Line 1: |
Line 1: |
| {{Adams | | {{Adams |
| | number = ML18348B239 | | | number = ML18089A041 |
| | issue date = 12/14/2018 | | | issue date = 03/29/2018 |
| | title = NRC Examination Report 05000382/2018301 | | | title = Notification of NRC Initial Operator Licensing Examination 05000382/2018301 |
| | author name = Gaddy V G | | | author name = Gaddy V G |
| | author affiliation = NRC/RGN-IV/DRS/OB | | | author affiliation = NRC/RGN-IV/DRS/OB |
Line 10: |
Line 10: |
| | license number = NPF-038 | | | license number = NPF-038 |
| | contact person = | | | contact person = |
| | document report number = ER 2018301 | | | case reference number = 50-382/18-301 |
| | document type = Letter, License-Operator Examination Report | | | document type = Letter, License-Operator, Part 55 Examination Related Material |
| | page count = 10 | | | page count = 4 |
| }} | | }} |
|
| |
|
Line 19: |
Line 19: |
| =Text= | | =Text= |
| {{#Wiki_filter: | | {{#Wiki_filter: |
| [[Issue date::December 14, 2018]] | | [[Issue date::March 29, 2018]] |
|
| |
|
| Mr. John Dinelli, Site Vice President Entergy Operations, Inc. | | Mr. John Dinelli, Site Vice President Entergy Operations, Inc. |
Line 25: |
Line 25: |
| 17265 River Road Killona, LA 70057-0751 | | 17265 River Road Killona, LA 70057-0751 |
|
| |
|
| SUBJECT: WATERFORD STEAM ELECTRIC STATION, UNIT 3 | | SUBJECT: WATERFORD STEAM ELECTRIC STATION, UNIT 3 - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000382/2018301 |
| - NRC EXAMINATION REPORT 05000382/201 8 301
| |
|
| |
|
| ==Dear Mr. Dinelli:== | | ==Dear Mr. Dinelli:== |
| On November 14, 20 18, the U.S. Nuclear Regulatory Commission (NRC) completed an initial operator license examination at Waterford Steam Electric Station, Unit 3. The enclosed report documents the examination results and licensing decisions. The preliminary examination results were discussed on November 9, 2018, with Mr. Rob Simpson, Training Manager, and other members of your staff.
| | In a telephone conversation on February 26, 2018, between Messrs. D. Constance, Superintendent, Training-Nuclear Operations, and B. Larson, Chief Examiner, arrangements were made for the administration of licensing examinations at Waterford Steam Electric Station, Unit 3, during the week of November 5, 2018. |
|
| |
|
| A telephonic exit meeting was conduct ed on December 4, 2018, with Mr. John Signorelli, Regulatory Assurance Manager (Acting), who was provided the NRC licensing decisions.
| | As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 11. The NRC's regional office will discuss with your staff any changes that might be necessary before the examinations are administered. |
|
| |
|
| The examination included the evaluation of three applicant s for reactor operator license s , two applicant s for instant senior reactor operator license s, and five applicants for upgrade senior reactor operator license s. The license examiners determined that all applicants satisfied the requirements of Title 10 of the Code of Federal Regulations (CF R) Part 55, and the appropriate licenses have been issued. | | The written examination outlines were provided to your staff on March 7, 2018. To meet the above schedule, it will be necessary for your staff to furnish the operating test outlines, revised written examination outlines, and reference materials identified in Attachment 3 to ES-201 by June 4, 2018. The written examinations and operating tests, with technical references, will be due by August 17, 2018. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations, an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submi tted to the NRC for review and approval. All materials shall be complete and ready-to-use. |
|
| |
|
| There were no post
| | We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Delays in receiving the required materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be cancelled or rescheduled. In addition, your support for on-site validation of the examinations is required during the week of October 1, 2018. |
| -examination comments submitted by your staff. The Enclosure contains details of this report.
| |
|
| |
|
| No findings were identified during this examination
| | To conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff shall retain the original simulator performance dat a (e.g., system pressures, temperatures, levels, and flows) generated during the operating test scenarios along with any video and audio recordings of the scenarios until the NRC takes its licensing action on all of the applications and |
| . In accordance with 10 CFR 2.390 of the NRC's "Agency Rules of Practice and Procedure," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
| |
| -rm/adams.html (the Public Electronic Reading Room).
