There is currently no text in this page. You can search for this page title in other pages, or search the related logs, but you do not have permission to create this page.
Category:Letter type:NLS
Jump to navigation
Jump to search
(previous page) (next page)
Pages in category "Letter type:NLS"
The following 200 pages are in this category, out of 874 total.
(previous page) (next page)N
- NLS2002005, Addressee Title Change to Service List
- NLS2002010, Request for Regulatory Conference
- NLS2002012, Part a - Resubmittal of Year 2000 Radioactive Effluent Release Report for Cooper Nuclear Station
- NLS2002013, Transmittal of Project Plan for CNS Environmental Qualification Improvement Project
- NLS2002014, Submittal of Seismic Evaluation Required by Cooper Nuclear Station License Condition 2.C. & Request for Review & Approval by NRC
- NLS2002015, Application for Amendment to License DPR-46 to Change Cooper Nuclear Station Technical Specifications. Proposed Change Will Modify TS SR 3.7.3.1 to Improve Consistency with CNS License Amendment No. 185
- NLS2002016, Delay of Application for Renewal of Operating License DPR-46 Beyond 2003
- NLS2002018, Clarification Related to NRC Inspection Report 50-298/0112
- NLS2002022, Transmittal of Revised Emergency Plan Implementing Procedures EPIP 5.7.6 (Revision 33), EPIP 5.7.17 (Revision 26), Eipip 5.7.24 (Revision 18) for Cooper Nuclear Station
- NLS2002027, Follow-up Response to the Regulatory Conference Held February 1, 2002 in Regard to an Apparent Violation at Cooper Nuclear Station
- NLS2002029, the Strategic Improvement Plan - 1
- NLS2002030, Response to Order for Interim Safeguards and Security Compensatory Measures
- NLS2002034, NRC Rule on Property Insurance - 10 CFR 50.54(w)(3)
- NLS2002035, Addition to Service List
- NLS2002038, Management Changes
- NLS2002039, Letter Providing Information Requested by NRC from Nebraska Public Power District During 03/25/2002 Telephone Conversation on Implementation of BWRVIP Program at Cooper Nuclear Station
- NLS2002040, Inservice Inspection Summary Report for Cooper Nuclear Station
- NLS2002041, Part 1 - Cooper Nuclear Station Radioactive Effluent Release Report for January 1, 2001 Through December 31, 2001
- NLS2002054, Annual Radiological Environmental Operating Report
- NLS2002056, Occupational Radiation Report
- NLS2002061, Emergency Plan Implementing Procedures
- NLS2002062, Safeguards Plan, Revision 40
- NLS2002063, Clarification Regarding Inspections and Reports for Core Spray Sparger Piping for Cooper Nuclear Station
- NLS2002064, Proposed License Amendment Revision to Operating License, Section 2.C.(4), Fire Protection
- NLS2002071, Emergency Plan Implementing Procedures
- NLS2002072, Request to Withhold Documents from Public Disclosure Under 10CFR2.790
- NLS2002073, Supplemental Information Related to License Condition 2.C.(6) Seismic Evaluation
- NLS2002074, Revision to the Response to Order for Interim Safeguards and Security Compensatory Measures for Cooper Nuclear Station
- NLS2002085, Nebraska Public Power District Safety Evaluation for Appendix R to 10 CFR Part 50, Items II.G.3 and Iii.I, Alternate or Dedicated Shutdown Capability Clarification
- NLS2002088, Reporting of Changes and Errors in ECCS Evaluation Models
- NLS2002089, Supplement to Annual Radioactive Release Report for Period from January 1, 2001 Through December 31, 2001, from Nebraska Public Power District
- NLS2002090, Response to Request for Additional Information on License Amendment Request to Revise the Ultimate Heat Sink and Reactor Equipment Cooling Water Temperature Requirements
- NLS2002091, Emergency Plan Implementing Procedures
- NLS2002093, Additional Information Related to License Condition 2.C.(6) Seismic Evaluation
- NLS2002094, Response to Revised DBA Methodology-Request for Cooper Nuclear Station
- NLS2002095, Request for Emergency Processing of Proposed License Amendment Requests
- NLS2002096, June 2002 Monthly Operating Report for Cooper
- NLS2002097, Response to Request for Additional Information on License Amendment Request to Revise Ultimate Heat Sink and Reactor Equipment Cooling Water Temperature Requirements
- NLS2002098, Application for Technical Specification Change Regarding Missed Surveillance Using the Consolidated Line Item Improvement Process
- NLS2002100, Nebraska Public Power District Regulatory Issue Summary 2002-09, Preparation and Scheduling of Operator Licensing Examinations.
