{{#Wiki_filter:.PI%IT1 rlnn'nor M&*z)QVX%.L J REGULATO INFORMATION DISTRIBUTION
{{#Wiki_filter:PI% IT1 rlnn'nor
~TEM (RIDS)ACCESSION NBR:9707220413 DOC.DATE: 97/07/14 NOTARIZED:
                                        .
NO DOCKET.¹FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 AUTH.NAME AUTHOR AFFILIATION MOWREY,C.L.
M&*     z) QVX%. L     J REGULATO     INFORMATION DISTRIBUTION             ~TEM (RIDS)
Florida Power 6 Light Co.HOVEY,R.J.
ACCESSION NBR:9707220413             DOC.DATE: 97/07/14 NOTARIZED: NO                       DOCKET .¹ FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light                       C   05000250 AUTH. NAME             AUTHOR AFFILIATION Florida MOWREY,C.L.
'lorida Power 6 Light Co.RECIP.NAME RECIPIENT.AFFILIATION
HOVEY,R.J.
RECIP.NAME
                  'lorida         Power 6 Light Co.
Power 6 Light Co.
RECIPIENT .AFFILIATION


==SUBJECT:==
==SUBJECT:==
LER 97-005-00:on 970618,RCP oil collection sys was found outside design basis.Caused because design did not consider component parts to be potential leakage sources.Entire RCP oil collection sys was reviewed.W/970714 ltr.DISTRIBUTION CODE: IE22T COPIES RECEIVED:LTR ENCL SIZE: TITLE: 50.73/50.9 Licensee Event Report (LER), Incident Rpt, etc.NOTES: RECIPIENT ID CODE/NAME PD2-3 PD NTERNAL: AEOD/SPD/RAB
LER     97-005-00:on 970618,RCP           oil collection   sys was found outside design basis. Caused because design did not consider component parts to be potential leakage sources. Entire RCP oil collection   sys was reviewed.W/970714           ltr.
','FILE'ENTER NRR/DE/EELB NRR/DRCH/HHFB NRR/DRCH/HOLB NRR/DRPM/PECB NRR/DSSA/SRXB RGN2 FILE 01 XTERNAL: L ST LOBBY WARD NOAC POOREiW.NRC PDR COPIES LTTR ENCL 1 1 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME CROTEAUgR AEOD/SPD/RRAB NRR/DE/ECGB NRR/DE/EMEB NRR/DRCH/HICB NRR/DRCH/HQMB NRR/DSSA/SPLB RES/DET/EIB LITCO BRYCEg J H NOAC QUEENERgDS NUDOCS FULL TXT COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1"1 1 1 1 1 1 1 0 D 0 C NOTE TO ALL"RIDS" RECIPIENTS:.
DISTRIBUTION CODE: IE22T         COPIES RECEIVED:LTR             ENCL     SIZE:
PLEASE HELP US TO REDUCE WASTE I CONTACT THE DOCUMENT CONTROL DES j(g ROOM OWFN SD-5(EXT.415-2083)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS"YOU DON'T NEEDI c=+FULL TEXT CONVERSION REQUIRED OTAL,.@UMBER.OF.COPIES~REgUKED-LTTR 24 ENCL..x-24  
TITLE: 50.73/50.9 Licensee Event Report (LER), Incident Rpt, etc.
NOTES:
RECIPIENT          COPIES                RECIPIENT           COPIES ID  CODE/NAME        LTTR ENCL            ID CODE/NAME       LTTR ENCL                0 PD2-3 PD                 1      1        CROTEAUgR                1    1 NTERNAL: AEOD/SPD/RAB                 2      2        AEOD/SPD/RRAB            1    1
        ', 'FILE'ENTER               1      1        NRR/DE/ECGB              1    1 NRR/DE/EELB                1      1        NRR/DE/EMEB              1    1 NRR/DRCH/HHFB              1      1        NRR/DRCH/HICB            1     1 NRR/DRCH/HOLB              1      1        NRR/DRCH/HQMB            1    1 NRR/DRPM/PECB              1      1        NRR/DSSA/SPLB            1    1 NRR/DSSA/SRXB              1      1        RES/DET/EIB             1   "1 RGN2    FILE 01          1     1 D
XTERNAL: L ST LOBBY WARD              1     1       LITCO BRYCEg J H        1     1 NOAC POOREiW.              1     1       NOAC QUEENERgDS          1     1               0 NRC PDR                  1       1       NUDOCS FULL TXT          1     1 C
NOTE TO   ALL "RIDS" RECIPIENTS:.
PLEASE HELP US TO REDUCE WASTE I CONTACT THE DOCUMENT CONTROL DES j(g ROOM OWFN SD-5(EXT. 415-2083) TO ELIMINATE YOUR NAME       FROM DISTRIBUTION LISTS FOR DOCUMENTS"YOU DON'T NEEDI c =+
FULL TEXT CONVERSION REQUIRED OTAL,.@UMBER.OF.COPIES~REgUKED-             LTTR     24   ENCL..x-24


