ML18018B917: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 05/13/1985
| issue date = 05/13/1985
| title = Forwards Rev 1 to Tdi Diesel Generator Design Review & Quality Revalidation Rept. Revised Sections E & F Pages Encl.Util Proceeding W/Const/Mod Work.One Engine to Be Operating by End of Jul 1985
| title = Forwards Rev 1 to Tdi Diesel Generator Design Review & Quality Revalidation Rept. Revised Sections E & F Pages Encl.Util Proceeding W/Const/Mod Work.One Engine to Be Operating by End of Jul 1985
| author name = CUTTER A B
| author name = Cutter A
| author affiliation = CAROLINA POWER & LIGHT CO.
| author affiliation = CAROLINA POWER & LIGHT CO.
| addressee name = DENTON H R
| addressee name = Denton H
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| docket = 05000400
| docket = 05000400
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:REGU ORY INFORNATION DISTRIBUTV SYSTEN (RIDS).,ACCESSIDN NBR:8505160162
{{#Wiki_filter:REGU       ORY INFORNATION DISTRIBUTV       SYSTEN   (RIDS)
~DOC,DATE: 85/05/13 NOTAZEO: NO DOCKET 0 F)CIL'!50-400 Shearon Harris Nuclear Power Planti Unit 1i Carolina 05000400 AUTH, NAME AUTHOR AFFILIATION CUTTERi A~8~Car o 1 ina Power 8 Light Co, RECIP~NAME-RECIPIENT AFFILIATION DENTONiH.R'f f ice of Nuclear Reactor Regul ationi Director  
.,ACCESSIDN NBR:8505160162 F)CIL'!50-400 Shearon
                                  ~
Harris DOC,DATE: 85/05/13   NOTAZEO:
Nuclear Power Planti Unit 1i Carolina NO                    DOCKET 0 05000400 AUTH, NAME             AUTHOR AFFILIATION CUTTERi A ~ 8 ~       Car o 1 ina Power 8 Light Co, RECIP ~ NAME-         RECIPIENT AFFILIATION DENTONiH.R'ff ice               of Nuclear Reactor Regul ationi Director


==SUBJECT:==
==SUBJECT:==
Forwards Rev 1 to"TDI Diesel Generator Design Review Quality Revalidation Rept." Revised Sections E 8 F pages encl, Util proceeding w/const/mod work, One engine to be operating by end of Jul 1985, f 0 DISTRIBUTION CODE~8031D COPIES RECEIVED LTR ENCL>~SIZ TITLE: Transamer i ca Del aval i Inc.(TDI)Diesel ener ator Owners Group NOTES: FILE 04 RECIPIENT ID CODE/NAME.
Forwards Rev     1 to "TDI Diesel Generator     Design Review Quality Revalidation Rept." Revised Sections E 8 F pages encl, Util proceeding w/const/mod work, One engine to be operating by end of Jul 1985, DISTRIBUTION     CODE ~ 8031D COPIES RECEIVED LTR           ENCL>
NRR L83 LA INTERNAL: ACRS AEOD CHIRAMALiM ASLBP GC NRR BERLINGERiC NRR MURPHEYiE NRA SELLERSiD NRR SPANOiA NRR TREHANiN COPIES LTTR ENCL 1 1N 8 1 1 1 1 1 1 1 1 1 1 1~ADM/LFMB ASLAP ELD/HDS1 KIESSEL i D NRR MICHAELSi T NRR PERSINKO NRR SHA&#xc3;iH NRR TOMLINSONiE NRR HRIGHTi R PA RGN2 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT, COPIES ID CODE/NAME LTTR: ENCL'UCKLEYi8 01 1 1 0 EXTERNAL: LPDR NSIC 03 05 1 1<1 1e NRC PDR 02'1~TOTAL NUMBER OF COPIES REQUIRED: LTTR 34 ENCL 33 F II'H M/e~en@I''b lie II II"f'I W I I CML Carolina Power&Light Company MgY 1 3 1985 SERIAL: NLS-85-100 Mr.Harold R.Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NO.1-DOCKET NO.50-000 EMERGENCY DIESEL GENERATORS
f~ 0 SIZ TITLE: Transamer i ca Del aval i Inc. (TDI) Diesel         ener ator   Owners Group NOTES:
RECIPIENT          COPIES          RECIPIENT,            COPIES ID CODE/NAME.         LTTR ENCL      ID CODE/NAME          LTTR:
NRR L83 LA                     1N                    01                          0 ENCL'UCKLEYi8 1                                      1                1 INTERNAL: ACRS                         8          ADM/LFMB                  1 AEOD   CHIRAMALiM         1           ASLAP                      1 ASLBP                    1           ELD/HDS1                   1 GC                        1          KIESSEL i D               1 NRR   BERLINGERiC        1          NRR MICHAELSiT            1 NRR  MURPHEYiE          1          NRR PERSINKO               1 NRA  SELLERSiD          1          NRR SHA&#xc3;iH                 1 NRR  SPANOiA            1          NRR TOMLINSONiE           1 NRR  TREHANiN            1          NRR HRIGHTi R             1 1           PA                        1 FILE        04      1     1 ~  RGN2                      1 EXTERNAL: LPDR                 03     1     1<   NRC PDR         02'                       1~
NSIC              05      1    1e TOTAL NUMBER OF COPIES REQUIRED: LTTR           34   ENCL     33


