IR 05000261/2012001: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(8 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 03/04/2013 | | issue date = 03/04/2013 | ||
| title = Annual Assessment Letter for H.B. Robinson Steam Electric Plant (NRC Inspection Report 05000261/2012001) | | title = Annual Assessment Letter for H.B. Robinson Steam Electric Plant (NRC Inspection Report 05000261/2012001) | ||
| author name = Musser R | | author name = Musser R | ||
| author affiliation = NRC/RGN-II/DRP/RPB4 | | author affiliation = NRC/RGN-II/DRP/RPB4 | ||
| addressee name = Gideon W | | addressee name = Gideon W | ||
| addressee affiliation = Carolina Power & Light Co | | addressee affiliation = Carolina Power & Light Co | ||
| docket = 05000261 | | docket = 05000261 | ||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION rch 4, 2013 | ||
==SUBJECT:== | |||
ANNUAL ASSESSMENT LETTER FOR H.B. ROBINSON STEAM ELECTRIC PLANT (NRC INSPECTION REPORT 05000261/2012001) | |||
==Dear Mr. Gideon,== | |||
On February 13, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of the H.B. Robinson Steam Electric Plant, Unit 2. The NRC reviewed the most recent quarterly Performance Indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2012 through December 31, 2012. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. | |||
The NRC determined that overall, H.B. Robinson Steam Electric Plant, Unit 2 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at H.B. Robinson Steam Electric Plant, Unit 2 during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility. | |||
The enclosed inspection plan lists the inspections scheduled through June 30, 2014. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence. | |||
We also plan on conducting several infrequently performed inspections which include: Operator Licensing Exams, TI 2515/182 and Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks, Phase 2. In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | |||
Please contact me at 404-997-4603 with any questions you may have regarding this letter. | |||
Sincerely, | |||
/RA/ | |||
Randall A. Musser, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket No.: 50-261 License No.: DPR-23 Enclosure: Robinson Inspection/Activity Plan (03/01/2013 - 06/30/2014) | |||
cc w/Encl: (See page 3) | |||
_________________________ X SUNSI REVIEW COMPLETE G FORM 665 ATTACHED OFFICE RII:DRP RII:DRP SIGNATURE JGW:/RA/ RXM:/RA/ | |||
NAME JWorosilo RMusser DATE 3/ /2013 3/ 3/ /2013 3/ /2013 3/ /2013 3/ /2013 3/ /2013 E-MAIL COPY? YES NO /20133/4/2013 YES NO YES NO YES NO YES NO YES NO YES NO cc:w/encl Division of Radiological Health Sharon Wheeler TN Dept. of Environment & Conservation Manager, Support Services 401 Church Street H B Robinson Steam Electric Plant Nashville, TN 37243-1532 Electronic Mail Distribution Donald W. Barker Brian C. McCabe Manager, Nuclear Oversight Manager, Nuclear Oversight H. B. Robinson Steam Electric Plant, Unit 2 Shearon Harris Nuclear Power Plant Progress Energy Progress Energy Electronic Mail Distribution Electronic Mail Distribution J. W. (Bill) Pitesa Richard Hightower Senior Vice President Supervisor Nuclear Operations Licensing/Regulatory Programs Duke Energy Corporation Progress Energy Electronic Mail Distribution Electronic Mail Distribution Lara S. Nichols Joseph W. Donahue Deputy General Counsel Vice President Duke Energy Corporation Nuclear Oversight Electronic Mail Distribution Progress Energy Electronic Mail Distribution M. Christopher Nolan Director - Regulatory Affairs David T. Conley General Office Senior Counsel Duke Energy Corporation Legal Department Electronic Mail Distribution Progress Energy Electronic Mail Distribution Mike Glover Director Site Operations John H. O'Neill, Jr. | |||