PPh JUL 14 t997 L-97-0169 10 CFR 50.73 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Re: Turkey Point Units 3 and 4 Docket Nos.50-250 and 50-251 Reportable Event: 97-005 Date of Event: June 18, 1997 Rea r lant Pum il Collection S stem 0 tside Desi Basis The attached Licensee Event Report is being submitted pursuant to the requirements of 10 CFR 50.73 t'o provide notiQcation of the subject event.Very truly yours, R.J.Hovey Vice President Turkey Point Plant CLM Attachment cc: Regional Administrator, USNRC Region II Senior Resident Inspector, USNRC, Turkey Point Plant/w~97072204%3 9'707%4 PDR ADOCK 05000250 S.PDR")Qg5'2" t 4e'F PL:Gr5up'd dmp'any">llllllllllllllllllllII)llllflllllllillll
PPh JUL 14 t997 L-97-0169 10 CFR 50.73 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re:     Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Reportable Event: 97-005 Date of Event: June 18, 1997 Rea     r     lant Pum il Collection S stem   0   tside Desi         Basis The attached Licensee Event Report is being submitted pursuant to the requirements               of 10 CFR 50.73 t'o provide notiQcation of the subject event.
Very truly yours, R. J. Hovey Vice President Turkey Point Plant CLM Attachment cc:     Regional Administrator, USNRC Region II
                                                                                                          /w~
Senior Resident Inspector, USNRC, Turkey Point Plant 97072204%3 9'707%4 PDR     ADOCK       05000250 S .                       PDR
        ") Qg5'2" llllllllllllllllllllII)llllflllllllillll t
4e'F PL:Gr5up'd dmp'any" >


FACILITY NAHE (1)LICENSEE EVENT REPORT (LER)DOCKET NUHBER LT)PAGE LB)TURKEY POINT UNIT 3 05000250 1 Of TITLE<4)REACTOR COOLANT PUMP OZL COLLECTION SYSTEM OUTSIDE DESIGN BASIS EVENT DATE<5)NON DAY YR 18 97 OPERATING HDDE{9)LER NUMBER{6)YR SEO 0 Rl 97 05 00 RPT DATE{7)H)N DAY YR 7 14 97 OTNER FACILITIES INV.<8)FACILITY NAHES TURKEY POINT UNIT 4 DOCKET 6{S)05000251 PONER LEVEL Z10)100/100 10 CFR 50.73 (a)(2)(ii)LICENSEE CONTACT FOR THIS LER (12)C.L MONREYq COMPLIANCE SPECIALIST Telephone Number (305)246-6204 COMPLETE ONE LINE FOR EACH COMPONENT FAILURE DESCRIBED IN THIS REPORT (13)CAUSE SYSTEH S YSTZH NPRDSF N I<SUPPLEHENTAL REPORT EXPECTED t14)))0 YE 0 EXPECTED SUBHZSSZON DATE (15).ZIE yesr cceplete EXPECTED SUBHZSSZON DATE), ABSTRACT (16)I During planning for a modification, Florida'ower
LICENSEE EVENT REPORT                                                   (LER)
&Light Company determined that the design of the Reactor Coolant Pump (RCP)Oil Collection System does not capture leakage from all potential leakage sites.Specifically, the level switches, their associated piping flanges, the level sightglasses, and the lube oil cooler piping drain are not protected from being potential leakage sites, and are not piovided with leakage collection.
FACILITY NAHE (1)                                                                                        DOCKET NUHBER LT)   PAGE LB)
This condition places both turkey Point units outside the design basis as stated in the Updated Final Safety Analysis Report.The original RCP Oil Collection System design did not consider these component parts to be potential leakage sources.The NRC's Safety Evaluation Report approving Turkey Point's Oil Collection System was received several months prior to the time that lOCFR50 Appendix R was issued.It appears that when Appendix R was issued, the design was not reconciled with respect to.theexact wording of section III.O.The Oil Collection System will be modified to collect potential leakage from these points.In the interim, the Oil Collection System is considered operable.  
TURKEY POINT UNIT 3 05000250               1     Of TITLE <4)               REACTOR COOLANT PUMP OZL COLLECTION SYSTEM OUTSIDE DESIGN BASIS EVENT DATE <5)                 LER NUMBER{6)         RPT DATE {7)         OTNER FACILITIES INV. <8)
NON            DAY        YR            YR    SEO 0    Rl    H)N      DAY  YR                      FACILITY NAHES           DOCKET 6  {S) 18        97            97    05      00    7        14  97      TURKEY POINT UNIT 4                     05000251 OPERATING HDDE      {9)
PONER LEVEL Z10)               100/100 10 CFR   50.73 (a) (2)       (ii)
LICENSEE CONTACT FOR THIS LER (12)
Telephone Number C.L       MONREYq COMPLIANCE                       SPECIALIST (305) 246-6204 COMPLETE ONE             LINE   FOR EACH COMPONENT FAILURE DESCRIBED               IN THIS     REPORT (13)
CAUSE       SYSTEH                                                                     S YSTZH                                   NPRDSF N
I<
SUPPLEHENTAL REPORT EXPECTED       t14)   ))0         YE   0                                   EXPECTED SUBHZSSZON DATE (15)
                          .ZIE yesr cceplete EXPECTED SUBHZSSZON DATE)
, ABSTRACT   (16)
I During planning for a modification, Florida'ower & Light Company determined that the design of the Reactor Coolant Pump (RCP) Oil Collection System does not capture leakage from all potential leakage sites. Specifically, the level switches, their associated piping flanges, the level sightglasses, and the lube oil cooler piping drain are not protected from being potential leakage sites, and are not piovided with leakage collection. This condition places both turkey Point units outside the design basis as stated in the Updated Final Safety Analysis Report.
The       original RCP Oil Collection System design did not consider these component parts to be potential leakage sources.                                                   The NRC's Safety Evaluation Report approving Turkey Point's Oil Collection System was received several months prior to the time that lOCFR50 Appendix R was issued.                             It   appears that when Appendix R was issued, the design was not reconciled with respect to .the exact wording of section III.O.
The       Oil Collection                   System     will be     modified to collect potential leakage from these points. In the interim, the Oil Collection System is considered operable.


