ML22011A273

From kanterella
Jump to navigation Jump to search

Summary of Meeting with Indiana Michigan Power Company to Discuss Planned Final Response to Generic Letter 2004-02 for Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2
ML22011A273
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 01/13/2022
From: Scott Wall
Plant Licensing Branch III
To:
Indiana Michigan Power Co
Wall S
References
EPID L-2021-LRM-0123
Download: ML22011A273 (4)


Text

January 13, 2022 LICENSEE:

Indiana Michigan Power Company, LLC FACILITY:

Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2

SUBJECT:

SUMMARY

OF JANUARY 11, 2022, MEETING WITH INDIANA MICHIGAN POWER COMPANY TO DISCUSS PLANNED FINAL RESPONSE TO GENERIC LETTER 2004-02 FOR DONALD C. COOK NUCLEAR PLANT, UNIT NOS. 1 AND 2 (EPID L-2021-LRM-0123)

On January 11, 2022, an observation public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Indiana Michigan Power Company (I&M, the licensee) via webinar. The purpose of this meeting was for I&M to provide information on a planned response to Generic Letter (GL) 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML042360586) request for the Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 (CNP).

The meeting notice and agenda dated November 22, 2021, are available at ADAMS Accession No. ML21357A033. A list of attendees is enclosed.

The licensee presented information (ADAMS Accession No. ML22006A348) regarding its forthcoming response concerning GL 2004-02. The presentation included an overview of the licensees approach and indicated, in part, that:

The response follows the industry template created in PWROG [Pressurized-Water Reactor Owners Group]-16073-P, Revision 0, TSTF [Technical Specifications Task Force]-567 Implementation Guidance, Evaluation of In-Vessel Debris Effects, Submittal Template for Final Response to Generic Letter 2004-02 and FSAR Changes, February 2020.

The licensee will be using closure option 2 - deterministic evaluation with methods outlined in WCAP-17788 Comprehensive Analysis and Test Program for GSI [Generic Safety Issue]-191 Closure (PA-SEE-1090) (ADAMS Accession No. ML20010F181).

The evaluation uses the clean plant criteria to calculate debris load.

The licensee stated that it expects to submit the GL 2004-02 response in January 2022.

The NRC staff did not make any regulatory decisions or commitments at the meeting. One member of the public participated in the meeting but did not have any questions or comments.

Public Meeting Feedback forms were not received.

Please direct any inquiries to me at 301-415-2855, or Scott.Wall@nrc.gov.

Sincerely,

/RA/

Scott P. Wall, Senior Project Manager Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-315 and 50-316

Enclosure:

List of Attendees cc: Listserv

Enclosure LIST OF ATTENDEES JANUARY 12, 2022, PUBLIC MEETING WITH I&M DONALD C. COOK NUCLEAR PLANT, UNIT NOS. 1 AND 2 PLANNED RESPONSE RELATED TO GENERIC LETTER 2004-02 Name Organization Scott Wall U.S. Nuclear Regulatory Commission (NRC)

Victor Cusumano NRC Ashley Smith NRC Andrea Russell NRC Matthew Yoder NRC Paul Klein NRC Steve Smith NRC Benjamin Parks NRC John Ma NRC Robert Vettori NRC Helen Levendosky Indiana Michigan Power Company (I&M)

David Williams I&M Jay Slaggert I&M Terry Groth I&M Maria Zamber Entergy Operations, Inc (Waterford 3)

ML22011A273 OFFICE NRR/DORL/LPL3/PM NRR/DORL/LPL3/LA NRR/DORL/LPL3/BC NRR/DORL/LPL3/PM NAME SWall SRohrer NSalgado SWall DATE 01/12/2022 01/12/2022 01/13/2022 01/13/2022