MONTHYEARML16193A5912016-07-15015 July 2016 Summary of Meeting with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Units 1 and 2 Project stage: Meeting 2016-07-15
[Table View] |
Similar Documents at Cook |
---|
Category:Meeting Summary
MONTHYEARML24305A1002024-11-0101 November 2024 Summary of Meeting with Indiana Michigan Power Company to Discuss Potential Changes to the Emergency Plan for Donald C. Cook Nuclear Plant, Units 1 and 2 ML24183A2292024-07-0101 July 2024 Summary of Public Outreach to Discuss the NRC 2023 End-Of-Cycle Plant Performance Assessment of Donald C. Cook Nuclear Plant, Units 1 and 2 ML24103A1872024-04-16016 April 2024 Summary of Meeting with Indiana Michigan Power Co., Regarding Surveillance Capsule Program for DC Cook Nuclear Plant, Unit 2 ML24031A5872024-02-0202 February 2024 Summary of Meeting with Indiana Michigan Power Company Regarding Neutron Flux Instrumentation for Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML23215A1662023-08-17017 August 2023 Summary of July 31, 2023, Meeting with Indiana Michigan Power Company Regarding Operating Power Sources for Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML23199A2402023-07-19019 July 2023 Summary of the July 13, 2023, Public Outreach to Discuss the NRC 2022 End-of-Cycle Plant Performance Assessment of Donald C. Cook Nuclear Plant, Units 1 and 2 ML22355A6022023-01-0303 January 2023 Summary of December 14, 2022, with Indiana Michigan Power Company to Discuss Potential Changes to the Emergency Plan for Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML22318A1992022-11-21021 November 2022 Summary of November 7, 2022, Meeting with Indiana Michigan Power Company Regarding Neutron Flux Instrumentation for Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML22154A5342022-06-0909 June 2022 Summary of the June 1, 2022, Public Outreach to Discuss the NRC 2021 End-Of-Cycle Plant Performance Assessment of Donald C. Cook Nuclear Plant ML22011A2732022-01-13013 January 2022 Summary of Meeting with Indiana Michigan Power Company to Discuss Planned Final Response to Generic Letter 2004-02 for Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML21349B3092022-01-0303 January 2022 Summary of Meeting with Indiana Michigan Power Company to Discuss Potential Changes to the Quality Assurance Program for Donald C. Cook Nuclear Plant, Units 1 and 2 ML21202A1072021-07-23023 July 2021 Summary of July 20, 2021, with Indiana Michigan Power Company to Discuss Potential Changes to the Emergency Plan for Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML21196A5182021-07-15015 July 2021 July 8, 2021, Summary of Public Webinar to Discuss the NRC 2020 End-Of-Cycle Plant Performance Assessment of the Donald C. Cook Nuclear Plant ML21082A0052021-03-24024 March 2021 Summary of March 19, 2021, with Indiana Michigan Power Company Regarding Containment Water Level Channels for Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML20349A0152020-12-17017 December 2020 Summary of November 30, 2020, Teleconference with Indiana Michigan Power Company Regarding a Planned License Amendment Request to Extend the Containment Integrated Leak Rate Testing Interval for Donald C. Cook Nuclear Plant, Unit No. 2 ML20282A2712020-10-14014 October 2020 Summary of October 2, 2020, Teleconference with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Unit No. 1 ML20248H4752020-09-10010 September 2020 Summary of August 6, 2020, Teleconference with Indian Michigan Power Company Related to Steam Generator Eddy Current Testing License Amendment Request ML20209A6032020-07-27027 July 2020 Summary of the July 21, 2020, Public Webinar to Discuss the NRC 2019 End-of-Cycle Plant Performance Assessment of the Donald C. Cook Nuclear Plant, Units 1 and 2 ML20133K1282020-05-21021 May 2020 Summary of May 4, 2020, Teleconference with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML20121A0692020-05-0404 May 2020 Summary of Teleconference with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML20041C9492020-02-13013 February 2020 Summary of February 6, 2020, Teleconference with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML19350A0552019-12-30030 December 2019 Summary of 12/12/2019 Meeting with Indiana Michigan Power Company, License Amendment Request for D.C. Cook Nuclear Plant, Units 1 and 2 to Delete Surveillance Requirement Related to Diesel Generator Load Test Resistor Banks ML19212A5652019-07-30030 July 2019 Summary of Public Open House to Discuss NRC Activities and the 2018 End-Of-Cycle Performance Assessment of Donald C. Cook Nuclear Generating Plant, Units 1 and 2 ML19141A0622019-06-0606 