|
---|
Category:License-Operator
MONTHYEARIR 05000382/20233012023-08-15015 August 2023 NRC Initial Operator Licensing Examination Approval 05000382/2023301 ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML22075A3442022-03-16016 March 2022 Response to Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML22108A2662022-03-0909 March 2022 WAT-2022-02 Public Forms W3F1-2022-0019, WAT-2022-02 Post Exam Analysis2022-03-0909 March 2022 WAT-2022-02 Post Exam Analysis ML21117A2932021-04-28028 April 2021 Notification of NRC Initial Operator Licensing Examination 05000382/2022301 ML21106A1512021-04-16016 April 2021 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations W3F1-2020-0056, 08 Post Exam Analysis2020-09-10010 September 2020 08 Post Exam Analysis ML20267A2132020-08-26026 August 2020 08 Final Operating Test ML20267A2062020-08-26026 August 2020 05000382/202008 Draft Outline Comments ML20267A2092020-08-26026 August 2020 08 Draft Operating Test.Pdf ML20267A2102020-08-26026 August 2020 08 Draft Operating Test Comments ML20267A2082020-08-26026 August 2020 08 Draft Written Exam Comments ES-401-9 ML20267A2072020-08-26026 August 2020 08 Draft Written Exam ML20267A2052020-08-26026 August 2020 08 Draft Outlines ML20267A2122020-08-26026 August 2020 Examination Inspection Report 05000382/2020008 Final Written Exam IR 05000382/20200082020-08-26026 August 2020 Examination Inspection Report 05000382/2020008 Final Outlines ML20294A1372020-08-26026 August 2020 08 Public Forms ML20307A1742020-08-10010 August 2020 08 Exam Approval Letter ML20219A292 ML20072L2192020-03-12012 March 2020 Response to Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations ML20307A1732020-01-0707 January 2020 05000382/2020008 Corporate Notification Letter ML20007E607 ML19135A6642019-05-15015 May 2019 Units 2 & 3; River Bend, and Waterford 3 - Response to RIS 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML19011A3712019-01-10010 January 2019 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2019 ML18304A4862018-10-30030 October 2018 NRC Initial Operator Licensing Examination Approval 05000382/2018301 ML18089A0412018-03-29029 March 2018 Notification of NRC Initial Operator Licensing Examination 05000382/2018301 ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17122A0502017-04-10010 April 2017 2017-03 Post Exam Comments ML17122A0482017-04-0505 April 2017 2017-03 Final Written Examination ML17137A1862017-04-0505 April 2017 WATERFORD-2017-03 Draft Written Examination - Do Not Release Until 4-30-19 ML17137A1842017-04-0505 April 2017 2017-03 Draft Outlines - Do Not Release Until 04/30/2019 ML17137A1852017-04-0505 April 2017 WATERFORD-2017-03 Draft Outline Comments - Do Not Release Until 4-30-19 ML17137A1902017-04-0505 April 2017 2017-03 Final Outlines ML17137A1882017-04-0505 April 2017 WATERFORD-2017-03 Draft Operating Test - Do Not Release Until 4-30-19 ML17137A1892017-04-0505 April 2017 2017-03 Draft Operting Test Comments - Do Not Release Until 04/30/2019 ML17137A1912017-04-0505 April 2017 WATERFORD-2017-03 Public Forms ML17137A1872017-04-0505 April 2017 WATERFORD-2017-03 Draft Written Exam Comments - Do Not Release Until 4-30-19 ML17122A0492017-03-27027 March 2017 2017-03 Final Operating Test - Do Not Release Until 4-30-19.pdf ML17075A3402017-03-14014 March 2017 NRC Initial Operator Licensing Examination Approval 05000382/2017301 ML17013A5482017-01-13013 January 2017 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2017 ML15351A0282015-12-17017 December 2015 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2016 ML15273A3322015-09-30030 September 2015 Generic Fundamentals Examination Results Sept 2015 ML15278A2222015-09-14014 September 2015 2015-09-FINAL Outlines ML15308A3802015-09-14014 September 2015 2015-09 Public Forms ML15278A2442015-09-14014 September 2015 WT-2015-09 Draft Written Exam Comments ML15278A2402015-09-14014 September 2015 WT - 2015 - 09 Draft Operating Test Comments ML15278A2372015-09-14014 September 2015 2015-09 Draft Outline Comments ML15278A2312015-09-14014 September 2015 2015-09 Final Operating Test ML15278A2282015-09-14014 September 2015 2015-09 Final Written Examination ML15273A4332015-09-14014 September 2015 2015-09 Post Exam Comments ML15225A5642015-09-14014 September 2015 2015-09 Draft Operating Test and Revised Outlines 2023-08-15
[Table view] Category:Part 55 Examination Related Material
