Category:Letter
MONTHYEARIR 05000382/20244022024-10-10010 October 2024 Security Baseline Inspection Report 05000382/2024402 Public IR 05000382/20244032024-10-0909 October 2024 Security Baseline Inspection Report 05000382/2024403 IR 05000382/20240112024-10-0101 October 2024 State Fire Protection Team Inspection Report 05000382/2024011 IR 05000382/20230042024-09-27027 September 2024 Amended Integrated Inspection Report 05000382/2023004 ML24229A1042024-09-25025 September 2024 Integrated Inspection Report 05000382/2023004, Disputed Non-Cited Violation Revised ML24268A1132024-09-24024 September 2024 Acknowledgment of Response to NRC Inspection Report 05000382/2024013, and Notice of Violation ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000382/20240052024-08-21021 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Waterford Steam Electric Station, Unit 3 Report 05000382/2024005 ML24220A2642024-08-20020 August 2024 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment IR 05000382/20240132024-08-20020 August 2024 Notice of Violation; NRC Inspection Report 05000382/2024013 ML24228A2612024-08-20020 August 2024 Notice of Violation; NRC Inspection Report 05000382/2024013 05000382/LER-2024-004, Automatic Reactor Trip Due to Lightning Strike2024-08-15015 August 2024 Automatic Reactor Trip Due to Lightning Strike IR 05000382/20240022024-08-0808 August 2024 Integrated Inspection Report 05000382/2024002 ML24164A2512024-08-0707 August 2024 Issuance of Amendment No. 271 Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program ML24213A1632024-08-0101 August 2024 2024 Waterford Notification of Biennial Problem Identification and Resolution Inspection and Request for Information ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification ML24150A3852024-06-0404 June 2024 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000382/2024011) and Request for Information ML24060A2192024-05-30030 May 2024 Authorization of Alternative to Use EN-RR-01 Concerning Proposed Alternative to Adopt Code Case N-752 ML24141A1012024-05-20020 May 2024 Amended Integrated Inspection Report 05000382/2023004 ML24137A3352024-05-16016 May 2024 Automatic Reactor Trip Due to Transformer Failure ML24128A0422024-05-0707 May 2024 License Amendment Request to Remove Obsolete License Conditions IR 05000382/20240012024-05-0606 May 2024 Integrated Inspection Report 05000382/2024001 ML24067A1032024-04-25025 April 2024 Closeout of Generic Letter 2004 02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors ML24101A3882024-04-10010 April 2024 Response to Request for Confirmation of Information by the Office of Nuclear Reactor Regulation Proposed Alternative Request EN-RR-22-001 Risk-Informed Categorization and Treatment for Repair ML24089A2262024-03-29029 March 2024 Entergy Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Exams IR 05000382/20244012024-03-18018 March 2024 Material Control and Accounting Program Inspection Report 05000382/2024401 ML24074A3742024-03-15015 March 2024 Acknowledgement of Response to NRC Inspection Report 05000382/2023004 and Disputed Non-Cited Violation ML24075A1712024-03-15015 March 2024 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML24074A2892024-03-14014 March 2024 Proof of Financial Protection (10 CFR 140.15) ML24032A0032024-03-0606 March 2024 – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0053 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000382/20230062024-02-28028 February 2024 Annual Assessment Letter for Waterford Steam Electric Station, Unit 3 Report 05000382/2023006 ML24039A1992024-02-12012 February 2024 – Integrated Inspection Report 05000382/2023004 IR 05000382/20230102024-01-31031 January 2024 Comprehensive Engineering Team Inspection Report 05000382/2023010 IR 05000382/20230032024-01-23023 January 2024 Acknowledgment of Reply to a Notice of Violation NRC Inspection Report 05000382/2023003 ML24012A1962024-01-12012 January 2024 Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 – Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and ML23340A2292023-12-28028 December 2023 Withdrawal of an Amendment Request to Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability (EPID L-2022-LLA-0169)-LTR ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology – Slides and Affidavit for Pre-Submittal Meeting ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1442023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23312A1832023-11-14014 November 2023 Integrated Inspection Report 05000382/2023003 and Notice of Violation ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000382/20234012023-10-0404 October 2023 Cyber Security Inspection Report 05000382/2023401 (Cover Letter Only) IR 05000382/20230052023-08-21021 August 2023 Updated Inspection Plan for Waterford Steam Electric Station, Unit 3 - (Report 05000382/2023005) IR 05000382/20233012023-08-15015 August 2023 NRC Initial Operator Licensing Examination Approval 05000382/2023301 IR 05000382/20230022023-08-0808 August 2023 Integrated Inspection Report 05000382/2023002 IR 05000382/20234022023-08-0707 August 2023 NRC Security Inspection Report 05000382/2023402 (Full Report) 2024-09-06
[Table view] Category:License-Operator
MONTHYEARIR 05000382/20253012024-09-0303 September 2024 Notification of NRC Initial Operator Licensing Examination 05000382/2025301 IR 05000382/20233012023-08-15015 August 2023 NRC Initial Operator Licensing Examination Approval 05000382/2023301 ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML22075A3442022-03-16016 March 2022 Response to Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations W3F1-2022-0019, WAT-2022-02 Post Exam Analysis2022-03-0909 March 2022 WAT-2022-02 Post Exam Analysis ML22108A2662022-03-0909 March 2022 WAT-2022-02 Public Forms ML21117A2932021-04-28028 April 2021 Notification of NRC Initial Operator Licensing Examination 05000382/2022301 ML21106A1512021-04-16016 April 2021 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations W3F1-2020-0056, 08 Post Exam Analysis2020-09-10010 September 2020 08 Post Exam Analysis ML20267A2062020-08-26026 August 2020 05000382/202008 Draft Outline Comments ML20267A2082020-08-26026 August 2020 08 Draft Written Exam Comments ES-401-9 ML20267A2072020-08-26026 August 2020 08 Draft Written Exam ML20267A2052020-08-26026 August 2020 08 Draft Outlines ML20267A2122020-08-26026 August 2020 Examination Inspection Report 05000382/2020008 Final Written Exam ML20267A2132020-08-26026 August 2020 08 Final Operating Test IR 05000382/20200082020-08-26026 August 2020 Examination Inspection Report 05000382/2020008 Final Outlines ML20294A1372020-08-26026 August 2020 08 Public Forms ML20267A2092020-08-26026 August 2020 08 Draft Operating Test.Pdf ML20267A2102020-08-26026 August 2020 08 Draft Operating Test Comments ML20307A1742020-08-10010 August 2020 08 Exam Approval Letter ML20219A292 ML20072L2192020-03-12012 March 2020 Response to Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations ML20307A1732020-01-0707 January 2020 05000382/2020008 Corporate Notification Letter ML20007E607 ML19135A6642019-05-15015 May 2019 Units 2 & 3; River Bend, and Waterford 3 - Response to RIS 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML19011A3712019-01-10010 January 2019 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2019 ML18304A4862018-10-30030 October 2018 NRC Initial Operator Licensing Examination Approval 05000382/2018301 ML18089A0412018-03-29029 March 2018 Notification of NRC Initial Operator Licensing Examination 05000382/2018301 ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17122A0502017-04-10010 April 2017 2017-03 Post Exam Comments ML17137A1872017-04-0505 April 2017 WATERFORD-2017-03 Draft Written Exam Comments - Do Not Release Until 4-30-19 ML17137A1912017-04-0505 April 2017 WATERFORD-2017-03 Public Forms ML17137A1892017-04-0505 April 2017 2017-03 Draft Operting Test Comments - Do Not Release Until 04/30/2019 ML17137A1882017-04-0505 April 2017 WATERFORD-2017-03 Draft Operating Test - Do Not Release Until 4-30-19 ML17137A1902017-04-0505 April 2017 2017-03 Final Outlines ML17137A1852017-04-0505 April 2017 WATERFORD-2017-03 Draft Outline Comments - Do Not Release Until 4-30-19 ML17137A1842017-04-0505 April 2017 2017-03 Draft Outlines - Do Not Release Until 04/30/2019 ML17137A1862017-04-0505 April 2017 