ML081120330: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML081120330
| number = ML081120330
| issue date = 04/18/2008
| issue date = 04/18/2008
| title = D. C. Cook EOC Public Meeting Summary
| title = EOC Public Meeting Summary
| author name = Lipa C
| author name = Lipa C
| author affiliation = NRC/RGN-III/DRP
| author affiliation = NRC/RGN-III/DRP
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:April 18, 2008  
{{#Wiki_filter:April 18, 2008 LICENSEE:       Indiana Michigan Power Company FACILITY:       Donald C. Cook Nuclear Plant
 
LICENSEE: Indiana Michigan Power Company FACILITY: Donald C. Cook Nuclear Plant  


==SUBJECT:==
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF THE APRIL 16, 2008, PUBLIC MEETING TO DISCUSS THE 2007 D.C. COOK UNIT 1 AND UNIT 2 END-OF-CYCLE PERFORMANCE ASSESSMENTS On April 16, 2008, the Nuclear Regulatory Commission (NRC) held a public meeting at the Lake Charter Township Hall in Bridgman, Michigan. The meeting was between NRC Region III management and Indiana Michigan Power Company representatives to discuss the NRC's 2007 End-of-Cycle Assessment of the D.C. Cook Nuclear Plant Unit 1 and 2 safety performances. The results of these assessments were discussed in a letter to the licensee dated March 3, 2008 (ADAMS ML080600289).
OF THE APRIL 16, 2008, PUBLIC MEETING TO DISCUSS THE 2007 D.C. COOK UNIT 1 AND UNIT 2 END-OF-CYCLE PERFORMANCE ASSESSMENTS On April 16, 2008, the Nuclear Regulatory Commission (NRC) held a public meeting at the Lake Charter Township Hall in Bridgman, Michigan. The meeting was between NRC Region III management and Indiana Michigan Power Company representatives to discuss the NRCs 2007 End-of-Cycle Assessment of the D.C. Cook Nuclear Plant Unit 1 and 2 safety performances.
The NRC began the meeting with an overview of the NRC and the nuclear industry, the NRC's Reactor Oversight Process (ROP), and national ROP results. This was followed by a summary of the NRC's assessment of D.C. Cook Unit 1 and Unit 2 performances in 2007. The NRC's meeting presentation slides can be found in ADAMS at ML081070238. A list of principal meeting attendees can be found in the attached enclosure.  
The results of these assessments were discussed in a letter to the licensee dated March 3, 2008 (ADAMS ML080600289).
 
The NRC began the meeting with an overview of the NRC and the nuclear industry, the NRCs Reactor Oversight Process (ROP), and national ROP results. This was followed by a summary of the NRCs assessment of D.C. Cook Unit 1 and Unit 2 performances in 2007. The NRCs meeting presentation slides can be found in ADAMS at ML081070238. A list of principal meeting attendees can be found in the attached enclosure.
The licensee then provided its perspective on the assessment. In summary, the licensee concurred with the NRC assessment that D.C. Cook Unit 1 and 2 were operated in a manner that preserved the safety of the public and the environment.
The licensee then provided its perspective on the assessment. In summary, the licensee concurred with the NRC assessment that D.C. Cook Unit 1 and 2 were operated in a manner that preserved the safety of the public and the environment.
At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials.  
At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials.
      /RA/  
                                              /RA/
 
Christine A. Lipa, Chief Branch 4 Division of Reactor Projects Docket Nos. 50-315 and 50-316 License Nos. DPR-58 and DPR-74
Christine A. Lipa, Chief       Branch 4       Division of Reactor Projects Docket Nos. 50-315 and 50-316 License Nos. DPR-58 and DPR-74  


==Enclosure:==
==Enclosure:==
As stated DISTRIBUTION
As stated DISTRIBUTION:
: See next page  
See next page


LICENSEE: Indiana Michigan Power Company FACILITY: Donald C. Cook Nuclear Plant  
LICENSEE:                 Indiana Michigan Power Company FACILITY:                 Donald C. Cook Nuclear Plant


