{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD.
{{#Wiki_filter:August 28, 2018


KING OF PRUSSIA, PA 19406
==SUBJECT:==
-2713 August 28, 2018 Mr. Richard Bologna Site Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station P.O. Box 4, Route 168 Shippingport, PA 15077 SUBJECT: BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2 UPDATED INSPECTION PLAN INSPECTION REPORT 05000334/2 01800 5 AND 05000412/201800
BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2 UPDATED INSPECTION PLAN INSPECTION REPORT 05000334/2 01800 5 AND 05000412/201800


==Dear Mr. Bologna:==
==Dear Mr. Bologna:==

Revision as of 07:04, 24 May 2019

Updated Inspection Plan Inspection Report 05000334/2018005 and 05000412/2018005
ML18226A078
Person / Time
Site: Beaver Valley
Issue date: 08/28/2018
From: Young M R
NRC/RGN-I/DRP/PB6
To: Bologna R
FirstEnergy Nuclear Operating Co
References
IR 2018005
Download: ML18226A078 (6)


Text

August 28, 2018

SUBJECT:

BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2 UPDATED INSPECTION PLAN INSPECTION REPORT 05000334/2 01800 5 AND 05000412/201800

Dear Mr. Bologna:

The enclosed inspection plan lists the inspections scheduled through June 30 , 20 20 , for Beaver Valley Power Station, Units 1 and 2. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC

's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading

-rm/adams.html (the Public Electronic Reading Room

). Please contact me at 610-337-5205 with any questions you have regarding this letter.

Sincerely,

/RA/ Matthew R. Young, Chief Reactor Projects Branch 6 Division of Reactor Projects Docket Nos.

50-334 and 50

-412 License Nos.

DPR-66 and NPF

-73 Enclosure:

Beaver Valley Inspection Plan cc: Distribution via ListServ SUBJECT: BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2 UPDATED INSPECTION PLAN INSPECTION REPORT 05000334/201800 5 AND 05000412/201800 5 DATED AUGUST 28, 2018 DISTRIBUTION w/encl (via e-mail) DLew, RA, ORA (R1ORAMAIL)

JGiessner, Acting DRA (R1ORAMAIL)

RLorson, DRP (R1DRPMAIL)

DPelton, DRP (R1DRPMAIL)

JYerokun, DRS (R1DRSMAIL)

BWelling, DRS (R1DRSMAIL)

MFerdas, DRP MRYoung, DRP SShaffer, DRP EAllen, DRP JKrafty, DRP SHorvitz, DRP AGould, AA JBowen, RI, OEDO RidsNrrPMBeaverValley Resource RidsNrrDorlLpl1 Resource ROPreports Resource DRS Branch Chiefs (6)

DScrenci, PAO NSheehan, PAO DTifft, SLO ROPAssessment Resource RidsNrrDirslpabResources DOCUMENT NAME:

G:\DRP\BRANCH6\ROP Assessment Folders

\ROP 19\BV Mid-cycle\BV 2nd Quarter ASM letter.docx ADAMS ACCESSION NUMBER:

ML18226A078 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP NAME SShaffer MYoung DATE 8/1/18 8/2/18 OFFICIAL RECORD CO PY Beaver Valley

07/01/2018 - 06/30/2020

Unit Start End Activity CAC Title Staff Count

3rd Quarter Site Support

1, 2 07/01/2018

09/30/2018

IP 71111.19

000711 Post Maintenance Testing

1, 2 07/01/2018

09/30/2018

IP 71153 000749 Followup of Events and Notices of Enforcement Discretion

TRIENNIAL FIRE PROTECTION

1, 2 07/23/2018

07/27/2018

IP 71111.05XT

000697 Fire Protection - NFPA 805 (Triennial)

1, 2 08/06/2018

08/10/2018

IP 71111.05XT

000697 Fire Protection - NFPA 805 (Triennial)

Annual Sample - Isophase Duct Inspections for License Renewal

1, 2 07/30/2018

08/03/2018

IP 71152 000748 Problem Identification and Resolution

BEAVER VALLEY 1 INITIAL OL EXAM

1 08/20/2018

08/24/2018

OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

09/17/2018

09/28/2018

EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)

