ML17081A453: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 25: | Line 25: | ||
City: BLUE BELL Agreement State: Yes County: License#: | City: BLUE BELL Agreement State: Yes County: License#: | ||
State: PA NRC Notified by: ARMAND LAUZON Notifications: SILAS KENNEDY R1DO HQ Ops Officer: JEFF HERRERA LADONNA ~UGGS R2DO Emergency Class: NON EMERGENCY AARON McGRAW R3DO 10 CFR Section: GREG WERNER R4DO 21.21 (a)(2) INTERIM EVAL OF DEVIATION PART 21/50.55 REACTORS EMAIL PART 21 MATERIALS EMAIL PART 21 - PLASTIC JAR DEDICATION SAMPLING The following is an excerpt of a part 21 re.ceived via email: | State: PA NRC Notified by: ARMAND LAUZON Notifications: SILAS KENNEDY R1DO HQ Ops Officer: JEFF HERRERA LADONNA ~UGGS R2DO Emergency Class: NON EMERGENCY AARON McGRAW R3DO 10 CFR Section: GREG WERNER R4DO 21.21 (a)(2) INTERIM EVAL OF DEVIATION PART 21/50.55 REACTORS EMAIL PART 21 MATERIALS EMAIL PART 21 - PLASTIC JAR DEDICATION SAMPLING The following is an excerpt of a part 21 re.ceived via email: | ||
"The purpose of this letter is to provide the NRG an interim report in general conformity to the requirements of | "The purpose of this letter is to provide the NRG an interim report in general conformity to the requirements of 10CFR Part 21.21 (a)(2). During an internal audit in November 2016, the sampling plan for dedication of plastic jars used in 1E battery cells was reviewed. Two lot numbers are associated with each plastic jar, a material lot number and a molding number. A material lot may encompass several molding lots. The dedication sampling plan was based on the material lot, and may not have properly sampled variations in critical characteristics generated b) molding lots. An analysis of historical data is underway to determine whether any deviations to specifications for critical characteristics may have occurred, and whether these possible deviations could represent a defect as defined by Part 21. C&D expects that this analysis will be completed by March 20, 2017. | ||
The facilities where the components have been supplied are: | The facilities where the components have been supplied are: | ||
Arkansas Nuclear One, Limerick, Beaver Valley, Millstone, Braidwood, Monticello, Browns Ferry, Nine Mile Point, Byron, Oconee, Clinton, Palisades, Columbia, Perry, Cook, Point Beach, Cooper, Prairie Island, Crystal River, River Bend, Diablo Canyon, Robinson, Duane Arnold, Salem, Farley, Sequoyah, Fermi, St. Lucie, Fitzpatrick, Summer, FLCalhoun, Susquehanna, Grand Gulf, Three Mile Island, Harris, US Navy, Hatch, Vogtle, Hope Creek, Vermont Yankee, Indian Point, Waterford, Watts Bar, LaSalle "If you have any questions or wish to discuss this matter or this report, please contact "Robert Malley | Arkansas Nuclear One, Limerick, Beaver Valley, Millstone, Braidwood, Monticello, Browns Ferry, Nine Mile Point, Byron, Oconee, Clinton, Palisades, Columbia, Perry, Cook, Point Beach, Cooper, Prairie Island, Crystal River, River Bend, Diablo Canyon, Robinson, Duane Arnold, Salem, Farley, Sequoyah, Fermi, St. Lucie, Fitzpatrick, Summer, FLCalhoun, Susquehanna, Grand Gulf, Three Mile Island, Harris, US Navy, Hatch, Vogtle, Hope Creek, Vermont Yankee, Indian Point, Waterford, Watts Bar, LaSalle "If you have any questions or wish to discuss this matter or this report, please contact "Robert Malley |
Revision as of 13:17, 10 November 2019
ML17081A453 | |
Person / Time | |
---|---|
Site: | Beaver Valley, Millstone, Hatch, Monticello, Browns Ferry, Salem, Oconee, Nine Mile Point, Palisades, Perry, Indian Point, Fermi, Harris, Saint Lucie, Point Beach, Watts Bar, Hope Creek, Grand Gulf, Cooper, Sequoyah, Byron, Arkansas Nuclear, Three Mile Island, Braidwood, Susquehanna, Summer, Prairie Island, Columbia, Brunswick, Limerick, River Bend, Vermont Yankee, Diablo Canyon, Vogtle, Waterford, Farley, Robinson, Clinton, Cook, Fort Calhoun, FitzPatrick, LaSalle, 05000001 |
Issue date: | 03/20/2017 |
From: | Lauzon A C&D Technologies |
To: | Jeffrey Herrera Office of Nuclear Reactor Regulation |
References | |
52502 | |
Download: ML17081A453 (3) | |
Text
..