MONTHYEARIR 05000382/20233012023-08-15015 August 2023 NRC Initial Operator Licensing Examination Approval 05000382/2023301 ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML22075A3442022-03-16016 March 2022 Response to Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML22108A2662022-03-0909 March 2022 WAT-2022-02 Public Forms W3F1-2022-0019, WAT-2022-02 Post Exam Analysis2022-03-0909 March 2022 WAT-2022-02 Post Exam Analysis ML21117A2932021-04-28028 April 2021 Notification of NRC Initial Operator Licensing Examination 05000382/2022301 ML21106A1512021-04-16016 April 2021 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations W3F1-2020-0056, 08 Post Exam Analysis2020-09-10010 September 2020 08 Post Exam Analysis IR 05000382/20200082020-08-26026 August 2020 Examination Inspection Report 05000382/2020008 Final Outlines ML20294A1372020-08-26026 August 2020 08 Public Forms ML20267A2132020-08-26026 August 2020 08 Final Operating Test ML20267A2122020-08-26026 August 2020 Examination Inspection Report 05000382/2020008 Final Written Exam ML20267A2052020-08-26026 August 2020 08 Draft Outlines ML20267A2072020-08-26026 August 2020 08 Draft Written Exam ML20267A2082020-08-26026 August 2020 08 Draft Written Exam Comments ES-401-9 ML20267A2102020-08-26026 August 2020 08 Draft Operating Test Comments ML20267A2092020-08-26026 August 2020 08 Draft Operating Test.Pdf ML20267A2062020-08-26026 August 2020 05000382/202008 Draft Outline Comments ML20307A1742020-08-10010 August 2020 08 Exam Approval Letter ML20219A292 ML20072L2192020-03-12012 March 2020 Response to Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations ML20307A1732020-01-0707 January 2020 05000382/2020008 Corporate Notification Letter ML20007E607 ML19135A6642019-05-15015 May 2019 Units 2 & 3; River Bend, and Waterford 3 - Response to RIS 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML18304A4862018-10-30030 October 2018 NRC Initial Operator Licensing Examination Approval 05000382/2018301 ML18089A0412018-03-29029 March 2018 Notification of NRC Initial Operator Licensing Examination 05000382/2018301 ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17122A0502017-04-10010 April 2017 2017-03 Post Exam Comments ML17137A1862017-04-0505 April 2017 WATERFORD-2017-03 Draft Written Examination - Do Not Release Until 4-30-19 ML17137A1882017-04-0505 April 2017 WATERFORD-2017-03 Draft Operating Test - Do Not Release Until 4-30-19 ML17137A1902017-04-0505 April 2017 2017-03 Final Outlines ML17137A1872017-04-0505 April 2017 WATERFORD-2017-03 Draft Written Exam Comments - Do Not Release Until 4-30-19 ML17137A1892017-04-0505 April 2017 2017-03 Draft Operting Test Comments - Do Not Release Until 04/30/2019 ML17122A0482017-04-0505 April 2017 2017-03 Final Written Examination ML17137A1912017-04-0505 April 2017 WATERFORD-2017-03 Public Forms ML17137A1842017-04-0505 April 2017 2017-03 Draft Outlines - Do Not Release Until 04/30/2019 ML17137A1852017-04-0505 April 2017 WATERFORD-2017-03 Draft Outline Comments - Do Not Release Until 4-30-19 ML17122A0492017-03-27027 March 2017 2017-03 Final Operating Test - Do Not Release Until 4-30-19.pdf ML17075A3402017-03-14014 March 2017 NRC Initial Operator Licensing Examination Approval 05000382/2017301 ML15351A0282015-12-17017 December 2015 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2016 ML15273A3322015-09-30030 September 2015 Generic Fundamentals Examination Results Sept 2015 ML15308A3802015-09-14014 September 2015 2015-09 Public Forms ML15278A2442015-09-14014 September 2015 WT-2015-09 Draft Written Exam Comments ML15278A2402015-09-14014 September 2015 WT - 2015 - 09 Draft Operating Test Comments ML15278A2372015-09-14014 September 2015 2015-09 Draft Outline Comments ML15278A2312015-09-14014 September 2015 2015-09 Final Operating Test ML15278A2282015-09-14014 September 2015 2015-09 Final Written Examination ML15278A2222015-09-14014 September 2015 2015-09-FINAL Outlines ML15273A4332015-09-14014 September 2015 2015-09 Post Exam Comments ML15225A5642015-09-14014 September 2015 2015-09 Draft Operating Test and Revised Outlines ML15225A5222015-09-14014 September 2015 2015-09 Draft Written Exam and Revised Outlines ML15225A4902015-09-14014 September 2015 2015-09-DRAFT Outlines 2023-08-15
[Table view] |
Text
DRAFT OUTLINE COMMENTS Facility: WAT First Exam Date: 03/27/17 Written Exam Outline (12/15/2016)
Comment Resolution 1 NRC Generated 2
3 4
5 Administrative JPM Outline (12/15/2016)
Comment Resolution 1 No Comments 2
3 4
5 Control Room / In-Plant System JPM Outline (12/15/2016)
Comment Resolution General comment-it is better to start with New Chief Examiner assigned 1/24/17. All 5 Alt path JPMs in case one gets thrown outline comments resolved via revisions to out or is not really alt path during the draft operating test submittal.
