MONTHYEARML19141A0622019-06-0606 June 2019 Summary of November 19, 2018, Meeting with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 Project stage: Meeting 2019-06-06
[Table View] |
Similar Documents at Cook |
---|
Category:Meeting Summary
MONTHYEARML24305A1002024-11-0101 November 2024 Summary of Meeting with Indiana Michigan Power Company to Discuss Potential Changes to the Emergency Plan for Donald C. Cook Nuclear Plant, Units 1 and 2 ML24183A2292024-07-0101 July 2024 Summary of Public Outreach to Discuss the NRC 2023 End-Of-Cycle Plant Performance Assessment of Donald C. Cook Nuclear Plant, Units 1 and 2 ML24103A1872024-04-16016 April 2024 Summary of Meeting with Indiana Michigan Power Co., Regarding Surveillance Capsule Program for DC Cook Nuclear Plant, Unit 2 ML24031A5872024-02-0202 February 2024 Summary of Meeting with Indiana Michigan Power Company Regarding Neutron Flux Instrumentation for Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML23215A1662023-08-17017 August 2023 Summary of July 31, 2023, Meeting with Indiana Michigan Power Company Regarding Operating Power Sources for Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML23199A2402023-07-19019 July 2023 Summary of the July 13, 2023, Public Outreach to Discuss the NRC 2022 End-of-Cycle Plant Performance Assessment of Donald C. Cook Nuclear Plant, Units 1 and 2 ML22355A6022023-01-0303 January 2023 Summary of December 14, 2022, with Indiana Michigan Power Company to Discuss Potential Changes to the Emergency Plan for Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML22318A1992022-11-21021 November 2022 Summary of November 7, 2022, Meeting with Indiana Michigan Power Company Regarding Neutron Flux Instrumentation for Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML22154A5342022-06-0909 June 2022 Summary of the June 1, 2022, Public Outreach to Discuss the NRC 2021 End-Of-Cycle Plant Performance Assessment of Donald C. Cook Nuclear Plant ML22011A2732022-01-13013 January 2022 Summary of Meeting with Indiana Michigan Power Company to Discuss Planned Final Response to Generic Letter 2004-02 for Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML21349B3092022-01-0303 January 2022 Summary of Meeting with Indiana Michigan Power Company to Discuss Potential Changes to the Quality Assurance Program for Donald C. Cook Nuclear Plant, Units 1 and 2 ML21202A1072021-07-23023 July 2021 Summary of July 20, 2021, with Indiana Michigan Power Company to Discuss Potential Changes to the Emergency Plan for Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML21196A5182021-07-15015 July 2021 July 8, 2021, Summary of Public Webinar to Discuss the NRC 2020 End-Of-Cycle Plant Performance Assessment of the Donald C. Cook Nuclear Plant ML21082A0052021-03-24024 March 2021 Summary of March 19, 2021, with Indiana Michigan Power Company Regarding Containment Water Level Channels for Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML20349A0152020-12-17017 December 2020 Summary of November 30, 2020, Teleconference with Indiana Michigan Power Company Regarding a Planned License Amendment Request to Extend the Containment Integrated Leak Rate Testing Interval for Donald C. Cook Nuclear Plant, Unit No. 2 ML20282A2712020-10-14014 October 2020 Summary of October 2, 2020, Teleconference with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Unit No. 1 ML20248H4752020-09-10010 September 2020 Summary of August 6, 2020, Teleconference with Indian Michigan Power Company Related to Steam Generator Eddy Current Testing License Amendment Request ML20209A6032020-07-27027 July 2020 Summary of the July 21, 2020, Public Webinar to Discuss the NRC 2019 End-of-Cycle Plant Performance Assessment of the Donald C. Cook Nuclear Plant, Units 1 and 2 ML20133K1282020-05-21021 May 2020 Summary of May 4, 2020, Teleconference with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML20121A0692020-05-0404 May 2020 Summary of Teleconference with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML20041C9492020-02-13013 February 2020 Summary of February 6, 2020, Teleconference with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML19350A0552019-12-30030 December 2019 Summary of 12/12/2019 Meeting with Indiana Michigan Power Company, License Amendment Request for D.C. Cook Nuclear Plant, Units 1 and 2 to Delete Surveillance Requirement Related to Diesel Generator Load Test Resistor Banks ML19212A5652019-07-30030 July 2019 Summary of Public Open House to Discuss NRC Activities and the 2018 End-Of-Cycle Performance Assessment of Donald C. Cook Nuclear Generating Plant, Units 1 and 2 ML19141A0622019-06-0606 June 2019 Summary of November 19, 2018, Meeting with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML19099A3262019-04-16016 April 2019 Summary of Meeting with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML19067A0482019-03-12012 March 2019 Summary of Public Teleconference with Indiana Michigan Power Co. (I&M) Review of LAR for Approval of Leak-Before-Break Methodology for Reactor Coolant System Small Diameter Piping (EPID-2019-LLA-0054) ML18334A0402018-12-13013 December 