LICENSEE EVENT REPORT (LER)TEXT CONTINUATION FACILITY NAME TURKEY POINT UNIT 3 DOCKET NUMBER 05000250 LER NUMBER.97-005-00 PAGE NO.2 OF 4 I.DESCRIPTION OF THE EVENT On June 18, 1997, Florida Power&Light Company's (FPL)Turkey Point Units 3 and 4 were at 100 percent power.During the planning for a modification, FPL determined that the Reactor Coolant Pump (RCP)[AB:p], Oil Collection System was not designed to capture leakage from all potential leakage sites.Because Unit 3 and Unit 4 have similar RCP motors[AB:mtr]and Oil Collection Systems, the design deficiencies are applicable to both units.The existing RCP Oil Collection System design consists of oil spray enclosures (shields)and drip pans on each RCP motor.A gravity drain piping system is provided to transport any accumulated oil from these devices to a closed vented oil collection tank.The tank is located outside the secondary shield wall, away from any sources of heat greater than the oil's flashpoint.
LICENSEE EVENT REPORT           (LER) TEXT CONTINUATION FACILITY NAME               DOCKET NUMBER          LER NUMBER          PAGE NO.
10CFR50 Appendix R section III.O requires, in part, that,"Such collection systems shall be capable of.collecting lube oil from all potential pressurized and unpressurized.
TURKEY POINT UNIT 3         05000250               .97-005-00         2 OF 4 I. DESCRIPTION OF THE EVENT On June 18, 1997, Florida Power & Light Company's (FPL) Turkey Point Units 3 and 4 were at 100 percent power. During the planning for a modification, FPL determined that the Reactor Coolant Pump (RCP) [AB:p],
leakage sites in the reactor coolant pump lube oil systems....
Oil Collection System was not designed to capture leakage from all potential leakage sites. Because Unit 3 and Unit 4 have similar RCP motors [AB:mtr] and Oil Collection Systems, the design deficiencies are applicable to both units.
Leakage points to be protected shall include lift pump and piping, ove'rflow lines, lube oil cooler, oil fill" and drain lines and'plugs, flanged connections on'oil lines, and lube oil reservoirs where=such features exist on the reactor coolant pumps." Turkey Point's interpretation of these requirements is that all possible leakage points shall be collected (if they are considered potential leakage points), or protected (from being potential leakage points).Therefore to satisfy 10CFR50 Appendix R section III.O, Turkey Point's Oil Collection System must collect potential leakage from all potential leakage sites, and protect other sites from being potential leakage sites.5 Appendix 9.6A of Turkey Point's Updated Final Safety Analysis Report (UFSAR)describes the plant's fire protection program.Section 2.5 of that appendix is a lineup of 10CFR50 Appendix R requirements and Turkey Point's method of conformance or alternative.
The existing RCP Oil Collection System design consists of oil spray enclosures     (shields) and drip pans on each RCP motor. A gravity drain piping system is provided to transport any accumulated oil from these devices to a closed vented oil collection tank. The tank is located outside the secondary shield wall, away from any sources of heat greater than the oil's flashpoint.
For 10CFR50 Appendix R, section III.O, the UFSAR states, in part,"The system collects potential leakage.from the oil lift pump and piping, lube oil cooler, flanged connections on oil lines, and lube oil reservoirs." Other possible sites are protected's follows,"The upper bearing'ssembly overflow/vent path is protected because oil would first leak through a shaft seal located below the overflow/vent connection.
10CFR50 Appendix R section III.O requires, in part, that, "Such collection systems shall be capable of. collecting lube oil from all potential pressurized and unpressurized. leakage sites in the reactor coolant pump lube oil systems.... Leakage points to be protected shall include   lift
This oil would then be collected in the lower bearing oil reservoir collection assembly..
" and drain lines  pump and piping, ove'rflow lines, lube oil cooler, oil and 'plugs, flanged connections on'oil lines, and lube fill oil reservoirs where =such features exist on the reactor coolant         pumps."
The fill lines are protected by being above normal operating levels and by being sealed with screw caps.The drain lined are protected by having valves and by being plugged with threaded caps to ensure leak-tight integrity."  
Turkey Point's interpretation of these requirements is that all possible leakage points shall be collected (if they are considered potential leakage points), or protected (from being potential leakage points) . Therefore to satisfy 10CFR50 Appendix R section III.O, Turkey Point's Oil Collection System must collect potential leakage from all potential leakage sites, and protect other sites from being potential leakage sites.                                               5 Appendix 9.6A of Turkey Point's Updated Final Safety Analysis Report (UFSAR) describes the plant's fire protection program.         Section 2.5 of that appendix is a lineup of 10CFR50 Appendix R requirements and Turkey Point's method of conformance or alternative. For 10CFR50 Appendix R, section III.O, the UFSAR states, in part, "The system collects potential leakage .from the oil       lift pump and piping, lube oil cooler, flanged connections on oil lines, and lube oil reservoirs." Other possible sites are protected's follows, "The upper bearing'ssembly overflow/vent path is protected because oil would first leak through a shaft seal located below the overflow/vent connection. This oil would then be collected in the lower bearing oil reservoir collection assembly.. The     fill lines are protected by being above normal operating levels and by being sealed with screw caps. The drain lined are protected by having valves and by being plugged with threaded caps to ensure   leak-tight integrity."


