NLS2003080, Inservice Inspection (ISI) Summary Report for the Spring 2003 Refueling Outage at Cooper Nuclear Station

From kanterella
Jump to navigation Jump to search
Inservice Inspection (ISI) Summary Report for the Spring 2003 Refueling Outage at Cooper Nuclear Station
ML032050554
Person / Time
Site: Cooper Entergy icon.png
Issue date: 07/21/2003
From: Thomas J. Palmisano
Nebraska Public Power District (NPPD)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NLS2003080
Download: ML032050554 (92)


Text

{{#Wiki_filter:Nebraska Public Power District NLS2003080 Always these when you need us July 21, 2003 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001

Subject:

Inservice Inspection Summary Report Cooper Nuclear Station NRC Docket No. 50-298, DPR-46 The purpose of this letter is to provide to the Nuclear Regulatory Commission the Inservice Inspection (ISI) Summary Report for the Spring 2003 Refueling Outage at Cooper Nuclear Station. This report is submitted in accordance with the requirements of the ASME Boiler and Pressure Vessel (B&PV) Code, Section XI. Enclosure provides the Owner's Reports for Inservice Inspections, and Repairs or Replacements. Certain non-ASME Section XI augmented ISI results are also included. Should you have any questions regarding this matter, please contact Paul V. Fleming at (402) 825-2774. Sincerely, T. J. Palmisano Site Vice President /wrv Enclosure cc: Regional Administrator w/enclosure USNRC Region IV Senior Resident Inspector w/enclosure USNRC Senior Project Manager w/enclosure USNRC - NRR Project Directorate IV-1 NPG Distribution w/o enclosure Records w/enclosure - 041 COOPER NU.EAR STATION P.O. Box 98 / Brownv,7le, NE 68321-0098 Telephone: (402) 825-3811 / Fax (402) 825-5211 www.nppd.com

I ATTACHMENT 3 LIST OF REGULATORY COMMITMENTSl Correspondence Number: NLS2003080 The following table identifies those actions committed to by Nebraska Public Power District (NPPD) in this document. Any other actions discussed in the submittal represent intended or planned actions by NPPD. They are described for information only and are I not regulatory commitments. Please notify the Licensing & Regulatory Affairs Manager at Cooper Nuclear Station of any questions regarding this document or any associated regulatory commitments. COMMITTED DATE COMMITMENT OR OUTAGE None 4 4 PROCEDURE 0.42 l REVISION 13 l PAGE 15OF 16O

NLS2003080 Enclosure 1 ASME B&PV Code, Section XI, Summary Report

ASME B&PV Code, Section XI, Summary Report Cooper Nuclear Station Spring 2003 Refueling Outage Table of Contents

1. Abstract of Examinations, Results, and Corrective Measures Total of 3 Pages
2. NIS-l Form Total of 1 Page Summary Table Total of 67 Pages
3. NIS-2 Form and Summary Table Total of 17 Pages

Page 1 of 3 Abstract of Examinations, Tests, Results, and Corrective Action Introduction This report documents the American Society of Mechanical Engineer (ASME) Boiler and Pressure Vessel (B&PV) Code, Section XI, Inservice Inspection (ISI) Examinations and Repair and Replacements performed from March 12, 2002 to April 20, 2003. April 20, 2003 corresponds with the end of Refueling Outage 21 (RFO21) at Cooper Nuclear Station. RFO21 is the first outage of the third period in the third ISI interval. It is the second outage of the second period in the first interval for Containment Inspection. Examinations, repairs, and replacements were perform to the requirements of the ASME B&PV Code, Section XI, 1989 Edition, no Addenda; 1989 Edition, 1989 Addenda; 1992 Edition, 1992 Addenda; and the 1995 Edition, 1996 Addenda, as appropriate, and the Code of Federal Regulations Title 10 Part 50.55a. Examinations Components The examinations of ASME Code Class 1,2, and 3 components are provided in the summary table. There was one (1) relevant indication associated with an integral attachment that required additional examinations in accordance with IWC-2430. An additional indication on an integral attachment was determined to be with in the allowable flaw size of IWB- 3514. No repairs were required. There were a total of two-hundred and twenty-two (222) ISI examinations performed during and prior to RFO21. Containment The containment inservice inspection program implements the examinations schedule of the primary containment pressure boundary in accordance with ASME B&PV Code, Section XI, 1992 Edition, 1992 Addenda. General Visual examinations and VT-3 examinations were performed for Code Category E-A. VT-I examination for bolting was performed for Code Category E-G. Three (3) Drywell Head Flange bolts were replaced as a result of these examinations. Since, 100% of the Drywell Head Flange bolts were examined and there were no other similar bolts, no additional examinations were performed. Snubber Inspection Program Cooper Nuclear Station (CNS) Snubber Inspection Program implements examination and testing based on Relief Request RI-13, approved March 11, 1999. CNS snubber population consists of two-hundred and five (205) safety related snubbers that require periodic visual examination, functional testing and service life monitoring and seal replacement. The 10% testing sample for RFO21 consisted of twenty-two (22) snubbers. A total of fifty (50) snubbers were removed and replaced for refurbishment as part of the service life-monitoring program. All snubbers replaced are listed on the summary attachment table of the NIS-2 form. The initial 10% sample detected no failures and therefore no additional testing was performed. Those snubbers representing the 10% testing population are given in the table below.

Page 2 of 3 10% Sample Component S/N Type Size Work Order Test Visual ___________ ~Results Results MS-SNUB-(MS-S149B) 462 PSA-3 3 4235920 Sat Sat MS-SNUB-(VR-S31) 25256 PSA-3 3 4258333 Sat Sat MS-SNUB-(VR-S3) 8141M PSA-10 10 4258334 Sat Sat RHR-SNUB-(RH-S 11) 8142M PSA-10 10 4258335 Sat Sat RHR-SNUB-(RH-S14) 460M PSA-10 10 4258336 Sat Sat MS-SNUB-(VR-58-12-Y) 493 PSA-10 10 4258337 Sat Sat MS-SNUB-(VR-S4) 494 PSA-10 10 4258338 Sat Sat RF-SNUB-(RF-S17) 5890 PSA-10 10 4258339 Sat Sat RF-SNUB-(RF-S14) 8138M PSA-10 10 4258400 Sat Sat MS-SNUB-(VR-H64D) 5230 PSA- 10 10 4258401 Sat Sat MS-SNUB-(SS-B3) 480 PSA-10 10 4258402 Sat Sat RR-SNUB-(SS-5B) 5298 PSA-35 35 4258403 Sat Sat RR-SNUB-(SS-IA) 5309 PSA-35 35 4258404 Sat Sat RR-SNUB-(SS-2A) 5313 PSA-35 35 4258405 Sat Sat MS-SNUB-(VR-S7B) 5322 PSA-35 35 4258406 Sat Sat MS-SNUB-(B5-SIB&R) 353 PSA-35 35 4258407 Sat Sat MS-SNUB-(MS-S16B) 8101 Hydraulic 2-1/2X5 4258408 Sat Sat RHR-SNUB-(RH-S77) 8579 Hydraulic 2-1/2X5 4258409 Sat Sat RHR-SNUB-(S48B) 8159 Hydraulic 2-1/2X5 4258410 Sat Sat RHR-SNUB-(RH-S42) 8023 Hydraulic 2-1/2X5 4258411 Sat Sat CS-SNUB-(CS-SI 1) 7767 Hydraulic 2-1/2X5 4258412 Sat Sat MS-SNUB-(MS-S3) 10048 Hydraulic 2-1/2X5 4258413 Sat Sat Pressure Testing The Class I system leakage test was performed to test the primary coolant system boundary, Code Category BP, and the Class 2 portion of the Control Rod Drive (CRD) system boundary, Code Category C-H. In conjunction with the Class 1 system leakage test visual examinations were performed as required by Code Category BE (Items B4.1 1, B4.12, and B4.13). The vessel flange seal leak detection system was pressure tested with the refueling cavity flooded as permitted by Relief Request PR-04, approved February 24, 2000. Two pressure tests were performed after RF020 (Fall 2001) summary report during the second period (ending October 30, 2002). The details of the pressure tests are provided below. System Test Code Code Exam Procedure Date Results Cat. Item ____ HPCI Class 3 C-H C7.30 VT-2 6.HPCI.501 04/2002 Sat (Suction) High Pressure C7.50 40 month Coolant Injection C7.70 RHR-A Class 2 C-H C7.10 VT-2 6.2RHR501 04/2002 Sat Residual Heat C7.30 40 month Removal C7.50 C7.70

Page 3 of 3 Owner Elected and Augmented Examinations The Owner elected examinations included ultrasonic and visual examinations recommended by the Boiler Water Reactor Vessel and Internals Project (BWRVIP) and industry operating experiences including General Electric (GE) Service Information Letters (SIL's). There was one additional through wall flaw found on the steam dryer skirt, but the previously reported circumferential indications on the skirt were determined to be manufacturing roller marks. One of the previously reported core spray internal piping weld flaws (P8b) was determined to be geometry. Other than the one new dryer skirt flaw no additional flaws were found. The augmented examinations included ultrasonic examination of sixty-five (65) Reactor Equipment Cooling (REC) system welds. One (1) three (3) inch weld was found to have a flaw indication. The indication was within the allowable flaw size and was repaired during RFO21. Repairs or Replacements The ASME Section XI repairs or replacements are as summarized in the Form NIS-2 Owner's Report and summary table.

Page 1of 1 FORM NIS-1 OWNER'S REPORT FOR INSERVICE INSPECTIONS As required by the Provisions of the ASME Code

1. Owner: Nebraska Public Power District, 1414 15th St., Columbus, NE 68601 (Name and Address of Owner)
2. Plant: Cooper Nuclear Station, P.O. Box 98, Brownville, NE 68321 (Name and Address of Plant)
3. Plant Unit: 1 4. Owner Certificate of Authorization (if required): NIA
5. Commerical Service Date 07/0111974 6. National Board Number: 20762
7. Components Inspected:

Component or Manufacturer Manufacture or State or National Board No Appurtenance or Installer Installer Serial No. Province No. Reactor Vessel / Vessel Combustion Engineering C.E.66106 I C.E.66206 N/A 20762 HeadIIII Piping, Pumps, Valves, N/A N/A N/A and Supports NA Containment Chicago Bridge and Iron C-4448 N/A None

8. Examination Date 3/12102 (62 Days Following the End of Last Outage) to 04/20/2003
9. Inspection Period Identification (ISI) Third Period 11/0112002 to 0212812006, (IWE) Second Period 06/0912001 to 01/08/2005
10. Inspection Interval Identification: (ISI) Third 03/01/1996 to 02/28/2006, (IWE) First 06102/1996 to 05/08/2007
11. Applicable Edition of Section Xi: (ISI) 1989, (WE) 1992 Addenda: (ISI) None, (WE) 1992
13. Abstract of Examinations and Tests. Include a list of examinations and tests and a statement concerning status of work required for the Inspection Plan. See Attachment 1
14. Abstract of Results of Examinations and Tests: See Attachment i
15. Abstract of Corrective Measures: See Attachment 1 We certify that a) the statements made in this report are correct, b) the examinations and test meet the Inspection Plan as required by the ASME Code, Section Xl, and c) corrective measures taken conform to the rules of the ASME Code, Section Xl.

