Informs of Confirmation W/Westinghouse That Reactor Trip Setpoint Methodology Used for Shearon Harris Same as for VC Summer.Fsar Will Be Revised to Reflect High Pressure Safety Analysis Limit of 2,445 Psig
ML18018B812
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 11/08/1984
From: Zimmerman S
CAROLINA POWER & LIGHT CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
NLS-84-473, NUDOCS 8411140370
Download: ML18018B812 (4)


Text

REGULATOR~iNFORMATION DISTRIBUTION TEM (RIDS)

ACCESSION NBR; 8411140'370 DOC ~ DATE: 84/11/08 NOTARIZED: NO FACIL:50 400 'Shearon Harr is Nuclear Power Pl anti Uni t 1q Car ol ina 05000400 AUTH ~ NAME AUTHOR AFFILIATION ZIMMERMANrS,R~ Carolina Power 8 Light Co>

RECIP,NAME RECIPIENT AFFILIATION NOTES'OCKET DENTONiH.R'o'ffice

SUBJECT:

of Nuclear Reactor: Regulatiani Director Informs of conf ir mation w/Westinghouse thap r eator tr ip setpoint methodology used for Shearon Ha< ris same as for VC Summer.FSAR will be revised to =reflect high pressure safety'nalysis limit of 2'i445 psig ~

DISTRIBUTION CODE! 8001D COPIES RECEIVED:LTR ENCL SIZEg TITLE: Licensing Submittal; PSAR/FSAR Amdts 8 Related orrespondence RECIPIENT- COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENC L ID CODE/NAME LTTR EN L NRR/DL/ADL 1 NRR LB3 BC 1 NRR L83 LA 1 BUCKLEY'S 01 1 INTERNAL: ACRS 6 ADM/LFMB 1 ELD/HDS1 1 IE F ILE 1 IE/DEPER/EPB 1 IE/DEPER/IRB 35 1 36'E/DQASIP/QAB21 1 NRR ROEgMiL: 1 NRR/DE/AEAB 1 NRR/DE/CEB 11 1 NRR/DE/EHEB 1 NRR/DE/EQB 13 2 NRR/DE/GB 28 NRR/DE/MEB 18 1 NRR/DE/MTEB 17 1. NRR/DE/SAB 24 1 NRR/DE/SGEB 25 1 NRR/DHFS/HFE840 1 NRR/DHFS/LQB 32 1 NRR/DHFS/PSRB 1 NRR/DL/SSPB NRR/DSI/AEB 26 NRR/DS I/ASS 1 NRR/DSI'/CPB 10 1 NRR/DS I/CSB 09 1 NRR/DS I/ICSB 16 NRR/DSI/PSB 19 1

NRR/DSI/METB 12 1 1 RAB 22 1 NRR/DSI/RSB 23 1 G 04 1 RGN2 3 RM/DDAMI/MI8 1 EXTERNAL: BNL(AMDTS ONLY) DMB/DSS (AMDTS)

FEMA REP DIV 39 LPDR 03 NRC PDR 02: NSIC 05 NTIS TOTAL NUMBER OF COPIES REQUIRED l. LTTR 53 ENCL

0 0 H

~

Hr il '

H' H )HI, Ir

,r'l

) I lh H ll g li

@IRK Carolina Power & Light Company SERIAL: NLS-84-473 Noy 08 1S84.

Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NO. 1 DOCKET NO. 50-400 REACTOR TRIP SETPOINT METHODOLOGY

Dear Mr. Denton:

Carolina Power 6 Light Company has confirmed with Westinghouse Electric Corporation that the reactor trip setpoint methodology used for the Shearon Harris Plant is the same as that used for the Virgil C. Summer Plant. We will revise the Final Safety Analysis Report, Table 15.0.6-1, in a future amendment to reflect a new high pressurizer pressure safety analysis limit of 2445 psig as calculated using the above mentioned reactor trip setpoint methodology, 'per your xequest.

Should you have any questions, please contact Mr. Pedro Salas at (919) 836-8015.

Yours very truly, Manager Nuclear Licensing Section PS/ccc (835PSA)

CC: Mr. B. C. Buckley (NRC) Mr. Wells Eddleman Mr. G. F. Maxwell (NRC-SHNPP) Mr. John D. Runkle Mr J P OrReilly (NRC-RII) Dr. Richard D. Wilson Mr. Travis Payne (KUDZU) Mr. G. 0. Bright (ASLB)

Mr. Daniel F. Read (CHANGE/ELP) Dr. J. H. Carpenter (ASLB)

Chapel Hill Public Library Mr. J. L. Kelley (ASLB)

Wake County Public Library 8411140370 841108 PDR ADOCK 05000400 A

PDR '

411 Fayettevilte Street ~ P. O. Box 1551 ~ Raleigh, N. C. 27602