June 2019 Summary of November 19, 2018, Meeting with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML19099A3262019-04-16016 April 2019 Summary of Meeting with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML19067A0482019-03-12012 March 2019 Summary of Public Teleconference with Indiana Michigan Power Co. (I&M) Review of LAR for Approval of Leak-Before-Break Methodology for Reactor Coolant System Small Diameter Piping (EPID-2019-LLA-0054) ML18334A0402018-12-13013 December 2018 Summary of Meeting with Indian Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Unit No. 1 ML18109A0692018-04-26026 April 2018 Summary of April 10, 2018, Meeting with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML18052B0542018-02-26026 February 2018 Summary of February 15, 2018, Meeting with Indian Michigan Power Company Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 (EPID L-2018-LRM-0008 ML18018B1382018-01-22022 January 2018 Summary of Meeting with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Unit No. 1 ML17265A4922017-10-0404 October 2017 Summary of Meeting with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 2 ML17235B1232017-08-23023 August 2017 Summary of the July 27, 2017, Open House to Discuss the 2016 End-of-Cycle Plant Performance Assessment of Donald C. Cook Nuclear Plant ML17082A0762017-03-27027 March 2017 Summary of March 20, 2017, Meeting with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML16308A1132016-11-16016 November 2016 Summary of October 27, 2016, Public Meeting with Indiana Michigan Power Company Regarding the Donald C. Cook Nuclear Plant, Units 1 and 2 ML16244A7062016-08-30030 August 2016 Summary of the August 22, 2016, Donald C. Cook Public Meeting ML16193A5912016-07-15015 July 2016 Summary of Meeting with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Units 1 and 2 ML15271A0462015-10-0505 October 2015 Summary of Public Meeting with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Units 1 and 2 ML15237A3362015-09-0202 September 2015 Summary of August 24, 2015, Telephone Call to Provide Verbal Authorization of Relief Request ISIR-4-06, Alternate Repair of Socket Weld ML15107A0982015-04-24024 April 2015 April 14, 2015, Summary of Meeting with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Units 1 and 2 ML14311A3182014-11-14014 November 2014 Summary of Conference Call with Donald C. Cook Nuclear Plant, Unit 1 Regarding the Fall 2014 Steam Generator Inspections ML14231A0752014-08-27027 August 2014 Summary of the August 8, 2014, Pre-Application Meeting with American Electric Power Company to Discuss a Future License Amendment Request for Alternative Source Term and TSTF-490 ML14209A9422014-07-30030 July 2014 July 9, 2014, Summary of Category 1, Public Meeting with Indiana Michigan Power Company to Discuss Seismic Hazard Reevaluations Associated with Implementation of Japan Lessons-Learned Near-Term Task Force Recommendation 2.1 ML14199A0802014-07-18018 July 2014 Summary of July 8, 2014 Donald C. Cook Public Annual Assessment Meeting ML14023A3872014-01-30030 January 2014 Summary of Joint Steering Committee Meeting to Discuss Activities Related to Lessons-Learned from the Fukushima Dai-Ichi Nuclear Power Plant Event ML13210A2272013-08-0202 August 2013 6/26/13, Summary of Pre-Application Meeting to Discuss Pending License Amendment Request to Modify the CNP Unit 1 Normal Operating Pressure and Temperature ML13189A2322013-07-15015 July 2013 Summary of Conference Telephone Call Regarding the 2013 Steam Generator Tube Inspections ML13154A4062013-06-0303 June 2013 5/30/2013 - Summary of the D.C. Cook Public Meeting ML12159A4022012-06-0707 June 2012 May 31, 2012 Summary of Public Meeting to Discuss the 2011 Annual Assessment Results for D.C. Cook ML1133307782011-11-29029 November 2011 Record of Discussion by Phone on 10/5/11 Regarding Steam Generator Inspection ML11129A2422011-06-0808 June 2011 Summary of Meeting with Indiana Michigan Power Company to Discuss Issues Related to a Future Submittal Using NFPA 805 2024-07-01
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 15, 2016 LICENSEE: Indiana Michigan Power Company, LLC FACILITY: Donald C. Cook Nuclear Plant, Units 1 and 2
SUBJECT:
SUMMARY
OF JULY 7, 2016, MEETING WITH INDIANA MICHIGAN POWER COMPANY REGARDING DONALD C. COOK NUCLEAR PLANT, UNITS 1 AND 2 (CAC NOS. MF7778 and MF7779)
On July 7, 2016, a Category I public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Indiana Michigan Power Company (l&M, the licensee) via teleconference. This meeting was open to members of the public. No regulatory decisions were made at this meeting.
