A2712020-10-14014 October 2020 Summary of October 2, 2020, Teleconference with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Unit No. 1 ML20248H4752020-09-10010 September 2020 Summary of August 6, 2020, Teleconference with Indian Michigan Power Company Related to Steam Generator Eddy Current Testing License Amendment Request ML20209A6032020-07-27027 July 2020 Summary of the July 21, 2020, Public Webinar to Discuss the NRC 2019 End-of-Cycle Plant Performance Assessment of the Donald C. Cook Nuclear Plant, Units 1 and 2 ML20133K1282020-05-21021 May 2020 Summary of May 4, 2020, Teleconference with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML20121A0692020-05-0404 May 2020 Summary of Teleconference with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML20041C9492020-02-13013 February 2020 Summary of February 6, 2020, Teleconference with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML19350A0552019-12-30030 December 2019 Summary of 12/12/2019 Meeting with Indiana Michigan Power Company, License Amendment Request for D.C. Cook Nuclear Plant, Units 1 and 2 to Delete Surveillance Requirement Related to Diesel Generator Load Test Resistor Banks ML19212A5652019-07-30030 July 2019 Summary of Public Open House to Discuss NRC Activities and the 2018 End-Of-Cycle Performance Assessment of Donald C. Cook Nuclear Generating Plant, Units 1 and 2 ML19141A0622019-06-0606 June 2019 Summary of November 19, 2018, Meeting with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML19099A3262019-04-16016 April 2019 Summary of Meeting with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML19067A0482019-03-12012 March 2019 Summary of Public Teleconference with Indiana Michigan Power Co. (I&M) Review of LAR for Approval of Leak-Before-Break Methodology for Reactor Coolant System Small Diameter Piping (EPID-2019-LLA-0054) ML18334A0402018-12-13013 December 2018 Summary of Meeting with Indian Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Unit No. 1 ML18109A0692018-04-26026 April 2018 Summary of April 10, 2018, Meeting with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML18052B0542018-02-26026 February 2018 Summary of February 15, 2018, Meeting with Indian Michigan Power Company Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 (EPID L-2018-LRM-0008 ML18018B1382018-01-22022 January 2018 Summary of Meeting with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Unit No. 1 ML17265A4922017-10-0404 October 2017 Summary of Meeting with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 2 ML17235B1232017-08-23023 August 2017 Summary of the July 27, 2017, Open House to Discuss the 2016 End-of-Cycle Plant Performance Assessment of Donald C. Cook Nuclear Plant ML17082A0762017-03-27027 March 2017 Summary of March 20, 2017, Meeting with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML16308A1132016-11-16016 November 2016 Summary of October 27, 2016, Public Meeting with Indiana Michigan Power Company Regarding the Donald C. Cook Nuclear Plant, Units 1 and 2 ML16244A7062016-08-30030 August 2016 Summary of the August 22, 2016, Donald C. Cook Public Meeting ML16193A5912016-07-15015 July 2016 Summary of Meeting with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Units 1 and 2 ML15271A0462015-10-0505 October 2015 Summary of Public Meeting with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Units 1 and 2 ML15237A3362015-09-0202 September 2015 Summary of August 24, 2015, Telephone Call to Provide Verbal Authorization of Relief Request ISIR-4-06, Alternate Repair of Socket Weld ML15107A0982015-04-24024 April 2015 April 14, 2015, Summary of Meeting with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Units 1 and 2 ML14311A3182014-11-14014 November 2014 Summary of Conference Call with Donald C. Cook Nuclear Plant, Unit 1 Regarding the Fall 2014 Steam Generator Inspections ML14231A0752014-08-27027 August 2014 