==Dear Mr.Denton:==
                          /
In a letter dated December 20, 1980+erial No.NLS-80-090), Carolina Power,"~!t:
                'H F II e
Light Company (CPttt:L)submitted the TDI Cgvners'roup (OG)Phase II DR/QR Reportfor the Shearon Harris Nuclear Power Plant (SHNPP)emergency diesel generators.
M
The, SHNPP DR/QR Report was recently revised by the OG.Enclosed in Attachment A is Revision 1 to the subject report.Revision 1 makes editorial corrections and updates pertinent Phase I results that have been revised since the initial issuance of the DR/QR Report.Attachment A to CPRL's December 20, 1980 letter.summarized the status of the SHNPP diesel generators and CPRL's plan fqL.placing the equipment into operation..With the issuance of Revision 1, the Compag would like to also revise Section E and F of Attachment A.Attachment B to this letter provides revised Section E and F pages.Carolina Power i': Light Company has been an active member in the OG and commits to implement the DR/QR report requirements necessary to assure the safe and reliable operation of the diesel generators.
                            ~en@
Deviations from the DR/QR report will be justified and supporting documentation will be available at the plant site for review.The Company is proceeding with the construction/modification work and anticipates operating one of the two engines in the end of the month of July.The implementation of the DR/QR requirements will provide assurance that the SHNPP diesel generators are capable of reliably performing their intended safety function.In addition, previous testing of the Catawba and Commanche Peak diesel generators have demonstrated the adequacy of the equipment/system design.Based on CPRL's implementation of the OG program and the successful lead engine testing, CPRL does not anticipate making additional submittals on the SHNPP diesel generators and considers the issue resolved.pDR 2 8505 850 8 ADOCK 0500Pppp paR 411 Fayettevilte Street o P.0, Box 1551 o Raleigh, N, C.27602 lb 4 I ll I Mr.H.R.Denton Page 2 Should you have any questions concerning this letter, please contact Mr.Patrick P.Carier at (919)836-8165.Yours ery truly ABC/PPC/ccc (1337P PC)Attachments
I''
.Cut er-Vice Presi ent Nuclear Engineering R Licensing Cco Mr.C.A.Barth (NRC)>>Mr.C.H.Berlinger (NRC)(8)>>Mr.B.C.Buckley (NRC)Mr.G.F.Maxwell (NRC-SHNPP)
b lie II    II "f'I W
Dr.3.Nelson Grace (NRC-RII)>>