Certificate of Authorization No. (if applicable): N/A Expiration Date: N/A Date t118lo3 Signed: Nebraska Public Power District By: 6 Owner CERTIFICATE OF INSERVICE INSPECTION I, the undersigned holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Provincepf and employed by k13 of period of

           ,W4efp M&4422 A.C17            to OWLIo /O, have inspected the components describe inthis Owners Report during the
                                                                           , and state that to the best of my knowledge and belief, the Owner has performed eamihations and test and taken cor ective measures described in this Owner's Report in accordance with the Inspection Plan and as required by the ASME Code, Section Xl.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations, tests, and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection. Commissions ,/ 147~ /7c Signature Wes National Board, tePrnde, and Endorsements Date: 6.3

, RF021: Inservice Inspection Report                                                                                                                                                                                     Page 1 of 67 1.Owner, NPPD P.O. Box 499 Columbus, NE 6860                                                                                          4. Commerical Service Date: July, 1974                                         Tuesday, June 17, 2003
2. Plant: Cooper Nuclear Station P.O. Box 98 Brownville, NE 68321 5. Owner Certification of Authorization: N/A
3. Plant Unit: 1 6. National Board Number 20762 Exam Credit: ISI Equal: 223 Category: B-E Equal: 19 Item No.: 6.11 Equal: 1 Summary No.: B4.11.N10 Component D: NVE-BE-N1O Exam Method: VT-2 Comments ICorrectlve Measures:

Class: I System: NB

Description:

SLC Nozzle to RPV Partial Penetration Weld Results: Accept Performed in conjunction with Class 1 System Leakage Test. Work Order 4230314 Report No.: VE-03-551 Item No.: 54.12 Equal: 12 Summary No.: B4.12.34-03 Component ID: CRD 34-03 Exam Method: VT-2 Comments I CorrectIve Measures: Class: 1 System: NB

Description:

CRD Nozzle to RPV Partial Penetration Weld Results: Accept Performed In conjunction with Class 1 System Leakage Test. Work Order 4230314 Report No.: VE-03-535 Summary No.: B4.1234-19 Component ID: CRD 34-19 Exam Method: VT-2 Comments I Corrective Measures: Class: 1 System: NB

Description:

CRD Nozzle to RPV Partial Penetration Weld Results: Accept Performed In conjunction with Class I System Leakage Test. Work Order 4230314 Report No.: VE-03-53 Summary No.: B4.12.34-35 Component ID: CRD 34-35 Exam Method: VT-2 Comments I Corrective Measures: Class: 1 System: NB

Description:

CRD Nozzle to RPV Partial Penetration Weld Results: Accept Performed in conjunction with Class 1 System Leakage Test. Work Order 4230314 Report No.: VE-03-537 Summary No.: B412.38-07 Component ID: CRD 38-07 Exam Method: VT-2 Comments I Corrective Measures: Class: I System: NB

Description:

CRD Nozzle to RPV Partial Penetration Weld Results: Accept Performed in conjunction with Class 1 System Leakage Test. Work Order 4230314 Report No.: VE-03-538 Summary No.: B4.12.38-27 Component ID: CRD 38-27 Exam Method: VT-2 Comments I Corrective Measures: Class: 1 System: NB

Description:

CRD Nozzle to RPV Partial Penetration Weld Results: Accept Performed in conjunction with Class 1 System Leakage Test. Work Order 4230314 Report No.: VE-03-539 Summary No.: 84.12.38-47 Component D: CRD 38-47 Exam Method: VT-2 Comments I Corrective Measures: Class: 1 System: NB

Description:

CRD Nozzle to RPV Partial Penetration Weld Results: Accept Performed in conjunction with Class 1 System Leakage Test. Work Order 4230314 Report No.: vE-o34o Summary No.: 84.12.42-11 Component D: CR0 42-11 Exam Method: VT-2 Comments I Corrective Measures: Class: 1 System: NB

Description:

CRD Nozzle to RPV Partial Penetration Weld Results: Accept Performed in conjunction with Class 1 System Leakage Test. Work Order 4230314 Report No.: VE-03-541 Summary No.: B4.12.42-15 Component D: CRD42-15 Exam Method: VT-2 Comments I Corrective Measures: Class: 1 System: NB

Description:

CRD Nozzle to RPV Partial Penetration Weld Results: Accept Performed in conjunction with Class 1 System Leakage Test. Work Order 4230314 Report No.: VE-03-542 Summary No.: 84.12.42-39 Component ID: CRD 42-39 Exam Method: VT-2 Comments I Corrective Measures: Class: 1 System: NB

Description:

CRD Nozzle to RPV Partial Penetration Weld Results: Accept Performed in conjunction with Class 1 System Leakage Test. Work Order 4230314 Report No.: VE-03-543

, RF021: Inservice Inspection Report                                                                                                                                            Page 2 of 67 1.Owner, NPPD P.O. Box 499 Columbus, NE 6860                                                                     4. Commerical Service Date: July, 1974                        Tuesday, June 17, 2003
2. Plant: Cooper Nuclear Station P.O. Box 98 Brownville, NE 68321 5. Owner Certification of Authorization: N/A
3. Plant Unit: 1 6. National Board Number 20762 Summary No.: B4.12.46-23 Component ID: CRD 46-23 Exam Method: VT-2 Comments I Corrective Measures:

Class: I System: NB

Description:

CRD Nozzle to RPV Partial Penetration Weld Results: Accept Performed in conjunction with Class 1 System Leakage Test. Work Order 4230314 Report No.: VE-03-54 Summary No.: B4.12.46-31 Component ID: CRD 46-31 Exam Method: VT-2 Comments I Corrective Measures: Class: I System: NB

Description:

CRD Nozzle to RPV Partial Penetration Weld Results: Accept Performed in conjunction with Class 1 System Leakage Test. Work Order 4230314 Report No.: VE-03-545 Summary No.: B4.12.46.43 Component ID: CRD 46-43 Exam Method: VT-2 Comments I Corrective Measures: Class: 1 System: NB

Description:

CRD Nozzle to RPV Partial Penetration Weld Results: Accept Performed in conjunction with Class I System Leakage Test. Work Order: 4230314 Report No.: VE-03-546 f Item No.: 84.13 Equa: 6 Summary No.: 84.13.20-45 Component ID: INCORE 20-45 Exam Method: VT-2 Comments I Corrective Measures: Class: 1 System: NB

Description:

Incore Monitoring LPRM Nozzle Reactor Vessel Results: Accept Performed inconjunction with Class 1 System Leakage Test. Work Order. 4230314 Partial Penetration Weld Report No.: VE-03-547 Summary No.: B4.13.28-05 Component ID: INCORE 28-05 Exam Method: VT-2 Comments Corrsctive Measures: Class: 1 System: NB

Description:

Incore Montoring LPRM Nozzle Reactor Vessel Results: Accept Performed in conjunction with Class 1 System Leakage Test. Work Order 4230314 Partial PenetratiOn Weld Report No.: VE-03-548 Summary No.: B4.13.2845 ComponentlD: INCORE28-45 Exam Method: VT-2 CommentsICorective Measures: Class: 1 System: NB

Description:

Incore Monitoring LPRM Nozzle Reactor Vessel Results: Accept Performed in conjunction with Class I System Leakage Test. Work Order. 4230314 Partial Penetration Weld Report No.: VE-03-549 Summary No.: 84.13.36-05 Component ID: INCORE 3645 Exam Method: VT-2 Comments I Corrective Measures: Class: I System: NB

Description:

Incore Monitoring LPRM Nozzle Reactor Vessel Results: Accept Performed in conjunction with Class 1 System Leakage Test. Work Order 4230314 Partial Penetration Weld Report No.: VE-3550 Summary No.: B4.13.N12A Component ID: NVE-BE-N12A Exam Method: VT-2 Comments I Corrective Measures: Class: I System: NB

Description:

Instrumentation Nozzle Reactor Vessel Partial Results: Accept Performed in conjunction with Class 1 System Leakage Test. Work Order. 4230314 Penetration Weld Report No.: VE-03-552 Summary No.: 84.13.N12B Component ID: NVE-BE-N12B Exam Method: VT-2 Comments Corrective Measures: Class: 1 System: NB

Description:

Instrumentation Nozzle Reactor Vessel Partial Results: Accept Performed in conjunction with Class 1 System Leakage Test. Work Order 4230314 Penetration Weld Report No.: VE-03-553

, RFO21: Inservice Inspection Report                                                                                                                                Page 3 of 67
1. Owner, NPPD P.O. Box 499 Columbus, NE 6860 4. Commerical Service Date: July, 1974 Tuesday, June 17, 2003
2. Plant: Cooper Nuclear Station P.O. Box 98 Brownville, NE 68321 5. Owner Certification of Authorization: N/A
3. Plant Unit: 1 6. National Board Number 20762 Cabry: BG-1 Equal: 32 l r Kem No.: B6.10 Equal: 1 Summary No.: B6. 10.0037 Component ID: PRB-BGI-37 Exam Method: VT-1 Comment Corrective Measures:

Class: 1 Syatem: NB

Description:

Reactor Pressure Vessel Head Closure Nut Results: Accept Work Order 4235637 one (1) fi ttwo (52) Report No.: VE-03-19 Summary No.: B.10.0038 Component D: PRB-BG1-38 Exam Method: VT-1 Comments I Cor ctive Measures: Class: I System: NB

Description:

Reactor Pressure Vessel Closure Nut one (1) Results: Accept Work Order. 4235637 of fifty two (52) Report No.: VE-03-198 Summary No.: B6.10.0039 Component ID: PRB-BGI-39 Exam Method: VT-1 Comments I Corrective Measures: Class: 1 System: NB

Description:

Reactor Pressure Vessel Closure Nut one (1) Results: Accept Work Order 4235637 of fifty tw (52) Report No.: VE 97 Summary No.: B6.10.0040 Component ID: PRB-BGI-40 Exam Method: VT-1 Comments I Corrective Measures: Class: 1 System: NB

Description:

Reactor Pressure Vessel Closure Nut one (1) Resuls: Accept Work Order 4235637 of fifty two (52) ReportNo.: VE-03-198 Summary No.: B6.10.0041 Component ID: PRB-BGI-41 Exam Method: VT-1 Comments l Coective Measures: Class: I System: NB

Description:

Reactor Pressure Vessel Closure Nut, one (1) Results: Accept Work Order 4235637 of fity tw (52) ReportNo.: V--i 9 Summary No.: B6. 10.0042 Component ID: PRB-BG1-42 Exam Method: VT-1 Comments I Corrective Measures: Class: 1 System: NB

Description:

Reactor Pressure Vessel Closure Nut one (1) Results: Accept Work Order 4235637 of fify tmo (52) Report No.: VE-03-200 Summary No.: B6.10.0043 Component ID: PRB-BG1-43 Exam Method: VT- Comments I Corrective Measures: Class: 1 System: NB

Description:

Reactor Pressure Vessel Closure Nut one (1) Results: Accept Work Order 4235637 of If two (52) Report No.: VE-03-201 Summary No.: B6.10.0044 Component ID: PRB-BG1-44 Exam Method: VT-1 Comments I Corrective Measures: Class: 1 System: NB

Description:

Reactor Pressure Vessel Closure Nut one (1) Results: Accept Work Order 4235637 of fifty two (52) Report No.: VE-03-202 Summary No.: B6.10.0045 Component ID: PRB-BGI-45 Exam Method: VT-1 Comments / Corrective Measures: Class: 1 System: NB

Description:

Reactor Pressure Vessel Closure Nut one (1) Results: Accept Work Order 4235637 of fity two (52) Report No.: VE-03-203 Summary No.: 6.10.0046 Component ID: PRB-BGI-4e Exam Method: VT-1 Comments I Corrective Measures: Class: 1 System: NB

Description:

Reactor Pressure Vessel Closure Nut one (1) Result: Accept Work Order 4235637 of f two (52) Report No.: VE-03-204 Summary No.: B6.10.0047 Component ID: PRB-BGI-47 Exam Method: VT-i Comments I Corrective Measures: Class: 1 System: NB

Description:

Reactor Pressure Vessel Closure Nut one (1) Results: Accept Work Order 4235637 of fifty two (52) Report No.: VE-03-205

, RF021: Inservice Inspection Report                                                                                                                                                                                                  Page 4 of 67
1. Owner, NPPD P.O. Box 499 Columbus, NE 6860 4. Commerical Service Date: July, 1974 Tuesday, June 17, 2003
2. Plant: Cooper Nuclear Station P.O. Box 98 Brownville, NE 68321 5. Owner Certification of Authorization: N/A
3. Plant Unit 1 6. National Board Number 20762 Summary No.: 86.10.0048 Component D: PRB-BG1-48 Exam Method: VT-1 Comments I Corrective Measures:

Class: I System: NB

Description:

Reactor Pressure Vessel Closure Nut, one (1) Results: Accept Work Order 4235637 of fifty two (52) Report No.: VE-03-208 Summary No.: B3.10.0049 Component ID: PRB-BG1-49 Exam Method: VT-1 Comments I Corrective Measures: Class: 1 System: NB

Description:

Reactor Pressure Vessel Closure Nut, one (1) Results: Accept Work Order 4235837 of fiftybwo (52) Report No.: VE43-207 Summary No.: 86.10.0050 Component 10: PRB-BGI-50 Exam Method: VT-1 Comments I Corrwve Measures: Class: 1 System: NB

Description:

Reactor Pressure Vessel Closure Nut, one (1) Results: Accept Work Order 4235637 of ny tm (52) Report No.: VE-03-208 Summary No.: B6.10.0051 Component ID: PRO-BG1-51 Exam Method: VT-1 Comments I Corrective Measures: Class: 1 System: NB

Description:

Reactor Pressure Vessel Closure Nut, one (1) Results: Accept Work Order 4235637 of two (52) Report No.: VE-03-209 Summary No.: 6.10.0052 Component D: PRB-BG1-52 Exam Method: VT-1 Comments I Corrective Measures: Class: 1 System: NB

Description:

Reactor Pressure Vessel Closure Nut one (1) Results: Accept Work Order 4235637 of fity to (52) Report No.: VE3-210 Item No.: 66.60 Equal: 16 Summary No.: B6.50.0037 Component ID: PRC-BG1-37 Exam Method: VT-1 Comments I Corrective Measures: Class: 1 System: NB

Description:

Reactor Pressure Vessel Closure Washer, one Results: Accept Work Order 4235837 (1)of fifty two (52) ReportNo.: VE3-150 Summary No.: Be.50.0038 Component ID: PRC-BG1-38 Exam Method: VT-1 Comments I Corrective Measures: Class: 1 System: NB

Description:

Reactor Pressure Vessel Closure Washer, one Results: Accept Work Order 4235637 (1)of fifytwo (52) ReportNo.: VE-03-151 Summary No.: B. 50.0039 Component ID: PRC-BG1-39 Exam Method: VT-1 Comments I Corrective Measures: Class: 1 System: NB

Description:

Reactor Pressure Vessel Closure Washer, one Results: Accept Work Order 4235637 (1)of fifty two (52) Report No.: VE-03152 Summary No.: Be.50.0040 Component ID: PRC-BGI-40 Exam Method: VT-1 Comments I Corrective Measures: Class: I System: NB

Description:

Reactor Pressure Vessel Closure Washer, one Results: Accept Work Order 4235637 (1)of fifty two (52) Report No.: VE-03-153 Summary No.: B8. 50.0041 Component ID: PRC-BG1-41 Exam Method: VT-1 Comments I Corrective Measures: Class: 1 System: NB

Description:

Reactor Pressure Vessel Closure Washer, one Results: Accept Work Order 4235637 (1)of fifty two (52) Report No.: VE-03-154 Summary No.: B. 50.0042 Component ID: PRC-BG1-42 Exam Method: VT-1 Comments I Corrective Measures: Class: I System: NB

Description:

Reactor Pressure V/el Closure Washer, one Results: Accept Work Order 4235637 (1)of fi two (52) Report No.: VE-03-155

Attachment 1, RF021: Inservice Inspection Report Page 5 of 67

1. Owner, NPPD P.O. Box 499 Columbus, NE 6860 4. Commerical Service Date: July, 1974 Tuesday, June 17, 2003
2. Plant Cooper Nuclear Station P.O. Box 98 Brownville, NE 68321 5. Owner Certification of Authorization: N/A
3. Plant Unit I S. National Board Number 20762
  ......  ........   .. ..... I- ----------------------------------------------------                                     ---------------------------------------------------                                -------------------------------------                  -------------........

Summary No.: B6.50.0043 Component ID: PRC-BG1-43 Exam Method: VT-1 Comments I Corrective Measures: Class: I System: NB

Description:

Reactor Pressure Vessel Closure Washer, one Results: Accept Work Order 4235637 (1)of fifty two (52) Report No.: VE-03-156 summary No.: 8650.0044 Component ID: PRC-BG1-44 Exam Method: VT-1 Comments I Corrective Measures: Class: I System: NB

Description:

Reactor Pressure Vessel Closure Washer, one Results: Accept Work Order 4235837 (1)of fi two (52) Report No.: VE-03-157 Summary No.: B6.50.0045 Component ID: PRC-BGI-45 Exam Method: VT-1 Comments I Corrective Measures: Class: 1 System: NB

Description:

Reactor Pressure Vessel Closure Washer, one Results: Accept Work Order 4235837 (1)of fiftytwo (52) Report No.: VE-03-158 Summary No.: 6.50.0046 Component ID: PRC-BGI-46 Exam Method: VT-1 Comments I Corrective Measures: Class: 1 System: NB

Description:

Reactor Pressure Vessel Closure Washer, one Results: Accept WorkOrder 4235637 (1)of fiftytwo(52) ReportNo.: VE-03-159

            --- ----      -- . . . . .. . .............----                        --- ............................                       ... ................             ...... ....... ... .. ...............               ......................     .. .............      I-------------------------------------------------------..........

Summary No.: B6.50.0047 Component ID: PRC-BGI-47 Exam Method: VT-1 Comments / Corrective Measures: Class: 1 System: NB

Description:

Reactor Pressure Vessel Closure Washer, one Results: Accept Work Order 4235637 (1)o fify Mo (52) RePor NO.: VE-03-160 Summary No.: 8e.50.0048 Component ID: PRC-BG1-48 Exam Method: VT-1 Comments / Corrective Measures: Class: 1 System: NB

Description:

Reactor Pressure Vessel Closure Washer, one Results: Accept Work Order 4235637 (1)of fiftlytwo (52) ReportNo.: VE-03-161 Summary No.: B6.50.0049 Component ID: PRC-BGI-49 Exam Method: VT-1 Comments I Corrective Measures: Class: 1 System: NB

Description:

Reactor Pressure Vessel Closure Washer, one Results: Accept Work Order 4235837 (1)of fifytwo (52) ReportNo.: VE-03162 Summary No.: B6.50.0050 Component ID: PRC-BGI-50 Exam Method: VT-1 Comments I Corrective Measures: Class: 1 System: NB

Description:

Reactor Pressure Vessel Closure Washer, one Result: Accept Work Order 4235837 (1)of fifty two (52) Report No.: VE-O1e3 Summary No.: 56.50.0051 Component ID: PRC-BGI-51 Exam Method: VT-1 Comments / Corrective Measures: Class: 1 System: NB

Description:

Reactor Pressure Vessel Closure Washer, one Results: Accept Work Order 4235637 (1)of fifytwo (52) ReportNo.: VE-03-164 Summary No.: B6.50.0052 Component ID: PRC-BG1-52 Exam Method: VT-1 Comments I Corrective Measures: Class: 1 System: NB

Description:

Reactor Pressure Vessel Closure Washer, one Resulh Accept Work Order 4235637 (1)o fifty two (52) Report No.: VE-03-165

, RF021: Inservice Inspection Report                                                                                                                                              Page 6 of 67 1.Owner, NPPD P.O. Box 499 Columbus, NE 6860                                                                        4. Commerical Service Date: July, 1974                         Tuesday, June 17, 2003
2. Plant: Cooper Nuclear Station P.O. Box 98 Brownville, NE 68321 5. Owner Certification of Authorization: WA
3. Plant Unit: 6. National Board Number 20762 Cate"or: B-G-2 Equal: 8 Itm o. B7.50 Equl Summary No.: 87.50.0001 Component ID: MSA-BG2-17 Exam Meto: VT-i CommentslI Corrective Measures:

Class: System: MS

Description:

Main Run Pipe Flange to Valve Flange Bolting Results: Accept The examination data sheet is Attachment of CNS procedure 3.28. 1. Work Order~ 4223304 Report No.: VE-03-598 Summary No.: B7.50.0002 Component ID: MSA-BG2-22 Exam Method: VT-I Comments I Corrective Measures: Class: I System: MS DescrIptIon: Main Run Pipe Flange to Valve Flange Bolting Results: Accept Work Order 4235683 Report No.: VE-03-143 Summary No.: 87.50.0003 Component ID: MSA-BG2-27 Exam Method: V`1-I Comments I corrective Measures: Class: System: MS

Description:

Main Run Pipe Flange to Valve Flange Bolting Results: Accept Work Order.~ 4235883 Report No.: VE-03-04 Summary No.: B7.50.0008 Component ID: MSD-BG2-17 Exam Method: VT-I CommentslI Corrective Measures: Class: System: MS

Description:

Main Run Pipe Flange to Valve Flange Bolting Results: Accept Work Order. 4235683 Report No.: VE-03-171 Summary No.: B7.50.0009 Component ID: MSD-BG2-22 Exam Method: VT-I comments I corrective Measures: Class: I System: MS

Description:

Main Run Pipe Flange to Valve Flange Bolting Results: Accept Work Order- 4235683 Report No.: VE-03-1I 8 Summary No.: 57.50.0010 Component ID: MSD-BG2-27 Exam Method: VT- Comments I Corrective Measures: Class: System: MS

Description:

Main Run Pipe Flange to Valve Flange Bolting Results: Accept Work Order. 42356583 Report No.: VE-03-172 Summary No.: B7.50.001 1 Component ID: MSD-BG2-31 Exam Method: VT-I Comments I corrective Measures: Class: I System: MS

Description:

Main Run Pipe Flange to Valve Flange Bolting Results: Accept Work Order~ 4235683 Report No.: VE-03-173 I Rem No.: 57.70 Equal: I Summary No.: B7.70.0025 Component ID: RF-15-CV Exam Method: VT-1 Comments I Corrective Measures: Class: System: RF

Description:

Valve Body Bolting Results: Accept Examined hinge pin cover studs and nuts. The examination data sheet is Work Order- 4223238 Report No.: VE-o3-62 Attachment 1 of CNS procedure 3.28.1.1.