==SUBJECT:==
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF THE APRIL 16, 2008, PUBLIC MEETING TO DISCUSS THE 2007 D.C. COOK UNIT 1 AND UNIT 2 END-OF-CYCLE PERFORMANCE ASSESSMENTS On April 16, 2008, the Nuclear Regulatory Commission (NRC) held a public meeting at the Lake Charter Township Hall in Bridgman, Michigan. The meeting was between NRC Region III management and Indiana Michigan Power Company representatives to discuss the NRC's 2007 End-of-Cycle Assessment of the D.C. Cook Nuclear Plant Unit 1 and 2 safety performances. The results of these assessments were discussed in a letter to the licensee dated March 3, 2008 (ADAMS ML080600289).
OF THE APRIL 16, 2008, PUBLIC MEETING TO DISCUSS THE 2007 D.C. COOK UNIT 1 AND UNIT 2 END-OF-CYCLE PERFORMANCE ASSESSMENTS On April 16, 2008, the Nuclear Regulatory Commission (NRC) held a public meeting at the Lake Charter Township Hall in Bridgman, Michigan. The meeting was between NRC Region III management and Indiana Michigan Power Company representatives to discuss the NRCs 2007 End-of-Cycle Assessment of the D.C. Cook Nuclear Plant Unit 1 and 2 safety performances.
The NRC began the meeting with an overview of the NRC and the nuclear industry, the NRC's Reactor Oversight Process (ROP), and national ROP results. This was followed by a summary of the NRC's assessment of D.C. Cook Unit 1 and Unit 2 performances in 2007. The NRC's meeting presentation slides can be found in ADAMS at ML081070238. A list of principal meeting attendees can be found in the attached enclosure.
The results of these assessments were discussed in a letter to the licensee dated March 3, 2008 (ADAMS ML080600289).
The NRC began the meeting with an overview of the NRC and the nuclear industry, the NRCs Reactor Oversight Process (ROP), and national ROP results. This was followed by a summary of the NRCs assessment of D.C. Cook Unit 1 and Unit 2 performances in 2007. The NRCs meeting presentation slides can be found in ADAMS at ML081070238. A list of principal meeting attendees can be found in the attached enclosure.
The licensee then provided its perspective on the assessment. In summary, the licensee concurred with the NRC assessment that D.C. Cook Unit 1 and 2 were operated in a manner that preserved the safety of the public and the environment.
The licensee then provided its perspective on the assessment. In summary, the licensee concurred with the NRC assessment that D.C. Cook Unit 1 and 2 were operated in a manner that preserved the safety of the public and the environment.
At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials.  
At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials.
 
Christine A. Lipa, Chief Branch 4 Division of Reactor Projects Docket Nos. 50-315 and 50-316 License Nos. DPR-58 and DPR-74
Christine A. Lipa, Chief       Branch 4       Division of Reactor Projects  
 
Docket Nos. 50-315 and 50-316 License Nos. DPR-58 and DPR-74  


==Enclosure:==
==Enclosure:==
As stated  
As stated DISTRIBUTION:
 
See next page DOCUMENT NAME: G:\Branch TSS\All EOC\EOC Cy 2007\Meeting Notices - Letters/
DISTRIBUTION
Cook EOC Meeting Summary 04-16-08.doc G Publicly Available                       G Non-Publicly Available                 G Sensitive             G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE             RIII                                 RIII                           RIII                               RIII NAME               FTran:dpt                           CLipa DATE               04/18/08                             04/18/08 OFFICIAL RECORD COPY
: See next page DOCUMENT NAME: G:\Branch TSS\All EOC\EOC Cy 2007\Meeting Notices - Letters/
Cook EOC Meeting Summary 04-16-08.doc G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII   RIII   RIII   RIII   NAME FTran:dpt CLipa DATE 04/18/08 04/18/08     OFFICIAL RECORD COPY


Letter to Indiana Michigan Power Company from C. Lipa dated April 18, 2008  
Letter to Indiana Michigan Power Company from C. Lipa dated April 18, 2008