I I
Mr.Travis Payne (KUDZU)Mr.Daniel F.Read (CHANGE/ELP)
Wake County Public Library>>Mr.Wells Eddleman>>Mr.3ohn D.Runkle Dr.Richard D.Wilson Mr.G.O.Bright (ASLB)Dr.J.H.Carpenter (ASLB)Mr.3.L.Kelley (ASLB)>>Mr.W.W.Laity (PNL)(2)>>" Denotes recipients of Attachment A.
SHEARON HARRIS NUCLEAR POWER PLANT REVISION 1 TO DR/QR REPORT Enclosed is Revision 1 to the DR/QR Report.Please revise your.copy(ies)per the instructions below.NOTE: Revise by component number and unique file identifier which is found in bottom left corner of revised page.VOLUME 1.Title Page (SH2605)Executive Summary (SH2605)Section J.II IIPII5I Section 3.0 (SH2592)Section 4.0 (SH2605)Delete Title Page Page i Page)-)Page 2-7 2-8 2-13 2-17 2-20 2-22 Pages 3-1 thru 3-22 Page 4-1 Insert Title Page Page i N%i-3 Page 2-7 2-8 2-13 2-17 2-20 2-22 Pages 3-1 thru 3-22 Page 4-1 VOLUME 2 Index (SH2651)F-068 (SH2268)MP-022/023 (SH2455)02-380A (SH2141)02-475A (SH2518)02-475C (SH2518)02-420 (SH2204), 02-467B-LB (SH2147)02-717K (SH2641)02-820C (SH1909)Pages i thru xiii Page 1 of 2 Page 2 of 3 Page 2 of'Pages 1 of 4 2of4 3of4 4of4 Pages 1 of 4 2of4 3of4 4of4 Pages 1 of 2 2of2 Pages 1 of 2 2of2 Page 1 of 2 Page 1 of 1 Pages i thru xiii Page 1 of 2 Page 2 of 3 Page 2 of 2 Pages 1 of 4 2of4 3of4 4of4 Pages 1 of 4 2of4 3of4 4of4 Pages 1 of 2 2of2 Pages 1 of 2 2of2 Page 1 of 2 Page 1 of 1 VOLUME 2 (continued) 02-820F (SH2205)02-305A (SH2279)02-310B (SH2652)02-315A (SH2498)02-315C (SH2381)Delete Page 1 of 2 20f 2 Page 3 of 4 Page 1 of 2 Pages 1 of 3 20f3 3 of 3 Bl thru 6 Pages 1 of 3 20f3 Insert Page 1 of 2 2of2 Page 3 of 4 Page 1 of 2 Pages 1 of 4 2of4 3of4 Bl Phru 6 Pages 1 of 2 2of 2 VOLUME 3 Index (SH2651)02-25B (SH2208)02-340A (SH2631)02-340A (SH1745)02-362A (SH2105)02-390E (SH2085)02-335B (SH2556)02-411B (SH2201)Pages i thru xiii Pages 1 of 2 2of 2 Pages 1 of 3 20f 3 ,30f 3 Pages Bl of 8 B4of 8 B8of 8 Page 1 of 2 Page 1 of 2 Page 1 of 2 Page 1 of 2 Pages j thru xiii Pages 1 of 2 2of 2 Pages Bl of 8 B4 of 8 B8 of 8 Page 1 of 2 Page 1 of 2 Page 1 of 2 Page 1 of 2 VOLUME 4 Index (SH2651)02-316A (SH2262)02-316B (SH2262)02-317C (SH2139)02-700A (SH2263)02-700E (SH2135)02-810A (SH1814)02-810C (SH2269)02-810E (SH2207)Pages i Page 2 Page 2 Page 1 Page 2 Page 1 Page 1 Page 1 Page 1 of 3 of 3 of 2 Qf 2 of 2 of 1 Qf 2 of 2 thru xiii Pages i thru xiii Page 2 of 3 Page 2 of 3 Page 1 of 2 Page 2 of 2 Page 1 of 2 Page 1 of 1 Page 1 of.2 Page 1 of 2


