ML17319A515: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(4 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 07/10/1980
| issue date = 07/10/1980
| title = Submits Reply to IE Bulletin 80-10 Re Contamination of Nonradioactive Sys & Potential for Releases.Adequate Monitoring Is Performed Routinely on Sys to Preclude Release Problems.No Further Action Required
| title = Submits Reply to IE Bulletin 80-10 Re Contamination of Nonradioactive Sys & Potential for Releases.Adequate Monitoring Is Performed Routinely on Sys to Preclude Release Problems.No Further Action Required
| author name = MALONEY G P
| author name = Maloney G
| author affiliation = INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
| author affiliation = INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
| addressee name = KEPPLER J G
| addressee name = Keppler J
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
| docket = 05000315, 05000316
| docket = 05000315, 05000316
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:~14ig8gINDiANA5MICHIGANELECTRICCOMPANYP.O.BOX18BOWLINGGREENSTATIONNEWYORK,N.Y.10004July10,1980AEP:NRC:00415DonaldC.CookNuclearPlantUnitNos.1and2DocketNos.50-315and50-316LicenseNos.DPR-58andDPR-74
{{#Wiki_filter:~   14ig8g INDiANA 5 MICHIGAN ELECTRIC COMPANY P. O. BOX 18 BO WL IN G G R E EN ST ATION NEW YORK, N. Y. 10004 July 10, 1980 AEP:NRC:00415 Donald C. Cook Nuclear Plant Unit Nos.       1  and 2 Docket Nos. 50-315 and 50-316 License Nos. DPR-58 and DPR-74


==SUBJECT:==
==SUBJECT:==
RESPONSETOIEBULLETIN80-10Nr.JamesG.Keppler,DirectorRegionIIIU.S.NuclearRegulatoryCommission799RooseveltRoadGlenEllyn,Illinois60137
RESPONSE    TO  IE BULLETIN 80-10 Nr. James  G. Keppler, Director Region  III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen  Ellyn, Illinois      60137


==DearMr.Keppler:==
==Dear Mr. Keppler:==
InresponsetoIEBulletinNo.80-10,wehavecompletedafacilitydesignandoperationreviewtoidentifysystemsthatareconsideredasnon-radioactive,butcouldpossiblybecomeradioactivethroughinter-faceswithradioactivesystems.Suchsystemsinclude:1.MainSteam,AuxiliarySteamandAssociatedSystems2.CondensateSystem3.FeedwaterSystem4.HiscellaneousDrains,VentsandSumps5.MakeupWaterSystem-DemineralizedMater6.EssentialServiceWaterSystem7.ComponentCoolingMaterSystem8.PlantAirSystem,and9.MellWaterSystemOurreviewindicatedthatadequatesampling/analysisormonitoringareperformedroutinelyontheabovelistedsystemstoprecludetheproblemsidentified'nBulletin80-10.Inadditiontotheexistingsampling/analysisandmonitoringsystems,thefollowingsamplepointswillbemonitoredweeklyforgrossbetagammaandtritiumtoexpeditedetectionofcontamination:1.TotalHotMell2.HeatingBoilerWater,and3.ColdLegDemineralizer800v230RK)


-Mr.J.G.Keppler1-2-AEP:NRC:00415Basedonthisreview,itisconcludedthatnofurtheractionisrequiredtorespondtotheactionitemsidentifiedinthesaidBulletin.Vertruyyours,GPM/emccc:R.C.CallenG.CharnoffJohnE.DolanR.R.JurgensenD.V.Shaller-BridgmanR.S.Hunter.MaloeyVicePres'dent}}
In response to IE Bulletin No. 80-10, we have completed a facility design and operation review to identify systems that are considered as non-radioactive, but could possibly become radioactive through inter-faces with radioactive systems. Such systems include:
: 1. Main Steam, Auxiliary Steam and Associated Systems
: 2. Condensate System
: 3. Feedwater System
: 4. Hiscellaneous Drains, Vents and Sumps
: 5. Makeup Water System - Demineralized Mater
: 6. Essential Service Water System
: 7. Component Cooling Mater System
: 8. Plant Air System, and
: 9. Mell Water System Our review indicated that adequate sampling/analysis or monitoring are performed routinely on the above listed systems to preclude the problems identified'n Bulletin 80-10. In addition to the existing sampling/analysis and monitoring systems, the following sample points will be monitored weekly for gross beta gamma and tritium to expedite detection of contamination:
: 1. Total Hot Mell
: 2. Heating Boiler Water, and
: 3. Cold Leg Demineralizer 800v 230 RK)
 
  -Mr. J. G. Keppler                                    AEP:NRC:00415 1
Based on this review, it is concluded that no further action is required to respond to the action items identified in the said Bulletin.
Ver  tru y yours,
                                                . Malo ey GPM/emc                                  Vice Pres'dent cc:   R. C. Callen G. Charnoff John E. Dolan R. R. Jurgensen D. V. Shaller - Bridgman R. S. Hunter}}

Latest revision as of 07:50, 29 October 2019

Submits Reply to IE Bulletin 80-10 Re Contamination of Nonradioactive Sys & Potential for Releases.Adequate Monitoring Is Performed Routinely on Sys to Preclude Release Problems.No Further Action Required
ML17319A515
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 07/10/1980
From: Maloney G
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
IEB-80-10, NUDOCS 8007220080
Download: ML17319A515 (4)


Text

~ 14ig8g INDiANA 5 MICHIGAN ELECTRIC COMPANY P. O. BOX 18 BO WL IN G G R E EN ST ATION NEW YORK, N. Y. 10004 July 10, 1980 AEP:NRC:00415 Donald C. Cook Nuclear Plant Unit Nos. 1 and 2 Docket Nos. 50-315 and 50-316 License Nos. DPR-58 and DPR-74

SUBJECT:

RESPONSE TO IE BULLETIN 80-10 Nr. James G. Keppler, Director Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137

Dear Mr. Keppler:

In response to IE Bulletin No. 80-10, we have completed a facility design and operation review to identify systems that are considered as non-radioactive, but could possibly become radioactive through inter-faces with radioactive systems. Such systems include:

1. Main Steam, Auxiliary Steam and Associated Systems
2. Condensate System
3. Feedwater System
4. Hiscellaneous Drains, Vents and Sumps
5. Makeup Water System - Demineralized Mater
6. Essential Service Water System
7. Component Cooling Mater System
8. Plant Air System, and
9. Mell Water System Our review indicated that adequate sampling/analysis or monitoring are performed routinely on the above listed systems to preclude the problems identified'n Bulletin 80-10. In addition to the existing sampling/analysis and monitoring systems, the following sample points will be monitored weekly for gross beta gamma and tritium to expedite detection of contamination:
1. Total Hot Mell
2. Heating Boiler Water, and
3. Cold Leg Demineralizer 800v 230 RK)

-Mr. J. G. Keppler AEP:NRC:00415 1

Based on this review, it is concluded that no further action is required to respond to the action items identified in the said Bulletin.

Ver tru y yours,

. Malo ey GPM/emc Vice Pres'dent cc: R. C. Callen G. Charnoff John E. Dolan R. R. Jurgensen D. V. Shaller - Bridgman R. S. Hunter