The purpose of the meeting was to discuss a planned license amendment request (LAR) for Donald C. Cook Nuclear Plant (CNP), Units 1 and 2. The licensee plans to submit a request to remove the containment humidity monitors from technical specification (TS) 3.4.15, "[Reactor Coolant System (RCS)] Leakage Detection Instrumentation." The meeting notice and agenda, dated June 16, 2016, are available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML16168A426. A list of attendees is included as . A handout was provided by the licensee, and is included as Enclosure 2. The handout includes the licensee's major discussion topics, as well as excerpts from TS 3.4.15 for CNP, Unit 1 and CNP, Unit 2.
The licensee presented information regarding its plan to submit the LAR in January 2017, and to request approval within the normal NRC review timeline. l&M briefly discussed the purpose of the LAR, and the technical justification for removing the containment humidity monitors. The licensee stated its intention to change TS 3.4.15 to be consistent with NUREG-1431, Standard Technical Specifications - Westinghouse Plants (ADAMS Accession No. ML12100A222), and to meet the intent of Regulatory Guide 1.45, Revision 0 (ADAMS Accession No ML003740113).
The licensee also stated that it would be revising the TS actions consistent with Technical Specifications Task Force (TSTF) Traveler TSTF-513, Revision 3, "Revise [Pressurized Water Reactor (PWR)] Operability Requirements and Actions for RCS Leakage Instrumentation" (ADAMS Accession No. ML102360355).
The NRC staff recommended that the licensee closely review TSTF-513 and the associated model safety evaluation to ensure that the technical bases in TSTF-513 are applicable to CNP.
The NRC staff also stated that LAR should include the licensing basis for CNP TS 3.4.15, and an explanation of how the LAR complies with the CNP plant-specific design criteria.
Additionally, the NRC staff stated that the LAR should include a discussion of any effect that the changes may have on the CNP updated final safety analysis report Chapter 14 safety analyses.
Members of the public were not in attendance. Public Meeting Feedback forms were not received. Please direct any inquiries to me at 301-415-2846, or Allison.Dietrich@nrc.gov.
Allison W. Dietrich, Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-315 and 50-316
Enclosure:
- 1. List of Attendees
- 2. Licensee Handout cc w/encl: Distribution via Listserv
LIST OF ATTENDEES JULY 7. 2016. PUBLIC MEETING WITH l&M. LLC DONALD C. COOK NUCLEAR PLANT. UNITS 1 AND 2 PLANNED LICENSE AMENDMENT REQUEST REGARDING TS 3.4.15 Name Organization Jerome Bettle NRC Kristy Bucholtz* NRC Allison Dietrich NRC Matthew Hamm NRC Richard Stattel NRC Hang Vu NRC Helen Kish* l&M Joe Tanke* l&M Allen Edwards* l&M Shaun Buck* l&M Scott Schneider* l&M Ted Dev* l&M Jeff Hudson* l&M
- Participated by phone Enclosure 1
Enclosure 2 Licensee Handout
Cook Nuclear Plant Pre-Submission License Amendment Request Discussion for Containment Humidity Monitoring What: Delete containment humidity monitor from Technical Specification (TS) 3.4.15.c "One containment humidity or containment atmosphere gaseous radioactivity monitor."
and revise U1 TS to be consistent with Unit 2 TS and NUREG 1431 and revise ACTIONS consistent with TSTF-513 Why: The Unit 1 and Unit 2 containment humidity monitors are obsolete. Significant resources are needed to maintain this equipment and each instance of maintenance causes dose to be acquired because the instruments are located in lower containment.
The average yearly cost is $100,000.