LICENSEE EVENT REPORT (LER)TEXT CONTINUATION FACILITY NAME TURKEY POINT UNIT 3 DOCKET NUMBER 05000250 LER NUMBER 97-005-00 PAGE NO.3 OF 4 UFSAR Appendix 9.6A, section 3.10.3, further describes'he Oil Collection System,"Oil collection assemblies are provided for the oil lift pump system, lower bearing oil reservoir and the bearing oil cooler.The bearing oil cooler collection assembly collects oil from the bearing oil cooler upper pipe flange, lower pipe flange, upper end flange and lower end flange." The UFSAR describes neither collection nor protection.for the upper and lower level switch assemblies and associated piping flanges,.-.the level sightglasses, and the lube oil cooler piping drain.FPL therefore determined that the design of the RCP Oil Collection System was deficient in that not all potential oil leakage sources have provisions for collection.
LICENSEE EVENT REPORT (LER) TEXT CONTINUATION FACILITY NAME             DOCKET NUMBER        LER NUMBER          PAGE NO.
II.CAUSE OF THE EVENT The original RCP Oil Collection System design did not consider these component parts to be potential leakage sources because they were essentially.
TURKEY POINT UNIT 3       05000250             97-005-00           3 OF 4 UFSAR   Appendix 9.6A, section 3.10.3, further describes'he Oil Collection System, "Oil collection assemblies are provided for the oil lift   pump system, lower bearing oil reservoir and the bearing oil cooler. The bearing oil cooler collection assembly collects oil from the bearing oil cooler upper pipe flange, lower pipe flange, upper end flange and lower end flange."
unpressurized and.considered unlikely to develop.a...significant rate or volume of leakage.The reservoirs operate at atmospheric pressure or at a slightly positive pressure.Therefore, design features were not provided to collect oil from these locations.
The UFSAR describes neither collection nor protection .for the upper and lower level switch assemblies and associated piping flanges,.-.the level sightglasses, and the lube oil cooler piping drain. FPL therefore determined that the design of the RCP Oil Collection System was deficient in that not all potential oil leakage sources have provisions for collection.
The NRC's Safety Evaluation Report approving.Turkey Point's Oil Collection System was received several months prior to the time that 10CFR50 Appendix R was issued.It appears that when Appendix R was issued, the design was not reconciled with respect to the exact wording of section III.O.III.ANALYSIS OF THE EVENT The uncollected potential leakage sites were assessed in order to characterize any postulated leakage and the.resultant.
II. CAUSE OF THE EVENT The original   RCP Oil Collection System design did not consider these component   parts to be potential leakage sources because they were essentially. unpressurized and .considered unlikely to develop .a ...
fire potential.
significant rate or volume of leakage. The reservoirs operate at atmospheric pressure or at a slightly positive pressure. Therefore, design features were not provided to collect oil from these locations.
Any postulated leakage would be from a low or zero pressure source.Therefore, postulated oil leakage would not be sprayed (atomized), but would result in only min'or drips of uncollected oil.The fire potential of such leakage i's minimal;-if a drip were to come in contact with a hot surface (temperature over the oil ignition temperature) it would not accumulate; the drop would burn but not support further combustion..
The NRC's Safety Evaluation Report approving .Turkey Point's Oil Collection System was received several months prior to the time that 10CFR50 Appendix R was issued.     It appears that when Appendix R was issued, the design was not reconciled with respect to the exact wording of section III.O.
If it comes in'ontact.
III. ANALYSIS OF     THE EVENT The   uncollected potential leakage sites were assessed in order to characterize any postulated leakage and the. resultant. fire potential.
with a cool surface it could locally accumulate, but would eventually migrate to the floor.Oil accumulating on the floor would flow to floor drains based on floor slope.Lubricating oil on the floor or in the sump is not subject to'gnition because the floor is a vast heat sink which will maintain the oil at a low temperature and prevent it from reaching its ignition point.Therefore, the potential for a fire resulting from minor oil leakage from these locations is not considered credible.
Any postulated leakage would be from a low or zero pressure source.
LICENSEE EVENT REPORT (LER)TEXT CONTINUATION FACILITY NAME TURKEY POINT UNIT 3 DOCKET NUMBER 05000250 LER NUMBER 97-005-00 PAGE NO.4 OF 4 Since no significant lea'kage has been experienced from the uncollected potential leakage sites, and since these sites are not expected to suffer any significant leakage, the condition reported herein did not compromise the health or safety of plant personnel or the general public.IV.CORRECTIVE ACTIONS 1.The entire RCP Oil Collection System was reviewed to ensure that all potential leakage sites were identified.
Therefore, postulated oil leakage would not be sprayed (atomized), but would result in only min'or drips of uncollected oil. The fire if potential of such leakage i's minimal;- a drip were to come in contact with a hot surface (temperature over the oil ignition temperature) would not accumulate; the drop would burn but not support further it combustion..       it                                      it If comes in'ontact. with a cool surface could locally accumulate, but would eventually migrate to the floor. Oil accumulating on the floor would flow to floor drains based on floor slope. Lubricating oil on the floor or in the sump is not subject because the floor is a vast heat sink which will maintain the it to'gnition oil at a low temperature and prevent         from reaching its ignition point. Therefore, the potential for a fire resulting from minor     oil leakage from these locations is not considered credible.
2.A modification will be implemented on the Unit 4 RCP Oil Collection System to ensure that any future oil leakage from the uncollected potential leakage sites would be captured by the system.FPL intends to complete this modification during the Cycle 17 refueling outage, scheduled'to start in early September.
 
