N Nebraska Public Power District Always there when you need us NLS2004087 July' 8, 2004 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001

Subject:

Monthly Operating Report for June 2004, Docket 50-298 The purpose of this letter is to provide the Cooper Nuclear Station Monthly Operating Report for June 2004. In accordance with the guidance provided by Generic Letter 97-02, this report includes an Operating Data Report and Unit Shutdown Report for the month ofiJune. In accordance with Technical Specification 5.6.4, this report also includes documentation of' challenges to the safety/relief valves.

Should you have any comments or require additional information regarding this report, please contact Paul Fleminfg at (402) 825-2774.

Sincerely, Paul Fleming Licensinig Manager

/cb Enclosure cc: NRC Regional Administrator W. J. Fclrman NRC Senior Resident Inspector WV. D. Shanks ANI Library R. K. Edington C. C. Warren J. M. Cline B. Lewis A. L. Dostal G. WN'. Griffith J. C. Roberts J. W. Dutton S. Moffitt R. L. Gunirn INPO Records Center Records COOPERNU.EARSTATION P.O. Box 98 / Brownville, NE 68321-0098 Telephone: (402) 825-3811 / Fax: (402) 825-5211 www.nppd.com

APPENDIX A OPERATING DATA REPORT DOCKET NO. 050-0298 UNIT NAME Cooper Nicelcar Station DATE 7/182004 COMPLETED BY Rodrik Wilson TELEPHONE (402) 825-5135 Reporting Period: June 2004 This Month Yr.-to-11ate Cumnuilatie

1. Design Electrical Rating (Net NWe). 778.0 N 'A NA The nominal net electrical output of the unit specified by the utility and used for the purpose of plant design.
2. Maximnum Decpendable Capacity (Net MWe): 764.0 NA NA The gross electrical output as measured at the output tenninals of the turbine-generator during the most restrictive seasonal conditions minus the nomial station service loads.
3. Number of llours the Reactor Was Critical. 720.0 4.367.0 203383.3 The total number of hlours during the gross hours of the reporting period that the reactor was critical.
4. Nutober of Ilours the Generator Was OtI Line. 720.0 4367.0 200)473.3 (Also called Service I lours). The total number of hours during thc gross hours of the reporting period that the unit operated with tltc breakers closed to tlte station bus.

The sum of the hours the generator was ott line plus the total outage hours should equal the gross hours in tlte reporting period.

5. Unit Reserve Shutdown I lours. 0.0 0.0 0.0 The total number of hours during the gross hours of the reporting period that the unit was remosved from service for economic or similar reasons but was available for operation.
6. Net Electrical Energy INI WI 1). 537.929.0 3280602.0 136434607.0 The gross electrical output of the unit measured at the output tenninals of the turbine-gencrator minus the nonnal station service loads during thle gross hours of the reporting period. expressed in mega-watt hours. Negative quantities should not he used.

7/P/2004 10:sa Af.

I APPENDIX B UNIT SIIUTDOWVNS DOCKET NO. 050-0298 UNIT NAME Cooper Nuclear Station DATE 7/8/2004 COMPLETED BY Rodrick Wilson TELEPHONE (402) 825-5135 REPORT MONTH June 2004 Tsype Mrtn Inr) Rao (I Method Of Shutting NO. Date F: FORCED nrtnoo (2) CAUS/CORRECTIVE ACTIONS COMMlIENTS

_S: SCEDULED

  • £ A A L A

SUMMARY

None (1) Reason:

A - Equipment Faluore (Esplaln)

B - Mtaintenance or Test C - Refueling D - Regulatory Restriction E

  • Operator Training/l.icense Examination F - Administrative G - Operational Error (Esplain) 11* Other (Etplaln)

(2) Method:

I - Manual 2- Manual Trip/Scram 3 - Aulomalic Trip/Scram 4 - Continuation 5 - Other (Elplain) 7/8/2004 10:31 AM

APPENDIX C SAFETY'/RELIEFl VALVE CHALLENGES JUNE 2004 There were no challenges to the safety/relief valves during the month of June.

I ATTACHMENT 3 LIST OF REGULATORY COMMITMIENTSl Correspondence Number: NLS2004087 The following table identifies those actions committed to by Nebraska Public Power District (NPPD) in this document. Any other actions discussed in the submittal represent intended or planned actions by NPPD. They are described for information only and are not regulatory commitments. Please notify the Licensing & Regulatory Affairs Manager at Cooper Nuclear Station of any questions regarding this document or any associated regulatory commitments.