| |
|
| |
|
| Sincerely,/RA/ Vincent G. Gaddy, Chief Operations Branch Division of Reactor Safety Docket No.:
| | any adjudicatory actions on any hearing demands are complete. Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered. |
| 50-382 License No.: NPF-38 Enclosure s: 1. Examination Report 05000382/2018301
| |
|
| |
|
| ===w/Attachment:===
| | To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator waiver or excusal requests (if any) (Office of Management and Budget (OMB) approval number 3150-0090) at least 60 days before the first examination date (if able). Mr. B. Larson should be contacted to determine the method for submission of the waiver and/or excusal requests. Preliminary reactor operator and senior reactor operator license applications (OMB approval number 3150-0090) and medical certifications (OMB approval number 3150-0024) should be submitted at least 30 days before the first examination date. If the preliminary applications are not received at least 30 days before the examination date, a postponement may be necessary. Final signed applications, certifying that all training has been completed and requesting any waivers or excusals, as applicable, should be submitted at least 14 days before the first examination date. |
| Supplemental Information 2. Simulator Fidelity Report
| |
|
| |
|
| ML18348B23 9 SUNSI Review:
| | Although the minimum guidelines for receiving waiver or excusal requests is 30 days before the first examination date (preliminary) and 14 days before the first examination date (final), the requests should be submitted as early in the process as possible (see the 60-day guideline, above). Resolutions resulting from verbal inquiries by the licensee to the NRC are not binding. Submittals addressing waivers and/or excusals should be in writing (i.e., on NRC Form 398, or as directed when Mr. Larson is contacted to determine the method for submission). The NRC's final decision on whether to grant a waiver or excusal will be documented on the final (not preliminary) NRC Form 398 submitted for the app licant and will not be provided until the final application is submitted to the NRC. |
| ADAMS: Non-Publicly Available Non-Sensitive Keyword: By: TFarina Yes No Publicly Available Sensitive OFFICE OE:OB SOE:OB OE:OB HP: FCDB C:PBE C:OB NAME TFarina JKirkland MHayes CSteely NO'Keefe VGaddy SIGNATURE /RA/ /RA/ /RA/ /RA by email/ /RA/ /RA/ DATE 12/10/18 12/11/18 12/10/18 12/13/18 12/14/18 12/14/18 Enclosure U.S. NUCLEAR REGULATORY COMMISSION REGION IV Docket No.: 05000382 License No.: NPF-38 Report No.: 05000382/2018 301 Licensee: Entergy Operations, Inc.
| |
|
| |
|
| Facility: Waterford Steam Electric Station, Unit 3 Location: Killona, LA 70057 Dates: November 5
| | Paperwork Reduction Act Statement This letter contains information collection requirements that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved |
| - December 4, 2018 Inspectors:
| |
| T. Farina, Chief Examiner, Operations Engineer J. Kirkland, Senior Operations Engineer M. Hayes, Operations Engineer C. Steely, Health Physicist Approved By:
| |
| Vincent G. Gaddy, Chief Operations Branch Division of Reactor Safety
| |
|
| |
|
| 2
| | by the Office of Management and Budget, approval number 3150-0018. |
|
| |
|
| =SUMMARY=
| | The burden to the public for these voluntary information collections is estimated to average 2,250 hours per examination including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the information collection. You may submit comments on any aspect of the information collection, including suggestions for reducing the burden, to the FOIA, Privacy and Information Collections Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by electronic mail to INFOCOLLECTS.RESOURCE@NRC.GO V; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503. |
| ER 05000382/2018 301; November 5
| |
| - December 4, 2018; Waterford Steam Electric Station, Unit 3; Initial Operator Licensing Examination Report. | |
|
| |
|
| NRC examiners evaluated the competency of three applicant s for reactor operator license s , two applicant s for instant senior reactor operator license s, and five applicant s for upgrade senior reactor operator license s at Waterford Steam Electric Station, Unit 3
| | Public Protection Notification |
| . The licensee developed the examinations using NUREG
| |
| -1021, "Operator Licensing Examination Standards for Power Reactors," Revision 11. The written examination was administered by the licensee on November 14, 2018
| |
| . NRC examiners administered the operating tests on November 5
| |
| -9, 2018. The examiners determined that all applicants satisfied the requirements of 10 CFR Part 55, and the appropriate licenses have been issued.