Should design, procurement, or construction difficulties arise which prevent, completion, the modification will be completed no'ater than the Cycle 18 refueling.outage,.presently scheduled.for the spring of 1999.3.Similar modifications will be implemented on the Unit 3 RCP Oil Collection System.These modifications.are presently scheduled to be.completed during the Cycle 17 refueling outage (fall 1998).V.ADDITIONAL INFORMATION Similar events: Licensee Event Report 250/89-016 also reported a condition of the RCP Oil Collection System outside the design basis.The size of the collection tank was determined to be less than that required by an approved exemption to 10CFR50 Appendix R, section III.O, as a result of replacement.
LICENSEE EVENT REPORT           (LER) TEXT CONTINUATION FACILITY NAME                 DOCKET NUMBER          LER NUMBER          PAGE NO.
of the 3A RCP motor with a motor haying a larger oil capacity.The corrective actions for this event could not have been reasonably expected to result in discovery of the condition reported herein.L EIIS Codes are shown in the format[EIIS SYSTEM: IEEE component function identifier, second component identifier (if appropriate)].}}
TURKEY POINT UNIT 3           05000250               97-005-00           4 OF 4 Since no significant lea'kage has been experienced from the uncollected potential leakage sites, and since these sites are not expected to suffer any significant leakage, the condition reported herein did not compromise the health or safety of plant personnel or the general public.
IV. CORRECTIVE ACTIONS
: 1. The entire   RCP Oil Collection System was reviewed to ensure that all potential     leakage sites were identified.
: 2. A modification will be implemented on the Unit 4 RCP Oil Collection System to ensure that any future oil leakage from the uncollected potential leakage sites would be captured by the system. FPL intends to complete this modification during the Cycle 17 refueling outage, scheduled 'to start in early September.
Should design, procurement, or construction difficulties arise which prevent, completion, the modification will be completed than the Cycle 18 refueling .outage,.presently scheduled .for no'ater the spring of 1999.
: 3. Similar modifications will be implemented on the Unit 3 RCP Oil Collection System. These modifications .are presently scheduled to be. completed during the Cycle 17 refueling outage (fall 1998).
V. ADDITIONAL INFORMATION Similar events: Licensee Event Report 250/89-016 also reported a condition of the RCP Oil Collection System outside the design basis.
The size of the collection tank was determined to be less than that required by an approved exemption to 10CFR50 Appendix R, section III.O, as a result of replacement. of the 3A RCP motor with a motor haying a larger oil capacity. The corrective actions for this event could not have been reasonably expected to result in discovery of the condition reported herein.
L EIIS Codes are shown in the format [EIIS         SYSTEM: IEEE component function identifier, second       component   identifier (if appropriate)].}}

