IR 05000261/2012404

From kanterella
Jump to navigation Jump to search
IR 05000261-12-404, on 08/09/2012, H. B. Robinson Steam Electric Plant Unit 2 - NRC Security Inspection Report
ML12248A410
Person / Time
Site: Robinson 
Issue date: 08/31/2012
From: Binoy Desai
NRC/RGN-II/DRS/PSB2
To: William Gideon
Progress Energy Co
References
IR-12-404
Download: ML12248A410 (4)


Text

August 31, 2012

SUBJECT:

H.B. ROBINSON STEAM ELECTRIC PLANT UNIT 2 - NRC SECURITY INSPECTION REPORT 05000261/2012404

Dear Mr. Gideon:

On August 9, 2012, the U. S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your H. B. Robinson Nuclear Steam Electric Plant, Unit 2. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed report documents the inspection results, which were discussed with you and other members of your staff.

This inspection examined activities conducted under your license as they relate to security, and compliance with the Commission=s rules and regulations, and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

Based on the results of this inspection, no findings were identified.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter=s enclosure will not be available for public inspection.

In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC=s document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response ASecurity Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390 (b)(1).

Sincerely,

/RA/

Binoy A. Desai, Chief Plant Support Branch 2 Division of Reactor Safety

Docket No.

50-261 License No. DPR-23

Enclosure:

Inspection Report 05000261/2012404 w/Attachment Supp. Info. (OUO)

cc w/encl: (See page 3)

ML12248A410

X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED OFFICE RII: DRS RII: DRS RII: DRS RII: DRS RII: DRS RII: DRS RII: DRP SIGNATURE RA/JG RA/KD RA/JW RA/JT For RP RA/JS For AT RA/BD RA/RM NAME J. Graham K.Davis J. Wallo R. Patterson A. True B. Desai R. Musser DATE 08/27/2012 08/24/2012 08/27/2012 08/30/2012 08/27/2012 08/26/2012 08/31/2012 E-MAIL COPY?

YES NO YES NO YES NO YES NO YES NO YES NO YES NO cc w/Encl:

Donald W. Barker Manager, Nuclear Oversight H. B. Robinson Steam Electric Plant, Unit 2 Progress Energy 3581 West Entrance Rd.

Hartsville, SC 29550

Richard Hightower Supervisor Licensing/Regulatory Programs Progress Energy H. B. Robinson Steam Electric Plant 3581 West Entrance Road Hartsville, SC 29550

William Vice President H. B. Robinson Steam Electric Plant, Unit 2 Progress Energy 3581 West Entrance Rd.

Hartsville, SC 29550

Thomas Cosgrove Plant General Manager H.B. Robinson Steam Electric Plant, Unit 2 Progress Energy 3581 West Entrance Rd.

Hartsville, SC 29550

Christos Kamilaris Manager, Support Services H.B. Robinson Steam Electric Plant, Unit 2 Progress Energy 3581 West Entrance Rd.

Hartsville, SC 29550

Joseph W. Donahue Vice President Nuclear Oversight Progress Energy TPP-15 100 E. Davie Street Raleigh, NC 27601

Edward T. O'Neil Director Nuclear Protective Service and Emergency Preparedness Progress Energy TPP-15 100 East Davie Street Raleigh, NC 27601

Scott D. West Superintendent Security H. B. Robinson Steam Electric Plant Progress Energy 3581 West Entrance Road Hartsville, SC 29550