==SUBJECT:==
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF THE APRIL 16, 2008, PUBLIC MEETING TO DISCUSS THE 2007 D.C. COOK UNIT 1 AND UNIT 2 END-OF-CYCLE PERFORMANCE ASSESSMENTS  
OF THE APRIL 16, 2008, PUBLIC MEETING TO DISCUSS THE 2007 D.C. COOK UNIT 1 AND UNIT 2 END-OF-CYCLE PERFORMANCE ASSESSMENTS cc w/encl:     M. Peifer, Site Vice President J. Gebbie, Plant Manager G. White, Michigan Public Service Commission L. Brandon, Michigan Department of Environmental Quality -
 
Waste and Hazardous Materials Division Emergency Management Division MI Department of State Police T. Strong, Chief, State Liaison Officer, State of Michigan Berrien County Board Chairman Berrien County Coordinator Berrien County Sheriff EMA Coordinator, Berrien County Emergency Management Agency Mayor of Benton Harbor City Manager of Benton Harbor Mayor of St. Joseph City Manager of St. Joseph Mayor of Bridgman City Manager of Bridgman Mayor of Buchanan City Manager of Buchanan President, Village of Stevensville President, Village of Berrien Springs President, Village of Shoreham G. Mortensen, INPO
cc w/encl: M. Peifer, Site Vice President   J. Gebbie, Plant Manager   G. White, Michigan Public Service Commission   L. Brandon, Michigan Department of Environmental Quality -   Waste and Hazardous Materials Division   Emergency Management Division     MI Department of State Police T. Strong, Chief, State Liaison Officer, State of Michigan   Berrien County Board Chairman   Berrien County Coordinator   Berrien County Sheriff EMA Coordinator, Berrien County Emergency Management Agency   Mayor of Benton Harbor   City Manager of Benton Harbor   Mayor of St. Joseph   City Manager of St. Joseph Mayor of Bridgman   City Manager of Bridgman   Mayor of Buchanan   City Manager of Buchanan   President, Village of Stevensville President, Village of Berrien Springs   President, Village of Shoreham   G. Mortensen, INPO  


Letter to Indiana Michigan Power Company from C. Lipa dated April 18, 2008  
Letter to Indiana Michigan Power Company from C. Lipa dated April 18, 2008


==SUBJECT:==
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF THE APRIL 16, 2008, PUBLIC MEETING TO DISCUSS THE 2007 D.C. COOK UNIT 1 AND UNIT 2 END-OF-CYCLE PERFORMANCE ASSESSMENTS  
OF THE APRIL 16, 2008, PUBLIC MEETING TO DISCUSS THE 2007 D.C. COOK UNIT 1 AND UNIT 2 END-OF-CYCLE PERFORMANCE ASSESSMENTS DISTRIBUTION:
 
JTA TEB RidsNrrDirslpab JLC1 MAS KGO RML2 SRI Cook DRPIII DRSIII PLB1 TXN
DISTRIBUTION
: JTA TEB RidsNrrDirslpab  
 
JLC1 MAS KGO RML2 SRI Cook DRPIII DRSIII PLB1 TXN  
 
PUBLIC MEETING PRINCIPAL ATTENDEES April 16, 2008
 
Indiana Michigan Power Company M. Rencheck, Senior Vice President and Chief Nuclear Officer M. Peifer, Site Vice President J. Gebbie, Plant Manager C. Hutchinson, Emergency Planning Manager J. Petro, Regulatory Affairs Manager B. Schalk, Cook Information Center Manager H. Etheridge, Senior Licensing Activity Coordinator Nuclear Regulatory Commission M. Satorius, Deputy Regional Administrator, Region III C. Lipa, Chief, Branch 4, Division of Reactor Projects  B. Kemker, Senior Resident Inspector, D.C. Cook J. Lennartz, Senior Resident Inspector, D. C. Cook J. Ellegood, Senior Resident Inspector, Palisades P. LaFlamme, Resident Inspector, D.C. Cook A. Garmoe, Reactor Engineer, Region III C. Hernandez, Secretary, D.C. Cook Other Attendees
 