H. B. Robinson Steam Electric Plant Shaw, Pittman, Potts & Trowbridge Electronic Mail Distribution 2300 N. Street, NW Washington, DC 20037-1128 Richard Keith Holbrook Operations Manager Richard Haynes H. B. Robinson Steam Electric Plant Director, Division of Waste Management Electronic Mail Distribution Bureau of Land and Waste Management S.C. Department of Health and Sandra Threatt, Manager Environmental Control Nuclear Response and Emergency Electronic Mail Distribution Environmental Surveillance Bureau of Land and Waste Management Thomas Cosgrove Department of Health and Environmental Plant General Manager Control H.B. Robinson Steam Electric Plant, Unit 2 Electronic Mail Distribution Progress Energy Electronic Mail Distribution (cc:w/encl continued next page) (cc:w/encl. continued) | |||
Donna B. Alexander Manager, Nuclear Regulatory Affairs (interim) | |||
Progress Energy Electronic Mail Distribution Robert P. Gruber Executive Director Public Staff - NCUC 4326 Mail Service Center Raleigh, NC 27699-4326 W. Lee Cox, III Section Chief Radiation Protection Section N.C. Department of Environmental Commerce & Natural Resources Electronic Mail Distribution Mark Yeager Division of Radioactive Waste Mgmt. | |||
S.C. Department of Health and Environmental Control Electronic Mail Distribution Public Service Commission State of South Carolina P.O. Box 11649 Columbia, SC 29211 Chairman North Carolina Utilities Commission Electronic Mail Distribution Henry Curry Training Manager H.B. Robinson Steam Electric Plant, Unit 2 Progress Energy Electronic Mail Distribution Senior Resident Inspector U.S. Nuclear Regulatory Commission H. B. Robinson Steam Electric Plant 2112 Old Camden Rd Hartsville, SC 29550 John W. Flitter Director of Electric & Gas Regulation South Carolina Office of Regulatory Staff Electronic Mail Distribution Letter to William from Randall A. Musser dated March 4, 2013. | |||
SUBJECT: ANNUAL ASSESSMENT LETTER FOR H.B. ROBINSON STEAM ELECTRIC PLANT (NRC INSPECTION REPORT 05000261/2012001) | SUBJECT: ANNUAL ASSESSMENT LETTER FOR H.B. ROBINSON STEAM ELECTRIC PLANT (NRC INSPECTION REPORT 05000261/2012001) | ||
Distribution w/encl: | |||
C. Evans L. Douglas OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMRobinson Resource ROP Assessment Institute of Nuclear Power Operations (INPO) | |||
Page 1 of 1 Robinson 03/04/2013 08:30:15 Inspection / Activity Plan Report 22 03/01/2013 - 06/30/2014 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site CDBI - COMPONENT DESIGN BASES INSPECTION 8 2 03/18/2013 03/22/2013 IP 7111121 Component Design Bases Inspection 2 04/08/2013 04/12/2013 IP 7111121 Component Design Bases Inspection 2 04/22/2013 04/26/2013 IP 7111121 Component Design Bases Inspection 2 05/13/2013 05/17/2013 IP 7111121 Component Design Bases Inspection EP - EMERGENCY PREPAREDNESS EXERCISE 1 2 05/20/2013 05/24/2013 IP 7111407 Exercise Evaluation - Hostile Action (HA) Event 2 05/20/2013 05/24/2013 IP 71151 Performance Indicator Verification RP - RP PUBLIC RAD SAFETY BASELINE 2 2 05/20/2013 05/24/2013 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 2 05/20/2013 05/24/2013 IP 71124.07 Radiological Environmental Monitoring Program 2 05/20/2013 05/24/2013 IP 71151 Performance Indicator Verification OL EXAM - INITIAL EXAM PREP 3 2 07/08/2013 07/12/2013 V23392 ROBINSON/JULY 2013 INITIAL EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM WEEK 3 2 07/29/2013 08/02/2013 V23392 ROBINSON/JULY 2013 INITIAL EXAM AT POWER FACILITIES TI-182 - TI-182 BURIED PIPING/TANK - PHASE 2 1 2 08/26/2013 08/28/2013 IP 2515/182 Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping ISI - UNIT 2 INSERVICE INSPECTION 1 2 09/23/2013 09/27/2013 IP 7111108P Inservice Inspection Activities - PWR SGISI - UNIT 2 SG INSERVICE INSPECTION 1 2 09/30/2013 10/04/2013 IP 7111108P Inservice Inspection Activities - PWR RP - RAD HAZARDS ANALYSIS AND TRANSPORTATION 2 2 10/07/2013 10/11/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2 10/07/2013 10/11/2013 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 2 10/07/2013 10/11/2013 IP 71151 Performance Indicator Verification EP - EP PROGRAM INSPECTION 1 2 05/05/2014 05/09/2014 IP 7111402 Alert and Notification System Testing 2 05/05/2014 05/09/2014 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 2 05/05/2014 05/09/2014 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 2 05/05/2014 05/09/2014 IP 71151 Performance Indicator Verification Comments: | |||