RAD INSTRUMENTATION

1, 2 09/10/2018

09/14/2018

IP 71124.05

000729 Radiation Monitoring Instrumentation

Unit 2 Inservice Inspection

2 10/29/2018

11/09/2018

IP 71111.08P

000702 Inservice Inspection Activities - PWR

Rad Safety Inspection

1, 2 10/29/2018

11/02/2018

IP 71124.01

000725 Radiological Hazard Assessment and Exposure Controls

1, 2 10/29/2018

11/02/2018

IP 71124.02

000726 Occupational ALARA Planning and Controls

1, 2 10/29/2018

11/02/2018

IP 71124.03

000727 In-Plant Airborne Radioactivity Control and Mitigation

1, 2 10/29/2018

11/02/2018

IP 71124.04

000728 Occupational Dose Assessment

RADWASTE

1, 2 11/05/2018

11/09/2018

IP 71124.08

000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and

Transportation

RAD SAFETY INSPECTION

1, 2 12/10/2018

12/14/2018

IP 71124.01

000725 Radiological Hazard Assessment and Exposure Controls

1, 2 12/10/2018

12/14/2018

IP 71124.02

000726 Occupational ALARA Planning and Controls

1, 2 12/10/2018

12/14/2018

IP 71124.03

000727 In-Plant Airborne Radioactivity Control and Mitigation

1, 2 12/10/2018

12/14/2018

IP 71124.04

000728 Occupational Dose Assessment

8/29/2018 11:28:40 AM

Page

of

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

IP 22 Inspection Activity Plan Report

Beaver Valley

07/01/2018 - 06/30/2020

Unit Start End Activity CAC Title Staff Count

RAD SAFETY INSPECTION

1, 2 12/10/2018

12/14/2018

IP 71151 000746 Performance Indicator Verification

PI&R BIENNIAL

1, 2 03/04/2019

03/08/2019

IP 71152B 000747 Problem Identification and Resolution

1, 2 03/18/2019

03/22/2019

IP 71152B 000747 Problem Identification and Resolution

RAD SAFETY 01,02,03,04

1, 2 03/18/2019

03/22/2019

IP 71124.01

000725 Radiological Hazard Assessment and Exposure Controls

1, 2 03/18/2019

03/22/2019

IP 71124.02

000726 Occupational ALARA Planning and Controls

1, 2 03/18/2019

03/22/2019

IP 71124.03

000727 In-Plant Airborne Radioactivity Control and Mitigation

1, 2 03/18/2019

03/22/2019

IP 71124.04

000729 Occupational Dose Assessment

FORCE-ON-FORCE PLANNING AND EXERCISES

1, 2 03/25/2019

03/29/2019

IP 71130.03

000735 Contingency Response - Force-On-Force Testing

1, 2 04/15/2019

04/19/2019

IP 71130.03

000735 Contingency Response - Force-On-Force Testing

EQ PROGRAM

1, 2 04/29/2019

05/03/2019

IP 71111.21N

000714 Design Bases Assurance Inspection (Programs)

1, 2 05/20/2019

05/24/2019

IP 71111.21N

000714 Design Bases Assurance Inspection (Programs)

BV2 REQUAL INSP WITH P/F RESULTS

2 05/06/2019

05/10/2019

IP 71111.11A

000703 Licensed Operator Requalification Program and Licensed Operator Performance (Annual)

05/06/2019

05/10/2019

IP 71111.11B

000704 Licensed Operator Requalification Program and Licensed Operator Performance (Biennial)

EP PROGRAM INSPECTION

1, 2 06/10/2019

06/14/2019

IP 71114.02

000717 Alert and Notification System Testing

1, 2 06/10/2019

06/14/2019

IP 71114.03

000718 Emergency Response Organization Staffing and Augmentation System

1, 2 06/10/2019

06/14/2019

IP 71114.05

000720 Correction of Emergency Preparedness Weaknesses and Deficiencies

1, 2 06/10/2019

06/14/2019

IP 71151 001397 Performance Indicator Verification

RAD SAFETY REMP

1, 2 07/08/2019

07/12/2019

IP 71124.07

000731 Radiological Environmental Monitoring Program

1, 2 07/08/2019

07/12/2019

IP 71151 000746 Performance Indicator Verification

8/29/2018 11:28:40 AM

Page

of

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

IP 22 Inspection Activity Plan Report

Beaver Valley

07/01/2018 - 06/30/2020

Unit Start End Activity CAC Title Staff Count

Triennial Heat Sink

1, 2 07/15/2019

