{{#Wiki_filter:REGULATOR~iNFORMATION DISTRIBUTION TEM (RIDS)ACCESSION NBR;8411140'370 DOC~DATE: 84/11/08 NOTARIZED:
{{#Wiki_filter:REGULATOR~iNFORMATION DISTRIBUTION                           TEM (RIDS)
NO FACIL:50 400'Shearon Harr is Nuclear Power Pl anti Uni t 1q Car ol ina AUTH~NAME AUTHOR AFFILIATION ZIMMERMANrS,R
ACCESSION NBR; 8411140'370                     DOC ~ DATE: 84/11/08   NOTARIZED:   NO FACIL:50 400 'Shearon   Harr               is Nuclear   Power Pl anti Uni t 1q Car ol ina 05000400 AUTH ~ NAME         AUTHOR               AFFILIATION ZIMMERMANrS,R~       Carolina Power                 8 Light Co>
~Carolina Power 8 Light Co>RECIP,NAME RECIPIENT AFFILIATION DENTONiH.R'o'ffice of Nuclear Reactor: Regulatiani Director
RECIP,NAME           RECIPIENT AFFILIATION NOTES'OCKET DENTONiH.R'o'ffice


==SUBJECT:==
==SUBJECT:==
Informs of conf ir mation w/Westinghouse thap r eator tr ip setpoint methodology used for Shearon Ha<ris same as for VC Summer.FSAR will be revised to=reflect high pressure safety'nalysis limit of 2'i445 psig~DISTRIBUTION CODE!8001D COPIES RECEIVED:LTR ENCL SIZEg TITLE: Licensing Submittal; PSAR/FSAR Amdts 8 Related orrespondence NOTES'OCKET 05000400 RECIPIENT-ID CODE/NAME NRR/DL/ADL NRR L83 LA INTERNAL: ACRS ELD/HDS1 IE/DEPER/EPB 36'E/DQASIP/QAB21 NRR/DE/AEAB NRR/DE/EHEB NRR/DE/GB 28 NRR/DE/MTEB 17 NRR/DE/SGEB 25 NRR/DHFS/LQB 32 NRR/DL/SSPB NRR/DS I/ASS NRR/DS I/CSB 09 NRR/DSI/METB 12 RAB 22 G 04 RM/DDAMI/MI 8 EXTERNAL: BNL(AMDTS ONLY)FEMA REP DIV 39 NRC PDR 02: NTIS COPIES LTTR ENC 1 1 6 1 1 1 1 1 1.1 1 1 1 1 1 1 1 L RECIPIENT ID CODE/NAME NRR LB3 BC BUCKLEY'S 01 ADM/LFMB IE F ILE IE/DEPER/IRB 35 NRR ROEgMiL: NRR/DE/CEB 11 NRR/DE/EQB 13 NRR/DE/MEB 18 NRR/DE/SAB 24 NRR/DHFS/HFE840 NRR/DHFS/PSRB NRR/DSI/AEB 26 NRR/DSI'/CPB 10 NRR/DS I/I CSB 16 NRR/DSI/PSB 19 NRR/DSI/RSB 23 RGN2 DMB/DSS (AMDTS)LPDR 03 NSIC 05 COPIES LTTR EN L 1 1 1 1 1 1 1 2 1 1 1 1 1 1 1 1 3 TOTAL NUMBER OF COPIES REQUIRED l.LTTR 53 ENCL 0 0 Hr il'H'H~H)HI, Ir ,r'l)I lh H ll g li
@IRK Carolina Power&Light Company Noy 08 1S84.SERIAL: NLS-84-473 Mr.Harold R.Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NO.1-DOCKET NO.50-400 REACTOR TRIP SETPOINT METHODOLOGY