Paul L. Bailey, Sheriff, Berrien County Sheriff's Department Gary Ruhl, Chief, Baroda-Lake Police Department


Enclosure}}
PUBLIC MEETING PRINCIPAL ATTENDEES April 16, 2008 Indiana Michigan Power Company M. Rencheck, Senior Vice President and Chief Nuclear Officer M. Peifer, Site Vice President J. Gebbie, Plant Manager C. Hutchinson, Emergency Planning Manager J. Petro, Regulatory Affairs Manager B. Schalk, Cook Information Center Manager H. Etheridge, Senior Licensing Activity Coordinator Nuclear Regulatory Commission M. Satorius, Deputy Regional Administrator, Region III C. Lipa, Chief, Branch 4, Division of Reactor Projects B. Kemker, Senior Resident Inspector, D.C. Cook J. Lennartz, Senior Resident Inspector, D. C. Cook J. Ellegood, Senior Resident Inspector, Palisades P. LaFlamme, Resident Inspector, D.C. Cook A. Garmoe, Reactor Engineer, Region III C. Hernandez, Secretary, D.C. Cook Other Attendees Paul L. Bailey, Sheriff, Berrien County Sheriff's Department Gary Ruhl, Chief, Baroda-Lake Police Department Enclosure}}

Latest revision as of 17:37, 14 November 2019

EOC Public Meeting Summary
ML081120330
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 04/18/2008
From: Christine Lipa
Division Reactor Projects III
To:
Indiana Michigan Power Co
References
Download: ML081120330 (5)


Text

April 18, 2008 LICENSEE: Indiana Michigan Power Company FACILITY: Donald C. Cook Nuclear Plant

SUBJECT:

SUMMARY

OF THE APRIL 16, 2008, PUBLIC MEETING TO DISCUSS THE 2007 D.C. COOK UNIT 1 AND UNIT 2 END-OF-CYCLE PERFORMANCE ASSESSMENTS On April 16, 2008, the Nuclear Regulatory Commission (NRC) held a public meeting at the Lake Charter Township Hall in Bridgman, Michigan. The meeting was between NRC Region III management and Indiana Michigan Power Company representatives to discuss the NRCs 2007 End-of-Cycle Assessment of the D.C. Cook Nuclear Plant Unit 1 and 2 safety performances.

The results of these assessments were discussed in a letter to the licensee dated March 3, 2008 (ADAMS ML080600289).

The NRC began the meeting with an overview of the NRC and the nuclear industry, the NRCs Reactor Oversight Process (ROP), and national ROP results. This was followed by a summary of the NRCs assessment of D.C. Cook Unit 1 and Unit 2 performances in 2007. The NRCs meeting presentation slides can be found in ADAMS at ML081070238. A list of principal meeting attendees can be found in the attached enclosure.

The licensee then provided its perspective on the assessment. In summary, the licensee concurred with the NRC assessment that D.C. Cook Unit 1 and 2 were operated in a manner that preserved the safety of the public and the environment.

At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials.

/RA/

Christine A. Lipa, Chief Branch 4 Division of Reactor Projects Docket Nos. 50-315 and 50-316 License Nos. DPR-58 and DPR-74

Enclosure:

As stated DISTRIBUTION:

See next page

LICENSEE: Indiana Michigan Power Company FACILITY: Donald C. Cook Nuclear Plant

SUBJECT:

SUMMARY

OF THE APRIL 16, 2008, PUBLIC MEETING TO DISCUSS THE 2007 D.C. COOK UNIT 1 AND UNIT 2 END-OF-CYCLE PERFORMANCE ASSESSMENTS On April 16, 2008, the Nuclear Regulatory Commission (NRC) held a public meeting at the Lake Charter Township Hall in Bridgman, Michigan. The meeting was between NRC Region III management and Indiana Michigan Power Company representatives to discuss the NRCs 2007 End-of-Cycle Assessment of the D.C. Cook Nuclear Plant Unit 1 and 2 safety performances.