2018 Summary of Meeting with Indian Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Unit No. 1 ML18109A0692018-04-26026 April 2018 Summary of April 10, 2018, Meeting with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML18052B0542018-02-26026 February 2018 Summary of February 15, 2018, Meeting with Indian Michigan Power Company Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 (EPID L-2018-LRM-0008 ML18018B1382018-01-22022 January 2018 Summary of Meeting with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Unit No. 1 ML17265A4922017-10-0404 October 2017 Summary of Meeting with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 2 ML17235B1232017-08-23023 August 2017 Summary of the July 27, 2017, Open House to Discuss the 2016 End-of-Cycle Plant Performance Assessment of Donald C. Cook Nuclear Plant ML17082A0762017-03-27027 March 2017 Summary of March 20, 2017, Meeting with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML16308A1132016-11-16016 November 2016 Summary of October 27, 2016, Public Meeting with Indiana Michigan Power Company Regarding the Donald C. Cook Nuclear Plant, Units 1 and 2 ML16244A7062016-08-30030 August 2016 Summary of the August 22, 2016, Donald C. Cook Public Meeting ML16193A5912016-07-15015 July 2016 Summary of Meeting with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Units 1 and 2 ML15271A0462015-10-0505 October 2015 Summary of Public Meeting with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Units 1 and 2 ML15237A3362015-09-0202 September 2015 Summary of August 24, 2015, Telephone Call to Provide Verbal Authorization of Relief Request ISIR-4-06, Alternate Repair of Socket Weld ML15107A0982015-04-24024 April 2015 April 14, 2015, Summary of Meeting with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Units 1 and 2 ML14311A3182014-11-14014 November 2014 Summary of Conference Call with Donald C. Cook Nuclear Plant, Unit 1 Regarding the Fall 2014 Steam Generator Inspections ML14231A0752014-08-27027 August 2014 Summary of the August 8, 2014, Pre-Application Meeting with American Electric Power Company to Discuss a Future License Amendment Request for Alternative Source Term and TSTF-490 ML14209A9422014-07-30030 July 2014 July 9, 2014, Summary of Category 1, Public Meeting with Indiana Michigan Power Company to Discuss Seismic Hazard Reevaluations Associated with Implementation of Japan Lessons-Learned Near-Term Task Force Recommendation 2.1 ML14199A0802014-07-18018 July 2014 Summary of July 8, 2014 Donald C. Cook Public Annual Assessment Meeting ML14023A3872014-01-30030 January 2014 Summary of Joint Steering Committee Meeting to Discuss Activities Related to Lessons-Learned from the Fukushima Dai-Ichi Nuclear Power Plant Event ML13210A2272013-08-0202 August 2013 6/26/13, Summary of Pre-Application Meeting to Discuss Pending License Amendment Request to Modify the CNP Unit 1 Normal Operating Pressure and Temperature ML13189A2322013-07-15015 July 2013 Summary of Conference Telephone Call Regarding the 2013 Steam Generator Tube Inspections ML13154A4062013-06-0303 June 2013 5/30/2013 - Summary of the D.C. Cook Public Meeting ML12159A4022012-06-0707 June 2012 May 31, 2012 Summary of Public Meeting to Discuss the 2011 Annual Assessment Results for D.C. Cook ML1133307782011-11-29029 November 2011 Record of Discussion by Phone on 10/5/11 Regarding Steam Generator Inspection ML11129A2422011-06-0808 June 2011 Summary of Meeting with Indiana Michigan Power Company to Discuss Issues Related to a Future Submittal Using NFPA 805 2024-07-01
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 6, 2019 LICENSEE: Indiana Michigan Power Company, LLC FACILITY: Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2
SUBJECT:
SUMMARY
OF MAY 14, 2019, MEETING WITH INDIANA MICHIGAN POWER COMPANY REGARDING DONALD C. COOK NUCLEAR PLANT, UNIT NOS. 1 AND 2 (EPID L-2019-LRM-0023)
On May 14, 2019, a Category I public teleconference was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Indiana Michigan Power Company (the licensee) via teleconference. This meeting was open to members of the public. No regulatory decisions were made at this meeting.
The purpose of the meeting was to discuss a planned license amendment for Donald C. Cook Nuclear Plant (CNP), Units Nos. 1 and 2. The licensee plans to submit an amendment to revise the technical specification (TS) requirements related to diesel generator (DG) testing using resistor banks. The meeting notice and agenda, dated March 21, 2018, is available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML19121A072. A list of attendees is provided as Enclosure 1. The licensee's presentation is provided in Enclosure 2.
The licensee discussed the planned license amendment to remove TS surveillance requirements (SRs) to connect the DG to resistor bank loads. The licensee indicated that the resistor banks are not safety-related, they have not used the banks since the 1990s, and removal of the banks from the facility is desired so that other equipment can be installed where the banks are located. The affected TS SRs are 3.8.1.20, 3.8.1.23, and 3.8.2.1.