==Dear Mr.Denton:==
of Nuclear Reactor: Regulatiani Director Informs of conf ir mation w/Westinghouse thap r eator tr ip setpoint methodology used for Shearon Ha< ris same as for VC Summer.FSAR will be revised to =reflect high pressure safety'nalysis limit of 2'i445 psig                    ~
Carolina Power 6 Light Company has confirmed with Westinghouse Electric Corporation that the reactor trip setpoint methodology used for the Shearon Harris Plant is the same as that used for the Virgil C.Summer Plant.We will revise the Final Safety Analysis Report, Table 15.0.6-1, in a future amendment to reflect a new high pressurizer pressure safety analysis limit of 2445 psig as calculated using the above mentioned reactor trip setpoint methodology,'per your xequest.Should you have any questions, please contact Mr.Pedro Salas at (919)836-8015.Yours very truly, Manager Nuclear Licensing Section PS/ccc (835PSA)CC: Mr.B.C.Buckley (NRC)Mr.G.F.Maxwell (NRC-SHNPP)
DISTRIBUTION CODE! 8001D                    COPIES RECEIVED:LTR        ENCL        SIZEg TITLE: Licensing Submittal; PSAR/FSAR Amdts                        8  Related    orrespondence RECIPIENT-                      COPIES            RECIPIENT            COPIES ID CODE/NAME                      LTTR ENC L      ID CODE/NAME          LTTR EN L NRR/DL/ADL                          1            NRR  LB3 BC              1 NRR L83 LA                          1            BUCKLEY'S      01        1 INTERNAL: ACRS                                  6            ADM/LFMB                  1 ELD/HDS1                            1            IE F ILE                  1 IE/DEPER/EPB                        1            IE/DEPER/IRB 35          1 36'E/DQASIP/QAB21 1            NRR  ROEgMiL:            1 NRR/DE/AEAB                          1            NRR/DE/CEB      11        1 NRR/DE/EHEB                          1            NRR/DE/EQB      13        2 NRR/DE/GB      28                                  NRR/DE/MEB      18        1 NRR/DE/MTEB    17                  1.            NRR/DE/SAB      24        1 NRR/DE/SGEB    25                    1            NRR/DHFS/HFE840          1 NRR/DHFS/LQB  32                    1            NRR/DHFS/PSRB            1 NRR/DL/SSPB                                        NRR/DSI/AEB 26 NRR/DS I/ASS                        1            NRR/DSI'/CPB 10          1 NRR/DS I/CSB    09                  1            NRR/DS  I/ICSB 16 NRR/DSI/PSB 19 1
Mr J P OrReilly (NRC-RII)Mr.Travis Payne (KUDZU)Mr.Daniel F.Read (CHANGE/ELP)
NRR/DSI/METB 12                      1                                      1 RAB  22                    1            NRR/DSI/RSB 23            1 G            04                  1            RGN2                      3 RM/DDAMI/MI8                        1 EXTERNAL: BNL(AMDTS ONLY)                                      DMB/DSS (AMDTS)
Chapel Hill Public Library Wake County Public Library Mr.Wells Eddleman Mr.John D.Runkle Dr.Richard D.Wilson Mr.G.0.Bright (ASLB)Dr.J.H.Carpenter (ASLB)Mr.J.L.Kelley (ASLB)8411140370 841108 PDR ADOCK 05000400 A PDR'411 Fayettevilte Street~P.O.Box 1551~Raleigh, N.C.27602@~1 i)o i>tr<,'-l+>+~>l}}
FEMA REP DIV 39                                    LPDR            03 NRC PDR        02:                                NSIC            05 NTIS TOTAL NUMBER OF COPIES REQUIRED l. LTTR                      53  ENCL
 
0                      0 H
                              ~
Hr il '
H' H  )HI,  Ir
                                    ,r'l
          ) I lh H ll g li
 
                                          @IRK Carolina Power & Light Company SERIAL: NLS-84-473 Noy 08 1S84.
Mr. Harold R. Denton,    Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC    20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NO. 1  DOCKET NO. 50-400 REACTOR TRIP SETPOINT METHODOLOGY
 
==Dear Mr. Denton:==
 
Carolina Power 6 Light Company has confirmed with Westinghouse Electric Corporation that the reactor trip setpoint methodology used for the Shearon Harris Plant is the same as that used for the Virgil C. Summer Plant. We will revise the Final Safety Analysis Report, Table 15.0.6-1, in a future amendment to reflect a new high pressurizer pressure safety analysis limit of 2445 psig as calculated using the above mentioned reactor trip setpoint methodology, 'per your xequest.
Should you have any questions,           please contact Mr. Pedro Salas at (919) 836-8015.
Yours very       truly, Manager Nuclear Licensing Section PS/ccc   (835PSA)
CC:   Mr. B. C. Buckley (NRC)                             Mr. Wells Eddleman Mr. G. F. Maxwell (NRC-SHNPP)                       Mr. John D. Runkle Mr J P OrReilly (NRC-RII)                             Dr. Richard D. Wilson Mr. Travis Payne (KUDZU)                             Mr. G. 0. Bright (ASLB)
Mr. Daniel F. Read (CHANGE/ELP)                       Dr. J. H. Carpenter (ASLB)
Chapel Hill Public Library                          Mr. J. L. Kelley (ASLB)
Wake County Public Library 8411140370 841108 PDR ADOCK     05000400 A
PDR     '
411 Fayettevilte Street ~ P. O. Box 1551 ~ Raleigh, N. C. 27602
                                                                                                      @~1 i)o
 
i>+> tr<,
    + ~ >
          '- l l}}

Latest revision as of 04:18, 22 October 2019

Informs of Confirmation W/Westinghouse That Reactor Trip Setpoint Methodology Used for Shearon Harris Same as for VC Summer.Fsar Will Be Revised to Reflect High Pressure Safety Analysis Limit of 2,445 Psig
ML18018B812
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 11/08/1984
From: Zimmerman S
CAROLINA POWER & LIGHT CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
NLS-84-473, NUDOCS 8411140370
Download: ML18018B812 (4)