This report does not include INPO and OUTAGE activities. | |||
This report shows only on-site and announced inspection procedures. Enclosure | |||
}} | }} |
Latest revision as of 21:28, 4 November 2019
ML13063A209 | |
Person / Time | |
---|---|
Site: | Robinson |
Issue date: | 03/04/2013 |
From: | Randy Musser NRC/RGN-II/DRP/RPB4 |
To: | William Gideon Carolina Power & Light Co |
References | |
IR-12-001 | |
Download: ML13063A209 (7) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION rch 4, 2013
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR H.B. ROBINSON STEAM ELECTRIC PLANT (NRC INSPECTION REPORT 05000261/2012001)
Dear Mr. Gideon,
On February 13, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of the H.B. Robinson Steam Electric Plant, Unit 2. The NRC reviewed the most recent quarterly Performance Indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2012 through December 31, 2012. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
The NRC determined that overall, H.B. Robinson Steam Electric Plant, Unit 2 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at H.B. Robinson Steam Electric Plant, Unit 2 during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The enclosed inspection plan lists the inspections scheduled through June 30, 2014. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.
We also plan on conducting several infrequently performed inspections which include: Operator Licensing Exams, TI 2515/182 and Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks, Phase 2. In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at 404-997-4603 with any questions you may have regarding this letter.
Sincerely,
/RA/
Randall A. Musser, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket No.: 50-261 License No.: DPR-23 Enclosure: Robinson Inspection/Activity Plan (03/01/2013 - 06/30/2014)
cc w/Encl: (See page 3)
_________________________ X SUNSI REVIEW COMPLETE G FORM 665 ATTACHED OFFICE RII:DRP RII:DRP SIGNATURE JGW:/RA/ RXM:/RA/
NAME JWorosilo RMusser DATE 3/ /2013 3/ 3/ /2013 3/ /2013 3/ /2013 3/ /2013 3/ /2013 E-MAIL COPY? YES NO /20133/4/2013 YES NO YES NO YES NO YES NO YES NO YES NO cc:w/encl Division of Radiological Health Sharon Wheeler TN Dept. of Environment & Conservation Manager, Support Services 401 Church Street H B Robinson Steam Electric Plant Nashville, TN 37243-1532 Electronic Mail Distribution Donald W. Barker Brian C. McCabe Manager, Nuclear Oversight Manager, Nuclear Oversight H. B. Robinson Steam Electric Plant, Unit 2 Shearon Harris Nuclear Power Plant Progress Energy Progress Energy Electronic Mail Distribution Electronic Mail Distribution J. W. (Bill) Pitesa Richard Hightower Senior Vice President Supervisor Nuclear Operations Licensing/Regulatory Programs Duke Energy Corporation Progress Energy Electronic Mail Distribution Electronic Mail Distribution Lara S. Nichols Joseph W. Donahue Deputy General Counsel Vice President Duke Energy Corporation Nuclear Oversight Electronic Mail Distribution Progress Energy Electronic Mail Distribution M. Christopher Nolan Director - Regulatory Affairs David T. Conley General Office Senior Counsel Duke Energy Corporation Legal Department Electronic Mail Distribution Progress Energy Electronic Mail Distribution Mike Glover Director Site Operations John H. O'Neill, Jr.