Revision as of 07:09, 22 October 2019

LER 97-005-00:on 970618,RCP Oil Collection Sys Was Found Outside Design Basis.Caused Because Design Did Not Consider Component Parts to Be Potential Leakage Sources.Entire RCP Oil Collection Sys Was reviewed.W/970714 Ltr
ML17354A580
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 07/14/1997
From: Hovey R, Mowrey C
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-97-0169, L-97-169, LER-97-005-01, LER-97-5-1, NUDOCS 9707220413
Download: ML17354A580 (11)


Text

PI% IT1 rlnn'nor

.

M&* z) QVX%. L J REGULATO INFORMATION DISTRIBUTION ~TEM (RIDS)

ACCESSION NBR:9707220413 DOC.DATE: 97/07/14 NOTARIZED: NO DOCKET .¹ FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 AUTH. NAME AUTHOR AFFILIATION Florida MOWREY,C.L.

HOVEY,R.J.

RECIP.NAME

'lorida Power 6 Light Co.

Power 6 Light Co.

RECIPIENT .AFFILIATION

SUBJECT:

LER 97-005-00:on 970618,RCP oil collection sys was found outside design basis. Caused because design did not consider component parts to be potential leakage sources. Entire RCP oil collection sys was reviewed.W/970714 ltr.

DISTRIBUTION CODE: IE22T COPIES RECEIVED:LTR ENCL SIZE:

TITLE: 50.73/50.9 Licensee Event Report (LER), Incident Rpt, etc.

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL 0 PD2-3 PD 1 1 CROTEAUgR 1 1 NTERNAL: AEOD/SPD/RAB 2 2 AEOD/SPD/RRAB 1 1

', 'FILE'ENTER 1 1 NRR/DE/ECGB 1 1 NRR/DE/EELB 1 1 NRR/DE/EMEB 1 1 NRR/DRCH/HHFB 1 1 NRR/DRCH/HICB 1 1 NRR/DRCH/HOLB 1 1 NRR/DRCH/HQMB 1 1 NRR/DRPM/PECB 1 1 NRR/DSSA/SPLB 1 1 NRR/DSSA/SRXB 1 1 RES/DET/EIB 1 "1 RGN2 FILE 01 1 1 D

XTERNAL: L ST LOBBY WARD 1 1 LITCO BRYCEg J H 1 1 NOAC POOREiW. 1 1 NOAC QUEENERgDS 1 1 0 NRC PDR 1 1 NUDOCS FULL TXT 1 1 C

NOTE TO ALL "RIDS" RECIPIENTS:.

PLEASE HELP US TO REDUCE WASTE I CONTACT THE DOCUMENT CONTROL DES j(g ROOM OWFN SD-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS"YOU DON'T NEEDI c =+

FULL TEXT CONVERSION REQUIRED OTAL,.@UMBER.OF.COPIES~REgUKED- LTTR 24 ENCL..x-24

PPh JUL 14 t997 L-97-0169 10 CFR 50.73 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Reportable Event: 97-005 Date of Event: June 18, 1997 Rea r lant Pum il Collection S stem 0 tside Desi Basis The attached Licensee Event Report is being submitted pursuant to the requirements of 10 CFR 50.73 t'o provide notiQcation of the subject event.