VOLUME 4 (continued) 02-360A (SH2382)02-365A (SH2210)02-365B (SH2202)02-825A (SH2599)Appendix II (SH2401)Appendix III (TDI 1154)Del ete Page 1 of 2 Page 1 of 2 Page 1 of 2 Page 1 of,2 Page 1 thru 55 Page 2 Insert Page 1 of 2 Page 1 of 2 Page 1 of 2 Page 1 of 2 Page 1 thru 59 Page 2  
CML Carolina Power & Light Company SERIAL: NLS-85-100 MgY  1 3 1985 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC    20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NO. 1 - DOCKET NO. 50-000 EMERGENCY DIESEL GENERATORS
~0~/}}
 
==Dear Mr. Denton:==
 
In a letter dated December 20, 1980+erial No. NLS-80-090), Carolina Power,"~!t: Light Company (CPttt:L) submitted the TDI Cgvners'roup (OG) Phase II DR/QR Report for the Shearon Harris Nuclear Power Plant (SHNPP) emergency diesel generators. The, SHNPP DR/QR Report was recently revised by the OG. Enclosed in Attachment A is Revision 1 to the subject report. Revision 1 makes editorial corrections and updates pertinent Phase I results that have been revised since the initial issuance of the DR/QR Report.
Attachment A to CPRL's December 20, 1980 letter. summarized the                        status of the SHNPP diesel generators and CPRL's plan fqL. placing the equipment into                      operation..With the issuance of Revision 1, the Compag would like to also revise                          Section E and F of Attachment A. Attachment B to this letter provides revised Section                    E and F pages.
Carolina Power i': Light Company has been an active member in the OG and commits to implement the DR/QR report requirements necessary to assure the safe and reliable operation of the diesel generators. Deviations from the DR/QR report will be justified and supporting documentation will be available at the plant site for review.
The Company is proceeding with the construction/modification work and anticipates operating one of the two engines in the end of the month of July. The implementation of the DR/QR requirements will provide assurance that the SHNPP diesel generators are capable of reliably performing their intended safety function. In addition, previous testing of the Catawba and Commanche Peak diesel generators have demonstrated the adequacy of the equipment/system design. Based on CPRL's implementation of the OG program and the successful lead engine testing, CPRL does not anticipate making additional submittals on the SHNPP diesel generators and considers the issue resolved.
850          2 8505 pDR    ADOCK 8                0500Pppp paR 411 Fayettevilte Street o P. 0, Box 1551 o Raleigh, N, C. 27602 lb
 
I 4
ll I
 
Mr. H. R. Denton Page 2 Should you have any questions    concerning this letter, please contact Mr. Patrick P.
Carier at (919) 836-8165.
Yours ery truly
                                                      . Cut er - Vice Presi ent Nuclear Engineering R Licensing ABC/PPC/ccc      (1337P PC)
Attachments Cco    Mr. C. A. Barth (NRC)>>                      Mr. Wells Eddleman>>
Mr. C. H. Berlinger (NRC) (8)>>              Mr. 3ohn D. Runkle Mr. B. C. Buckley (NRC)                    Dr. Richard D. Wilson Mr. G. F. Maxwell (NRC-SHNPP)              Mr. G. O. Bright (ASLB)
Dr. 3. Nelson Grace (NRC-RII)>>              Dr. J. H. Carpenter (ASLB)
Mr. Travis Payne (KUDZU)                    Mr. 3. L. Kelley (ASLB)>>
Mr. Daniel F. Read (CHANGE/ELP)            Mr. W. W. Laity (PNL) (2)>>
Wake County Public Library>>
"  Denotes recipients of Attachment A.
 
SHEARON HARRIS NUCLEAR POWER PLANT REVISION  1 TO DR/QR REPORT Enclosed    is Revision 1 to the  DR/QR  Report.      Please revise your. copy(ies) per the instructions below.
NOTE:    Revise by component number and unique          file identifier which  is found in bottom left corner of revised page.
Delete                                Insert VOLUME 1
  . Title  Page  (SH2605)              Title Page                          Title Page Executive Summary (SH2605)          Page i                              Page i Section J.II                              )-)                          N% i-3 Page IIPII5I Page 2-7                            Page 2-7 2-8                                2-8 2-13                              2-13 2-17                              2-17 2-20                              2-20 2-22                              2-22 Section 3.0 (SH2592)                Pages 3-1 thru 3-22                Pages 3-1 thru 3-22 Section 4.0 (SH2605)                Page 4-1                            Page 4-1 VOLUME 2 Index (SH2651)                      Pages  i thru xiii                Pages  i thru    xiii F-068 (SH2268)                      Page  1  of  2                    Page  1  of 2 MP-022/023 (SH2455)                  Page 2    of  3                    Page  2 of 3 02-380A (SH2141)                    Page 2    of'                      Page  2 of 2 02-475A (SH2518)                    Pages  1  of    4                Pages    1 of 4 2of4                                2of4 3of4                                3of4 4of4                                4of4 02-475C (SH2518)                    Pages    1  of    4                Pages    1  of  4 2of4                                2of4 3of4                                3of4 4of4                                4of4 02-420 (SH2204),                    Pages    1  of    2                Pages    1  of  2 2of2                                2of2 02-467B-LB (SH2147)                Pages    1  of    2                Pages    1  of  2 2of2                                2of2 02-717K (SH2641)                    Page  1  of  2                    Page  1  of  2 02-820C (SH1909)                    Page  1  of  1                    Page  1  of  1
 