- NLS2002102, Special Report, Offgas Treatment System Charcoal Adsorbers Out of Service
- NLS2002104, License Amendment Request, Adopt Integrated Reactor Vessel Material Surveillance Program
- NLS2002106, Licensee Guarantees of Payment of Deferred Premiums
- NLS2002108, July 2002 Monthly Operating Report for Cooper Nuclear Station
- NLS2002111, Inservice Testing Program Relief Request RP-06, RP-07
- NLS2002112, Final Response to Commission Order to Modify License for Interim Safeguards & Security Measures
- NLS2002114, Deletions to Service List
- NLS2002115, Emergency Plan Implementing Procedures, Cooper Nuclear Station
- NLS2002118, Emergency Plan Implementing Procedures
- NLS2002120, Response to Request for Additional Information Related to Nebraska Public Power District'S Reevaluation Proposed to Address License Condition 2.C.(6)
- NLS2002122, 10CFR50.59(d)(2) Summary Report
- NLS2002125, Clarification of Amendment No.194 Safety Evaluation Cooper Nuclear Station
- NLS2002128, Revision to Service List
- NLS2002129, License Amendment Request to Revise TS-Safety Limit Minimum Critical Power Ratio, Cooper Nuclear Station
- NLS2002133, Clarification of Safety Evaluation, Quality Assurance Program
- NLS2002135, Design Basis Accident Radiological Assessment Calculation Methodology Additional Information
- NLS2002136, Response to Draft Request for Additional Information on the Supplemental Information Submitted by Nebraska Public Power District for Cooper Nuclear Station License Condition, 2.6 (6)
- NLS2002137, Regulatory Information Summary (RIS) 2002-15, NRC Approval of Commercial Data Encryption Systems for the Electronic Transmission of Safeguards Information.
- NLS2002142, Reporting of Changes and Errors in ECCS Evaluation Models
- NLS2002144, Notification to the NRC of the New Vice President-Nuclear at Cooper
- NLS2003001, Supplement to Proposed License Amendment Revision to Operating License, Section 2.C.(4), Fire Protection, Cooper Nuclear Station
- NLS2003002, Rev. 26 to EPIP 5.7.21, Maintaining Emergency Preparedness - Emergency Exercises, Drills, Tests & Evaluations.
- NLS2003005, Appointment of New President and Chief Executive Officer at Nebraska Public Power District, Cooper Nuclear Station
- NLS2003008, Response to Order for Compensatory Measures Related to Access Authorization
- NLS2003011, Design Basis Accident Radiological Assessment Calculation Methodology Additional Information
- NLS2003012, Nebraska Public Power District - Answer to Issuance of Order for Compensatory Measures Related to Access Authorization, Cooper Nuclear Station
- NLS2003014, Emergency Plan Implementing Procedures
- NLS2003018, Safeguards Plan, Revision 41, Cooper Nuclear Station
- NLS2003022, License Amendment Request to Revise TS Surveillance Requirements for Locked, Sealed, or Secured Secondary Containment Isolation Valves
- NLS2003025, Emergency Plan Implementing Procedures
- NLS2003026, Response to Request for Additional Information Related to License Amendment for Safety Limits Minimum Critical Power Ratio
- NLS2003027, Response to NRC Generic Letter 96-06
- NLS2003028, BWRVIP-25 Rim Hold Down Bolt Inspection Deferral
- NLS2003032, Clarification of License Amendment 196 Safety Evaluation Information
- NLS2003033, Safeguards Plan, Revision 42
- NLS2003034, NRC Rule on Property Insurance - 10 CFR 50.54(w)(3)
- NLS2003039, Third Biennial Report on Financial Assurance for Decommissioning Funding
- NLS2003041, Emergency Plan Implementing Procedure, Cooper Nuclear Station, NRC Docket 50-298, DPR-46
- NLS2003042, Core Operating Limits Report for Cooper Nuclear Station
- NLS2003043, Corrected May 2002 & November 2002 Monthly Operating Report for Cooper Nuclear Station
- NLS2003044, Occupational Radiation Exposure Report, Cooper Nuclear Station