Very truly yours, R. J. Hovey Vice President Turkey Point Plant CLM Attachment cc: Regional Administrator, USNRC Region II

/w~

Senior Resident Inspector, USNRC, Turkey Point Plant 97072204%3 9'707%4 PDR ADOCK 05000250 S . PDR

") Qg5'2" llllllllllllllllllllII)llllflllllllillll t

4e'F PL:Gr5up'd dmp'any" >

LICENSEE EVENT REPORT (LER)

FACILITY NAHE (1) DOCKET NUHBER LT) PAGE LB)

TURKEY POINT UNIT 3 05000250 1 Of TITLE <4) REACTOR COOLANT PUMP OZL COLLECTION SYSTEM OUTSIDE DESIGN BASIS EVENT DATE <5) LER NUMBER{6) RPT DATE {7) OTNER FACILITIES INV. <8)

NON DAY YR YR SEO 0 Rl H)N DAY YR FACILITY NAHES DOCKET 6 {S) 18 97 97 05 00 7 14 97 TURKEY POINT UNIT 4 05000251 OPERATING HDDE {9)

PONER LEVEL Z10) 100/100 10 CFR 50.73 (a) (2) (ii)

LICENSEE CONTACT FOR THIS LER (12)

Telephone Number C.L MONREYq COMPLIANCE SPECIALIST (305) 246-6204 COMPLETE ONE LINE FOR EACH COMPONENT FAILURE DESCRIBED IN THIS REPORT (13)

CAUSE SYSTEH S YSTZH NPRDSF N

I<

SUPPLEHENTAL REPORT EXPECTED t14) ))0 YE 0 EXPECTED SUBHZSSZON DATE (15)

.ZIE yesr cceplete EXPECTED SUBHZSSZON DATE)

, ABSTRACT (16)

I During planning for a modification, Florida'ower & Light Company determined that the design of the Reactor Coolant Pump (RCP) Oil Collection System does not capture leakage from all potential leakage sites. Specifically, the level switches, their associated piping flanges, the level sightglasses, and the lube oil cooler piping drain are not protected from being potential leakage sites, and are not piovided with leakage collection. This condition places both turkey Point units outside the design basis as stated in the Updated Final Safety Analysis Report.

The original RCP Oil Collection System design did not consider these component parts to be potential leakage sources. The NRC's Safety Evaluation Report approving Turkey Point's Oil Collection System was received several months prior to the time that lOCFR50 Appendix R was issued. It appears that when Appendix R was issued, the design was not reconciled with respect to .the exact wording of section III.O.

The Oil Collection System will be modified to collect potential leakage from these points. In the interim, the Oil Collection System is considered operable.

LICENSEE EVENT REPORT (LER) TEXT CONTINUATION FACILITY NAME DOCKET NUMBER LER NUMBER PAGE NO.

TURKEY POINT UNIT 3 05000250 .97-005-00 2 OF 4 I. DESCRIPTION OF THE EVENT On June 18, 1997, Florida Power & Light Company's (FPL) Turkey Point Units 3 and 4 were at 100 percent power. During the planning for a modification, FPL determined that the Reactor Coolant Pump (RCP) [AB:p],

Oil Collection System was not designed to capture leakage from all potential leakage sites. Because Unit 3 and Unit 4 have similar RCP motors [AB:mtr] and Oil Collection Systems, the design deficiencies are applicable to both units.

The existing RCP Oil Collection System design consists of oil spray enclosures (shields) and drip pans on each RCP motor. A gravity drain piping system is provided to transport any accumulated oil from these devices to a closed vented oil collection tank. The tank is located outside the secondary shield wall, away from any sources of heat greater than the oil's flashpoint.

10CFR50 Appendix R section III.O requires, in part, that, "Such collection systems shall be capable of. collecting lube oil from all potential pressurized and unpressurized. leakage sites in the reactor coolant pump lube oil systems.... Leakage points to be protected shall include lift

" and drain lines pump and piping, ove'rflow lines, lube oil cooler, oil and 'plugs, flanged connections on'oil lines, and lube fill oil reservoirs where =such features exist on the reactor coolant pumps."

Turkey Point's interpretation of these requirements is that all possible leakage points shall be collected (if they are considered potential leakage points), or protected (from being potential leakage points) . Therefore to satisfy 10CFR50 Appendix R section III.O, Turkey Point's Oil Collection System must collect potential leakage from all potential leakage sites, and protect other sites from being potential leakage sites. 5 Appendix 9.6A of Turkey Point's Updated Final Safety Analysis Report (UFSAR) describes the plant's fire protection program. Section 2.5 of that appendix is a lineup of 10CFR50 Appendix R requirements and Turkey Point's method of conformance or alternative. For 10CFR50 Appendix R, section III.O, the UFSAR states, in part, "The system collects potential leakage .from the oil lift pump and piping, lube oil cooler, flanged connections on oil lines, and lube oil reservoirs." Other possible sites are protected's follows, "The upper bearing'ssembly overflow/vent path is protected because oil would first leak through a shaft seal located below the overflow/vent connection. This oil would then be collected in the lower bearing oil reservoir collection assembly.. The fill lines are protected by being above normal operating levels and by being sealed with screw caps. The drain lined are protected by having valves and by being plugged with threaded caps to ensure leak-tight integrity."

