ML17331A758: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 07/01/1981
| issue date = 07/01/1981
| title = Requests Extension of Implementation Date for Public Notification Sys to 810807.Extension Necessary Due to Delays in Equipment Receipt
| title = Requests Extension of Implementation Date for Public Notification Sys to 810807.Extension Necessary Due to Delays in Equipment Receipt
| author name = HUNTER R S
| author name = Hunter R
| author affiliation = INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
| author affiliation = INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
| addressee name = DENTON H R
| addressee name = Denton H
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| docket = 05000315, 05000316
| docket = 05000315, 05000316
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:REGULATORYINFORMATIONDISTRIBUTIONSYSTEM(RIDS)ACCESSIONNBR:8107080450DOC~DATE:81/07/01NOTARIZED:NODOCKET&#xb9;FACIL:50"315DonaldC,CookNuclearPowerPlantpUnit1~Indiana805000350316DonaldC~CookibuclearPowerPlant<Unit2<Indiana~0500316AUTH,NAMEAUTHORAFFILIATIONHUNTERgR,SeIndiana8MichiganE)ectricCo,RECIP~NAMERECIPIENTAFFILIATION'ENTONeH~REOfficeofNuclearReactorRegulationi'irector
{{#Wiki_filter:REGULATORY INFORMATION DISTRIBUTION SYSTEM          (RIDS)
ACCESSION NBR:8107080450              DOC ~ DATE: 81/07/01      NOTARIZED: NO        DOCKET  &#xb9; FACIL:50"315 Donald C, Cook Nuclear Power Plantp Unit 1~ Indiana                  8  050003 50 316 Donald C ~ Cook ibucl ear Power Plant< Uni t 2< Indiana           ~ 050 0316 AUTH, NAME              AUTHOR AFFILIATION HUNTERgR,Se              Indiana 8 Michigan E)ectr ic Co, REC IP ~ N AME          RECIPIENT AFFILIATION
'ENTONeH ~     RE          Office of Nuclear Reactor Regulationi'irector


==SUBJECT:==
==SUBJECT:==
Requestsextensionofimplementationcateforpublicnotificationsysto810807'xtensionnecessaryduetodelaysinequipmentreceipt~DISTRIBUTIONCODE:A001SCOPIESRECEIVED:LTRENCL'IZE'.~~TITLE:GeneralDistributionforafterIssuanceofOperatingLicenseNOTES:IFE:3copiesallmaterial.Send3copiesofallmaterialtoItIE~0500031505000316RECIPIENTIDCODE/NAMEACTION:ORB&#xb9;1BC04INTERNAL:D/DIRiHUMFAC08IIl,EObOELD11RADASSTBRT,N13COPIESLTRERECIPIENTIDCODE/NAMEDIRgDIYOFLICNRCPDR020SSBR10REGFILE01COPIESLTTRENCLEXTERNAL:ACRSNSIC09161051LPDRNTIS03TOTALNUSBEROFCOPIESREQUIRED:LTTRENCL
Requests extension of implementation cate for public notification sys to 810807 'xtension necessary due to delays in equipment receipt        ~
DISTRIBUTION CODE: A001S          COPIES RECEIVED:LTR      ENCL'IZE'.       ~
TITLE: General Distribution for after Issuance of Operating                  License NOTES:IFE:3 copies          all material.                                           05000315 Send 3      copies of all material to      ItIE ~                           05000316 RECIPIENT          COPIES            RECIPIENT          COPIES ID CODE/NAME          LT T,R EN        ID CODE/NAME        LTTR ENCL ACTION:       ORB   &#xb9;1 BC      04    13 INTERNAL: D/DIRiHUM FAC08                            DIRgDIY    OF  LIC I Il,E            Ob                  NRC PDR          02 OELD              11                  0        SS  BR 10 RAD ASST    BR                        REG    FILE      01 EXTERNAL: ACRS                  09    16    1      LPDR              03 NSIC              05      1          NTIS TOTAL NUSBER OF COPIES          REQUIRED: LTTR            ENCL


INDIANAIIMICHIGANELECTRICCOMPANYP.O.BOX18BOWLINGGREENSTATIONNEWYORK,N.Y.10004July1,1981AEP:NRC:0308HDonaldC.CookNuclearPlantUnitNos.1and2DocketNos.50-315and50-316LicenseNos.DPR-58andDPR-74PublicNotificationSystemImplementationDateExtensionRequestMr.HaroldR.Denton,DirectorOfficeofNuclearReactorRegulationU,S.NuclearRegulatoryCommissionWashington,D.C.20555
INDIANA II MICHIGAN ELECTRIC COMPANY P. O. BOX 18 BOWLING GREEN STATION NEW YORK, N. Y. 10004 July 1,     1981 AEP:NRC:0308H Donald C. Cook Nuclear Plant Unit Nos.         1  and 2 Docket Nos. 50-315 and 50-316 License Nos. DPR-58 and DPR-74 Public Notification System Implementation Date Extension Request Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U, S. Nuclear Regulatory Commission Washington, D. C. 20555