, RF021: Inservice Inspection Report                                                                                                                                                                                                                                                                               Page 7 of 67
1. Owner, NPPD P.O. Box 499 Columbus, NE 6860 4. Commerical Service Date: July, 1974 Tuesday, June 17, 2003
2. Plant: Cooper Nuclear Station P.O. Box 98 Brownville, NE 68321 5. Owner Certification of Authorization: N/A
3. Plant Unit: 1 6. National Board Number 20762 Ctgr: B-K Equal: 6 Rom No.: B10.20 Equal: 3 Summary No.: B10.20.0049 Component ID: FWD-BK1-4 Exam Method: MT Comments I Corrective Measures:

Class: I System: RF DescrIptIon: Hanger Shear Lugs (4total) r11x2x2 Inches Results: Accept Work Order: 4235686 ASTM 515, GR85 ReportNo.: VE-03-175 Summary No.: B10.20.0025 ComponentlD: MSD-BK1-32 Exam Method: MT Comments ICorrective Measures: Class: 1 System: MS

Description:

Lugs(2total)1/4x1x9 Inches Results: Accept Work Order 4235684 Report No.: VE.03177 Summary No.: 810.20.0055 Component ID: RHB-BKI-18 Exam Method: MT Comments/Corrective Measures: Class: I System: RHR

Description:

Snubber Shear Lugs (4 total) Results: Accept Work Order 4235685 Report No.: VE-03-178 Iitem No.: B10.30 Equal: 3 Summary No.: B10.30.0002 Component ID: RR-BKI-1B Exam Method: PT Comments I Corrective Measures: Class: 1 System: RR

Description:

Reactor Recirculatlon Pump Lug one (1)of 3 Results: Accept Work Order: 4235633 (throe) ReportNo.: VE-03-105 Summary No.: B10.30.0004 Component D: RR-8KI-28 Exam Method: PT Comments I Corrective Measures: Class: 1 System: RR

Description:

Reactor Recirculation Pump Lug one (1)of 3 Results: Accept Work Order. 4235633 (three) ReportNo.: VE-03-10f Summary No.: B10.30.0006 Component ID: RR-BK1-3B Exam Method: PT Comments I Corrective Measures: Class: 1 System: RR

Description:

Reactor Recirculatlon Pump Lug one (1)of 3 Results: Accept Work Order. 4235633 (three) Report No.: VE-03-107 Category: B-M-2 Equal: 3 I tem No.: 812.50 Equal: 3 Summary No.: B12.50.0012 Component ID: MS-RV-70A-BM2 Exam Method: VT-3 Comments / Corrective Measures: Class: 1 System: MSRV

Description:

Valve Body Internal Surfaces Results: Accept Valve Body Group: F The examination data sheet Is Attachment 1 of Work Order 4223304 Report No.: vE-03.597 CNS procedure 3.28.1.3. Summary No.: B 12.50.0017 Component ID: MS-RV-71C-BM2 Exam Method: VT-3 Comments / Corrective Measures: Class: I System: MSRV

Description:

Valve Body internal Surfaces Results: Accept Valve Body Group: G The examination data sheet is Attachment 1 of Work Order 4223311 Report No.: VE-03.623 CNS procedure 3.28.1.3. Summary No.: 812.50.0033 ComponentlD: RF-13-CV-BM2 Exam Method: VT-3 Comments ICorrective Measures: Class: I System: RF

Description:

Valve Body intemal Surfaces Results: Accept Valve Body Group: D The examination data sheet is Attachment 1 of Work Order 4223237 Report No.: VE-03-59S CNS procedure 3.28.1.3.

, RFO21: Inservice Inspection Report                                                                                                                                     Page 8 of 67 1.Owner, NPPD P.O. Box 499 Columbus, NE 6860                                                                  4. Commerical Service Date: July, 1974                      Tuesday, June 17, 2003
2. Plant: Cooper Nuclear Station P.O. Box 98 Brownville, NE 68321 5. Owner Certification of Authorization: N/A
3. Plant Unit: I 6. National Board Number 20762 I Caegory: B-N-1 Equal: I F-item No.: B13.10 Equal: I Summary No.: B13.10.0004 Component ID: VES-INTERQ180>360 Exam Mettod: Vr-3 Comments I Corrective Measures:

Class: I System: NB

Description:

RPV Interior Surfaces (One Half RPV Wall Results: Accept Examined accessible areas of RPV interior. Work Order. 4235471 Accessible Areas) Report No.: VE-03-217

, RF021: Inservice Inspection Report                                                                                                                                                                                                                                         Page 9 of 67
1. Owner, NPPD P.O. Box 499 Columbus, NE 6860 4. Commerical Service Date: July, 1974 Tuesday, June 17, 2003
2. Plant: Cooper Nuclear Station P.O. Box 98 Brownville, NE 68321 5. Owner Certification of Authorization: WA
3. Plant Unit: 1 6. National Board Number 20762 l Caeory: B-N-2 Equal: 32 I Item No.: B13.40 Equal: 32 l Summary No.: B13.40.GTIO-11 Component ID: CRGT10-11) Exam Method: VT.3 Comments ICorrective Measures:

Class: 1 System: NB

Description:

Control Rod Guide Tube Results: Accept Examined accessible surfaces of RPV Core Support Structure. The top Work Order: 4235471 Report No.: VE-03-235 edge of the Guide Tube was deformed. The adjacent core plate plug was also damaged. Determine to be the result of a dropped fuel support pice In 1985. Evaluated and found acceptable per Engineering Evaluation EE-03-039. Reference Notifications 10235675 and 10235144. Summary No.: B13.40.GT1O-27 Component ID: CRGT410-27) Exam Method: VT-3 Comments I Corrective Measures: Class: System: NB

Description:

Control Rod Guide Tube Results: Accept Examined accessible surfaces of RPV Core Support Structure. Work Order. 4235471 Report No.: VE-03-236 Summary No.: 813.40.GT1O-43 Component ID: CRGT-(10-43) Exam Method: VT-3 CommentsI Corrective Measures: Class: I System: NB

Description:

Control Rod Guide Tube Results: Accept Examined accessible surfaces of RPV Core Support Structure. Work Order 4235471 Report No.: VE-03-237 Summary No.: 813.40.GTIS-19 Component ID: CRGT(18-19) Exam Method: VT-3 Comments I Corrective Measures: Class: 1 System: NB

Description:

Control Rod Guide Tube Results: Accept Examined accessible surfaces of RPV Core Support Structure. Work Order 4235471 Report No.: VE-03-238 Summary No.: B13.40.GT18-35 Component D: CRGT-(18-35) Exam Method: VT-3 Comments ICorrective Measures: Class: 1 System: NB

Description:

Control Rod Guide Tube Results: Accept Examined accessible surfaces of RPV Core Support Structure. Work Order 4235471 Report No.: VE-03-239 Summary No.: 813.40.GT18-39 Component ID: CRGT(1839) Exam Method: VT-3 Comments I Corrective Measures: Class: 1 System: NB

Description:

Control Rod Guide Tube Results: Accept Examined accessible surfaces of RPV Core Support Structure. Work Order. 4235471 Report No.: VE-03-240 Summary No.: B13.40.GT26-11 Component D: CRGT-(26-1 1) Exam Method: VT-3 Comment. I Corrective Measures: Class: 1 System: NB

Description:

Control Rod Guide Tube Results: Accept Examined accessible surfaces of RPV Core Support Structure. Work Order 4235471 Report No.: VE-03-241 Summary No.: 813.40.GT26-27 Component ID: CRGT426-27) Exam Method: VT-3 Comments I Corrective Measures: Class: 1 System: NB

Description:

Control Rod Guide Tube Results: Accept Examined accessible surfaces of RPV Core Support Structure. Work Order: 4235471 Report No.: VE-03-242 Summary No.: B13.40.GT26-43 Component ID: CRGT426-43) Exam Method: VT-3 Comment. I Corrective Measures: Class: 1 System: NB

Description:

Control Rod Guide Tube Results: Accept Examined accessible surfaces of RPV Core Support Structure. Work Order: 4235471 Report No.: VE-03243 Summary No.: B13.40.GT34-11 Component ID: CRGT434-11) Exam Method: VT-3 Comments I Corrective Measures: Class: 1 System: NB

Description:

Control Rod Guide Tube Results: Accept Examined accessible surfaces of RPV Core Support Structure. Work Order 4235471 Report No.: VE-03-244

, RFO21: Inservice Inspection Report                                                                                                                                       Page 10 of 67
1. Owner, NPPD P.O. Box 499 Columbus, NE 6860 4. Commerical Service Date: July, 1974 Tuesday, June 17, 2003
2. Plant: Cooper Nuclear Station P.O. Box 98 Brownville, NE 68321 5. Owner Certification of Authorization: N/A
3. Plant Unit: 1 6. National Board Number 20762 Summary No.: B13.40.GT34-19 Component D: CRGT34-19) Exam Method: VT-3 Comments I Corrective Measures:

Class: I System: NB

Description:

Control Rod Guide Tube Results: Accept Examined accessible surfaces of RPV Core Support Structure. Work Order 4235471 Report No.: VEo3-245 Summary No.: B13.40.GT34-27 Component ID: CRGT{34-27) Exam Method: VT-3 Comments I Corrective Measures: Class: 1 System: NB

Description:

Control Rod Guide Tube Results: Accept Examined accessible surfaces of RPV Core Support Structure. Work Order 4235471 Report No.: VE43-246 Summary No.: B13.40.GT34-35 Component ID: CRGT-34-35) Exam Method: VT-3 Comments I Corrective Measures: Class: 1 System: NB

Description:

Control Rod Guide Tube Results: Accept Examined accessible surfaces of RPV Core Support Structure. Work Order 4235471 Report No.: VE-03-247 Summary No.: B13.40.GT3S-31 Component ID: CRGT38-31) Exam Method: VT-3 Comments I Corrective Measures: Class: 1 System: NB

Description:

Control Rod Guide Tube Results: Accept Examined accessible surfaces of RPV Core Support Structure. Work Order 4235471 Report No.: VE-43-248 Summary No.: B13.40.GT42-11 Component D: CRGT42-11) Exam Method: VT-3 Comments ICorrective Measures: Clas: 1 System: NB

Description:

Control Rod Guide Tube Results: Accept Examined accessible surfaces of RPV Core Support Structure. Work Order 4235471 Repor NO.: VE-3250 Summary No.: B13.40.GT42-43 Component D: CRGT42-43) Exam Method: VT-3 Comments I Corrective Measures: Class: 1 System: NB

Description:

Control Rod Guide Tube Results: Accept Examined accessible surfaces of RPV Core Support Structure. Work Order 4235471 Report No.: VE-03-251 Summary No.: B13.40.OF10-11 Component D: OFSC-(10-11) Exam Method: VT-3 Comments I Corrective Measures: Class: 1 System: NB

Description:

Four Lobed Orificed Fuel Support Casting Results: Accept Examined accessible surfaces of RPV Core Support Structure. Work Order 4235471 Assembly Report No.: VE-03-252 Summary No.: B13.40.GT42-11 Component D: OFSC-(10-27) Exam Method: VT-3 Comments ICorrective Measures: Class: 1 System: NB

Description:

Four Lobed Orified Fuel Support Casting Results: Accept Examined accessible surfaces of RPV Core Support Structure. Work Order 4235471 Assembly Report No.: VE-03249 Summary No.: B13.40.OF1-43 Component D: OFSC-(1O43) Exam Method: VT-3 Comments I Corrective Measures: Class: I System: NB

Description:

Four Lobed Orificed Fuel Support Casting Results: Accept Examined accessible surfaces of RPV Core Support Structure. Work Order 4235471 Assembly Report No.: VE-03-253 Summary No.: B13.40.0F18-19 Component ID: OFSC-(18-19) Exam Method: VT-3 Comments I Corrective Measures: Class: 1 System: NB

Description:

Four Lobed Orificed Fuel Support Casting Results: Accept Examined accessible surfaces of RPV Core Support Structure. Work Order 4235471 Asserbly Report No.: VE-03-254 Summary No.: B13.40.0F18-35 Component ID: OFSC-{18-35) Exam Method: VT-3 Comments I Corrective Measures: Class: 1 System: NB

Description:

Four Lobed Orliced Fuel Support Casting Results: Accept Examined accessible surfaces of RPV Core Support Structure. Work Order 4235471 Assembly Report No.: VE-03-255 Summary No.: B13.40.0F18-39 Component D: OFSC-(18-39) Exam Method: VT-3 Comments I Corrective Measures: Class: 1 System: NB

Description:

Four Lobed Oriflced Fuel Support Casting Results: Accept Examined accessible surfaces of RPV Core Support Structure. Work Order 4235471 Assembly Report No.: VE-03-256

, RFO21: Inservice Inspection Report                                                                                                                                                                                         Page 11 of 67
1. Owner, NPPD P.O. Box 499 Columbus, NE 6860 4. Commerical Service Date: July, 1974 Tuesday, June 17, 2003
2. Plant Cooper Nuclear Station P.O. Box 98 Brownville, NE 68321 5. Owner Certification of Authorization: N/A
3. Plant Unit 1 6. National Board Number 20762 Summary No.: B13.40.0F26-11 Component ID: OFSC-(26-1 1) Exam Method: VT-3 Comments I Corrective Measures:

Class: 1 System: NB

Description:

Four Lobed Orificed Fuel Support Casting Results: Accept Examined accessible surfaces of RPV Core Support Structure. Work Order 4235471 Assembly Report NO.: VE-03-257 Summary No.: B13.40.0F26-27 Component ID: OFSC426-27) Exam Method: VT-3 Comments I Corrective Measures: Class: 1 System: NB

Description:

Four Lobed Orifced Fuel Support Casting Results: Accept Examined accessible surfaces of RPV Core Support Structure. Work Order 4235471 Assembly Report No.: VE-03-258

                 - - --I -- -- - ---- - - - - - -- - - - - - - - - -- - - - - - - - -  -- - - - -- - - - -- - - - .. .. .....