Justification: The proposed request would result in TS 3.4.15 being consistent with NUREG-1431 and also meeting the intent of Regulatory Guide 1.45, Revision 0, Section 3 of the Regulatory Position which states:
"At least three separate detection methods should be employed and two of these methods should be (1) sump level and flow monitoring and (2) airborne particulate radioactivity monitoring. The third method may be selected from the following:
- a. monitoring of condensate flow rate from air coolers,
- b. monitoring of airborne gaseous radioactivity Humidity, temperature or pressure monitoring of the containment atmosphere should be considered as alarms or indirect indication of leakage to the containment."
CNP would continue to maintain the three required methods above (monitoring sump level and flow monitoring, airborne particulate radioactivity monitoring, and monitoring airborne gaseous radioactivity) as detailed in RG 1.45, and would also continue to have temperature and pressure monitoring as indirect indications of leakage in containment.
A historical review was conducted of actual plant data for the currently installed containment humidity monitoring instrumentation ability to detect less than TS allowable RCS leakage. Two instances were identified in which RCS leakage in containment was identified by other monitored parameters, but were not detected by the containment humidity monitoring instrumentation.
Timeline: CNP intends to submit this LAR in early 2017 and would request a normal NRC review timeline from that point.
Unit 1 TS prior to STS:
3/4 LIMITIJ'liG CONDmONS FOR OPERATION AND SURVEILLANCE REQl.JIR.EMEl't"TS 314.4 REACTOR COOLANT SYSTEM
- \/4.4 6 REACTOR COOLANT SYSTEM b,EAKAGE LEAK.AGE DETECTION SYSTEMS LiMITING CONDITION FOR OPERATION 3 4.6.1 The following Reactor Coolant Syslem leakage detectlon systems shall be OPERABLE
- a. One of the containment atmm-phere paniculate radioactivity monitonng channels (ERS-1'30 l or ERS-1401),
- b. The concainment sump level and flow monitoring system, and
- c. Either the containment humidity monitor or one of the containment atmosphere gaseous radioacuvity monitoring channels (ERS-1305 or ERS-1405)
APPL1CABILITY. MODES l. 2, 3 an<l 4.
Unit 1 Current TS (STS):
3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.15 RCS Leakage Detection Instrumentation LCO 3.4.15 The following RCS leakage detection instrumentation shall be OPERABLE:
- a. One containment sump monitor in each sump:
- b. One containment atmosphere particulate radioactivity monitor: and
- c. One containment humidity or containment atmosphere gaseous radioactivity monitor.
APPLICABILITY: MODES 1. 2. 3, and 4.
Unit 2 TS prior to STS:
.... ****----*--***---* -~- .. *- .... _., .~
31-4 LIMmNGCONDrrIONS FOR OPEMTION ANDSURVED.J..ANCE REQblREMENTS 314.1 WCIOBCQQLANJ' SYSTEM 3/4 4 6 REACIOR coot ANT SYSTEM I EAKAGE I EAKAQE PFTRCDON SYSTEMS t IMrtINO CQNDmaN FOR OPEB &DON 3.4.6.1 'The followins RcactOt Coolant System leake;o deteetioft systems shall be OPERABLE:
L Ono of the containment aunosphote particulate radioactivity monitorina channels (ER,S..2301 or ERS-2401).
b.
- c. Elthef the containment humidity monitor or one of d\o containment atmosphere pseo111 radioai:::tivity monitorins cb.amtel1 (ERS-2305 or ER.S-~).
APPI JCABUJTY* MODES 1. 2. 3 and 4 Unit 2 Current TS (STS):
3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.15 RCS Leakage Detection Instrumentation LCO 3.4.15 The following RCS leakage detection instrumentation shall be OPERABLE:
- a. One containment sump monitor in each sump:
- b. One containment atmosphere radioactivity monitor (gaseous or particulate): and
- c. One containment humidity monitor.
APPLICABILITY: MODES 1. 2. 3. and 4.
Mtg Summary: ML16193A591; Handouts: ML16193A594 OFFICE DORL/LPL3-1/PM DORL/LPL3-1/LA DORL/LPL3-1 /BC DORL/LPL3-1 /PM NAME ADietrich SRohrer DWrona ADietrich DATE 7/11/2016 7/12/2016 7/15/2016 7/15/2016