The results of these assessments were discussed in a letter to the licensee dated March 3, 2008 (ADAMS ML080600289).

The NRC began the meeting with an overview of the NRC and the nuclear industry, the NRCs Reactor Oversight Process (ROP), and national ROP results. This was followed by a summary of the NRCs assessment of D.C. Cook Unit 1 and Unit 2 performances in 2007. The NRCs meeting presentation slides can be found in ADAMS at ML081070238. A list of principal meeting attendees can be found in the attached enclosure.

The licensee then provided its perspective on the assessment. In summary, the licensee concurred with the NRC assessment that D.C. Cook Unit 1 and 2 were operated in a manner that preserved the safety of the public and the environment.

At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials.

Christine A. Lipa, Chief Branch 4 Division of Reactor Projects Docket Nos. 50-315 and 50-316 License Nos. DPR-58 and DPR-74

Enclosure:

As stated DISTRIBUTION:

See next page DOCUMENT NAME: G:\Branch TSS\All EOC\EOC Cy 2007\Meeting Notices - Letters/

Cook EOC Meeting Summary 04-16-08.doc G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME FTran:dpt CLipa DATE 04/18/08 04/18/08 OFFICIAL RECORD COPY

Letter to Indiana Michigan Power Company from C. Lipa dated April 18, 2008

SUBJECT:

SUMMARY

OF THE APRIL 16, 2008, PUBLIC MEETING TO DISCUSS THE 2007 D.C. COOK UNIT 1 AND UNIT 2 END-OF-CYCLE PERFORMANCE ASSESSMENTS cc w/encl: M. Peifer, Site Vice President J. Gebbie, Plant Manager G. White, Michigan Public Service Commission L. Brandon, Michigan Department of Environmental Quality -

Waste and Hazardous Materials Division Emergency Management Division MI Department of State Police T. Strong, Chief, State Liaison Officer, State of Michigan Berrien County Board Chairman Berrien County Coordinator Berrien County Sheriff EMA Coordinator, Berrien County Emergency Management Agency Mayor of Benton Harbor City Manager of Benton Harbor Mayor of St. Joseph City Manager of St. Joseph Mayor of Bridgman City Manager of Bridgman Mayor of Buchanan City Manager of Buchanan President, Village of Stevensville President, Village of Berrien Springs President, Village of Shoreham G. Mortensen, INPO

Letter to Indiana Michigan Power Company from C. Lipa dated April 18, 2008

SUBJECT:

SUMMARY

OF THE APRIL 16, 2008, PUBLIC MEETING TO DISCUSS THE 2007 D.C. COOK UNIT 1 AND UNIT 2 END-OF-CYCLE PERFORMANCE ASSESSMENTS DISTRIBUTION:

JTA TEB RidsNrrDirslpab JLC1 MAS KGO RML2 SRI Cook DRPIII DRSIII PLB1 TXN

PUBLIC MEETING PRINCIPAL ATTENDEES April 16, 2008 Indiana Michigan Power Company M. Rencheck, Senior Vice President and Chief Nuclear Officer M. Peifer, Site Vice President J. Gebbie, Plant Manager C. Hutchinson, Emergency Planning Manager J. Petro, Regulatory Affairs Manager B. Schalk, Cook Information Center Manager H. Etheridge, Senior Licensing Activity Coordinator Nuclear Regulatory Commission M. Satorius, Deputy Regional Administrator, Region III C. Lipa, Chief, Branch 4, Division of Reactor Projects B. Kemker, Senior Resident Inspector, D.C. Cook J. Lennartz, Senior Resident Inspector, D. C. Cook J. Ellegood, Senior Resident Inspector, Palisades P. LaFlamme, Resident Inspector, D.C. Cook A. Garmoe, Reactor Engineer, Region III C. Hernandez, Secretary, D.C. Cook Other Attendees Paul L. Bailey, Sheriff, Berrien County Sheriff's Department Gary Ruhl, Chief, Baroda-Lake Police Department Enclosure