Summary No.: B13.40.0F26-43 Component ID: OFSC-(26-43) Exam Method: VT-3 Comments / Corecve Measures: Class: I System: NB

Description:

Four Lobed Orificed Fuel Support Casting Results: Accept Examined accessible surfaces of RPV Core Support Structure. Work Order 4235471 Assembly Report No.: VE-03-259 Summary No.: B13.40.OF34-11 Component ID: OFSC434-1 1) Exam Method: VT-3 Commentsl Corrective Measures: Class: I System: NB

Description:

Four Lobed Orificed Fuel Support casting Results: Accept Examined accessible surfaces of RPV Core Support Structure Work Order 4235471 Assembly Report No.: VE-03-26o Summary No.: B13.40.OF34-19 ComponentlD: OFSC-(34-19) Exam Method: VT-3 CommentsICorrective Measures: Class: I System: NB

Description:

Four Lobed Orificed Fuel Support Casting Results: Accept Examined accessible surfaces of RPV Core Support Structure. Work Order 4235471 Assembly Report No.: VE-03-261 Summary No.: B1340.0F34-27 Component ID: OFSC-(34.27) Exam Method: VT-3 Comments I Corrective Measures: Class: 1 System: NB

Description:

Four Lobed Orifloed Fuel Support Casting Results: Accept Examined accessible surfaces of RPV Core Support Structure. Work Order 4235471 Assembly Report No.: VE-03-262 Summary No.: 813.40.OF34-35 Component D: OFSC-(3435) Exam Method: VT-3 Comments I Corrective Measures: Class: 1 System: NB

Description:

Four Lobed Orificed Fuel Support Casting Results: Accept Examined accessible surfaces of RPV Core Support Structure. Work Order 4235471 Assemby Report No.: VE-03-253 Summary No.: B13.40.0F38-31 Component ID: OFSC-(38-31) Exam Method: VT-3 Comments Corrective Measures: Class: I System: NB

Description:

Four Lobed Orlilced Fuel Support Casting Results: Accept Examined accessible surfaces of RPV Core Support Structure. Work Order 4235471 Assembly Report N.: VE-03-264 Summary No.: B13.40.0F42-11 Component ID: OFSC-(42-1 1) Exam Method: VT-3 Comment I Corrective Measures: Class: 1 System: NB

Description:

Four Lobed Orificed Fuel Support Casting Results: Accept Examined accessible surfaces of RPV Core Support Structure. Work Order 4235471 Assembly Report No.: VE-03-265 Summary No.: B13.40.0F4243 Component ID: OFSC-(42-43) Exam Method: VT-3 Comments I Corrective Measures: Class: 1 System: NB

Description:

Four Lobed Ortficed Fuel Support Casting Results: Accept Examined accessible surfaces of RPV Core Support Structure. Work Order 4235471 Assembly Report No.: VE-03-266

, RF021: Inservice Inspection Report                                                                                                                      Page 12 of 67
1. Owner, NPPD P.O. Box 499 Columbus, NE 6860 4. Commerical Service Date: July, 1974 Tuesday, June 17, 2003
2. Plant: Cooper Nuclear Station P.O. Box 98 Brownville, NE 68321 5. Owner Certification of Authorization: N/A
3. Plant Unit: 1 6. National Board Number 20762 Category: B6- Equal: 4 Item No.: B14.10 Equal: 4 Summary No.: 814.10.22-51-1 Component ID: CRD-22-51-1 Exam Method: PT Comments I Corrective Measures:

Class: 1 System: CRD

Description:

Control Rod Drive Housing to Flange Results: Accept Work Order 4235636 Report No.: E-03-108 Summary No.: 814.10.26-03-1 Component ID: CRD-26-03-1 Exam Method: PT Comments Corrective Measures: Class: 1 System: CRD

Description:

Control Rod Drive Housing to Flange Results: Accept Work Order 4235636 ReportNo.: vE-o3-110 Summary No.: 814.10.26-51-1 Component ID: CRD-26-51-1 Exam Method: PT Comments I Corrective Measures: Class: 1 System: CRD

Description:

Control Rod Drive Housing to Flange Results: Accept Work Order 4235636 RsportNo.: VE-03-111 Summary No.: 814.10.30-03-1 Component ID: CRD-30-03-1 Exam Method: PT Comments I Corrective Measures: Class: I System: CRD

Description:

Control Rod Drive Housing to Flange Results: Accept Work Order 4235636 Report No.: vEC-o

, RF021: Inservice Inspection Report                                                                                                                                          Page 13 of 67
1. Owner, NPPD P.O. Box 499 Columbus, NE 6860 4. Commerical Service Date: July, 197 Tuesday, June 17, 2003
2. Plant: Cooper Nuclear Station P.O. Box 98 Brownville, NE 68321 5. Owner Certification of Authorization: N/A
3. Plant Unit: 1 6. National Board Number 20762 Category: B-P Equal: 7 Rtm No.: B16.10 Equal: 2 Summary No.: B15.10.RPV.SLT01 Component ID: RPV.PRB.SLT Exam Method: VT-2 CommentsI Corrective Measures:

Class: I System: NB

Description:

Reactor Pressure Vessel Pressure Retaining Results: Accept System Leakage Test. Formerly 6.MISC.502.RPV. Work Order: 4230314 Boundary System Leakage Test Report No.: VE-03-531 Summary No.: B15.10.RPV.SLT02 Component D: VS.HD.FLGSEL.LEKDETEC Exam Method: VT1-2 Comments/Corrective Measures: Class: I System: NB

Description:

RPV Flange Seal Leak Detection System RPV Results: Accept System Leakage Test. Examination performed with reactor refuel cavity Work Order. 4223135 Pressure Retaining Boundary System Leakage Report No.: VE03-555 flooded. Reference Relief Request PR-04. Test Iftem No. BIG 61.0 Equal: 2-Summary No.: B15.50.PIPE.SLT01 Component ID: PIPE.PRB.SLT Exam Method: VT-2 Comments I Corrective Measures: Class: I System: NB

Description:

Piping Pressure Retaining Boundary System Results: Accept System Leakage Test. Formerly 6.MISC.502.PIPE Work Order 4230314 Leakage Test Report No.: VE-03-532 Summary No.: B15.50.PIPE.SLT02 Component ID: VS.HD.FLGSELLEK.DETEC Exam Method: VT-2 Comments I Corrective Measures: Class: I System: NB

Description:

RPV Flange Seal Leak Detection System Results: Accept System Leakage Test. Examination performed with Reactor refuel cavity Work Order: 4223135 Piping Pressure Retaining Boundary System Report No.: VE-03-55e flooded. Reference Relief Request PR-04. Leakage Test L Inem No.: B15.B0 615.60~~~~~~ Equal: 1I Summary No.: Bt5.eo.PUMP.SLTo1 Component ID: PUMP.PRB.SLT Exam Method: VT-2 Comments Corrective Measures: Class: 1 System: NB

Description:

Pumps Pressure Retaining Boundary System Results: Accept System Leakage Test. Formerly 6.MISC.502.PMP. Work Order: 4230314 Leakage Test Report No.: VE-03-533 Item No.: B1S.70 Equa 2 Summary No.: B15.70.VALVE.STL01 Component D: VALVE.PRB.SLT Exam Method: VT-2 Comments Corrective Measures: Class: 1 System: NB

Description:

Valves Pressure Retaining Boundary System Results: Accept System Leakage Test. Fomerly 6.MISC.502.VAL. Work Order 4230314 Leakage Test Report No.: VE43-534 Summary No.: B15.70.VALVE.SLT02 Component ID: VS.HD.FLGSEL.LEK.DETEC Exam Method: VT-2 Comments I Corrective Measures: Class: 1 System: NB

Description:

RPV Flange Seal Leak Detection System Results: Accept System Leakage Test. Examination performed with Reactor refuel cavity Work Order 4223135 Valves Pressure Retaining Boundary System Report No.: VE43-557 flooded. Reference Relief Request PR-04. Leakage Test

, RF021: Inservice Inspection Report                                                                                                                                                                                                          Page 14 of 67 1.Owner, NPPD P.O. Box 499 Columbus, NE 6860                                                                                                             4. Commerical Service Date: July, 1974                                           Tuesday, June 17, 2003
2. Plant: Cooper Nuclear Station P.O. Box 98 Brownville, NE 68321 5. Owner Certification of Authorization: N/A
3. Plant Unit: 1 6. National Board Number 20762 Categoly: C-A Equal: 2 tem No.: C1.10 Equal: 2 Summary No.: Cl.10.0002 Component ID: RHR-CA-3A Exam Method: VT-1 Comments I Corrective Measures:

Class: 2 System: RHR

Description:

Distributor Ring End Bottom to Shell Flange Results: Accept Per Relief Request RI-05 a VT-2 examination of this component will be Work Order. 4235397 Report No.: vEo3-9o4 conducted during performance of category C-H 40 month system pressure test and 120 month system hydrostatic test per surveillance procedure 6.1RHR.501. Reference Inspection Period 2 Surviliance Work Order 4185633. Surveillance procedure 6.1 RHR.501 will also be conducted for Inspection Period 3, post RF021. Summary No: C1.10.00Q4 Component ID: RHR-CA-5A Exam Method: Manual UT Comments I Corrective Measures: Class: 2 System: RHR

Description:

Distributor Ring to Distributor Ring End Bottom Results: Acoept Work Order 4235397 Report No.: VE-03-092 Category: C-B Equal: 2 tem No C2.31 Equal 2 Summary No.: C2.31 .0001 Component ID: RHR-CB-3A Exam Method: MT Comments I Corrective Measures: Class: 2 System: RHR

Description:

Reinforcement Plate to Nozzle Results: Accept Work Order 4235397 Report No.: VE-03-529 Summary No.: C2.31 .0002 Component ID: RHR-CB-4A Exam Method: MT Comments I Corrective Measures: Class: 2 System: RHR

Description:

Distributor Ring to Reinforcement Plate Results: Accept Work Order 4235397 Report No.: VE-03-530

, RFO21: Inservice Inspection Report                                                                                                                                           Page 15 of 67 1.Owner, NPPD P.O. Box 499 Columbus, NE 6860                                                                   4. Commerical Service Date: July, 1974                           Tuesday, June 17, 2003
2. Plant: Cooper Nuclear Station P.O. Box 98 Brownville, NE 68321 5. Owner Certification of Authorization: N/A
3. Plant Unit: 1 6. National Board Number 20762 I Category: C-C Equal: 11 7 I Itm No.:- C3.20 Equal:

Summary No.: C3.20.0001 Component ID: CSA-CC-10 Exam Method: MT CommentsICorrective Measures: Class: 2 System: CS

Description:

Stanchlons Results: Accept One (1) of four (4)Additional examinations per IWC-2430 (a). Reference Work Order 4296827 Report No.: VE-03-180 Summary Number C3.30.0002, Component CS-PB-A1, Notification 10225272, and Work Order 4296827. Summary No.: C3.20.0012 Component ID: CSB-CC-32 Exam Method: MT Comment I Corrective Measures: Class: 2 System: CS

Description:

Plate Results: Accept One (1) of four (4)Additional examinations per WC-2430 (a). Reference Work Order. 4296828 Report No.: VE-03-102 Summary Number C3.30.0002, Component CS-PB-A1, Notification 10225272, and Work Order 4296828. Recordable Indication that was acceptable per IWC-3512. No additional examinations required per IWC-2430 (b), reference Notification 10232632. Summary No.: C3.20.0015 Component ID: CSB-CC-57 Exam Method: MT Comments I Corrective Measures: Class: 2 System: CS

Description:

Elbow Lug Results: Accept One (1) of four (4) Additional examinations per WC-2430 (a). Reference Work Order: 4296828 ReportNo.: VE-03-1 19 Summary Number C3.30.0002, Component CS-PB-A1, Notification 10225272, and Work Order 4296828. Summary No.: C3.20.0072 Component ID: RHB-CC-53 Exam Method: MT Comments I Corrective Measures: Class: 2 System: RHR

Description:

Elbow to Lug Results: Accept Work Order: 4235682 Report No.: VE-03-147 Summary No.: C3.20.0090 Component ID: RPC-CC-10 Exam Method: MT Comments Corrective Measures: Class: 2 System: RHR

Description:

Stanchion Integrally Welded Attachment Result: Accept Work Order. 4235681 Report No.: VE-03-179 f em No.: C3.30 Equal: 6 Summary No.: C3.30OO01 Component ID: CS-PA-Al Exam Method: PT Comments I Corrective Measures: Class: 2 System: CS

Description:

Pump Support Integrally Welded Attachment Results: Accept One (1) of four (4) Additional examinations per IWC-2430 (a). Reference Work Order: 4298827 ReportNo.: E-03-185 Summary Number C3.30.0002, Component CS-PB-A1, Notification 10225272, and Work Order 4296827. 100 Percent of required examination area coverage obtained by combined performance of two (2) NDE methods. Summary No.: C3.30.0001 Component ID: CS-PA-Al Exam Method: MT Comments I Corectdve Measures: Class: 2 System: CS

Description:

Pump Support Integrally Welded Attachment Results: Accept One (1) of four (4)Additional examinations per IWC-2430 (a). Reference Work Order 4296827 ReportNo.: VE-03-184 Summary Number C3.30.0002, Component CS-PB-A1, Notification 10225272, and Work Order 4296827. 100 Percent of required examination area coverage obtained by combined performance of two (2) NDE methods.

, RF021: Inservice nspection Report                                                                                                                                           Page 16 of 67 1.Owner, NPPD P.O. Box 499 Columbus, NE 6860                                                                   4. Commerical Service Date: July, 1974                        Tuesday, June 17, 2003
2. Plant: Cooper Nuclear Station P.O. Box 98 Brownville, NE 68321 5.Owner Certification of Authorization: NIA
3. Plant Unit 1 6. National Board Number 20762 Summary No.: C3.30.0002 component lo: CS-PB-A Exam Metod PT Comments I Corrective Measures:

Class: 2 System: CS DescrIptIon: Pump Support Integrally Welded Attachment Results: Reject 100 Percent of required examination area coverage obtained by Work Order 4235408 Report No.: vE-o3-loo0 combined performance of two (2) NDE methods. Recordable Indication by PT method on gusset number nine (9), reference Notification 10225272. Work scope expanded by four (4)additIonal examinations as required per IWC-2430 (a), reference Work Orders 4296827 and 4296828. Summary No.: C3.30.0002 Component ID: CS-PB-Al Exam Method: MT Comments I Corrective Measures: Class: 2 System: CS

Description:

Pump Support Integrally Welded Attachment Results: Accept 100 Percent of required examination area coverage obtained by Work Order. 4235408 Report No.: vE-o3-ogg combined performance of two (2) NDE methods. Recordable Indication by PT method on gusset number nine (9), reference Notification 10225272. Work scope expanded by four (4) additional examinations as required per IWC-2430 (a), reference Work Orders 4296827 and 4296828. Summary No.: C3.30.0003 Component ID: RHR-PA-AI Exam Method: MT Comment I Corrective Measures: Class: 2 System: RHR

Description:

Pump Support Integrally Welded Attachment Results: Accept Complete coverage of accessible examination areas obtained by Work Order 4235681 Report No.: VE-o3-1sl combined performance of two (2) NDE methods. Reference Relief Rquest RI-18. Summary No.: C3.30.0003 Component ID: RHR-PA-A1 Exam Method: PT Commnt I Corrective Measures: Class: 2 System: RHR

Description:

Pump Support Integrally Welded Attachment Results: Accept Complete coverage of accessible examination areas obtained by Work Order 4235681 Report No.: VE-03-182 combined performance of two (2) NDE methods. Reference Relief Rquest RI1-i 8. Ctgr: C-G Equal: 2 item No.: C6.20 Equal: 2 Summary No.: C6.20.0015 Component ID: PNC-CG-36A Exam Method: PT Comments I Corrective Measures: Class: 2 System: PNC

Description:

Valve Body Weld Results : Accept Work Order 4235880 Report No.: VE-03-174 Summary No.: C6.20.0016 Component ID: PNC-CG-36B Exam Method: PT Comments I Corrective Measures: Class: 2 System: PNC

Description:

Valve Body Weld Results: Accept Work Order. 4235680 Report No.: VE-o3-48

, RFO21: Inservice Inspection Report                                                                                                                                                                          Page 17of67
1. Owner, NPPD P.O. Box 499 Columbus, NE 6860 4. Commerical Service Date: July, 1974 Tuesday, June 17, 2003
2. Plant: Cooper Nuclear Station P.O. Box 98 Brownville, NE 68321 5. Owner Certification of Authorization: NIA
3. Plant Unit: 1 6. National Board Number 20762 Category: C-H Equal: 3 1 Item Eqa...- ~~.No CT.10 Equl - - - -- - - - ------ ---------- - - I - - - - - - - - - - - - - - - - - - -- ------------------- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

Summary No.: C7.10.CRD.PV.SPT01 Component ID: CRD.PV.PRB.SPT Exam Method: VT-2 Comments / Conectve Measures: Class: 2 System: CRD

Description:

Pressure Vessels Pressure Retaining Boundary Result: Accept Performed in conjunction with Class 1 System Leakage Test. Work Order 4230314 System Pressure Test Report No.: VE-03-599 Item No.: C7.30 Equal: 1 Summary No.: C7.30.CRD.PIPE.SPT01 Component ID: CRD.PIPE.PRB.SPT Exam Meod: VT-2 Comments / Conctve Measures: Class: 2 System: CRD

Description:

Piping Pressure Retaining Boundary System Results: Accept Performed in conjunction with Class I System Leakage Test. Work Order 4230314 Pressure Test Report No.: VE-03400 itm No.: C7.70 Equal: I SummaryNo.: C7.70.CRD.VALVE.SPTOI ComponentID: CRD.VALVE.PRB.SPT Exam Method: VT-2 Comments I Corrective Measures: Class: 2 System: CRD

Description:

Valves Pressure Retaining Boundary System Results: Accept Performed In conjunction with Class 1 System Leakage Test. Work Order 4230314 Pressure Test Report No.: VE-03601

, RF021: Inservice Inspection Report                                                                                                                                            Page 18 of 67
1. Owner, NPPD P.O. Box 499 Columbus, NE 6860 4. Commerical Service Date: July, 1974 Tuesday, June 17, 2003
2. Plant Cooper Nuclear Station P.O. Box 98 Brownville, NE 68321 5. Owner Certification of Authorization: NA
3. Plant Unit: 1 6. National Board Number 20762 l Category: D-A Equal: 10 nem R N D1.10 Equal: 6 Summary No.: D1.10.0013 Component ID: REC-HXA-A1 Exam Method: VT-1 Commentsl Corrective Measures:

Class: 3 System: REC

Description:

Vessel Support (heat exchanger) Integrally Results: Accept Work Order: 4235405 Welded Attachment Report No.: VE-03-101 Summary No.: D1.10.0014 Component ID: REC-HXA-A2 Exam Method: Vr-1 Comments I Corrective Measures: Class: 3 System: REC

Description:

Vessel Support (heat exchanger) Integrally Results: Accept Work Order: 4235405 Welded Attachment Report No.: VE-o3-010 Summary No.: D1.10.0015 Component ID: REC-HXA-A3 Exam Method: VT-1 Comments I Corrective Measures: Class: 3 System: REC

Description:

Vessel Support (heat exchanger) Integrally Results: Accept Work Order 4235405 Welded Attachment Report No.: VE-03-011 Summary No.: D1.10.0016 ComponentlO: REC-HXA-A4 Exam Method: VT-1 Commentb/Corrective Measures: Class: 3 System: REC

Description:

Vessel Support (heat exchanger) Integrally Results: Accept Work Order: 4235405 Welded Attachment Report No.: VE-03-012 Summary No.: D1.10.0023 ComponentID: SW-STRA-A1 Exam Method: Vr-1 Comments ICorrective Measures: Class: 3 System: SW

Description:

Vessel Support (Straineo Integrally Welded Results: Accept Work Order: 4235399 Attachment Report No.: VE-03-095 Summary No.: D1.10.0025 Component ID: VR-DA-1 Exam Method: Vr-1 Comments I Corrective Measures: Class: 3 System: MSRV

Description:

Lugs (8total 314x2x3 1/2 Results: Accept Work Order 4235884 Report No.: VE-03-149 Im No.: D1.20 Equal: 3 Summary No.: D1.20.0084 Component ID: SW-DB-178 Exam Method: VT-1 Comments I Corrective Measures: Class: 3 System: SW

Description:

Lugs (4total) 2x2x1 1/2 Integrally Welded Results: Accept Work Order: 4235406 Attachment Report No.: VE-03-007 Summary No.: D1.20.0050 Component ID: SW-DB-45 Exam Method: VT-1 Comments I Corrective Measures: Class: 3 System: SW

Description:

Elbow Lug Integrally Welded Attachment Results: Accept Work Order 4235395 Report No;: VE-03-5e Summary No.: D1.20.0051 Component ID: SW-DB-46 Exam Method: VT-1 Comments I Corrective Measures: Class: 3 System: SW

Description:

Stanchion Integrally Welded Attachment Results: Accept Work Order 4235395 Report No.: VE-03-055 tem No.: D1.30 Equal: 1 Summary No.: D1.30.0004 Component ID: SW-PD-A1 Exam Method: VT-1 Comments I Corrective Measures: Class: 3 System: SW

Description:

Pump Support Integrally Welded AttAchment Results: 0 The examination data sheet is Attachment I of CNS procedure 3.28.1.3 Work Order 4235402 Report No.: VE-03-215

, RFO21: Inservice Inspection Report                                                                                                                                                                                                        Page 19 of 67 1.Owner, NPPD P.O. Box 499 Columbus, NE 6860                                                                                                         4. Commencal Service Date: July, 1974                                             Tuesday, June 17, 2003
2. Plant: Cooper Nuclear Station P.O. Box 98 Brownville, NE 68321 S.Owner Certification of Authorization: N/A
3. Plant Unit: 1 6. National Board Number. 20762 Cteosry: E-A Equal: 26 I em No.: E1.11 Equal: 2 Summary No.: E1.11.0001 ComponentlD: DW Exam Method: VT.G Comm/tsICorretlve Measures:

Class: MC System: PC

Description:

Drywell Containment Vessel Shell Accessible Results: Accept General Visual Examination performed on the Drywell Containment Work Order 4236136 Surface Areas Report No.: VE.03-594 Vessel Shell (Drywall) accessible surface areas. Summary No.: E1.11.0002 Component ID: SP Exam Method: VT-G CommentsICorrective Measures: Class: MC System: PC

Description:

Suppression Chamber Containment Shell Results: Accept General Visual Examination performed on the Suppression Chamber Work Order. 4236136 Accessible Surface Areas Report No.: VE-03-s55 Containment Shell (Tous) accessible exterior surface areas and interior surface areas about the waterline. Item No.: E1.12 Equal: 22 Summary No.: E1.12.0049 Component D: B10-SDL-ATT Exam Method: VT-8 Comments I Corrective Measures: Class: MC System: PC DescriptIon: Bay 10 Saddle Attchment Welds Including Results: Accept Examined Integral attachment welds and accessible adjacent exterior Work Order 4236137 Adjacent Ex orSurface Areas ReportNo.: vE3mia6 surface areas. Summary No.: E1.12.0050 Component ID: B10-SPT-ATT Exam Method: VT-3 Comments I Correcte Measures: Class: MC System: PC

Description:

Bay10SupportColumnAttachmentWelds Results: Accept Examined Integral attachment welds and accessible adjacent exterior Work Order: 4236137 Including Adjacent Exterior Surface Areas Report No.: VE-03-124 surface areas.