LICENSEE EVENT REPORT (LER) TEXT CONTINUATION FACILITY NAME DOCKET NUMBER LER NUMBER PAGE NO.

TURKEY POINT UNIT 3 05000250 97-005-00 3 OF 4 UFSAR Appendix 9.6A, section 3.10.3, further describes'he Oil Collection System, "Oil collection assemblies are provided for the oil lift pump system, lower bearing oil reservoir and the bearing oil cooler. The bearing oil cooler collection assembly collects oil from the bearing oil cooler upper pipe flange, lower pipe flange, upper end flange and lower end flange."

The UFSAR describes neither collection nor protection .for the upper and lower level switch assemblies and associated piping flanges,.-.the level sightglasses, and the lube oil cooler piping drain. FPL therefore determined that the design of the RCP Oil Collection System was deficient in that not all potential oil leakage sources have provisions for collection.

II. CAUSE OF THE EVENT The original RCP Oil Collection System design did not consider these component parts to be potential leakage sources because they were essentially. unpressurized and .considered unlikely to develop .a ...

significant rate or volume of leakage. The reservoirs operate at atmospheric pressure or at a slightly positive pressure. Therefore, design features were not provided to collect oil from these locations.

The NRC's Safety Evaluation Report approving .Turkey Point's Oil Collection System was received several months prior to the time that 10CFR50 Appendix R was issued. It appears that when Appendix R was issued, the design was not reconciled with respect to the exact wording of section III.O.

III. ANALYSIS OF THE EVENT The uncollected potential leakage sites were assessed in order to characterize any postulated leakage and the. resultant. fire potential.

Any postulated leakage would be from a low or zero pressure source.

Therefore, postulated oil leakage would not be sprayed (atomized), but would result in only min'or drips of uncollected oil. The fire if potential of such leakage i's minimal;- a drip were to come in contact with a hot surface (temperature over the oil ignition temperature) would not accumulate; the drop would burn but not support further it combustion.. it it If comes in'ontact. with a cool surface could locally accumulate, but would eventually migrate to the floor. Oil accumulating on the floor would flow to floor drains based on floor slope. Lubricating oil on the floor or in the sump is not subject because the floor is a vast heat sink which will maintain the it to'gnition oil at a low temperature and prevent from reaching its ignition point. Therefore, the potential for a fire resulting from minor oil leakage from these locations is not considered credible.

LICENSEE EVENT REPORT (LER) TEXT CONTINUATION FACILITY NAME DOCKET NUMBER LER NUMBER PAGE NO.

TURKEY POINT UNIT 3 05000250 97-005-00 4 OF 4 Since no significant lea'kage has been experienced from the uncollected potential leakage sites, and since these sites are not expected to suffer any significant leakage, the condition reported herein did not compromise the health or safety of plant personnel or the general public.

IV. CORRECTIVE ACTIONS

1. The entire RCP Oil Collection System was reviewed to ensure that all potential leakage sites were identified.
2. A modification will be implemented on the Unit 4 RCP Oil Collection System to ensure that any future oil leakage from the uncollected potential leakage sites would be captured by the system. FPL intends to complete this modification during the Cycle 17 refueling outage, scheduled 'to start in early September.

Should design, procurement, or construction difficulties arise which prevent, completion, the modification will be completed than the Cycle 18 refueling .outage,.presently scheduled .for no'ater the spring of 1999.

3. Similar modifications will be implemented on the Unit 3 RCP Oil Collection System. These modifications .are presently scheduled to be. completed during the Cycle 17 refueling outage (fall 1998).

V. ADDITIONAL INFORMATION Similar events: Licensee Event Report 250/89-016 also reported a condition of the RCP Oil Collection System outside the design basis.

The size of the collection tank was determined to be less than that required by an approved exemption to 10CFR50 Appendix R, section III.O, as a result of replacement. of the 3A RCP motor with a motor haying a larger oil capacity. The corrective actions for this event could not have been reasonably expected to result in discovery of the condition reported herein.

L EIIS Codes are shown in the format [EIIS SYSTEM: IEEE component function identifier, second component identifier (if appropriate)].