H. B. Robinson Steam Electric Plant Shaw, Pittman, Potts & Trowbridge Electronic Mail Distribution 2300 N. Street, NW Washington, DC 20037-1128 Richard Keith Holbrook Operations Manager Richard Haynes H. B. Robinson Steam Electric Plant Director, Division of Waste Management Electronic Mail Distribution Bureau of Land and Waste Management S.C. Department of Health and Sandra Threatt, Manager Environmental Control Nuclear Response and Emergency Electronic Mail Distribution Environmental Surveillance Bureau of Land and Waste Management Thomas Cosgrove Department of Health and Environmental Plant General Manager Control H.B. Robinson Steam Electric Plant, Unit 2 Electronic Mail Distribution Progress Energy Electronic Mail Distribution (cc:w/encl continued next page) (cc:w/encl. continued)
Donna B. Alexander Manager, Nuclear Regulatory Affairs (interim)
Progress Energy Electronic Mail Distribution Robert P. Gruber Executive Director Public Staff - NCUC 4326 Mail Service Center Raleigh, NC 27699-4326 W. Lee Cox, III Section Chief Radiation Protection Section N.C. Department of Environmental Commerce & Natural Resources Electronic Mail Distribution Mark Yeager Division of Radioactive Waste Mgmt.
S.C. Department of Health and Environmental Control Electronic Mail Distribution Public Service Commission State of South Carolina P.O. Box 11649 Columbia, SC 29211 Chairman North Carolina Utilities Commission Electronic Mail Distribution Henry Curry Training Manager H.B. Robinson Steam Electric Plant, Unit 2 Progress Energy Electronic Mail Distribution Senior Resident Inspector U.S. Nuclear Regulatory Commission H. B. Robinson Steam Electric Plant 2112 Old Camden Rd Hartsville, SC 29550 John W. Flitter Director of Electric & Gas Regulation South Carolina Office of Regulatory Staff Electronic Mail Distribution Letter to William from Randall A. Musser dated March 4, 2013.
SUBJECT: ANNUAL ASSESSMENT LETTER FOR H.B. ROBINSON STEAM ELECTRIC PLANT (NRC INSPECTION REPORT 05000261/2012001)
Distribution w/encl:
C. Evans L. Douglas OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMRobinson Resource ROP Assessment Institute of Nuclear Power Operations (INPO)
Page 1 of 1 Robinson 03/04/2013 08:30:15 Inspection / Activity Plan Report 22 03/01/2013 - 06/30/2014 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site CDBI - COMPONENT DESIGN BASES INSPECTION 8 2 03/18/2013 03/22/2013 IP 7111121 Component Design Bases Inspection 2 04/08/2013 04/12/2013 IP 7111121 Component Design Bases Inspection 2 04/22/2013 04/26/2013 IP 7111121 Component Design Bases Inspection 2 05/13/2013 05/17/2013 IP 7111121 Component Design Bases Inspection EP - EMERGENCY PREPAREDNESS EXERCISE 1 2 05/20/2013 05/24/2013 IP 7111407 Exercise Evaluation - Hostile Action (HA) Event 2 05/20/2013 05/24/2013 IP 71151 Performance Indicator Verification RP - RP PUBLIC RAD SAFETY BASELINE 2 2 05/20/2013 05/24/2013 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 2 05/20/2013 05/24/2013 IP 71124.07 Radiological Environmental Monitoring Program 2 05/20/2013 05/24/2013 IP 71151 Performance Indicator Verification OL EXAM - INITIAL EXAM PREP 3 2 07/08/2013 07/12/2013 V23392 ROBINSON/JULY 2013 INITIAL EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM WEEK 3 2 07/29/2013 08/02/2013 V23392 ROBINSON/JULY 2013 INITIAL EXAM AT POWER FACILITIES TI-182 - TI-182 BURIED PIPING/TANK - PHASE 2 1 2 08/26/2013 08/28/2013 IP 2515/182 Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping ISI - UNIT 2 INSERVICE INSPECTION 1 2 09/23/2013 09/27/2013 IP 7111108P Inservice Inspection Activities - PWR SGISI - UNIT 2 SG INSERVICE INSPECTION 1 2 09/30/2013 10/04/2013 IP 7111108P Inservice Inspection Activities - PWR RP - RAD HAZARDS ANALYSIS AND TRANSPORTATION 2 2 10/07/2013 10/11/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2 10/07/2013 10/11/2013 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 2 10/07/2013 10/11/2013 IP 71151 Performance Indicator Verification EP - EP PROGRAM INSPECTION 1 2 05/05/2014 05/09/2014 IP 7111402 Alert and Notification System Testing 2 05/05/2014 05/09/2014 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 2 05/05/2014 05/09/2014 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 2 05/05/2014 05/09/2014 IP 71151 Performance Indicator Verification Comments:
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures. Enclosure