        - -- ---- ------------ ---- . . ...........- ----------. ... ... ---.. ...... .--....... ...- -- -...... -........ -- ... ........... ..-.I.- ------------- .......... ------------------ -... ...............- ----------------..- ---------. -......---------...

Summary No.: E1.12.0054 Component ID: B11-SDL-ATT Exam Method: VT-3 Comments I Corrective Measures: Class: MC System: PC DescriptIon: Bay 11 Saddle Attachment Welds Including Results: Accept Examined integral attachment welds and accessible adjacent exterior Work Order 4236137 Adjacent Exterior Surface Areas Report No.: VE-03-121 surface areas. Summary No.: E1.12.0055 Component ID: B11-SPT-ATT Exam Method: VT-3 Comments I Corrective Measures: Class: MC System: PC

Description:

Bay 11 Support Column Attachment Welds Results: Accept Examined integral attachment welds and accessible adjacent exterior Work Order: 4236137 Including Adjacent Exterior Surface Areas Report No.: VE-03-142 surface areas. Summary No.: E1.12.0059 Component ID: B12-SDL-ATT Exam Method: VT-3 Comments ICorrective Measures: Class: MC System: PC

Description:

Bay 12 Saddle Attachment Welds Including Results: Accept Examined integral attachment welds and accessible adjacent exterior Work Order 4236137 Adjacent Exterior Surface Areas Report No.: VE.03-123 surface areas. Summary No.: E1.12.0060 Component ID: B12-SPT-ATT Exam Method: VT-3 Comments ICorrectlve Measures: Class: MC System: PC

Description:

Bay 12 Support Column Attachment Welds Results: Accept Examined Integral attachment welds and accessible adjacent exterior Work Order 4236137 Including Adjacent Exterior Surface Areas Report No.: VE.03-122 surface areas. Summary No.: E1.12.0064 Component ID: B13-SDL-ATT Exam Method: VT-3 Comments I Corrective Measures: Class: MC System: PC DescriptIon: Bay 13 Saddle Attachment Welds Including Results: Accept Examined integral attachment welds and accessible adjacent exterior Work Order 4236137 Adjacent Exterior Surface Areas Report No.: VE03-125 surface areas. Summary No.: E1.12.0065 Component ID: B13-SPT-ATT Exam Method: VT-3 CommentsICorrective Measures: Class: MC System: PC

Description:

Bay 13 SupportlCumn Attachment Welds Results: Accept Examined integral attachment welds and accessible adjacent exterior Work Order. 4236137 Including Adjacent Exterior Surface Areas ReportNo.: VE-03-128 surface areas.

, RF021: Inservice Inspection Report                                                                                                                                                                                                                         Page 20 of 67
1. Owner, NPPD P.O. Box 499 Columbus, NE 6860 4. Commerical Service Date: July, 1974 Tuesday, June 17, 2003
2. Plant Cooper Nuclear Station P.O. Box 98 Brownville, NE 68321 5. Owner Certification of Authorization: N/A
3. Plant Unit: 1 6. National Board Number 20762 Summary No.: E1.12.0069 ComponentiD: B14-SDL-ATT Exam Method: VT-3 Comments ICorrective Measures:

Class: MC System: PC

Description:

Bay 14 Saddle Attachment Welds Including Results: Accept Examined integral attachment welds and accessible adjacent exterior Work Order 4236137 Adjacent Exterior Surface Areas Report No.: VE-3-130 surface areas. Summary No.: E1.12.0070 Component ID: B14-SPT-ATr Exam Method: VT-3 Comments Corrective Measures: Class: MC System: PC

Description:

Bay 14 Support Column Attachment Welds Results: Accept Examined integral attachment welds and accessible adjacent exterior Work Order 4236137 Including Adjacent Exlerior Surface Areas Report No.: VE-03-129 surface areas. Summary No.: E1.12.0074 ComponentlD: B15-SDL-ATT Exam Method: VT-3 Comments ICorrecive Measures: Class: MC System: PC

Description:

Bay15SaddleAtachmentWeldsincluding Results: Accept Examined integral attachment welds and accessible adjacent exterior Work Order 4236137 Adjacent ExtE Surface Areas ReportNo.: V-SI 32 surface areas. Summary No.: E1.12.0075 Component ID: B16-SPT-ATT Exam Method: VT-3 Comments I Corrective Measures: Class: MC System: PC

Description:

Bay15SupportColumnAttachmentWelds Results: Accept Examined Integral attachment welds and accessible adjacent exterior Work Order 4238137 Including Adjacent Exterior Surface Areas ReportNo.: VE-03i31 surface areas. Summary No.: E1.12.0079 Component D: B1-SDL-ATT Exam Method: VT-3 Comments I Corrective Measures: Class: MC System: PC

Description:

Bay16SaddleAttachmentWeldsincluding Results: Accept Examined Integral attachment welds and accessible adjacent exterior Work Order 4236137 Adjacent Exterior Surface Areas Report No.: V-SI34 surface areas Summary No.: E1.12.0080 Component ID: B16-SPT-ATT Exam Method: VT-3 Comments I Corrective Measures: Class: MC System: PC

Description:

Bay16SupportColumn AttachmentWelds Results: Accept Examined integral attachment welds and accessible adjacent exterior Work Order 4236137 Including Adjacent Exterior Surface Areas Report No.: VE-03-133 surface areas. Summary No.: E1.12.0029 Component ID: Be-SDL-ATT Exam Method: Vr-3 Comments I Corrective Measures: Class: MC System: PC

Description:

Bay eSaddle Attachment Welds Including Results: Accept Examined integral attachment welds and accessible adjacent exterior Work Order 4236137 Adjacent Exterior Surface Areas Report No.: VES-0-120 surface areas. Summary No.: E1.12.0030 Component ID: 86-SPT-ATT Exam Method: VT-3 Comments I Corrective Measures: Class: MC System: PC

Description:

Bay e Support Column Attachment Welds Results: Accept Examined Integral attachment welds and accessible adjacent exterior Work Order 4236137 Including Adjacent Exterior Surface Areas ReportNo.: VE-o-I28 surface areas. Summary No.: E1.12.0034 Component ID: B7-SDL-ATT Exam Method: VT-3 Commnts I Corrective Measures: Class: MC System: PC

Description:

Bay 7 Saddle Attachment Welds Including Results: Accept Examined Integral attachment welds and accessible adjacent exterior Work Order, 4236137 Adjacent Exterior Surface Areas Report No.: VE4-3-135 surface areas. Summary No.: E1.12.0035 Component ID: B7-SPT-ATT Exam Method: VT-3 Comments I Corrective Measures: Class: MC System: PC

Description:

Bay 7 Support Column Attachment Welds Results: Accept Examined integral attachment welds and accessible adjacent exterior Work Order 4236137 Including Adjacent Exterior Surface Areas Report No.: VE-0I 27 surface areas. Summary No.: E1.12.0039 Component ID: B8-SDL-ATT Exam Method: VT-3 Comments I Corrective Measures: Class: MC System: PC

Description:

Bay8 Saddle Attachment Welds Including Results: Accept Examined Integral attachment welds and accessible adjacent exterior Work Order 4236137 Adjacent Exterior Surface Areas ReprtNo.: V-osi 39 surface areas. Summary No.: E1. 12.0040 Component ID: B8-SPTATT Exam Method: VT-3 Comments I Correctdve Measures: Class: MC System: PC DescriptIon: Bay 8 Support Column Attachment Welds Results: Accept Examined integral attachment welds and accessible adjacent exterior Work Order 4236137 Including Adjacent Exterior Surface Areas Report No.: VE-OSI3S surface areas.

, RFO21: Inservice Inspection Report                                                                                                                                                  Page 21 of 67
1. Owner, NPPD P.O. Box 499 Columbus, NE 6860 4. Commerical Service Date: July, 1974 Tuesday, June 17, 2003
2. Plant: Cooper Nuclear Station P.O. Box 98 Brownville, NE 68321 5. Owner Certification of Authorization: N/A
3. Plant Unit: 1 6. National Board Number 20762 Summary No.: E1 .12.0044 Component ID: B9-SDL-ATT Exam Method: VT-3 Comments I Corrective Measures:

Class: MC System: PC Descripton: Bay 9 Saddle Attachment Welds nduding Results: Accept Examined integral attachment welds and accessible adjacent exterior Work Order 4236137 AdJacent Exterior Surifce Areas Report No.: VE-03-137 surface areas. Summary No.: E1.12.0045 Component ID: B9-SPT-ATT Exam Method: VT-3 Comments Corrective Measures: Class: MC System: PC

Description:

Bay 9 Support Column Attachment Welds Results: Accept Examined integral attachment welds and accessible adjacent exterior WorkOrder 4238137 IncludingAdjacent Exterior SurfaceAreas Report No.: VE-03-136 surface areas. ItKem N-o E1.20 Equal:2 Summary No.: E1.20.0083 Component ID: X201C-EB Exam Method: VT-3 Comments I Corrective Measures: Class: MC ystem: PC

Description:

Vent Lne Expansion Bellows Bay 6 Results: Accept Examined accessible surface areas. Work Order 4236137 Report No.: VE-0S-140 Summary No.: E1.20.0084 ComponentlD: X201D-EB Exam Method: VT-3 Comments/Corrective Measures: Class: MC System: PC

Description:

Vent Line Expansion Bellows Bay 8 Results: Accept Examined accessible surface areas. Work Order. 4236137 Report No.: VE-03-141 Category: EG Equal: 5 Itm No. E8.10 Equal 5 Summary No.: E8.10.0001 Component ID: DW-FLG-BLT Exam Method: VT-1 Comments I Corrective Measures: Class: MC System: PC

Description:

Drywell Head Flange Bolting Results: Accept Examined all visible surfaces. Relevant Indications on four (4) bolts and Work Order. 4236137 Report No.: VE-03-216 one (1) washer. The Indications consisted of one washer with gouge, one bolt with arc strike, one bolt with significant necking, one with galling on shaft, and one bolt with machining chatter on threads. Three of the bolts were replaced (Work Order 4223196). Civil Design Engineering evaluated and found the washer with gouge and bolt with arc strike to be acceptable (Reference Notification 10235927). Since, 100% of the drywell head flange bolting were examined no additional examinations were performed. Summary No.: E8.10.0020 Component ID: X200B-BLT Exam Method: VT-1 Comments I Corcwve Measures: Class: MC System: PC

Description:

Suppression Pool Manway Flange Bolting Results: Accept Examined all visible surfaces. Work Order. 4236137 Report No.: VE-03-192 Summary No.: E8.10.0021 Component ID: X213A-BLT Exam Method: VT-1 Comments I Corrective Measures: Class: MC System: PC

Description:

Torus Drain A Flange Boling Bay 4 Results: Accept Examined all visible surfaces. Work Order: 4236137 Report No.: VE-03-187 Summary No.: E8,10.0022 Component ID: X213B-BLT Exam Method: VT-1 Comments I Corrective Measures: Class: MC System: PC

Description:

Torus Drain B Flange Bolting Bay 12 Results: Accept Examined all visible surfaces. Work Order 4236137 Report No.: VE-03-190 Summary No.: E8.10.0017 Component ID: X4-BLT Exam Method: VT-1 Comments I Corrective Measures: Class: MC System: PC

Description:

Drywell Head Manway Boling Results: Accept Examined all visible surfaces. WorkOrder 4236137 Report No.: VE-03-191