| |
|
| |
|
| ===A. NRC-Identified and Self-Revealing Findings===
| | The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid OMB control number. In accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice and Procedure," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web Site at http://www.nrc.gov/reading-rm/adams.html. Thank you for your cooperation in this matter. Mr. D. Constance has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Larson at 817-200-1171 or myself at 817-200-1159. |
|
| |
|
| None.
| | Sincerely,/RA/ |
| | Vincent G. Gaddy, Chief Operations Branch Division of Reactor Safety Docket No. 50-382 License No. NPF-38 |
|
| |
|
| ===B. Licensee-Identified Violations===
| | cc: Electronic Distribution |
|
| |
|
| None.
| | ML18089A041 SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword: By: VGG Yes No Publicly Available Sensitive NRC-002 OFFICE SOE:OB C:OB NAME BLarson VGaddy SIGNATURE /RA/ /RA/ DATE 3/25/2018 3/29/2018 |
| | |
| 3
| |
| | |
| =REPORT DETAILS=
| |
| | |
| ==OTHER ACTIVITIES (OA)==
| |
| {{a|4OA5}}
| |
| ==4OA5 Other Activities (Initial Operator License Examination)==
| |
| | |
| ===.1 License Applications===
| |
| | |
| ====a. Scope====
| |
| NRC examiners reviewed all license application s submitted to ensure each applicant satisfied relevant license eligibility requirements.
| |
| | |
| Examiners also audited three of the license applications in detail to confirm that they accurately reflected the subject applicant's qualifications. This audit focused on the applicant's experience and on
| |
| -the-job training, including control manipulations that provided significant reactivity changes.
| |
| | |
| ====b. Findings====
| |
| No findings were identifie d.
| |
| | |
| ===.2 Examination Development===
| |
| | |
| ====a. Scope====
| |
| NRC examiners reviewed integrated examination outlines and draft examinations submitted by the licensee against the requirements of NUREG-1021. The NRC examination team conducted an onsite validation of the operating test s.
| |
| | |
| ====b. Findings====
| |
| NRC examiners provided outline, draft examination and post
| |
| -validation comments to the licensee. The licensee satisfactorily completed comment resolution prior to examination administration.
| |
| | |
| NRC examiners determined the written examinations and operating tests initially submitted by the licensee were within the range of acceptability expected for a proposed examination
| |
| .
| |
| | |
| ===.3 Operator Knowledge and Performance===
| |
| | |
| ====a. Scope====
| |
| On November 14, 2018, the licensee proctored the administration of the written examinations to all ten applicants. The licensee staff graded the written examinations , analyzed the results, and presented their analysis and post examination comments to the NRC on November 28, 2018.
| |
| | |
| The NRC examination team administered the various portions of the operating test s to all applicants on November 5
| |
| -9, 2018.
| |
| | |
| ====b. Findings====
| |
| No findings were identified.
| |
| | |
| All applicants passed the written examination and all parts of the operating test.
| |
| | |
| Th e final written examination s and post examination analysis and comments may be accessed in the ADAMS system under the accession numbers noted in the attachment.
| |
| | |
| The examination team note d one generic weaknesses associated with applicant performance on the simulator JPM section of the operating test.
| |
| | |
| The applicants displayed a weakness responding to an unrecoverable loss of Component Cooling Water (CCW) to Reactor Coolant Pumps while at power
| |
| , caused by an inadvertent Containment Spray Actuation Signal (CSAS)
| |
| . Specifically, three applicants tripped Reactor Coolant Pumps without first tripping the reactor while at 100% power, resulting in an automatic reactor trip.
| |
| | |
| Copies of all individual examination reports were sent to the facility Training Manager for evaluation and determination of appropriate remedial training. This weakness was entered into the licensee's corrective action program as Condition Report WT
| |
| -WTWF3-2018-00099, Corrective Acti on 196. | |
| | |
| ===.4 Simulation Facility Performance===
| |
| | |
| ====a. Scope====
| |
| The NRC examiners observed simulator performance with regard to plant fidelity during examination validation and administration.
| |
| | |
| ====b. Findings====
| |
| No findings were identified. | |
| | |
| During one scenario run, High Pressure Safety Injection (HPSI) Pump B tripped unexpectedly during a large break LOCA. This did not affect the success path of the scenario however. The licensee has entered this into their corrective action program as Simulator Deficiency Report 18-0147.