WATERFORD-2017-03 Draft Written Examination - Do Not Release Until 4-30-19 ML17122A0482017-04-0505 April 2017 2017-03 Final Written Examination ML17122A0492017-03-27027 March 2017 2017-03 Final Operating Test - Do Not Release Until 4-30-19.pdf ML17075A3402017-03-14014 March 2017 NRC Initial Operator Licensing Examination Approval 05000382/2017301 ML17013A5482017-01-13013 January 2017 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2017 ML15351A0282015-12-17017 December 2015 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2016 ML15273A3322015-09-30030 September 2015 Generic Fundamentals Examination Results Sept 2015 ML15308A3802015-09-14014 September 2015 2015-09 Public Forms ML15278A2442015-09-14014 September 2015 WT-2015-09 Draft Written Exam Comments ML15278A2402015-09-14014 September 2015 WT - 2015 - 09 Draft Operating Test Comments ML15278A2372015-09-14014 September 2015 2015-09 Draft Outline Comments ML15278A2312015-09-14014 September 2015 2015-09 Final Operating Test ML15278A2282015-09-14014 September 2015 2015-09 Final Written Examination ML15278A2222015-09-14014 September 2015 2015-09-FINAL Outlines ML15273A4332015-09-14014 September 2015 2015-09 Post Exam Comments 2024-09-03
[Table view] Category:Part 55 Examination Related Material
MONTHYEARIR 05000382/20253012024-09-0303 September 2024 Notification of NRC Initial Operator Licensing Examination 05000382/2025301 IR 05000382/20233012023-08-15015 August 2023 NRC Initial Operator Licensing Examination Approval 05000382/2023301 ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML22075A3442022-03-16016 March 2022 Response to Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML22108A2662022-03-0909 March 2022 WAT-2022-02 Public Forms W3F1-2022-0019, WAT-2022-02 Post Exam Analysis2022-03-0909 March 2022 WAT-2022-02 Post Exam Analysis ML21117A2932021-04-28028 April 2021 Notification of NRC Initial Operator Licensing Examination 05000382/2022301 ML21106A1512021-04-16016 April 2021 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations W3F1-2020-0056, 08 Post Exam Analysis2020-09-10010 September 2020 08 Post Exam Analysis ML20294A1372020-08-26026 August 2020 08 Public Forms ML20267A2132020-08-26026 August 2020 08 Final Operating Test IR 05000382/20200082020-08-26026 August 2020 Examination Inspection Report 05000382/2020008 Final Outlines ML20267A2122020-08-26026 August 2020 Examination Inspection Report 05000382/2020008 Final Written Exam ML20267A2052020-08-26026 August 2020 08 Draft Outlines ML20267A2072020-08-26026 August 2020 08 Draft Written Exam ML20267A2082020-08-26026 August 2020 08 Draft Written Exam Comments ES-401-9 ML20267A2102020-08-26026 August 2020 08 Draft Operating Test Comments ML20267A2092020-08-26026 August 2020 08 Draft Operating Test.Pdf ML20267A2062020-08-26026 August 2020 05000382/202008 Draft Outline Comments ML20307A1742020-08-10010 August 2020 08 Exam Approval Letter ML20219A292 ML20072L2192020-03-12012 March 2020 Response to Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations ML20307A1732020-01-0707 January 2020 05000382/2020008 Corporate Notification Letter ML20007E607 ML19135A6642019-05-15015 May 2019 Units 2 & 3; River Bend, and Waterford 3 - Response to RIS 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML18304A4862018-10-30030 October 2018 NRC Initial Operator Licensing Examination Approval 05000382/2018301 ML18089A0412018-03-29029 March 2018 Notification of NRC Initial Operator Licensing Examination 05000382/2018301 ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17122A0502017-04-10010 April 2017 2017-03 Post Exam Comments ML17137A1872017-04-0505 April 2017 WATERFORD-2017-03 Draft Written Exam Comments - Do Not Release Until 4-30-19 ML17137A1862017-04-0505 April 2017 WATERFORD-2017-03 Draft Written Examination - Do Not Release Until 4-30-19 ML17137A1882017-04-0505 April 2017 WATERFORD-2017-03 Draft Operating Test - Do Not Release Until 4-30-19 ML17137A1902017-04-0505 April 2017 2017-03 Final Outlines ML17137A1892017-04-0505 April 2017 2017-03 Draft Operting Test Comments - Do Not Release Until 04/30/2019 ML17137A1912017-04-0505 April 2017 WATERFORD-2017-03 Public Forms