==DearMr.Denton:==
==Dear Mr. Denton:==
ThisletterrequestsanextensionuntilAugust7,1981oftheimplementationdateforapublicnotificationsystemasdelineatedinAppendixEto10CFRPart50.Thisextensionisnecessaryduetoun-foreseendelaysinreceiptofequipmentfromAlertingCommunicationsofAmerica(ACA),asirenmanufacturer.TheoriginalorderwithACAfortherequiredsystemequipmentwasplacedonApril1,1981followingafourmonthstudybyanAEPtaskforceonhowtoimplementthesystemforthe10mileemergencyplanningzonefortheDonaldC.CookNuclearPlant.Anadditionalsurveyoverasixmonthperiodwasalsoconductedbyaconsultanttodeterminethebestpossiblemeansofprovidingearlywarningandnotif-icationtothepublicaroundtheCookPlant.BoththeAEPstudyandtheconsultantsurveyconcludedthatuseofsirenswasthebestnotificationsystemfortheCookPlant.Mehavehadmeetingswithseverallocalgovernmentalagenciestoexplaintheconceptandoperationofthispublicinformationsystem.Specifically,representativesfromtheBerrienCountyBoardofCommissioners,Sheriff'sDepartment,TownshipSupervisors,localfireofficialsandmediarepresentativeshavebeeninformedofthesystemanditsoperationalaspects.OurpurchaseordertothesirenvendorspecifiedadeliveryofthesirenstobeginonJune1,1981inordertosupportthescheduledin-stallationcompletiondateofJuly1,1981.Mewerepreparedinthefield8107080450810701PDRADOCI405000315FPDR


Mr.HaroldR.Denton-2-AEP:NRC:0308HonthatdatetobeginimmediateinstallationofthesirenequipmentthroughtheuseofIndiana8MichiganElectricCompany'sBentonHarborServiceDivisionpersonnelwhohadbeenpreviouslytrainedspecificallyforthiswork.However,thecurrentschedulefromthevendorindicatespartialshipmentofourordertotakeplaceontheweeksofJune22,June29andJuly6.InstallationwouldcommenceimmediatelyuponreceiptandisexpectedtobecompletedbyAugust1,1981.BasedondiscussionswiththeBerrienCountySheriff'sDepartment(BCSD),ithasbeenestimatedthat.thetestingofthesystembyalocalcontractortotheBCSDforinstallingthecontrolsandtestingthesirenequipmentwilltakeanadditionalweek.Barringanyunforeseendelaysinequipmentdelivery,installationofthesirensandcontrolequipment,andtestingofthesystem,wewouldexpectthatthesystemwouldbeoperationalonapproximatelyAugust7,1981.RSH/osVerytrulyyours,R.S.HunterVicePresidentcc:JohnE.Dolan-ColumbusR.C.CallenG.CharnoffR.W.JurgensenD.V.Shaller-BridgmanNRCRegionIIIResidentInspector-BridgmanJoeWilliams,Jr.}}
This letter requests an extension until August 7, 1981 of the implementation date for a public notification system as delineated in Appendix E to 10 CFR Part 50. This extension is necessary due to un-foreseen delays in receipt of equipment from Alerting Communications of America (ACA), a siren manufacturer.          The original order with ACA for the required system equipment      was  placed  on  April 1, 1981 following a four month study by  an  AEP  task  force  on  how  to implement the system for the 10  mile emergency  planning  zone  for  the  Donald C. Cook Nuclear Plant. An additional survey over a six month period was also conducted by a consultant to determine the best possible means of providing early warning and notif-ication to the public around the Cook Plant. Both the AEP study and the consultant survey concluded that use of sirens was the best notification system for the Cook Plant.
Me  have had meetings with several          local governmental agencies to explain  the concept and operation of this            public  information system.
Specifically, representatives      from  the  Berrien    County  Board of Commissioners, Sheriff's Department, Township      Supervisors,      local  fire  officials and media representatives    have  been  informed    of  the  system  and  its operational aspects.
Our purchase    order to the siren vendor specified a delivery of the sirens to begin on June 1, 1981 in order            to support the scheduled in-stallation completion date of July 1, 1981.              Me were prepared in the field 8107080450 810701 PDR ADOCI4 05000315 F                PDR
 
Mr. Harold R. Denton                                       AEP:NRC:0308H on  that date to begin immediate installation of the siren equipment through the use of Indiana 8 Michigan Electric Company's Benton Harbor Service Division personnel who had been previously trained specifically for this work. However, the current schedule from the vendor indicates partial shipment of our order to take place on the weeks of June 22, June 29 and July 6. Installation would commence immediately upon receipt and is expected to be completed by August 1, 1981.
Based on discussions with the Berrien County Sheriff's Department (BCSD),it has been estimated that. the testing of the system by a local contractor to the BCSD for installing the controls and testing the siren equipment will take an additional week. Barring any unforeseen delays in equipment delivery, installation of the sirens and control equipment, and testing of the system, we would expect that the system would be operational on approximately August 7, 1981.
Very  truly yours, R. S. Hunter RSH/os                                    Vice President cc:   John E. Dolan   - Columbus R. C. Callen G. Charnoff R. W. Jurgensen D. V. Shaller - Bridgman NRC  Region III Resident  Inspector - Bridgman Joe  Williams, Jr.}}