- NLS2003050, Emergency Plan Implementing Procedures, Cooper Nuclear Station
- NLS2003055, April 2003 Monthly Operating Report for Cooper Nuclear Station
- NLS2003056, Emergency Plan Implementing Procedures for Cooper Nuclear Station
- NLS2003059, Inservice Testing Program Relief Request RP-06, Revision 1
- NLS2003061, Core Operating Limits Report, Cycle 22, Revision 1
- NLS2003062, Answer, Request for Relief, and Response to April 29, 2003, Order Requiring Compliance with Revised Design Basis Threat for Operating Power Reactors
- NLS2003063, Answer, Request for Relief and Response to April 29, 2003, Order for Compensatory Measures Related to Training Enhancements on Tactical and Firearms Proficiency and Physical Fitness Applicable to Armed Nuclear Power Plant Security Force P
- NLS2003064, Answer, Response, and Request for Clarification in Response to April 29, 2003, Order for Compensatory Measures Related to Fitness-for-Duty Enhancements Applicable to Nuclear Facility Security Force Personnel
- NLS2003065, Nebraska Public Power District 2002 Annual Financial Report
- NLS2003066, License Amendment Request to Revise Technical Specification 3.5.1 to Incorporate TS Task Force (TSTF) 318 for One Low Pressure Coolant Injection (LPCI) Pump Inoperable in Each of the Two Emergency Core Cooling Systems (ECCS) Divisions
- NLS2003068, Revision 32 to EPIP 5.7.17, Dose Assessment, and Revision 17 to EPIP 5.7.20, Protective Action Recommendations.
- NLS2003069, May 2003 Monthly Operating Report for Cooper
- NLS2003074, Emergency Plan Implementing Procedure, Cooper Nuclear Station, NRC Docket 50-298, DPR-46
- NLS2003077, License Amendment Request to Revise Technical Specification (TS) Surveillance Requirement (SR) 3.3.2.1.4 and TS Table 3.3.2.1-1 for Mathematical Symbols and Use of Allowable Values
- NLS2003078, Management Change - Site Vice President, Cooper Nuclear Station
- NLS2003080, Inservice Inspection (ISI) Summary Report for the Spring 2003 Refueling Outage at Cooper Nuclear Station
- NLS2003087, Supplemental Answer to April 29, 2003, Order for Compensatory Measures Related to Fitness-For-Duty Enhancements Applicable to Nuclear Facility Security Force Personnel (EA-03-038)
- NLS2003090, Licensee Guarantees of Payment of Deferred Premiums
- NLS2003094, Safeguards Plan, Revision 44
- NLS2003098, Technical Specification Bases Changes
- NLS2003099, August 2003 Monthly Operating Report for Cooper Nuclear Station
- NLS2003100, Quality Assurance Program Changes
- NLS2003101, Safeguards Plan, Revision 45
- NLS2003103, Meeting - Licensee Presentation
- NLS2003105, License Amendment Request for LOCA Dose Calculation Methodology and Resolution of Remaining License Condition 2.C.(6) Issues
- NLS2003106, Response to Regulatory Issue Summary 2003-14, Preparation and Scheduling of Operator Licensing Examinations
- NLS2003107, Management Change
- NLS2003108, September 2003 Monthly Operating Report for Cooper Nuclear Station
- NLS2003113, Compliance with Compensatory Measures Related to Security Force Training and Fitness-for-Duty (EA-03-0038)
- NLS2003116, Emergency Plan Implementing Procedures for Cooper Nuclear Station
- NLS2003117, Initial Response to NRC Generic Letter 2003-01
- NLS2003119, October 2003 Monthly Operating Report for Cooper Nuclear Station
- NLS2003120, Inservice Testing Program Relief Request RP-06, Revision 2
- NLS2003121, Reporting of Changes and Errors in ECCS Evaluation Models
- NLS2003122, Confirmation of Commitments, Per 11/13/03 Telephone Conference Regarding Diesel Generator Fuel Oil Strainer Fouling
- NLS2003123, November 2003 Monthly Operating Report for Cooper Nuclear Station
- NLS2003124, Revision 31 to EPIP 5.7.1, Emergency Classification.
- NLS2003128, Revisions to the Strategic Improvement Plan
- NLS2003132, Revision 2 to EPIP 5.7ENS, ENS Communicator.