| |
| | |
| ===.5 Examination Security===
| |
| | |
| ====a. Scope====
| |
| The NRC examiners reviewed examination security for examination development during both the onsite preparation week and examination administration week for compliance with 10 CFR 55.49 and NUREG-1021. Plans for simulator security and applicant control were reviewed and discussed with licensee personnel.
| |
| | |
| ====b. Findings====
| |
| No findings were identified.
| |
| | |
| 5 4OA 6 Meetings, Including Exit
| |
| | |
| ===Exit Meeting Summary===
| |
| The chief examiner presented the preliminary examination results to Mr. Rob Simpson, Training Manager, and other members of the staff on November 9, 2018
| |
| . A telephonic exit was conducted on December 4, 2018, between M r. Thomas Farina, Chief Examiner, and Mr
| |
| . John Signorelli, Regulatory Assurance Manager (Acting)
| |
| . The licensee did not identify any information or materials used during the examination as proprietary.
| |
| | |
| =SUPPLEMENTAL INFORMATION=
| |
| | |
| ==KEY POINTS OF CONTACT==
| |
| | |
| ===Licensee Personnel===
| |
| : [[contact::R. Simpson]], Training Manager
| |
| : [[contact::D. Constance]], Facility Reviewer
| |
| : [[contact::J. Mendoza ]], Lead Examination Writer
| |
| ===NRC Personnel===
| |
| : [[contact::F. Ramirez]], Senior Resident Inspector
| |
| : [[contact::C. Speer]], Resident Inspector
| |
| | |
| ==ADAMS DOCUMENTS REFERENCED==
| |
| Accession No. ML18333A347
| |
| - FINAL WRITTEN EXAMS
| |
| : Accession No. ML18333A348 | |
| - FINAL OPERATING TEST
| |
| : Accession No. ML18333A349
| |
| - POST EXAM ANALYSIS
| |
| -COMMENTS
| |
| : Simulator Fidelity Report Facility Licensee: WATERFORD STEAM ELECTRIC STATION, UNIT 3
| |
| : Facility Docket No.:
| |
| : 50-382
| |
| : Operating Tests Administered on: November 5 to 9, 2018
| |
| : This form is to be used only to report observations.
| |
| : These observations do not constitute audit or inspection findings and, without further verification and review in accordance with
| |
| : IP 71111.11, are not indicative of noncompliance with 10
| |
| : CFR 55.46.
| |
| : No licensee action is required in response to these observations.
| |
| : While conducting the simulator portion of the operating tests, examiners observed the following item:
| |
| : Item
| |
| : Description
| |
| : HPSI Pump B tripped unexpectedly during large break LOCA
| |
| : During one scenario run, High Pressure Safety Injection (HPSI) Pump B tripped unexpectedly during a large break LOCA.
| |
| : This pump did not trip during the other two runs of this scenario, or during exam validation.
| |
| : The success path of the scenario was not affected by this malfunction.
| |
| : The licensee has entered this into their corrective action program as Simulator Deficiency Report 18
| |
| -0147.
| |
| }} | | }} |
|
---|
Category:Letter
MONTHYEARIR 05000382/20230102024-01-31031 January 2024 Comprehensive Engineering Team Inspection Report 05000382/2023010 IR 05000382/20230032024-01-23023 January 2024 Acknowledgment of Reply to a Notice of Violation NRC Inspection Report 05000382/2023003 ML24012A1962024-01-12012 January 2024 Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and ML23340A2292023-12-28028 December 2023 Withdrawal of an Amendment Request to Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability (EPID L-2022-LLA-0169)-LTR ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology Slides and Affidavit for Pre-Submittal Meeting ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1442023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23312A1832023-11-14014 November 2023 Integrated Inspection Report 05000382/2023003 and Notice of Violation ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000382/20234012023-10-0404 October 2023 Cyber Security Inspection Report 05000382/2023401 (Cover Letter Only) IR 05000382/20230052023-08-21021 August 2023 Updated Inspection Plan for Waterford Steam Electric Station, Unit 3 - (Report 05000382/2023005) IR 05000382/20233012023-08-15015 August 2023 NRC Initial Operator Licensing Examination Approval 05000382/2023301 IR 05000382/20230022023-08-0808 August 2023 Integrated Inspection Report 05000382/2023002 IR 05000382/20234022023-08-0707 August 2023 NRC Security Inspection