ML17122A0482017-04-0505 April 2017 2017-03 Final Written Examination ML17137A1852017-04-0505 April 2017 WATERFORD-2017-03 Draft Outline Comments - Do Not Release Until 4-30-19 ML17137A1842017-04-0505 April 2017 2017-03 Draft Outlines - Do Not Release Until 04/30/2019 ML17122A0492017-03-27027 March 2017 2017-03 Final Operating Test - Do Not Release Until 4-30-19.pdf ML17075A3402017-03-14014 March 2017 NRC Initial Operator Licensing Examination Approval 05000382/2017301 ML15351A0282015-12-17017 December 2015 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2016 ML15273A3322015-09-30030 September 2015 Generic Fundamentals Examination Results Sept 2015 ML15308A3802015-09-14014 September 2015 2015-09 Public Forms ML15278A2442015-09-14014 September 2015 WT-2015-09 Draft Written Exam Comments ML15278A2402015-09-14014 September 2015 WT - 2015 - 09 Draft Operating Test Comments ML15278A2372015-09-14014 September 2015 2015-09 Draft Outline Comments ML15278A2312015-09-14014 September 2015 2015-09 Final Operating Test ML15278A2282015-09-14014 September 2015 2015-09 Final Written Examination ML15278A2222015-09-14014 September 2015 2015-09-FINAL Outlines ML15273A4332015-09-14014 September 2015 2015-09 Post Exam Comments ML15225A5642015-09-14014 September 2015 2015-09 Draft Operating Test and Revised Outlines ML15225A5222015-09-14014 September 2015 2015-09 Draft Written Exam and Revised Outlines 2024-09-03
[Table view] |
See also: IR 05000382/2017301
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION IV
1600 E. LAMAR BLVD
ARLINGTON, TX 76011-4511
March 14, 2017
Mr. Michael R. Chisum
Site Vice President
Entergy Operations, Inc.
17265 River Road
Killona, LA 70057-0751
SUBJECT: WATERFORD STEAM ELECTRIC STATION, UNIT 3: NRC INITIAL
OPERATOR LICENSING EXAMINATION APPROVAL 05000382/2017301
Dear Mr. Chisum:
The purpose of this letter is to confirm the final arrangements for the upcoming operator
licensing examinations at the Waterford Steam Electric Station, Unit 3.
The NRC has completed its review of the operator license applications submitted in connection
with this examination and separately provided a list of approved applicants to Mr. Robert
Simpson, Manager, Training and Development. Note that any examination waivers and
application denials have been addressed in separate correspondence.
The U.S. Nuclear Regulatory Commission (NRC) has approved the subject examinations and
you may administer the written examinations in accordance with Revision 10, of NUREG-1021,
Operator Licensing Examination Standards for Power Reactors, on April 5, 2017. The NRC
staff will administer the operating tests during the week of March 27, 2017. This examination
has undergone extensive review by my staff and representatives responsible for licensed
operator training at your facility. Based on this review I have concluded that the examination
meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By
administering this examination, you also agree that it meets NUREG-1021 guidelines, and is
appropriate for measuring the qualifications of licensed operator applicants at your facility. If
you determine that this examination is not appropriate for licensing operators at your facility, do
not administer the examination and contact me at (817) 200-1159.
Please contact your Chief Examiner, Chris Cowdrey, at (817) 200-1545, if you have any
questions or identify any errors or changes in the license level (RO or SRO) or type of
M. Chisum 2
examination (partial or complete written examination and/or operating test) specified for each
applicant.
Sincerely,
/RA/
Vincent G. Gaddy, Chief
Operations Branch
Division of Reactor Safety
Docket No. 50-382
License No. NPF-38
Enclosure:
ES-201-4
cc w/enclosure:
Robert Simpson
Manager, Training and Development
Entergy Operations, Inc.
17265 River Road
Killona, LA 70057-0751
cc w/o enclosure:
Electronic Distribution for Waterford
Steam Electric Station, Unit 3
ML17075A340
SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword:
By: CBC Yes No Publicly Available Sensitive NRR-077
OFFICE RIV:OB:LA SOE:OB C:OB
NAME JBridges CCowdrey VGaddy
SIGNATURE /RA/ /RA/ /RA/
DATE 3/14/17 3/14/17 3/14/17