validation. Your call for now since we are at outline stages. Four is the absolute minimum to meet the standard which is what you have.
1 2
3 4
5 6
For JPM S7 this is not an E category New Chief Examiner assigned 1/24/17. All JPM since it is not in-plant JPM. The outline comments resolved via revisions to 7
tables are also wrong because of this the draft operating test submittal.
and will need updating. OBDI 202 - IOLE Process Rev 1
8 Simulator Scenario Outline Comments (12/15/2016)
Comment Resolution
- 1. Event 5 is a Major since the New Chief Examiner assigned 1/24/17. All reactor trip is an ATWT. outline comments resolved via revisions to
- 2. Probably need an ATC bean the draft operating test submittal.
before the majors on this one to 1
balance the scenario.
- 3. Every scenario needs a CT table added (see example at end of this table).
- 1. Every scenario needs a CT table New Chief Examiner assigned 1/24/17. All added (see example at end of outline comments resolved via revisions to this table). the draft operating test submittal.
2
- 2. Split event 8 into two line items since you malfunctions.
- 1. Split event 7 into two line items New Chief Examiner assigned 1/24/17. All since you malfunctions. outline comments resolved via revisions to
- 2. Every scenario needs a CT table the draft operating test submittal.
3 added (see example at end of this table).
- 1. I think that you need to split out New Chief Examiner assigned 1/24/17. All event 5 to several lines for clarity. outline comments resolved via revisions to Event 5 is an RCS leak with the draft operating test submittal.
failure of auto start of Charging pump A. Then event 6 would be that the leaks grows to a LOCA, which is a Major. The next event is a malfunction after EOP entry 4 and this would be event 7 (CS-125B). Event 8 would be the second Major (MSLB) and event 9 is the second malfunction after EOP entry, currently listed as event 7 (the CS-125A valve).
- 2. Every scenario needs a CT table added (see example at end of this table). OBDI 202 - IOLE Process Rev 1
You need to have a Critical Task list table (see example below from RB). It contains each CT and its basis as well as the footnote for post-scenario CTs.
Critical Task Number Description Basis Per EOP basis, An area temperature above its maximum normal operating level is an indication that steam from a primary system may be discharging into the secondary containment. As temperatures Per EOP-3, close one RWCU continue to increase, the continued isolation valve (G33-MOV-1 OR operability of equipment needed to carry 1 G33-MOV-4) after failure to close on out EOP actions may be compromised.
group 15 isolation before completion High area temperatures also present a of step 5.9 of AOP-3 (EOP-3, SC-4) danger to personnel, a consideration of significance since access to the secondary containment may be required by actions specified in the EOPs.
(EPSTG*0002, B-9-3)
Per EOP basis, Submergence is the preferred method for cooling the core. The core is adequately cooled by Restore HPCS injection prior to submergence when it can be determined 2 Emergency Depressurization (EOP- that RPV water level is at or above the top 1, ALC-8). of the active fuel. All fuel nodes are then assumed to be covered with water and heat is removed by boiling heat transfer.
(EPSTG*0002, B-3-1) OBDI 202 - IOLE Process Rev 1
- Critical Task (As defined in NUREG 1021 Appendix D)
- Per NUREG-1021, Appendix D, If an operator or the crew significantly deviates from or fails to follow procedures that affect the maintenance of basic safety functions, those actions may form the basis of a CT identified in the post-scenario review. OBDI 202 - IOLE Process Rev 1