COMMITTED DATE COMMITMENT OR OUTAGE None I PROCEDURE 0.42 l REVISION 15 1 PAGE 18 OF 24

Text

N Nebraska Public Power District Always there when you need us NLS2004087 July' 8, 2004 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001

Subject:

Monthly Operating Report for June 2004, Docket 50-298 The purpose of this letter is to provide the Cooper Nuclear Station Monthly Operating Report for June 2004. In accordance with the guidance provided by Generic Letter 97-02, this report includes an Operating Data Report and Unit Shutdown Report for the month ofiJune. In accordance with Technical Specification 5.6.4, this report also includes documentation of' challenges to the safety/relief valves.

Should you have any comments or require additional information regarding this report, please contact Paul Fleminfg at (402) 825-2774.

Sincerely, Paul Fleming Licensinig Manager

/cb Enclosure cc: NRC Regional Administrator W. J. Fclrman NRC Senior Resident Inspector WV. D. Shanks ANI Library R. K. Edington C. C. Warren J. M. Cline B. Lewis A. L. Dostal G. WN'. Griffith J. C. Roberts J. W. Dutton S. Moffitt R. L. Gunirn INPO Records Center Records COOPERNU.EARSTATION P.O. Box 98 / Brownville, NE 68321-0098 Telephone: (402) 825-3811 / Fax: (402) 825-5211 www.nppd.com

APPENDIX A OPERATING DATA REPORT DOCKET NO. 050-0298 UNIT NAME Cooper Nicelcar Station DATE 7/182004 COMPLETED BY Rodrik Wilson TELEPHONE (402) 825-5135 Reporting Period: June 2004 This Month Yr.-to-11ate Cumnuilatie

1. Design Electrical Rating (Net NWe). 778.0 N 'A NA The nominal net electrical output of the unit specified by the utility and used for the purpose of plant design.
2. Maximnum Decpendable Capacity (Net MWe): 764.0 NA NA The gross electrical output as measured at the output tenninals of the turbine-generator during the most restrictive seasonal conditions minus the nomial station service loads.
3. Number of llours the Reactor Was Critical. 720.0 4.367.0 203383.3 The total number of hlours during the gross hours of the reporting period that the reactor was critical.
4. Nutober of Ilours the Generator Was OtI Line. 720.0 4367.0 200)473.3 (Also called Service I lours). The total number of hours during thc gross hours of the reporting period that the unit operated with tltc breakers closed to tlte station bus.

The sum of the hours the generator was ott line plus the total outage hours should equal the gross hours in tlte reporting period.

5. Unit Reserve Shutdown I lours. 0.0 0.0 0.0 The total number of hours during the gross hours of the reporting period that the unit was remosved from service for economic or similar reasons but was available for operation.
6. Net Electrical Energy INI WI 1). 537.929.0 3280602.0 136434607.0 The gross electrical output of the unit measured at the output tenninals of the turbine-gencrator minus the nonnal station service loads during thle gross hours of the reporting period. expressed in mega-watt hours. Negative quantities should not he used.

7/P/2004 10:sa Af.

I APPENDIX B UNIT SIIUTDOWVNS DOCKET NO. 050-0298 UNIT NAME Cooper Nuclear Station DATE 7/8/2004 COMPLETED BY Rodrick Wilson TELEPHONE (402) 825-5135 REPORT MONTH June 2004 Tsype Mrtn Inr) Rao (I Method Of Shutting NO. Date F: FORCED nrtnoo (2) CAUS/CORRECTIVE ACTIONS COMMlIENTS

_S: SCEDULED

  • £ A A L A

SUMMARY

None (1) Reason:

A - Equipment Faluore (Esplaln)

B - Mtaintenance or Test C - Refueling D - Regulatory Restriction E

  • Operator Training/l.icense Examination F - Administrative G - Operational Error (Esplain) 11* Other (Etplaln)

(2) Method:

I - Manual 2- Manual Trip/Scram 3 - Aulomalic Trip/Scram 4 - Continuation 5 - Other (Elplain) 7/8/2004 10:31 AM

APPENDIX C SAFETY'/RELIEFl VALVE CHALLENGES JUNE 2004 There were no challenges to the safety/relief valves during the month of June.

I ATTACHMENT 3 LIST OF REGULATORY COMMITMIENTSl Correspondence Number: NLS2004087 The following table identifies those actions committed to by Nebraska Public Power District (NPPD) in this document. Any other actions discussed in the submittal represent intended or planned actions by NPPD. They are described for information only and are not regulatory commitments. Please notify the Licensing & Regulatory Affairs Manager at Cooper Nuclear Station of any questions regarding this document or any associated regulatory commitments.

COMMITTED DATE COMMITMENT OR OUTAGE None I PROCEDURE 0.42 l REVISION 15 1 PAGE 18 OF 24