Delete                        Insert VOLUME 2  (continued) 02-820F (SH2205)  Page  1  of  2          Page  1  of  2 20f    2                2of2 02-305A (SH2279)  Page 3    of 4          Page  3    of 4 02-310B (SH2652)  Page  1 of 2            Page  1 of 2 02-315A (SH2498) Pages    1 of 3          Pages    1 of 4 20f3                      2of4 3  of  3                  3of4 Bl thru        6 Bl Phru        6 02-315C (SH2381)  Pages    1  of  3        Pages    1  of  2 20f3                      2of    2 VOLUME 3 Index (SH2651)   Pages    i thru      xiii Pages    j thru xiii 02- 25B (SH2208) Pages    1  of  2 2of    2 02-340A (SH2631)  Pages    1  of  3        Pages    1  of  2 20f    3                  2of    2
                            ,30f      3 02-340A (SH1745) Pages    Bl of 8          Pages    Bl of 8 B4of      8                B4  of  8 B8of      8                B8  of  8 02-362A (SH2105) Page  1 of 2              Page  1    of  2 02-390E (SH2085) Page  1 of 2              Page   1   of 2 02-335B (SH2556)  Page 1 of 2             Page   1   of 2 02-411B (SH2201)  Page 1 of 2             Page   1   of  2 VOLUME 4 Index (SH2651)    Pages  i thru xiii      Pages    i thru     xiii 02-316A (SH2262)  Page 2    of 3          Page  2 of 3 02-316B (SH2262)  Page 2    of 3          Page  2 of 3 02-317C (SH2139)  Page  1    of 2          Page  1 of 2 02-700A (SH2263)  Page 2 Qf 2              Page  2 of 2 02-700E (SH2135)  Page  1    of 2          Page  1 of 2 02-810A (SH1814)  Page  1    of 1          Page  1 of 1 02-810C (SH2269)  Page  1    Qf 2          Page  1 of .2 02-810E (SH2207)  Page  1    of 2          Page   1 of 2
 
Del ete          Insert VOLUME 4  (continued) 02-360A (SH2382)          Page  1  of 2    Page 1 of 2 02-365A (SH2210)          Page  1  of 2    Page 1 of 2 02-365B (SH2202)          Page 1 of 2   Page 1 of 2 02-825A (SH2599)          Page 1 of,2   Page 1 of 2 Appendix  II  (SH2401)    Page 1  thru 55 Page 1 thru 59 Appendix  III (TDI  1154) Page 2          Page 2
 
0
~
    ~/}}

Latest revision as of 04:14, 22 October 2019

Forwards Rev 1 to Tdi Diesel Generator Design Review & Quality Revalidation Rept. Revised Sections E & F Pages Encl.Util Proceeding W/Const/Mod Work.One Engine to Be Operating by End of Jul 1985
ML18018B917
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 05/13/1985
From: Cutter A
CAROLINA POWER & LIGHT CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML18018B918 List:
References
NLS-85-104, NUDOCS 8505160162
Download: ML18018B917 (10)


Text

REGU ORY INFORNATION DISTRIBUTV SYSTEN (RIDS)

.,ACCESSIDN NBR:8505160162 F)CIL'!50-400 Shearon

~

Harris DOC,DATE: 85/05/13 NOTAZEO:

Nuclear Power Planti Unit 1i Carolina NO DOCKET 0 05000400 AUTH, NAME AUTHOR AFFILIATION CUTTERi A ~ 8 ~ Car o 1 ina Power 8 Light Co, RECIP ~ NAME- RECIPIENT AFFILIATION DENTONiH.R'ff ice of Nuclear Reactor Regul ationi Director

SUBJECT:

Forwards Rev 1 to "TDI Diesel Generator Design Review Quality Revalidation Rept." Revised Sections E 8 F pages encl, Util proceeding w/const/mod work, One engine to be operating by end of Jul 1985, DISTRIBUTION CODE ~ 8031D COPIES RECEIVED LTR ENCL>

f~ 0 SIZ TITLE: Transamer i ca Del aval i Inc. (TDI) Diesel ener ator Owners Group NOTES:

RECIPIENT COPIES RECIPIENT, COPIES ID CODE/NAME. LTTR ENCL ID CODE/NAME LTTR:

NRR L83 LA 1N 01 0 ENCL'UCKLEYi8 1 1 1 INTERNAL: ACRS 8 ADM/LFMB 1 AEOD CHIRAMALiM 1 ASLAP 1 ASLBP 1 ELD/HDS1 1 GC 1 KIESSEL i D 1 NRR BERLINGERiC 1 NRR MICHAELSiT 1 NRR MURPHEYiE 1 NRR PERSINKO 1 NRA SELLERSiD 1 NRR SHAÃiH 1 NRR SPANOiA 1 NRR TOMLINSONiE 1 NRR TREHANiN 1 NRR HRIGHTi R 1 1 PA 1 FILE 04 1 1 ~ RGN2 1 EXTERNAL: LPDR 03 1 1< NRC PDR 02' 1~

NSIC 05 1 1e TOTAL NUMBER OF COPIES REQUIRED: LTTR 34 ENCL 33

/

'H F II e

M

~en@

I

b lie II II "f'I W

I I

CML Carolina Power & Light Company SERIAL: NLS-85-100 MgY 1 3 1985 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NO. 1 - DOCKET NO.50-000 EMERGENCY DIESEL GENERATORS

Dear Mr. Denton:

In a letter dated December 20, 1980+erial No. NLS-80-090), Carolina Power,"~!t: Light Company (CPttt:L) submitted the TDI Cgvners'roup (OG) Phase II DR/QR Report for the Shearon Harris Nuclear Power Plant (SHNPP) emergency diesel generators. The, SHNPP DR/QR Report was recently revised by the OG. Enclosed in Attachment A is Revision 1 to the subject report. Revision 1 makes editorial corrections and updates pertinent Phase I results that have been revised since the initial issuance of the DR/QR Report.

Attachment A to CPRL's December 20, 1980 letter. summarized the status of the SHNPP diesel generators and CPRL's plan fqL. placing the equipment into operation..With the issuance of Revision 1, the Compag would like to also revise Section E and F of Attachment A. Attachment B to this letter provides revised Section E and F pages.

Carolina Power i': Light Company has been an active member in the OG and commits to implement the DR/QR report requirements necessary to assure the safe and reliable operation of the diesel generators. Deviations from the DR/QR report will be justified and supporting documentation will be available at the plant site for review.

The Company is proceeding with the construction/modification work and anticipates operating one of the two engines in the end of the month of July. The implementation of the DR/QR requirements will provide assurance that the SHNPP diesel generators are capable of reliably performing their intended safety function. In addition, previous testing of the Catawba and Commanche Peak diesel generators have demonstrated the adequacy of the equipment/system design. Based on CPRL's implementation of the OG program and the successful lead engine testing, CPRL does not anticipate making additional submittals on the SHNPP diesel generators and considers the issue resolved.

850 2 8505 pDR ADOCK 8 0500Pppp paR 411 Fayettevilte Street o P. 0, Box 1551 o Raleigh, N, C. 27602 lb

I 4

ll I

Mr. H. R. Denton Page 2 Should you have any questions concerning this letter, please contact Mr. Patrick P.

Carier at (919) 836-8165.

Yours ery truly

. Cut er - Vice Presi ent Nuclear Engineering R Licensing ABC/PPC/ccc (1337P PC)

Attachments Cco Mr. C. A. Barth (NRC)>> Mr. Wells Eddleman>>

Mr. C. H. Berlinger (NRC) (8)>> Mr. 3ohn D. Runkle Mr. B. C. Buckley (NRC) Dr. Richard D. Wilson Mr. G. F. Maxwell (NRC-SHNPP) Mr. G. O. Bright (ASLB)

Dr. 3. Nelson Grace (NRC-RII)>> Dr. J. H. Carpenter (ASLB)

Mr. Travis Payne (KUDZU) Mr. 3. L. Kelley (ASLB)>>

Mr. Daniel F. Read (CHANGE/ELP) Mr. W. W. Laity (PNL) (2)>>

Wake County Public Library>>

" Denotes recipients of Attachment A.

