DRAFT OUTLINE COMMENTS Facility: WAT First Exam Date: 03/27/17 Written Exam Outline (12/15/2016)

Comment Resolution 1 NRC Generated 2

3 4

5 Administrative JPM Outline (12/15/2016)

Comment Resolution 1 No Comments 2

3 4

5 Control Room / In-Plant System JPM Outline (12/15/2016)

Comment Resolution General comment-it is better to start with New Chief Examiner assigned 1/24/17. All 5 Alt path JPMs in case one gets thrown outline comments resolved via revisions to out or is not really alt path during the draft operating test submittal.

validation. Your call for now since we are at outline stages. Four is the absolute minimum to meet the standard which is what you have.

1 2

3 4

5 6

For JPM S7 this is not an E category New Chief Examiner assigned 1/24/17. All JPM since it is not in-plant JPM. The outline comments resolved via revisions to 7

tables are also wrong because of this the draft operating test submittal.

and will need updating. OBDI 202 - IOLE Process Rev 1

8 Simulator Scenario Outline Comments (12/15/2016)

Comment Resolution

1. Event 5 is a Major since the New Chief Examiner assigned 1/24/17. All reactor trip is an ATWT. outline comments resolved via revisions to
2. Probably need an ATC bean the draft operating test submittal.

before the majors on this one to 1

balance the scenario.

3. Every scenario needs a CT table added (see example at end of this table).
1. Every scenario needs a CT table New Chief Examiner assigned 1/24/17. All added (see example at end of outline comments resolved via revisions to this table). the draft operating test submittal.

2

2. Split event 8 into two line items since you malfunctions.
1. Split event 7 into two line items New Chief Examiner assigned 1/24/17. All since you malfunctions. outline comments resolved via revisions to
2. Every scenario needs a CT table the draft operating test submittal.

3 added (see example at end of this table).

1. I think that you need to split out New Chief Examiner assigned 1/24/17. All event 5 to several lines for clarity. outline comments resolved via revisions to Event 5 is an RCS leak with the draft operating test submittal.

failure of auto start of Charging pump A. Then event 6 would be that the leaks grows to a LOCA, which is a Major. The next event is a malfunction after EOP entry 4 and this would be event 7 (CS-125B). Event 8 would be the second Major (MSLB) and event 9 is the second malfunction after EOP entry, currently listed as event 7 (the CS-125A valve).

2. Every scenario needs a CT table added (see example at end of this table). OBDI 202 - IOLE Process Rev 1

You need to have a Critical Task list table (see example below from RB). It contains each CT and its basis as well as the footnote for post-scenario CTs.

Critical Task Number Description Basis Per EOP basis, An area temperature above its maximum normal operating level is an indication that steam from a primary system may be discharging into the secondary containment. As temperatures Per EOP-3, close one RWCU continue to increase, the continued isolation valve (G33-MOV-1 OR operability of equipment needed to carry 1 G33-MOV-4) after failure to close on out EOP actions may be compromised.

group 15 isolation before completion High area temperatures also present a of step 5.9 of AOP-3 (EOP-3, SC-4) danger to personnel, a consideration of significance since access to the secondary containment may be required by actions specified in the EOPs.

(EPSTG*0002, B-9-3)

Per EOP basis, Submergence is the preferred method for cooling the core. The core is adequately cooled by Restore HPCS injection prior to submergence when it can be determined 2 Emergency Depressurization (EOP- that RPV water level is at or above the top 1, ALC-8). of the active fuel. All fuel nodes are then assumed to be covered with water and heat is removed by boiling heat transfer.

(EPSTG*0002, B-3-1) OBDI 202 - IOLE Process Rev 1

  • Critical Task (As defined in NUREG 1021 Appendix D)