07/19/2019

IP 71111.07T

000700 Heat Sink Performance -Triennial

ACCESS CONTROL, EQUIP PERF, TRAINING

1, 2 07/22/2019

07/26/2019

IP 71130.02

000734 Access Control

1, 2 07/22/2019

07/26/2019

IP 71130.04

000736 Equipment Performance, Testing, and Maintenance

1, 2 07/22/2019

07/26/2019

IP 71130.07

000739 Security Training

1, 2 07/22/2019

07/26/2019

IP 71151 001338 Performance Indicator Verification

50.59 Process

1, 2 08/12/2019

08/16/2019

IP 71111.17T

000709 Evaluations of Changes, Tests, and Experiments

RAD SAFETY 01,02,03,04

1, 2 08/12/2019

08/16/2019

IP 71124.01

000725 Radiological Hazard Assessment and Exposure Controls

1, 2 08/12/2019

08/16/2019

IP 71124.02

000726 Occupational ALARA Planning and Controls

1, 2 08/12/2019

08/16/2019

IP 71124.03

000727 In-Plant Airborne Radioactivity Control and Mitigation

1, 2 08/12/2019

08/16/2019

IP 71124.04

000729 Occupational Dose Assessment

BEAVER VALLEY 2 INITIAL OL EXAM

2 08/26/2019

08/30/2019

OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

10/07/2019

10/18/2019

EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)

INSERVICE INSPECTION - UNIT 1

1 10/07/2019

10/18/2019

IP 71111.08P

000702 Inservice Inspection Activities - PWR

RAD SAFETY OUT

1, 2 10/28/2019

11/01/2019

IP 71124.01

000725 Radiological Hazard Assessment and Exposure Controls

1, 2 10/28/2019

11/01/2019

IP 71124.02

000726 Occupational ALARA Planning and Controls

1, 2 10/28/2019

11/01/2019

IP 71124.03

000727 In-Plant Airborne Radioactivity Control and Mitigation

1, 2 10/28/2019

11/01/2019

IP 71124.04

000729 Occupational Dose Assessment

1, 2 10/28/2019

11/01/2019

IP 71151 000746 Performance Indicator Verification

Rad Safety Inspection

1, 2 01/27/2020

01/31/2020

IP 71124.01

000725 Radiological Hazard Assessment and Exposure Controls

1, 2 01/27/2020

01/31/2020

IP 71124.02

000726 Occupational ALARA Planning and Controls

1, 2 01/27/2020

01/31/2020

IP 71124.03

000727 In-Plant Airborne Radioactivity Control and Mitigation

8/29/2018 11:28:40 AM

Page

of

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

IP 22 Inspection Activity Plan Report

Beaver Valley

07/01/2018 - 06/30/2020

Unit Start End Activity CAC Title Staff Count

Rad Safety Inspection

1, 2 01/27/2020

01/31/2020

IP 71124.04

000729 Occupational Dose Assessment

BV1 Requal Inspection with P/F Results

1 04/13/2020

04/18/2020

IP 71111.11A

000703 Licensed Operator Requalification Program and Licensed Operator Performance (Annual)

04/13/2020

04/18/2020

IP 71111.11B

000704 Licensed Operator Requalification Program and Licensed Operator Performance (Biennial)

Rad Safety Refuel

1, 2 04/13/2020

04/17/2020

IP 71124.01

000725 Radiological Hazard Assessment and Exposure Controls

1, 2 04/13/2020

04/17/2020

IP 71124.02

000726 Occupational ALARA Planning and Controls

1, 2 04/13/2020

04/17/2020

IP 71124.03

000727 In-Plant Airborne Radioactivity Control and Mitigation

1, 2 04/13/2020

04/17/2020

IP 71124.04

000729 Occupational Dose Assessment

ISI - UNIT 2

2 04/20/2020

05/01/2020

IP 71111.08P

000702 Inservice Inspection Activities - PWR

BEAVER VALLEY EP EXERCISE INSPECTION

1, 2 06/08/2020

06/12/2020

IP 71114.01

000716 Exercise Evaluation

1, 2 06/08/2020

06/12/2020

IP 71151 001397 Performance Indicator Verification

Rad Safety RETS

1, 2 06/22/2020

06/26/2020

IP 71124.06

000730 Radioactive Gaseous and Liquid Effluent Treatment

1, 2 06/22/2020

06/26/2020

IP 71151 000746 Performance Indicator Verification

8/29/2018 11:28:40 AM

Page

of

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

IP 22 Inspection Activity Plan Report