Summary of Public Meeting with Staff from the D.C. Cook Nuclear Power Plant Regarding the September 2008 Unit 1 Turbine Vibration Event
ML093130557
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 11/09/2009
From: Jamnes Cameron
NRC/RGN-III/DRP/B6
To:
References
Download: ML093130557 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 November 9, 2009 LICENSEE: Indiana Michigan Power Company Nuclear Generation Group FACILITY: Donald C. Cook Nuclear Power Plant

SUBJECT:

SUMMARY

OF THE NOVEMBER 2, 2009, PUBLIC MEETING WITH STAFF FROM THE D.C. COOK NUCLEAR POWER PLANT REGARDING THE SEPTEMBER 2008 UNIT 1 TURBINE VIBRATION EVENT On November 2, 2009, members of the Region III staff, of the D.C. Cook Nuclear Power Plant, and of the public met to discuss the September 2008 Unit 1 turbine vibration event at D. C. Cook. The licensee presented the sequence of events, root cause assessment including results, assessment methodology, and corrective actions. The licensee also provided an overview of ongoing activities supporting D.C. Cook Unit 1 restart.

The slides used by the licensee can be found in the Agencywide Documents Access and Management System (ADAMS) as ML093090256.

/RA/

Jamnes L. Cameron, Chief Branch 6 Division of Reactor Projects Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74 cc: Distribution via ListServ

November 9, 2009 LICENSEE: Indiana Michigan Power Company Nuclear Generation Group FACILITY: Donald C. Cook Nuclear Power Plant

SUBJECT:

SUMMARY

OF THE NOVEMBER 2, 2009, PUBLIC MEETING WITH STAFF FROM THE D.C. COOK NUCLEAR POWER PLANT REGARDING THE SEPTEMBER 2008 UNIT 1 TURBINE VIBRATION EVENT On November 2, 2009, members of the Region III staff, of the D.C. Cook Nuclear Power Plant, and of the public met to discuss the September 2008 Unit 1 turbine vibration event at D. C. Cook. The licensee presented the sequence of events, root cause assessment including results, assessment methodology, and corrective actions. The licensee also provided an overview of ongoing activities supporting D.C. Cook Unit 1 restart.

The slides used by the licensee can be found in the Agencywide Documents Access and Management System (ADAMS) as ML093090256.

/RA/

Jamnes L. Cameron, Chief Branch 6 Division of Reactor Projects Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74 cc: Distribution via ListServ DOCUMENT NAME: G:\Cook\Nov 2 meeting minutes memo.doc G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME GWright:dtp JCameron DATE 11/09/09 11/09/09 OFFICIAL RECORD COPY

PUBLIC MEETING PRINCIPAL ATTENDEES NRC M. Satroius, RIII, Administrator C. Pederson, RIII, Deputy Administrator A. Boland, Director, Division of Reactor Safety J. Cameron, Chief, Branch 6, Division of Reactor Projects Other members of the RIII staff Donald C. Cook Nuclear Power Plant J. Jensen, Senior vice President & chief Nuclear Officer L. Weber, Site Vice President R. Hruby, Site Services vice President Other members of D.C. Cook staff

Letter to Indiana Michigan Power Company Nuclear Generation Group from J. Cameron dated November 9, 2009.

SUBJECT:

SUMMARY

OF THE NOVEMBER 2, 2009, PUBLIC MEETING WITH STAFF FROM THE D.C. COOK NUCLEAR POWER PLANT REGARDING THE SEPTEMBER 2008 UNIT 1 TURBINE VIBRATION EVENT DISTRIBUTION:

Susan Bagley RidsNrrDorlLpl3-1 Resource RidsNrrPMDCCook Resource RidsNrrDirsIrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports Resource