0312012017 U.S. Nuclear Regulatory Commission Operations Center Event Report Pagel
- -This Event has been retracted!!! ***This Event has been retracted !!!
Part 21 (PAR) . Event#, 52502 Rep Org: C&D TECHNOLOGIES, INC. Notification Date I Time: 01/20/2017 16:01 (EST)
'
Supplier: C&D TECHNOLOGIES Event Date I Time: 11/23/2016 (EST)
Last Modification: 03/20/2017 Region: 1 Docket#:
City: BLUE BELL Agreement State: Yes County: License#:
State: PA NRC Notified by: ARMAND LAUZON Notifications: SILAS KENNEDY R1DO HQ Ops Officer: JEFF HERRERA LADONNA ~UGGS R2DO Emergency Class: NON EMERGENCY AARON McGRAW R3DO 10 CFR Section: GREG WERNER R4DO 21.21 (a)(2) INTERIM EVAL OF DEVIATION PART 21/50.55 REACTORS EMAIL PART 21 MATERIALS EMAIL PART 21 - PLASTIC JAR DEDICATION SAMPLING The following is an excerpt of a part 21 re.ceived via email:
"The purpose of this letter is to provide the NRG an interim report in general conformity to the requirements of 10CFR Part 21.21 (a)(2). During an internal audit in November 2016, the sampling plan for dedication of plastic jars used in 1E battery cells was reviewed. Two lot numbers are associated with each plastic jar, a material lot number and a molding number. A material lot may encompass several molding lots. The dedication sampling plan was based on the material lot, and may not have properly sampled variations in critical characteristics generated b) molding lots. An analysis of historical data is underway to determine whether any deviations to specifications for critical characteristics may have occurred, and whether these possible deviations could represent a defect as defined by Part 21. C&D expects that this analysis will be completed by March 20, 2017.
The facilities where the components have been supplied are:
Arkansas Nuclear One, Limerick, Beaver Valley, Millstone, Braidwood, Monticello, Browns Ferry, Nine Mile Point, Byron, Oconee, Clinton, Palisades, Columbia, Perry, Cook, Point Beach, Cooper, Prairie Island, Crystal River, River Bend, Diablo Canyon, Robinson, Duane Arnold, Salem, Farley, Sequoyah, Fermi, St. Lucie, Fitzpatrick, Summer, FLCalhoun, Susquehanna, Grand Gulf, Three Mile Island, Harris, US Navy, Hatch, Vogtle, Hope Creek, Vermont Yankee, Indian Point, Waterford, Watts Bar, LaSalle "If you have any questions or wish to discuss this matter or this report, please contact "Robert Malley
- VP Quality and Process Engineering bmalley@cdtechno.com
0312012017 U.S. Nuclear Regulatory Commission Operations Center Event Report Page2 (215) 619-7830"
- RETRACTION ON 3/20/17 AT 1602 EDT FROM ROBERT MALLEY TO DONG PARK***
The following is an excerpt of a part 21 received via email:
"Based on this review the Interim. Report (NRC Log No. 2016-00-06) dated January 20, 2017 is retracted. If you have any questions or wish to discuss this matter, please contact *
"Robert Malley VP Quality and Process Engi'neering bmalley@cdtechno.com (215) 619-7830" Notified R1 DO (Bickett), R2DO (Ernstes), R3DO (Orlikowski), R4DO (Drake), Part 21/50.55 Reactors group, and Part 21 Materials group.