IR 05000382/2018301: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 1: Line 1:
{{Adams
{{Adams
| number = ML18089A041
| number = ML18304A486
| issue date = 03/29/2018
| issue date = 10/30/2018
| title = Waterford, Unit 3 - Notification of NRC Initial Operator Licensing Examination 05000382/2018301
| title = Waterford Steam Electric Station, Unit 3 - NRC Initial Operator Licensing Examination Approval 05000382/2018301
| author name = Gaddy V G
| author name = Gaddy V G
| author affiliation = NRC/RGN-IV/DRS/OB
| author affiliation = NRC/RGN-IV/DRS/OB
Line 9: Line 9:
| docket = 05000382
| docket = 05000382
| license number = NPF-038
| license number = NPF-038
| contact person =  
| contact person = Gaddy V G
| case reference number = 50-382/18-301
| case reference number = 50-382/18-301
| document report number = 50-382/OL-18
| document type = Letter, License-Operator, Part 55 Examination Related Material
| document type = Letter, License-Operator, Part 55 Examination Related Material
| page count = 4
| page count = 3
}}
}}


Line 19: Line 20:
=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:
[[Issue date::March 29, 2018]]
Mr. John Dinelli, Site Vice President Entergy Operations, Inc.
17265 River Road Killona, LA 70057-0751
SUBJECT: WATERFORD STEAM ELECTRIC STATION, UNIT 3 - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000382/2018301
==Dear Mr. Dinelli:==
In a telephone conversation on February 26, 2018, between Messrs. D. Constance, Superintendent, Training-Nuclear Operations, and B. Larson, Chief Examiner, arrangements were made for the administration of licensing examinations at Waterford Steam Electric Station, Unit 3, during the week of November 5, 2018.
As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 11. The NRC's regional office will discuss with your staff any changes that might be necessary before the examinations are administered.
The written examination outlines were provided to your staff on March 7, 2018. To meet the above schedule, it will be necessary for your staff to furnish the operating test outlines, revised written examination outlines, and reference materials identified in Attachment 3 to ES-201 by June 4, 2018. The written examinations and operating tests, with technical references, will be due by August 17, 2018. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations, an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submi tted to the NRC for review and approval. All materials shall be complete and ready-to-use.
We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Delays in receiving the required materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be cancelled or rescheduled. In addition, your support for on-site validation of the examinations is required during the week of October 1, 2018.
To conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff shall retain the original simulator performance dat a (e.g., system pressures, temperatures, levels, and flows) generated during the operating test scenarios along with any video and audio recordings of the scenarios until the NRC takes its licensing action on all of the applications and
any adjudicatory actions on any hearing demands are complete. Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator waiver or excusal requests (if any) (Office of Management and Budget (OMB) approval number 3150-0090) at least 60 days before the first examination date (if able). Mr. B. Larson should be contacted to determine the method for submission of the waiver and/or excusal requests. Preliminary reactor operator and senior reactor operator license applications (OMB approval number 3150-0090) and medical certifications (OMB approval number 3150-0024) should be submitted at least 30 days before the first examination date. If the preliminary applications are not received at least 30 days before the examination date, a postponement may be necessary. Final signed applications, certifying that all training has been completed and requesting any waivers or excusals, as applicable, should be submitted at least 14 days before the first examination date.
Although the minimum guidelines for receiving waiver or excusal requests is 30 days before the first examination date (preliminary) and 14 days before the first examination date (final), the requests should be submitted as early in the process as possible (see the 60-day guideline, above). Resolutions resulting from verbal inquiries by the licensee to the NRC are not binding. Submittals addressing waivers and/or excusals should be in writing (i.e., on NRC Form 398, or as directed when Mr. Larson is contacted to determine the method for submission). The NRC's final decision on whether to grant a waiver or excusal will be documented on the final (not preliminary) NRC Form 398 submitted for the app licant and will not be provided until the final application is submitted to the NRC.
Paperwork Reduction Act Statement This letter contains information collection requirements that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved
by the Office of Management and Budget, approval number 3150-0018.
The burden to the public for these voluntary information collections is estimated to average 2,250 hours per examination including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the information collection. You may submit comments on any aspect of the information collection, including suggestions for reducing the burden, to the FOIA, Privacy and Information Collections Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by electronic mail to INFOCOLLECTS.RESOURCE@NRC.GO V; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.
Public Protection Notification
The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid OMB control number. In accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice and Procedure," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web Site at http://www.nrc.gov/reading-rm/adams.html. Thank you for your cooperation in this matter. Mr. D. Constance has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Larson at 817-200-1171 or myself at 817-200-1159.
Sincerely,/RA/
Vincent G. Gaddy, Chief Operations Branch Division of Reactor Safety Docket No. 50-382 License No. NPF-38
cc: Electronic Distribution
ML18089A041 SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword: By: VGG Yes No Publicly Available Sensitive NRC-002 OFFICE SOE:OB C:OB NAME BLarson VGaddy SIGNATURE /RA/ /RA/ DATE 3/25/2018 3/29/2018
}}
}}

Revision as of 08:13, 11 December 2018

Waterford Steam Electric Station, Unit 3 - NRC Initial Operator Licensing Examination Approval 05000382/2018301
ML18304A486
Person / Time
Site: Waterford Entergy icon.png
Issue date: 10/30/2018
From: Vincent Gaddy
Operations Branch IV
To: Dinelli J
Entergy Operations
Gaddy V G
References
50-382/18-301 50-382/OL-18
Download: ML18304A486 (3)


Text