Report 05000382/2023402 (Full Report) IR 05000382/20230402023-07-12012 July 2023 Revised 95001 Supplemental Inspection Report 05000382/2023040, Exercise of Enforcement Discretion, and Follow-Up Assessment Letter ML23191A4562023-07-10010 July 2023 Notification of Comprehensive Engineering Team Inspection (050003822023010) and Request for Information ML23158A1042023-06-0808 June 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000382/2023401 ML23145A2272023-06-0202 June 2023 95001 Supplemental Inspection Report 05000382/2023040, and Exercise of Enforcement Discretion ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment IR 05000382/20230012023-04-24024 April 2023 Integrated Inspection Report 05000382/2023001, Independent Spent Fuel Storage Installation Report 07200075/2023001, and Exercise of Enforcement Discretion ML23111A2132023-04-21021 April 2023 Responses to RAI Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities ML23110A1122023-04-20020 April 2023 Annual Report for Entergy Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d). Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G ML23108A2542023-04-18018 April 2023 WCGS Information Request, Security IR 2023401 IR 05000382/20234032023-04-17017 April 2023 Security Baseline Inspection Report 05000382/2023403 ML23093A2122023-04-0303 April 2023 Annual Report on Westinghouse Electric Company LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models for Calendar Year 2022 ML23089A0602023-03-30030 March 2023 Entergy Operations, Inc. - Fleet Project Manager Assignment ML23088A3922023-03-29029 March 2023 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML23080A2882023-03-21021 March 2023 Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) Entergy Operations, Inc ML23059A2592023-03-0707 March 2023 Correction to Issuance to Amendment No. 270 Adoption of TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML23065A2002023-03-0303 March 2023 EN 56252 Update - Flow Serve - Final Notification of Potential Part 21 on Peerless 56 Frame DC Motors ML23060A1092023-03-0101 March 2023 Proof of Financial Protection (10 CFR 140.15) IR 05000382/20220062023-03-0101 March 2023 Annual Assessment Letter for Waterford Steam Electric Station, Unit 3, (Report 05000382/2022006) ML22322A1092023-02-17017 February 2023 Issuance of Amendment No. 270 Adoption of TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b IR 05000382/20230902023-02-0101 February 2023 Final Significance Determination of a White Finding, NOV, and Follow-Up Assessment Letter; NRC Inspection Report 05000382/2023090 ML23032A5062023-02-0101 February 2023 Technical Specification Index and Bases Update to the NRC for the Period November 11, 2021 Through July 25, 2022 ML23030A6642023-01-27027 January 2023 Flowserve, Part 21 Second Interim Notification Report Re Peerless 56 Frame DC Motors IR 05000382/20220042023-01-26026 January 2023 Integrated Inspection Report 05000382/2022004 and Independent Fuel Storage Installation Inspection Report 07200075/2022001 ML23024A0822023-01-20020 January 2023 Stephens Insurance, Entergy - 2023 Nuclear Energy Liability Evidence of Financial Protection ML23018A2202023-01-18018 January 2023 Quality Assurance Program Manual Reduction in Commitment IR 05000382/20220912023-01-12012 January 2023 Emergency Preparedness Inspection Report 05000382/2022091 and Preliminary White Finding and Apparent Violation IR 05000382/20220032023-01-0505 January 2023 Revised Integrated Inspection Report 05000382/2022003 ML22342B1402022-12-0202 December 2022 56252-EN 56252 - Flowserve - Limitorque - Interim Report Potential Part 21 on Peerless 56 Frame DC Motors ML22300A2082022-11-30030 November 2022 Issuance of Amendment No. 269 Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML22332A5292022-11-29029 November 2022 Notification of NRC Initial Operator Licensing Examination 05000382/2023301 IR 05000382/20220132022-11-28028 November 2022 Design Basis Assurance Inspection (Programs) Inspection Report 05000382/2022013 IR 05000382/20220022022-11-0101 November 2022 Revised Integrated Inspection Report 05000382/2022002 2024-01-31
[Table view] Category:License-Operator