The NRC staff questioned the licensee as to whether there are any safety-related components affected by the change. The licensee indicated that the change will impact safety-related breakers and cables that connect the resistor banks to the DG, and the amendment request would include a discussion of potential impact on safety-related equipment. The NRC staff questioned if the equipment to be placed in the vacated resistor bank location would be connected to the DGs. The licensee indicated that any new equipment would not be connected to the DGs or other safety-related equipment. The NRC staff questioned the licensee on the licensing history and why the TSs included the requirements that they planned to delete. The licensee indicated that the amendment would describe licensing history and why the requirement existed and why it is no longer needed.
No members of the public participated in the meeting.
Please direct any inquiries to me at 301-415-3733, or Robert.Kuntz@nrc.gov.
Sincerely, Robert . Kun z, ior Project Manager Plant Licensing Branch Ill Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-315 and 50-316
Enclosure:
List of Attendees cc: Listserv
LIST OF ATIENDEES MAY 14, 2019, PUBLIC MEETING WITH INDIANA AND MICHIGAN (l&M)
DONALD C. COOK NUCLEAR PLANT, UNIT NOS. 1 AND 2 PLANNED LICENSE AMENDMENT REQUEST REGARDING DIESEL GENERATOR LOAD TEST BANKS Name Oraanization Robert Kuntz Nuclear Reoulatorv Commission (NRC)
Donna Williams NRC Adakou Foli NRC Vijay Goel NRC Helen Levendosky Indiana Michioan Power Company (l&M)
Joseph Waters l&M Kirk Newel l&M David Pedersen l&M Eddie Hoskins l&M Jerry Dowdy l&M Peter Caursona Saroent and Lundy (licensee contractor)
NehalShah San:Jent and Lundy (licensee contractor)
Jasmine Robinson Sargent and Lundy (licensee contractor)
Enclosure 1
=
Background===
- The D.C. Cook design currently includes nonsafety-related resistor banks originally intended for use in deiseal generator (DG) testing.
- The resistor banks are located on the Auxiliary Building roof and are provided with a safety-related breaker to connect the safety related DG output cabling to the nonsafety-related resistor bank cabling.
- Resistor bank components have become degraded and are no longer functional.
- l&M now uses grid loads and plant engineered safety feature (ESF) loads for DG testing and governor tuning.
- The grid loads and ESF loads are connected to the generator output by the two safety-related breakers that connect the DG output the 4 kV (kilovolt) Safety buses.
- l&M plans to remove the resistor banks to allow placement of other nonsafety-related equipment in the vacated resistor bank location.
- There are two D.C. Cook technical specification {TS) surveillance requirements (SRs) that ensure DG availability under accident conditions will not be compromised when the DG is operating in test mode, depending on which "test mode" is being used:
o D.C. Cook TS SR 3.8.1.20 states (emphasis added):
"Verify, with a DG operating in test mode and connected to its load test resistor bank, an actual or simulated ESF actuation signal overrides the test mode by:
- a. Returning DG to ready-to-load operation; and
- b. Verifying the emergency loads are serviced by offsite power
This D.C. Cook-specific SR ensures that the DG availability will not be compromised as the result of testing that involves connecting the DG to its test load resistor bank.
o D.C. Cook TS SR 3.8.1.21 states (emphasis added):
"Verify, with a DG operating in test mode and connected to its bus, an actual or simulated ESF actuation signal overrides the test mode by:
- a. Returning DG to ready-to-load operation; and
- b. Verifying the emergency loads are serviced by offsite power."
This standard SR ensures that the DG availability will not be compromised as the result of testing that involves connecting the DG to its bus, i.e. the 4 kV Safety buses that are now used to connect grid loads or plant ESF loads to the DG output for generator testing and governor tuning.
Enclosure 2
Planned License Amendment Request (LAR)
- l&M plans to submit an LAR to delete SR 3.8.1.20 to recognize that the resistor banks will no longer exist.
- Existing SR 3.8.1.21 will be unaffected.
- Copies of supporting TS Bases changes will be included in the LAR for information only.
- The LAR technical basis will describe:
The manner in which DG testing and governor tuning is now performed using grid loads and plant ESF loads via the 4 kV Safety buses rather than resistor bank loads.
How assurance of DG availability during current testing and governor tuning is provided by existing SR 3.8.1.21.
The final configuration of the safety-related components affected by the plant modification to remove the resistor banks.
- The regulatory basis will describe:
How compliance with 10 CFR 50.36(c)(3), "Surveillance Requirements," will be maintained.
How compliance with the D.C. Cook Plant Specific Design Criteria (PSDC) 38, "Reliability and Testability of Engineered Safety Features," and PSDC and 39, "Emergency Power,"
will be maintained.
How conformance with NUREG 1431, "Standard Technical Specifications -Westinghouse Plants," will be maintained.
The determination of no significant hazards considerations based on the standards set forth in 10 CFR 50.92(c).
The determination that no environmental impact statement or environmental assessment is required pursuant to 10 CFR 51.22(b).
Schedule
- LAR submittal is planned for mid-2019.
- NRC approval by mid-2020 will be requested.
ML19141A062 OFFICE DORL/LPL3/PM DORL/LPL3/LA DORL/LPL3/BC/A DORL/LPL3/PM NAME RKuntz SRohrer LRegner RKuntz DATE 05/21/19 05/21/19 06/05/19 06/06/19