Text

REGULATOR~iNFORMATION DISTRIBUTION TEM (RIDS)

ACCESSION NBR; 8411140'370 DOC ~ DATE: 84/11/08 NOTARIZED: NO FACIL:50 400 'Shearon Harr is Nuclear Power Pl anti Uni t 1q Car ol ina 05000400 AUTH ~ NAME AUTHOR AFFILIATION ZIMMERMANrS,R~ Carolina Power 8 Light Co>

RECIP,NAME RECIPIENT AFFILIATION NOTES'OCKET DENTONiH.R'o'ffice

SUBJECT:

of Nuclear Reactor: Regulatiani Director Informs of conf ir mation w/Westinghouse thap r eator tr ip setpoint methodology used for Shearon Ha< ris same as for VC Summer.FSAR will be revised to =reflect high pressure safety'nalysis limit of 2'i445 psig ~

DISTRIBUTION CODE! 8001D COPIES RECEIVED:LTR ENCL SIZEg TITLE: Licensing Submittal; PSAR/FSAR Amdts 8 Related orrespondence RECIPIENT- COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENC L ID CODE/NAME LTTR EN L NRR/DL/ADL 1 NRR LB3 BC 1 NRR L83 LA 1 BUCKLEY'S 01 1 INTERNAL: ACRS 6 ADM/LFMB 1 ELD/HDS1 1 IE F ILE 1 IE/DEPER/EPB 1 IE/DEPER/IRB 35 1 36'E/DQASIP/QAB21 1 NRR ROEgMiL: 1 NRR/DE/AEAB 1 NRR/DE/CEB 11 1 NRR/DE/EHEB 1 NRR/DE/EQB 13 2 NRR/DE/GB 28 NRR/DE/MEB 18 1 NRR/DE/MTEB 17 1. NRR/DE/SAB 24 1 NRR/DE/SGEB 25 1 NRR/DHFS/HFE840 1 NRR/DHFS/LQB 32 1 NRR/DHFS/PSRB 1 NRR/DL/SSPB NRR/DSI/AEB 26 NRR/DS I/ASS 1 NRR/DSI'/CPB 10 1 NRR/DS I/CSB 09 1 NRR/DS I/ICSB 16 NRR/DSI/PSB 19 1

NRR/DSI/METB 12 1 1 RAB 22 1 NRR/DSI/RSB 23 1 G 04 1 RGN2 3 RM/DDAMI/MI8 1 EXTERNAL: BNL(AMDTS ONLY) DMB/DSS (AMDTS)

FEMA REP DIV 39 LPDR 03 NRC PDR 02: NSIC 05 NTIS TOTAL NUMBER OF COPIES REQUIRED l. LTTR 53 ENCL

0 0 H

~

Hr il '

H' H )HI, Ir

,r'l

) I lh H ll g li

@IRK Carolina Power & Light Company SERIAL: NLS-84-473 Noy 08 1S84.

Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NO. 1 DOCKET NO. 50-400 REACTOR TRIP SETPOINT METHODOLOGY

Dear Mr. Denton:

Carolina Power 6 Light Company has confirmed with Westinghouse Electric Corporation that the reactor trip setpoint methodology used for the Shearon Harris Plant is the same as that used for the Virgil C. Summer Plant. We will revise the Final Safety Analysis Report, Table 15.0.6-1, in a future amendment to reflect a new high pressurizer pressure safety analysis limit of 2445 psig as calculated using the above mentioned reactor trip setpoint methodology, 'per your xequest.

Should you have any questions, please contact Mr. Pedro Salas at (919) 836-8015.

Yours very truly, Manager Nuclear Licensing Section PS/ccc (835PSA)

CC: Mr. B. C. Buckley (NRC) Mr. Wells Eddleman Mr. G. F. Maxwell (NRC-SHNPP) Mr. John D. Runkle Mr J P OrReilly (NRC-RII) Dr. Richard D. Wilson Mr. Travis Payne (KUDZU) Mr. G. 0. Bright (ASLB)

Mr. Daniel F. Read (CHANGE/ELP) Dr. J. H. Carpenter (ASLB)

Chapel Hill Public Library Mr. J. L. Kelley (ASLB)

Wake County Public Library 8411140370 841108 PDR ADOCK 05000400 A

PDR '

411 Fayettevilte Street ~ P. O. Box 1551 ~ Raleigh, N. C. 27602

@~1 i)o

i>+> tr<,

+ ~ >

'- l l