MONTHYEARIR 05000382/20233012023-08-15015 August 2023 NRC Initial Operator Licensing Examination Approval 05000382/2023301 ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML22075A3442022-03-16016 March 2022 Response to Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML22108A2662022-03-0909 March 2022 WAT-2022-02 Public Forms W3F1-2022-0019, WAT-2022-02 Post Exam Analysis2022-03-0909 March 2022 WAT-2022-02 Post Exam Analysis ML21117A2932021-04-28028 April 2021 Notification of NRC Initial Operator Licensing Examination 05000382/2022301 ML21106A1512021-04-16016 April 2021 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations W3F1-2020-0056, 08 Post Exam Analysis2020-09-10010 September 2020 08 Post Exam Analysis ML20267A2132020-08-26026 August 2020 08 Final Operating Test ML20267A2062020-08-26026 August 2020 05000382/202008 Draft Outline Comments ML20267A2092020-08-26026 August 2020 08 Draft Operating Test.Pdf ML20267A2102020-08-26026 August 2020 08 Draft Operating Test Comments ML20267A2082020-08-26026 August 2020 08 Draft Written Exam Comments ES-401-9 ML20267A2072020-08-26026 August 2020 08 Draft Written Exam ML20267A2052020-08-26026 August 2020 08 Draft Outlines ML20267A2122020-08-26026 August 2020 Examination Inspection Report 05000382/2020008 Final Written Exam IR 05000382/20200082020-08-26026 August 2020 Examination Inspection Report 05000382/2020008 Final Outlines ML20294A1372020-08-26026 August 2020 08 Public Forms ML20307A1742020-08-10010 August 2020 08 Exam Approval Letter ML20219A292 ML20072L2192020-03-12012 March 2020 Response to Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations ML20307A1732020-01-0707 January 2020 05000382/2020008 Corporate Notification Letter ML20007E607 ML19135A6642019-05-15015 May 2019 Units 2 & 3; River Bend, and Waterford 3 - Response to RIS 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML19011A3712019-01-10010 January 2019 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2019 ML18304A4862018-10-30030 October 2018 NRC Initial Operator Licensing Examination Approval 05000382/2018301 ML18089A0412018-03-29029 March 2018 Notification of NRC Initial Operator Licensing Examination 05000382/2018301 ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17122A0502017-04-10010 April 2017 2017-03 Post Exam Comments ML17122A0482017-04-0505 April 2017 2017-03 Final Written Examination ML17137A1862017-04-0505 April 2017 WATERFORD-2017-03 Draft Written Examination - Do Not Release Until 4-30-19 ML17137A1842017-04-0505 April 2017 2017-03 Draft Outlines - Do Not Release Until 04/30/2019 ML17137A1852017-04-0505 April 2017 WATERFORD-2017-03 Draft Outline Comments - Do Not Release Until 4-30-19 ML17137A1902017-04-0505 April 2017 2017-03 Final Outlines ML17137A1882017-04-0505 April 2017 WATERFORD-2017-03 Draft Operating Test - Do Not Release Until 4-30-19 ML17137A1892017-04-0505 April 2017 2017-03 Draft Operting Test Comments - Do Not Release Until 04/30/2019 ML17137A1912017-04-0505 April 2017 WATERFORD-2017-03 Public Forms ML17137A1872017-04-0505 April 2017 WATERFORD-2017-03 Draft Written Exam Comments - Do Not Release Until 4-30-19 ML17122A0492017-03-27027 March 2017 2017-03 Final Operating Test - Do Not Release Until 4-30-19.pdf ML17075A3402017-03-14014 March 2017 NRC Initial Operator Licensing Examination Approval 05000382/2017301 ML17013A5482017-01-13013 January 2017 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2017 ML15351A0282015-12-17017 December 2015 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2016 ML15273A3322015-09-30030 September 2015 Generic Fundamentals Examination Results Sept 2015 ML15278A2222015-09-14014 September 2015 2015-09-FINAL Outlines ML15308A3802015-09-14014 September 2015 2015-09 Public Forms ML15278A2442015-09-14014 September 2015 WT-2015-09 Draft Written Exam Comments ML15278A2402015-09-14014 September 2015 WT - 2015 - 09 Draft Operating Test Comments ML15278A2372015-09-14014 September 2015 2015-09 Draft Outline Comments ML15278A2312015-09-14014 September 2015 2015-09 Final Operating Test ML15278A2282015-09-14014 September 2015 2015-09 Final Written Examination ML15273A4332015-09-14014 September 2015 2015-09 Post Exam Comments ML15225A5642015-09-14014 September 2015 2015-09 Draft Operating Test and Revised Outlines 2023-08-15
[Table view] Category:Part 55 Examination Related Material
