uly 12, 2018

SUBJECT:

BEAVER VALLEY POWER STATION - NRC MATERIAL CONTROL AND ACCOUNTING PROGRAM INSPECTION REPORT NOS.

05000334/2018410 AND 05000412/2018410

Dear Mr. Bologna:

On June 15, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Beaver Valley Power Station, Units 1 and 2, and discussed the inspection results with you and other members of your staff. The results of this inspection are documented in the enclosed report.

The NRC inspectors did not identify any finding or violation of more than minor significance.

This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR), Part 2.390, Public Inspections, Exemptions, Requests for Withholding.

However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response is necessary to provide an acceptable response, please mark your entire response Security-Related Information-Withhold from Public Disclosure under 10 CFR 2.390 in Enclosure contains sensitive, unclassified, non-safeguards information. When separated from the enclosure, the transmittal document is decontrolled. accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Sincerely,

/RA/

Mel Gray, Chief Engineering Branch 1 Division of Reactor Safety Docket Nos. 50-334 and 50-412 License Nos. DPR-66 and NPF-73 Non-Public Enclosure:

NRC Inspection Report Nos. 05000334/2018410 and 05000412/2018410 (OUO-SRI)

cc w/o encl; w/o OUO-SRI: Distribution via ListServ cc w/encl; w/OUO-SRI:

M. Fox, Manager, Site Protection, FENOC, Beaver Valley Station D. Allard, State Liaison Officer, PA DEP C. Salz, State Liaison Officer, State of Ohio J. Frame, State Liaison Officer Designee, State of West Virginia ML18194A460 (Cover letter)

ADAMS ACCESSION NUMBER: ML18194A468 (Cover letter w/enclosure)