Summary of February 6, 2020, Teleconference with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2
ML20041C949
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 02/13/2020
From: Robert Kuntz
Plant Licensing Branch III
To: Gebbie J
Indiana Michigan Power Co
Kuntz R
References
EPID L-2020-LRM-0006
Download: ML20041C949 (4)


Text

February 13, 2020 LICENSEE: Indiana Michigan Power Company, LLC FACILITY: Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2

SUBJECT:

SUMMARY

OF FEBRUARY 6, 2020, TELECONFERENCE WITH INDIANA MICHIGAN POWER COMPANY REGARDING DONALD C. COOK NUCLEAR PLANT, UNIT NOS. 1 AND 2 (EPID L-2020-LRM-0006)

On February 6, 2020, a Category I public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Indiana Michigan Power Company (the licensee) via teleconference. No regulatory decisions were made at this meeting.

The purpose of the meeting was to discuss planned license amendment requests (LARs) for Donald C. Cook Nuclear Plant (CNP), Unit Nos. 1 and 2. The LARs would update the pressure temperature (P-T) limit curves and the low temperature over-pressurization protection (LTOP) analysis. The meeting notice, dated January 24, 2020, and agenda are available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML20024D649. A list of attendees is provided as Enclosure 1.

The licensee presented information on the planned amendments. The licensee indicated that the planned amendment for CNP, Unit No. 2, was not needed until a later date. Therefore, the licensee plans to submit an amendment in the near term for CNP, Unit No. 1, and a similar amendment for CNP, Unit No. 2, later. The planned amendment for CNP, Unit No. 1, would revise the P-T curves from the current 32 effective full-power years (EFPY) to 48 EFPY. The current 32 EFPY P-T curves are anticipated to no longer be valid beyond February 2021. The licensee indicated that the planned amendment would be submitted in early April 2020. The NRC staff asked the licensee why the LAR would not be submitted sooner. The licensee indicated that additional analysis related to the LTOP needed to be completed prior to submitting the LARs. The NRC staff indicated that the LAR should be submitted as soon as practical to allow as much time as possible to complete the review to meet the need date of February 2021.

No members of the public participated in the meeting.

Please direct any inquiries to me at 301-415-3733, or Robert.Kuntz@nrc.gov.

Sincerely,

/RA/

Robert F. Kuntz, Senior Project Manager Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-315 and 50-316

Enclosure:

List of Attendees cc: Listserv

LIST OF ATTENDEES FEBRUARY 6, 2020, PUBLIC MEETING WITH I&M DONALD C. COOK NUCLEAR PLANT, UNIT NOS. 1 AND 2 PLANNED LICENSE AMENDMENT REQUEST RELATED TO PRESSURE TEMPERATURE LIMITS AND LOW TEMPERATURE OVER-PRESSURIZATION PROTECTION Name Organization Robert Kuntz Nuclear Regulatory Commission (NRC)

Hippolito Gonzalez NRC Carolyn Fairbanks NRC Muhammad Razzaque NRC Helen Levendosky Indiana Michigan Power Company (I&M)

Joseph Tanko I&M Derek Simpson I&M Paul Meilstrup I&M Doug Badgero I&M David Aubrey I&M David Williams I&M Brett Lynch Westinghouse (contractor for licensee)

Jianwei Chen Westinghouse Andy Hawk Westinghouse Tom Joseph Westinghouse Bryan Jaskiewicz Westinghouse Luke Mitchell Westinghouse Enclosure

ML20041C949 *via e-mail OFFICE NRR/DORL/LPL3/PM NRR/DORL/LPL3/LA NRR/DORL/LPL3/BC NRR/DORL/LPL3/PM NAME RKuntz SRohrer NSalgado RKuntz DATE 02/13/2020 02/12/2020 02/13/2020 02/13/2020