SHEARON HARRIS NUCLEAR POWER PLANT REVISION 1 TO DR/QR REPORT Enclosed is Revision 1 to the DR/QR Report. Please revise your. copy(ies) per the instructions below.

NOTE: Revise by component number and unique file identifier which is found in bottom left corner of revised page.

Delete Insert VOLUME 1

. Title Page (SH2605) Title Page Title Page Executive Summary (SH2605) Page i Page i Section J.II )-) N% i-3 Page IIPII5I Page 2-7 Page 2-7 2-8 2-8 2-13 2-13 2-17 2-17 2-20 2-20 2-22 2-22 Section 3.0 (SH2592) Pages 3-1 thru 3-22 Pages 3-1 thru 3-22 Section 4.0 (SH2605) Page 4-1 Page 4-1 VOLUME 2 Index (SH2651) Pages i thru xiii Pages i thru xiii F-068 (SH2268) Page 1 of 2 Page 1 of 2 MP-022/023 (SH2455) Page 2 of 3 Page 2 of 3 02-380A (SH2141) Page 2 of' Page 2 of 2 02-475A (SH2518) Pages 1 of 4 Pages 1 of 4 2of4 2of4 3of4 3of4 4of4 4of4 02-475C (SH2518) Pages 1 of 4 Pages 1 of 4 2of4 2of4 3of4 3of4 4of4 4of4 02-420 (SH2204), Pages 1 of 2 Pages 1 of 2 2of2 2of2 02-467B-LB (SH2147) Pages 1 of 2 Pages 1 of 2 2of2 2of2 02-717K (SH2641) Page 1 of 2 Page 1 of 2 02-820C (SH1909) Page 1 of 1 Page 1 of 1

Delete Insert VOLUME 2 (continued) 02-820F (SH2205) Page 1 of 2 Page 1 of 2 20f 2 2of2 02-305A (SH2279) Page 3 of 4 Page 3 of 4 02-310B (SH2652) Page 1 of 2 Page 1 of 2 02-315A (SH2498) Pages 1 of 3 Pages 1 of 4 20f3 2of4 3 of 3 3of4 Bl thru 6 Bl Phru 6 02-315C (SH2381) Pages 1 of 3 Pages 1 of 2 20f3 2of 2 VOLUME 3 Index (SH2651) Pages i thru xiii Pages j thru xiii 02- 25B (SH2208) Pages 1 of 2 2of 2 02-340A (SH2631) Pages 1 of 3 Pages 1 of 2 20f 3 2of 2

,30f 3 02-340A (SH1745) Pages Bl of 8 Pages Bl of 8 B4of 8 B4 of 8 B8of 8 B8 of 8 02-362A (SH2105) Page 1 of 2 Page 1 of 2 02-390E (SH2085) Page 1 of 2 Page 1 of 2 02-335B (SH2556) Page 1 of 2 Page 1 of 2 02-411B (SH2201) Page 1 of 2 Page 1 of 2 VOLUME 4 Index (SH2651) Pages i thru xiii Pages i thru xiii 02-316A (SH2262) Page 2 of 3 Page 2 of 3 02-316B (SH2262) Page 2 of 3 Page 2 of 3 02-317C (SH2139) Page 1 of 2 Page 1 of 2 02-700A (SH2263) Page 2 Qf 2 Page 2 of 2 02-700E (SH2135) Page 1 of 2 Page 1 of 2 02-810A (SH1814) Page 1 of 1 Page 1 of 1 02-810C (SH2269) Page 1 Qf 2 Page 1 of .2 02-810E (SH2207) Page 1 of 2 Page 1 of 2

Del ete Insert VOLUME 4 (continued) 02-360A (SH2382) Page 1 of 2 Page 1 of 2 02-365A (SH2210) Page 1 of 2 Page 1 of 2 02-365B (SH2202) Page 1 of 2 Page 1 of 2 02-825A (SH2599) Page 1 of,2 Page 1 of 2 Appendix II (SH2401) Page 1 thru 55 Page 1 thru 59 Appendix III (TDI 1154) Page 2 Page 2

0

~

~/