- NLS2004001, Compliance with Compensatory Measures Related to Access Authorization
- NLS2004002, December 2003 Monthly Operating Report for Cooper Nuclear Station
- NLS2004004, Revision to Commitment Referenced to Amendment 201 Safety Evaluation
- NLS2004005, License Amendment Request to Revise Technical Specification 3.4.9 Pressure Temperature (P/T) Curves Figures 3.4.9-1, 3.4.9-2, and 3.4.9-3
- NLS2004006, Response to RAI Regarding License Amendment Request to Revise Technical Specifications (TS) Surveillance Requirements and TS Table for Mathematical Symbols and Use of Allowable Values in the Place of Analytical Limits
- NLS2004007, License Amendment Request - One-Time Extension of Surveillance Requirements
- NLS2004009, Inservice Inspection Relief Requests PR-03, RC-06, RC-07, R1-17, R1-31, R1-32, and R1-33
- NLS2004011, Clarification of Generic Letter 96-06 Safety Evaluation
- NLS2004013, Revision 19 to EPIP 5.7.2, Shift Supervisor Epip.
- NLS2004015, Semi-Annual Fitness-for-Duty Program Performance Report
- NLS2004016, Revision 25 to EPIP 5.7.9, Activation of Eof.
- NLS2004017, January 2004 Monthly Operating Report for Cooper Nuclear Station
- NLS2004018, Revision 2 to EPIP 5.7COMMUN, Communications
- NLS2004019, Response to RAI Regarding Proposed License Amendment Request for Loss-of-Coolant Accident (LOCA) Dose Calculation Methodology and Resolution of Remaining License Condition 2.C0(6) Issues
- NLS2004021, Contesting of Finding in Inspection Report 05000298/2003-007
- NLS2004022, Reply to Preliminary White Finding Regarding NRC Inspection Report 05000298/2004-009
- NLS2004023, Risk-Informed Inservice Inspection Program (Relief Request RI-34)
- NLS2004034, Compliance with NRC Rule Property Insurance, Per 10 CFR 50.54(w)(3)
- NLS2004035, February 2004 Monthly Operating Report for Cooper Nuclear Station
- NLS2004038, Nebraska Public Power District - Letter - Revisions to the Strategic Improvement Plan Cooper Nuclear Station Docket 50-298, DPR-46 Dated March 30, 2004
- NLS2004040, Revision 5 to EPIP 5.7.8.1, Activation of Alternate OSC and Revision 3 to EPIP 5.7COMMUN, Communications.
- NLS2004042, Confirmation of Commitments Discussed in 03/05/04 Teleconference
- NLS2004043, Supplement to License Amendment Request to Revise Technical Specification 3.4.9 Pressure Temperature (P/T) Curves, Figures 3.4.9-1, 3.4.9-2, & 3.4.9-3
- NLS2004047, 2003 Annual Radioactive Effluent Release Report
- NLS2004048, 2003 Annual Radiological Environmental Operating Report
- NLS2004051, License Amendment Request, Revised Logic for Reactor Water Cleanup System Isolation, Secondary Containment Isolation, and Control Room Emergency Filter System Initiation
- NLS2004056, Emergency Plan Implementing Procedures
- NLS2004061, Supplemental Response to the April 29, 2003, Orders to Nebraska Public Power District
- NLS2004063, Resubmittal of Inservice Inspection Relief Request PR-03
- NLS2004064, April 2004 Monthly Operating Report for Cooper Nuclear Station
- NLS2004065, Response to Request for Additional Information Regarding Loss-of-Coolant Accident (LOCA) Dose Calculation Methodology and Resolution of Remaining License Condition 2.C.(6) Issues
- NLS2004066, Emergency Plan, Revision 46
- NLS2004068, Response to Request for Additional Information Regarding Relief Request RC-06
- NLS2004070, Revision to Service List
- NLS2004071, Nebraska - 2003 Annual Financial Report
- NLS2004073, Use of Encryption Software for Electronic Transmission of Safeguards Information
- NLS2004076, License Amendment Request, Extend Diesel Generator Allowed Outage Time and Utilize Temporary Fuel Oil Storage Tanks on a One-Time Basis
- NLS2004081, Response to Request for Additional Information Regarding Risk-Informed Relief Request RI-34
- NLS2004083, Response to Request for Additional Information Regarding Relief Requests RI-17 and RI-31
- NLS2004086, Nebraska Public Power District Response to Request for Additional Information
- NLS2004087, June 2004 Monthly Operating Report for Cooper Nuclear Station
- NLS2004088, Application for Technical Specification Improvement to Eliminate Requirements to Provide Monthly Operating Reports and Occupational Radiation Exposure Reports
- NLS2004089, Reply to a Notice of Violation NRC Letter No. EA-04-120
- NLS2004091, Response to Request for Additional Information Regarding Risk-Informed Relief Request RI-34
- NLS2004092, Response to NRC Regulatory Issue Summary 2004-10
- NLS2004097, Licensee Guarantees of Payment of Deferred Premiums
- NLS2004098, Nebraska Public Power District Response to Request for Additional Information
- NLS2004099, License Amendment Request to Revise Technical Specifications - Safety Limit Minimum Critical Power Ratio
- NLS2004100, Nebraska Public Power District Response to Request for Additional Information
- NLS2004103, July 2004 Monthly Operating Report for Copper Nuclear Station
- NLS2004105, Initial Actions Summary Report and Response to NRC Generic Letter 2003-01, Control Room Habitability.