Latest revision as of 14:36, 22 October 2019

Requests Extension of Implementation Date for Public Notification Sys to 810807.Extension Necessary Due to Delays in Equipment Receipt
ML17331A758
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 07/01/1981
From: Hunter R
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: Harold Denton
Office of Nuclear Reactor Regulation
References
AEP:NRC:03084, AEP:NRC:3084, NUDOCS 8107080450
Download: ML17331A758 (5)


Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8107080450 DOC ~ DATE: 81/07/01 NOTARIZED: NO DOCKET ¹ FACIL:50"315 Donald C, Cook Nuclear Power Plantp Unit 1~ Indiana 8 050003 50 316 Donald C ~ Cook ibucl ear Power Plant< Uni t 2< Indiana ~ 050 0316 AUTH, NAME AUTHOR AFFILIATION HUNTERgR,Se Indiana 8 Michigan E)ectr ic Co, REC IP ~ N AME RECIPIENT AFFILIATION

'ENTONeH ~ RE Office of Nuclear Reactor Regulationi'irector

SUBJECT:

Requests extension of implementation cate for public notification sys to 810807 'xtension necessary due to delays in equipment receipt ~

DISTRIBUTION CODE: A001S COPIES RECEIVED:LTR ENCL'IZE'. ~

TITLE: General Distribution for after Issuance of Operating License NOTES:IFE:3 copies all material. 05000315 Send 3 copies of all material to ItIE ~ 05000316 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LT T,R EN ID CODE/NAME LTTR ENCL ACTION: ORB ¹1 BC 04 13 INTERNAL: D/DIRiHUM FAC08 DIRgDIY OF LIC I Il,E Ob NRC PDR 02 OELD 11 0 SS BR 10 RAD ASST BR REG FILE 01 EXTERNAL: ACRS 09 16 1 LPDR 03 NSIC 05 1 NTIS TOTAL NUSBER OF COPIES REQUIRED: LTTR ENCL

INDIANA II MICHIGAN ELECTRIC COMPANY P. O. BOX 18 BOWLING GREEN STATION NEW YORK, N. Y. 10004 July 1, 1981 AEP:NRC:0308H Donald C. Cook Nuclear Plant Unit Nos. 1 and 2 Docket Nos. 50-315 and 50-316 License Nos. DPR-58 and DPR-74 Public Notification System Implementation Date Extension Request Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U, S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear Mr. Denton:

This letter requests an extension until August 7, 1981 of the implementation date for a public notification system as delineated in Appendix E to 10 CFR Part 50. This extension is necessary due to un-foreseen delays in receipt of equipment from Alerting Communications of America (ACA), a siren manufacturer. The original order with ACA for the required system equipment was placed on April 1, 1981 following a four month study by an AEP task force on how to implement the system for the 10 mile emergency planning zone for the Donald C. Cook Nuclear Plant. An additional survey over a six month period was also conducted by a consultant to determine the best possible means of providing early warning and notif-ication to the public around the Cook Plant. Both the AEP study and the consultant survey concluded that use of sirens was the best notification system for the Cook Plant.

Me have had meetings with several local governmental agencies to explain the concept and operation of this public information system.

Specifically, representatives from the Berrien County Board of Commissioners, Sheriff's Department, Township Supervisors, local fire officials and media representatives have been informed of the system and its operational aspects.

Our purchase order to the siren vendor specified a delivery of the sirens to begin on June 1, 1981 in order to support the scheduled in-stallation completion date of July 1, 1981. Me were prepared in the field 8107080450 810701 PDR ADOCI4 05000315 F PDR

Mr. Harold R. Denton AEP:NRC:0308H on that date to begin immediate installation of the siren equipment through the use of Indiana 8 Michigan Electric Company's Benton Harbor Service Division personnel who had been previously trained specifically for this work. However, the current schedule from the vendor indicates partial shipment of our order to take place on the weeks of June 22, June 29 and July 6. Installation would commence immediately upon receipt and is expected to be completed by August 1, 1981.

Based on discussions with the Berrien County Sheriff's Department (BCSD),it has been estimated that. the testing of the system by a local contractor to the BCSD for installing the controls and testing the siren equipment will take an additional week. Barring any unforeseen delays in equipment delivery, installation of the sirens and control equipment, and testing of the system, we would expect that the system would be operational on approximately August 7, 1981.

Very truly yours, R. S. Hunter RSH/os Vice President cc: John E. Dolan - Columbus R. C. Callen G. Charnoff R. W. Jurgensen D. V. Shaller - Bridgman NRC Region III Resident Inspector - Bridgman Joe Williams, Jr.