MONTHYEARIR 05000382/20233012023-08-15015 August 2023 NRC Initial Operator Licensing Examination Approval 05000382/2023301 ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML22075A3442022-03-16016 March 2022 Response to Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML22108A2662022-03-0909 March 2022 WAT-2022-02 Public Forms W3F1-2022-0019, WAT-2022-02 Post Exam Analysis2022-03-0909 March 2022 WAT-2022-02 Post Exam Analysis ML21117A2932021-04-28028 April 2021 Notification of NRC Initial Operator Licensing Examination 05000382/2022301 ML21106A1512021-04-16016 April 2021 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations W3F1-2020-0056, 08 Post Exam Analysis2020-09-10010 September 2020 08 Post Exam Analysis IR 05000382/20200082020-08-26026 August 2020 Examination Inspection Report 05000382/2020008 Final Outlines ML20294A1372020-08-26026 August 2020 08 Public Forms ML20267A2132020-08-26026 August 2020 08 Final Operating Test ML20267A2122020-08-26026 August 2020 Examination Inspection Report 05000382/2020008 Final Written Exam ML20267A2052020-08-26026 August 2020 08 Draft Outlines ML20267A2072020-08-26026 August 2020 08 Draft Written Exam ML20267A2082020-08-26026 August 2020 08 Draft Written Exam Comments ES-401-9 ML20267A2102020-08-26026 August 2020 08 Draft Operating Test Comments ML20267A2092020-08-26026 August 2020 08 Draft Operating Test.Pdf ML20267A2062020-08-26026 August 2020 05000382/202008 Draft Outline Comments ML20307A1742020-08-10010 August 2020 08 Exam Approval Letter ML20219A292 ML20072L2192020-03-12012 March 2020 Response to Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations ML20307A1732020-01-0707 January 2020 05000382/2020008 Corporate Notification Letter ML20007E607 ML19135A6642019-05-15015 May 2019 Units 2 & 3; River Bend, and Waterford 3 - Response to RIS 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML18304A4862018-10-30030 October 2018 NRC Initial Operator Licensing Examination Approval 05000382/2018301 ML18089A0412018-03-29029 March 2018 Notification of NRC Initial Operator Licensing Examination 05000382/2018301 ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17122A0502017-04-10010 April 2017 2017-03 Post Exam Comments ML17137A1862017-04-0505 April 2017 WATERFORD-2017-03 Draft Written Examination - Do Not Release Until 4-30-19 ML17137A1882017-04-0505 April 2017 WATERFORD-2017-03 Draft Operating Test - Do Not Release Until 4-30-19 ML17137A1902017-04-0505 April 2017 2017-03 Final Outlines ML17137A1872017-04-0505 April 2017 WATERFORD-2017-03 Draft Written Exam Comments - Do Not Release Until 4-30-19 ML17137A1892017-04-0505 April 2017 2017-03 Draft Operting Test Comments - Do Not Release Until 04/30/2019 ML17122A0482017-04-0505 April 2017 2017-03 Final Written Examination ML17137A1912017-04-0505 April 2017 WATERFORD-2017-03 Public Forms ML17137A1842017-04-0505 April 2017 2017-03 Draft Outlines - Do Not Release Until 04/30/2019 ML17137A1852017-04-0505 April 2017 WATERFORD-2017-03 Draft Outline Comments - Do Not Release Until 4-30-19 ML17122A0492017-03-27027 March 2017 2017-03 Final Operating Test - Do Not Release Until 4-30-19.pdf ML17075A3402017-03-14014 March 2017 NRC Initial Operator Licensing Examination Approval 05000382/2017301 ML15351A0282015-12-17017 December 2015 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2016 ML15273A3322015-09-30030 September 2015 Generic Fundamentals Examination Results Sept 2015 ML15308A3802015-09-14014 September 2015 2015-09 Public Forms ML15278A2442015-09-14014 September 2015 WT-2015-09 Draft Written Exam Comments ML15278A2402015-09-14014 September 2015 WT - 2015 - 09 Draft Operating Test Comments ML15278A2372015-09-14014 September 2015 2015-09 Draft Outline Comments ML15278A2312015-09-14014 September 2015 2015-09 Final Operating Test ML15278A2282015-09-14014 September 2015 2015-09 Final Written Examination ML15278A2222015-09-14014 September 2015 2015-09-FINAL Outlines ML15273A4332015-09-14014 September 2015 2015-09 Post Exam Comments ML15225A5642015-09-14014 September 2015 2015-09 Draft Operating Test and Revised Outlines ML15225A5222015-09-14014 September 2015 2015-09 Draft Written Exam and Revised Outlines ML15225A4902015-09-14014 September 2015 2015-09-DRAFT Outlines 2023-08-15
[Table view] |
Text
March 29, 2018
Mr. John Dinelli, Site Vice President Entergy Operations, Inc.