- NLS2004111, Response to Request for Additional Information Regarding One Time Extension of Diesel Generator Allowed Outage Time
- NLS2004112, Response to Request for Additional Information Regarding Revision of Technical Specification Surveillance Requirement 3.3.2.1.4 and Table 3.3.2.1-1
- NLS2004114, Nebraska Public Power District, Cooper Nuclear Station Safeguards Plan, Guard Training and Qualification Plan, and Contingency Plan, Revision 0
- NLS2004116, Response to Request for Additional Information Regarding Containment Isolation Logic Change for Reactor Vessel Water Level
- NLS2004117, 1OCFR50.59(d)(2) Summary Report
- NLS2004119, License Amendment 178 Clarification
- NLS2004121, Safeguards Plan, Guard Training and Qualification Plan, and Contingency Plan, Revision 0
- NLS2004122, License Amendment Request to Revise the Required Channels Per Trip System for Primary and Secondary Containment Isolation and Control Room Emergency Filter System Instrumentation
- NLS2004123, September 2004 Monthly Operating Report for Cooper Nuclear Station
- NLS2004125, Inservice Inspection Relief Request RI-35 Cooper Nuclear Station
- NLS2004126, Letter to NRC from Fleming, Nebraska Public Power District, Service Water Pump Test Report, Cooper
- NLS2004128, CNS Regulatory Conference Request for Additional Information
- NLS2004129, Nebraska Public Power District, Updated Cooper Nuclear Station Safeguards Plan, Guard Training and Qualification Plan, and Contingency Plan, Revision 0
- NLS2004132, License Conditions for License Amendment Request to Extend Diesel Generator Allowed Outage Time and Utilize Temporary Fuel Oil Storage Tanks on a One-Time Basis
- NLS2004135, Nebraska Public Power District, Updated Cooper Nuclear Station Safeguards Plan, Guard Training and Qualification Plan, and Contingency Plan, Revision 0
- NLS2004136, Nebraska Public Power District - Confirmation of Implementation of Nuclear Regulatory Commission April 29, 2003, Orders at Cooper Nuclear Station
- NLS2004137, Supplemental Response to Request for Additional Information Regarding Revision of Technical Specification Surveillance Requirement 3.3.2.1.4 and Table 3.3.2.1-1
- NLS2004138, Quality Assurance Program Revision 15
- NLS2004142, Quality Assurance Program for Packaging and Transportation of Radioactive Material
- NLS2004143, Core Operating Limits Report, Cycle 22, Revision 2
- NLS2004148, Request for Extension to Answer the 11/05/04 Order Imposing Requirements for Protecting Certain Safeguards Information (EA-04-190)
- NLS2004151, Revision to Service List
- NLS2004168, Response to Request for Additional Information on License Amendment Request to Review Technical Specifications - Safety Limit Minimum Critical Power Ratio
- NLS2005001, License Amendment Request to Revise Technical Specification Definitions of Channel Calibration, Channel Functional Test, and Logic System Functional Test
- NLS2005003, Response to Request for Additional Information Regarding Relief Request RI-35 Cooper Nuclear Station
- NLS2005004, December 2004 Monthly Operating Report, Cooper Nuclear Station
- NLS2005005, Revision to Service List
- NLS2005007, License Amendment Request to Adopt Generic Changes to Standard Technical Specifications
- NLS2005010, Use of Encryption Software for Electronic Transmission of Safeguards Information