Summary of the August 8, 2014, Pre-Application Meeting with American Electric Power Company to Discuss a Future License Amendment Request for Alternative Source Term and TSTF-490 ML14209A9422014-07-30030 July 2014 July 9, 2014, Summary of Category 1, Public Meeting with Indiana Michigan Power Company to Discuss Seismic Hazard Reevaluations Associated with Implementation of Japan Lessons-Learned Near-Term Task Force Recommendation 2.1 ML14199A0802014-07-18018 July 2014 Summary of July 8, 2014 Donald C. Cook Public Annual Assessment Meeting ML14023A3872014-01-30030 January 2014 Summary of Joint Steering Committee Meeting to Discuss Activities Related to Lessons-Learned from the Fukushima Dai-Ichi Nuclear Power Plant Event ML13210A2272013-08-0202 August 2013 6/26/13, Summary of Pre-Application Meeting to Discuss Pending License Amendment Request to Modify the CNP Unit 1 Normal Operating Pressure and Temperature ML13189A2322013-07-15015 July 2013 Summary of Conference Telephone Call Regarding the 2013 Steam Generator Tube Inspections ML13154A4062013-06-0303 June 2013 5/30/2013 - Summary of the D.C. Cook Public Meeting ML12159A4022012-06-0707 June 2012 May 31, 2012 Summary of Public Meeting to Discuss the 2011 Annual Assessment Results for D.C. Cook ML1133307782011-11-29029 November 2011 Record of Discussion by Phone on 10/5/11 Regarding Steam Generator Inspection ML11129A2422011-06-0808 June 2011 Summary of Meeting with Indiana Michigan Power Company to Discuss Issues Related to a Future Submittal Using NFPA 805 ML0931305572009-11-0909 November 2009 Summary of Public Meeting with Staff from the D.C. Cook Nuclear Power Plant Regarding the September 2008 Unit 1 Turbine Vibration Event 2024-07-01
[Table view] |
Text
April 18, 2008 LICENSEE: Indiana Michigan Power Company FACILITY: Donald C. Cook Nuclear Plant
SUBJECT:
SUMMARY
OF THE APRIL 16, 2008, PUBLIC MEETING TO DISCUSS THE 2007 D.C. COOK UNIT 1 AND UNIT 2 END-OF-CYCLE PERFORMANCE ASSESSMENTS On April 16, 2008, the Nuclear Regulatory Commission (NRC) held a public meeting at the Lake Charter Township Hall in Bridgman, Michigan. The meeting was between NRC Region III management and Indiana Michigan Power Company representatives to discuss the NRCs 2007 End-of-Cycle Assessment of the D.C. Cook Nuclear Plant Unit 1 and 2 safety performances.
The results of these assessments were discussed in a letter to the licensee dated March 3, 2008 (ADAMS ML080600289).
The NRC began the meeting with an overview of the NRC and the nuclear industry, the NRCs Reactor Oversight Process (ROP), and national ROP results. This was followed by a summary of the NRCs assessment of D.C. Cook Unit 1 and Unit 2 performances in 2007. The NRCs meeting presentation slides can be found in ADAMS at ML081070238. A list of principal meeting attendees can be found in the attached enclosure.
The licensee then provided its perspective on the assessment. In summary, the licensee concurred with the NRC assessment that D.C. Cook Unit 1 and 2 were operated in a manner that preserved the safety of the public and the environment.
At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials.
/RA/
Christine A. Lipa, Chief Branch 4 Division of Reactor Projects Docket Nos. 50-315 and 50-316 License Nos. DPR-58 and DPR-74
Enclosure:
As stated DISTRIBUTION:
See next page
LICENSEE: Indiana Michigan Power Company FACILITY: Donald C. Cook Nuclear Plant
SUBJECT:
SUMMARY
OF THE APRIL 16, 2008, PUBLIC MEETING TO DISCUSS THE 2007 D.C. COOK UNIT 1 AND UNIT 2 END-OF-CYCLE PERFORMANCE ASSESSMENTS On April 16, 2008, the Nuclear Regulatory Commission (NRC) held a public meeting at the Lake Charter Township Hall in Bridgman, Michigan. The meeting was between NRC Region III management and Indiana Michigan Power Company representatives to discuss the NRCs 2007 End-of-Cycle Assessment of the D.C. Cook Nuclear Plant Unit 1 and 2 safety performances.
