IR 05000261/2012403

From kanterella
Jump to navigation Jump to search
IR 05000261-12-403, 4/12/2012, H. B. Robinson Steam Electric Plant Unit 2, Cover Letter
ML12128A430
Person / Time
Site: Robinson Duke energy icon.png
Issue date: 05/04/2012
From: Binoy Desai
NRC/RGN-II/DRS/PSB2
To: William Gideon
Progress Energy Co
References
IR-12-403
Download: ML12128A430 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION May 4, 2012

SUBJECT:

H.B. ROBINSON STEAM ELECTRIC PLANT UNIT 2 - NRC SECURITY INSPECTION REPORT 05000261/2012403

Dear Mr. Gideon:

On April 12, 2012, the U. S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your H.B. Robinson Steam Electric Plant, Unit 2. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed report documents the inspection results which were discussed with Mr.

T. Cosgrove and other members of your staff.

This inspection examined activities conducted under your license as they relate to security and compliance with the Commission=s rules and regulations, and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

No NRC-identified or self-revealing findings were idenfied during this inspection. However, one licensee-identified violation which was determined to be of very low safety significance is listed in this report. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2, of the NRC Enforcement Policy. If you contest any NCV violation in the enclosed report, you should provide a response within 30 days of the date of this inspection report, with the basis of your denial, to the Nuclear Regulatory Commission, Administrator, Region II; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at the H.B. Robinson Steam Electric Plant.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS. Progress Energy 2 ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter=s enclosure will not be available for public inspection.

In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC=s document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response ASecurity Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390 (b)(1).

Sincerely,

/RA/

Binoy Desai, Chief Plant Support Branch 2 Division of Reactor Safety Docket No.: 50-261 License No.: DPR-23 Enclosure:

Inspection Report 05000261/2012403 w/Attachment Supp. Info. (OUO)

cc w/encl: (See page 3) ML12128A430 X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED OFFICE RII: DRS/PSB2 RII: DRS/PSB2 RII: DRS/PSB2 RII: DRP/BR4 SIGNATURE RA/AR RA/JT RA/BD RA/RM NAME A. Richardson J. Tornow B. Desai R. Musser DATE 05/02/2012 05/02/2012 05/02/2012 05/03/2012 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO NAME: Progress Energy 3 cc w/Encl:

Donald W. Barker Christos Kamilaris Manager, Nuclear Oversight Manager, Support Services H. B. Robinson Steam Electric Plant, Unit 2 H.B. Robinson Steam Electric Plant, Unit 2 Progress Energy Progress Energy 3581 West Entrance Rd. 3581 West Entrance Rd.

Hartsville, SC 29550 Hartsville, SC 29550 Richard Hightower Joseph W. Donahue Supervisor Vice President Licensing/Regulatory Programs Nuclear Oversight Progress Energy Progress Energy H. B. Robinson Steam Electric Plant TPP-15 3581 West Entrance Road 100 E. Davie Street Hartsville, SC 29550 Raleigh, NC 27601 Robert J. Duncan II Kelvin Henderson Vice President General Manager Nuclear Operations Nuclear Fleet Operations Progress Energy Progress Energy TPP-15 TPP-15 100 E. Davie Street 100 E. Davie Street Raleigh, NC 27601 Raleigh, NC 27601 William Edward T. O'Neil Vice President Director H. B. Robinson Steam Electric Plant, Unit 2 Nuclear Protective Serv and Emergency Progress Energy Preparedness 3581 West Entrance Rd. Progress Energy Hartsville, SC 29550 TPP-15 100 East Davie Street Thomas Cosgrove Raleigh, NC 27601 Plant General Manager H.B. Robinson Steam Electric Plant, Unit 2 Scott D. West Progress Energy Superintendent Security 3581 West Entrance Rd. H. B. Robinson Steam Electric Plant Hartsville, SC 29550 Progress Energy 3581 West Entrance Road Hartsville, SC 29550