17265 River Road Killona, LA 70057-0751
SUBJECT: WATERFORD STEAM ELECTRIC STATION, UNIT 3 - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000382/2018301
Dear Mr. Dinelli:
In a telephone conversation on February 26, 2018, between Messrs. D. Constance, Superintendent, Training-Nuclear Operations, and B. Larson, Chief Examiner, arrangements were made for the administration of licensing examinations at Waterford Steam Electric Station, Unit 3, during the week of November 5, 2018.
As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 11. The NRC's regional office will discuss with your staff any changes that might be necessary before the examinations are administered.
The written examination outlines were provided to your staff on March 7, 2018. To meet the above schedule, it will be necessary for your staff to furnish the operating test outlines, revised written examination outlines, and reference materials identified in Attachment 3 to ES-201 by June 4, 2018. The written examinations and operating tests, with technical references, will be due by August 17, 2018. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations, an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submi tted to the NRC for review and approval. All materials shall be complete and ready-to-use.
We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Delays in receiving the required materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be cancelled or rescheduled. In addition, your support for on-site validation of the examinations is required during the week of October 1, 2018.
To conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff shall retain the original simulator performance dat a (e.g., system pressures, temperatures, levels, and flows) generated during the operating test scenarios along with any video and audio recordings of the scenarios until the NRC takes its licensing action on all of the applications and
any adjudicatory actions on any hearing demands are complete. Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator waiver or excusal requests (if any) (Office of Management and Budget (OMB) approval number 3150-0090) at least 60 days before the first examination date (if able). Mr. B. Larson should be contacted to determine the method for submission of the waiver and/or excusal requests. Preliminary reactor operator and senior reactor operator license applications (OMB approval number 3150-0090) and medical certifications (OMB approval number 3150-0024) should be submitted at least 30 days before the first examination date. If the preliminary applications are not received at least 30 days before the examination date, a postponement may be necessary. Final signed applications, certifying that all training has been completed and requesting any waivers or excusals, as applicable, should be submitted at least 14 days before the first examination date.
Although the minimum guidelines for receiving waiver or excusal requests is 30 days before the first examination date (preliminary) and 14 days before the first examination date (final), the requests should be submitted as early in the process as possible (see the 60-day guideline, above). Resolutions resulting from verbal inquiries by the licensee to the NRC are not binding. Submittals addressing waivers and/or excusals should be in writing (i.e., on NRC Form 398, or as directed when Mr. Larson is contacted to determine the method for submission). The NRC's final decision on whether to grant a waiver or excusal will be documented on the final (not preliminary) NRC Form 398 submitted for the app licant and will not be provided until the final application is submitted to the NRC.
Paperwork Reduction Act Statement This letter contains information collection requirements that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved
by the Office of Management and Budget, approval number 3150-0018.
The burden to the public for these voluntary information collections is estimated to average 2,250 hours0.00289 days <br />0.0694 hours <br />4.133598e-4 weeks <br />9.5125e-5 months <br /> per examination including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the information collection. You may submit comments on any aspect of the information collection, including suggestions for reducing the burden, to the FOIA, Privacy and Information Collections Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by electronic mail to INFOCOLLECTS.RESOURCE@NRC.GO V; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.
Public Protection Notification
The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid OMB control number. In accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice and Procedure," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web Site at http://www.nrc.gov/reading-rm/adams.html. Thank you for your cooperation in this matter. Mr. D. Constance has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Larson at 817-200-1171 or myself at 817-200-1159.
Sincerely,/RA/
Vincent G. Gaddy, Chief Operations Branch Division of Reactor Safety Docket No. 50-382 License No. NPF-38
cc: Electronic Distribution
ML18089A041 SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword: By: VGG Yes No Publicly Available Sensitive NRC-002 OFFICE SOE:OB C:OB NAME BLarson VGaddy SIGNATURE /RA/ /RA/ DATE 3/25/2018 3/29/2018