The results of these assessments were discussed in a letter to the licensee dated March 3, 2008 (ADAMS ML080600289).
The NRC began the meeting with an overview of the NRC and the nuclear industry, the NRCs Reactor Oversight Process (ROP), and national ROP results. This was followed by a summary of the NRCs assessment of D.C. Cook Unit 1 and Unit 2 performances in 2007. The NRCs meeting presentation slides can be found in ADAMS at ML081070238. A list of principal meeting attendees can be found in the attached enclosure.
The licensee then provided its perspective on the assessment. In summary, the licensee concurred with the NRC assessment that D.C. Cook Unit 1 and 2 were operated in a manner that preserved the safety of the public and the environment.
At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials.
Christine A. Lipa, Chief Branch 4 Division of Reactor Projects Docket Nos. 50-315 and 50-316 License Nos. DPR-58 and DPR-74
Enclosure:
As stated DISTRIBUTION:
See next page DOCUMENT NAME: G:\Branch TSS\All EOC\EOC Cy 2007\Meeting Notices - Letters/
Cook EOC Meeting Summary 04-16-08.doc G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME FTran:dpt CLipa DATE 04/18/08 04/18/08 OFFICIAL RECORD COPY
Letter to Indiana Michigan Power Company from C. Lipa dated April 18, 2008
SUBJECT:
SUMMARY
OF THE APRIL 16, 2008, PUBLIC MEETING TO DISCUSS THE 2007 D.C. COOK UNIT 1 AND UNIT 2 END-OF-CYCLE PERFORMANCE ASSESSMENTS cc w/encl: M. Peifer, Site Vice President J. Gebbie, Plant Manager G. White, Michigan Public Service Commission L. Brandon, Michigan Department of Environmental Quality -
Waste and Hazardous Materials Division Emergency Management Division MI Department of State Police T. Strong, Chief, State Liaison Officer, State of Michigan Berrien County Board Chairman Berrien County Coordinator Berrien County Sheriff EMA Coordinator, Berrien County Emergency Management Agency Mayor of Benton Harbor City Manager of Benton Harbor Mayor of St. Joseph City Manager of St. Joseph Mayor of Bridgman City Manager of Bridgman Mayor of Buchanan City Manager of Buchanan President, Village of Stevensville President, Village of Berrien Springs President, Village of Shoreham G. Mortensen, INPO
Letter to Indiana Michigan Power Company from C. Lipa dated April 18, 2008
SUBJECT:
SUMMARY
OF THE APRIL 16, 2008, PUBLIC MEETING TO DISCUSS THE 2007 D.C. COOK UNIT 1 AND UNIT 2 END-OF-CYCLE PERFORMANCE ASSESSMENTS DISTRIBUTION:
JTA TEB RidsNrrDirslpab JLC1 MAS KGO RML2 SRI Cook DRPIII DRSIII PLB1 TXN
PUBLIC MEETING PRINCIPAL ATTENDEES April 16, 2008 Indiana Michigan Power Company M. Rencheck, Senior Vice President and Chief Nuclear Officer M. Peifer, Site Vice President J. Gebbie, Plant Manager C. Hutchinson, Emergency Planning Manager J. Petro, Regulatory Affairs Manager B. Schalk, Cook Information Center Manager H. Etheridge, Senior Licensing Activity Coordinator Nuclear Regulatory Commission M. Satorius, Deputy Regional Administrator, Region III C. Lipa, Chief, Branch 4, Division of Reactor Projects B. Kemker, Senior Resident Inspector, D.C. Cook J. Lennartz, Senior Resident Inspector, D. C. Cook J. Ellegood, Senior Resident Inspector, Palisades P. LaFlamme, Resident Inspector, D.C. Cook A. Garmoe, Reactor Engineer, Region III C. Hernandez, Secretary, D.C. Cook Other Attendees Paul L. Bailey, Sheriff, Berrien County Sheriff's Department Gary Ruhl, Chief, Baroda-Lake Police Department Enclosure