, RF021: Inservice Inspection Report                                                                                                                                                                                                                                                                                                                                                                Page 22 of 67
1. Owner, NPPD P.O. Box 499 Columbus, NE 6860 4. Commerical Service Date: July, 1974 Tuesday, June 17, 2003
2. Plant Cooper Nuclear Station P.O. Box 98 Brownville, NE 68321 5. Owner Certification of Authorization: WA
3. Plant Unit: I 6. National Board Number 20762 Category: F-A Equal: 50 Item No.: F1.10A Equal 5 Summary No.: F1.10A.0012 Component ID: CUH-220 Exam Method: VT-3 Commenth Corrective Measures:

Class: 1 System: RWCU

Description:

Rod Hanger Results: Accept Work Order 4235687 Report No.: VE--I 13 Summary No.: F1.10A0014 Component ID: CUH-222 Exam Method: VT-3 Comments I Corrective Measures: Class: 1 System: RWCU

Description:

Rod Hanger Results: Accept Work Order 4235687 Report No: VE-03-212 Summary No.: F1.10A.0010 Component ID: RHS-7 Exam Method: VT-3 Comments /Corrective Measures: Class: I System: RHR

Description:

Sway Strut Results: Accept Work Order 4235685 Report No.: VE.03-145 Summary No.: F110A0004 Component ID: RRH-20 Exam Method: VT-3 Comments I Corrective Measures: Class: 1 System: NBDR

Description:

Restraint Box Frame Results: Accept Work Order 4235687 Report No.: VES03-114 Summary No.: F1.10AOOOS ComponentlD: RRH-20A Exam Method: VT-S Comments ICorrective Measures: Class: 1 System: NBDR

Description:

Restraint Box Frame Results: Accept Work Order 4235687 Report No.: VE-03I 5 Itm NO.:- Fl .10.B2 Equal: ~2 Summary No.: F1.10.B.0001 ComponentlD: MS-GA1 Exam Method: VT-3 CommentsICorrective Measures: Class: 1 System: MS

Description:

Restraint Structural Frame Results: Accept Work Order 4235684 Report No.: VE-03-167 Summary No.: F1.10.B.0003 Component ID: MS-GC1 Exam Method: VT-3 Comments I Corrective Measures: Class: 1 System: MS

Description:

Restraint Structural Frame Results: Accept Work Order 4235684 Report No.: VE-03-188 Item No.: F1.10.C Equal 2 Summary No.: F1.10.C.0037 Component D: RFH-64 Exam M eO : VT-3 Comments Corrective Measures: Class: I System: RF

Description:

Constant Support Results: Accept Work Order 4235688 ReportNo.: VE-03-189

                                              ------------ -..- . . . -----..                      I -. ------ ---.-

Summary No.: F1.10.C.0063 Component ID: RHH-122 Exam Method: VT-3 Comments I Corrective Measures: Class: I System: RHR

Description:

Variable Spring Can Results: Accept Work Order 4235685 Report No.: VE-03-214 Item No.: F1.20.A Equal: 11 Summary No.: F1.20A.0137 Component ID: CRD-2S Exam Method: VT-3 Comments I Corrective Measures: Class: 2 System: SDV

Description:

Rod Hanger Pipe Roll Results: Accept Remote examination using a "Everest VIr camera system. Work Order 4235691 Report No.: VE-03-103

, RF021: Inservice Inspection Report                                                                                                                     Page 23 of 67 1.Owner, NPPD P.O. Box 499 Columbus, NE 6860                                                 4. Commerical Service Date: July, 1974                      Tuesday, June 17, 2003
2. Plant: Cooper Nuclear Station P.O. Box 98 Brownville, NE 68321 5. Owner Certification of Authorization: N/A
3. Plant Unit: 1 6. National Board Number 20762 Summary No.: F1.20.A.0148 Component ID: CRD-8N Exam Method: VT-3 Comments I Corrctve Measures:

ClasS: 2 System: SDV

Description:

Rod Hanger Pipe Roll Results: Accept Remote examination using a "Everest vir camera system. Work Order. 4235690 Report No.: VE-03-211 Summary No.: F1.20A.0012 Component D: CSS10 Exam Method: VT-3 Comments coective Measures: Class: 2 System: CS

Description:

Rigid Strut Results: Accept Remote examination using a Everest vir camera system. Work Order 4235411 Report No.: VE-3-4 Summary No.: F1.20A.0061 Component ID: MSS-17 Exam Method: VT-3 Comments I Corrective Measures: Class: 2 System: MS

Description:

Rigid Strut Results: Accept Work Order. 4235688 Report No.: VE-o3-528 Summary No.: F1.20.A.0049 Component ID: MSS-e Exam Method: VT-3 Comments I Corrective Measures: Class: 2 System: MS

Description:

Stanchion Results: Accept Work Order: 4235688 Report No.: VE-03-170 Summary No.: F1.20.A.0050 Component D: MSS-8 Exam Method: VT-3 CommentslCorrective Measures: Class: 2 System: MS

Description:

Rigid Strut Results: Accept Remote examination using a Everest Vir camera system. Work Order 4235888 ReportNo.: V--31eg Summary No.: F1.20A.0084 Component ID: RCH-34 Exam Method: VT-3 Comments I Corrective Measures: Class: 2 System: RCIC

Description:

Sway Strut Results: Accept Work Order. 4235442 Report No.: VE-03-003 Summary No.: F1.20.A.0030 Component ID: RFH-56 Exam Method: VT-3 Comments I Corrective Measures: Class: 2 System: HPCI

Description:

Sway Strut Results: Accept Work Order 4235689 Report No.: V31B 6 Summary No.: F1.20A.Q091 Component ID: RHH-5 Exam Method: VT-3 Comments I Corrective Measures: Class: 2 System: RHR

Description:

Stanchion Results: Accept Work Order. 4235681 Report No.: VE-03-146 Summary No.: F1.20A.0092 Component ID: RHH-5A Exam Method: VT-3 Comments I Corrective Measures: Class: 2 System: RHR

Description:

Restraint Structural Frame Results: Accept Work Order: 4235681 Report No.: VE-3-213 Summary No.: F1.20A.0093 Component ID: RHH-6 Exam Method: VT-3 Comments I Corrective Measures: Class: 2 System: RHR

Description:

Stanchion Results: Accept Work Order 4235881 Report No.: VE3-144 tm N - F1.20. Equal: S Summary No.: F1.20.B.0011 Component ID: CSB-WR-2 Exam Method: VT-3 Comments I Corrective Measures: Class: 2 System: CS

Description:

Rigid Brace Results: Accept Work Order: 4235408 Report No.: VE-3-9e

Attachment 1, RF021: Inservice Inspection Report Page 24 of6

1. Owner, NPPD P.O. Box 499 Columbus, NE 6860 4. Commerlcal Service Date: July, 1974 Tuesday, June 17, 2003
2. Plant: Cooper Nuclear Station P.O. Box 98 Brownville, NE 68321 5. Owner Certification of Authorization: NIA
3. Plant Unit: 1 6. National Board Number 20762 Summary No.: Fl .20.1B.0024 Component ID: MSH-107A Exam Method: VT-3 CommentslI Corrective Measures:

Class: 2 System: MS

Description:

Sway Strut Results: Accept Work Order 4235688 Report No.: VE-03-1 12 Summary No.: Fl .20.B.0047 Component ID: RHH-93 Exam Method: VT-3 Comments I Corrective Measures: Class: 2 System: RHR

Description:

Restraint Box Frame Results: Accept Work Order 4235682 Report No.: VE-03-176 Summary No.: F1.20.1B.0054 Component ID: RHR-X-225C Exam Method: VT-3 Comments Corrective Measures: Class: 2 System: RHR

Description:

Rigid Brace Results: Accep Work Order. 4235443 Report No.: VE-03-060 Summary No.: F1.20.8.0031 Component ID: RWA-X-224 Exam Method: VT-3 Comments I Corrective Measures: Class: 2 System: RCIC

Description:

Rigid Brace Results: Accept Work Order 4235442 Report No.: VE.03-oog Item No.:- F11.20.C Equal: 5 Summary No.: Fl.20.C.0007 Component ID: CSHl-12 Exam Method: VT-3 Comments I Corrective Measures: Class: 2 System: CS

Description:

Constant Support Results: Accept Remote examination using a 'Everest ViT" camera system. Work Order 4235408 Report No.: VE-03-097 Summary No.: Fl .20.C.0023 Component ID: MSH-08 Exam Method: VT-3 CommentslI Corrective Measures: Class: 2 System: MS

Description:

Variable Spring Results: Accept Remote examination using a 'Everest viT" camera system. Work Order 4235688 Report No.: VE-03-18es summary No.: Fl .20.C.0079 Component ID: RHIH-45 Exam Method: VT-3 Comments I Corrective Measures: Class: 2 System: RHR

Description:

Variable Spring Results: Reject Work Order 4235443 Report No.: vE-o3-o59 Summary No.: F1.20.C.0087 Component ID: RHH-55 Exam Method: VT-3 CommentslI Corr ective Measures: Class: 2 System: RHR

Description:

Variable Spring Results: Accept Work Order 4235443 Report No.: VE-03.057 Summary No.: Fl .20.C.0100 Component ID: RHH-90 Exam Method: VT-3 Comments I Corrective Measures: Class: 2 System: RHR

Description:

Variable Spring Can Results: Accept Work Order. 4235682 Report No.: VE-03-93 I Item No.: F11.30.A Equal: Summary No.: Fl .30.A.0037 Component 1D: RCC-H-24A Exam Metod VT-3 Comments I Corrective Measures: Class: 3 System: REC

Description:

Pipe Support Stanchion Results: Accept Work Order 423,5405 Report No.: VE-03-002 Summary No.: F1.30.A0143 Component ID: SW-H-178 Exam Method: VT-3 Comments ICorrective Measures: Class: 3 System: SW

Description:

Rod Hanger Trapeze Results: Accept Work Order 4235406 Report No.: VE-03-008

, RF021: Inservice Inspection Report                                                                                                                                                                                    Page 25 of 67
1. Owner, NPPD P.O. Box 499 Columbus, NE 6860 4. Commerical Service Date: July, 197 Tuesday, June 17, 2003
2. Plant: Cooper Nuclear Station P.O. Box 98 Brownville, NE 68321 5. Owner Certification of Authorzation: N/A
3. Plant Unit: 1 6. National Board Number 20762 Summary No.: F1.30A.0155 Component ID: SW-H-223 Exam Method: VT-3 Comments I Corrective Measures:

Class: 3 System: SW Descriptlon: Rod Hanger Results: Accept Work Order: 4235409 Report No.: VE-o3-o98

     -- I- -- - - - - - .... . .. ... . ...

Summary No.: F1.30A-0079 Component ID: SW-H-45 Exam Method: VT-3 Comments I Corrective Measures: Class: 3 System: SW

Description:

Rod Hanger Results: Accept Work Order. 4235395 Report No.: VE-03-053 Summary No.: F1 .30A0164 Component ID: SW-S-14 Exam Method: VT-3 Comments I Corrective Measures: Class: 3 System: SW

Description:

Restraint Structual Frame Results: Accept Work Order: 4235395 Report No.: VE.03-054 Summary No.: F1.30A0223 Component ID: SW-S-178A Exam Method: VT-3 Comments Corrective Measures: Class 3 System: SW

Description:

Sway Strut Results: Accept Work Order 4235406 Report No.: VE-03-005 Summary No.: F1.30A.0185 Component D: SW-S-50 Exam Method: VT-3 Comments/Correctve Measures: Class: 3 System: SW

Description:

Sway Strut Results: Accept Successive examination. Work Order 4235446 Report No.: VE-03-017 Summary No.: F1.30A.0201 Component ID: SW-"9 Exam Method: VT-3 Comments I Corrective Measures: Class: 3 System: SW

Description:

Restraint Structual Frame Results: Accept Work Order 4235395 Report No.: VE-03-052 item No.: F1.30.B Equal: 2 Summary No.: FI.30.B.0048 Component ID: SW4-I SIA Exam Method: VT-3 Comments I Corrective Measures: Class: 3 System: SW

Description:

Sway Strut Results: Accept Work Order 4235408 Report No.: VE-03-0 Summary No.: Fl.30. B.0038 Component ID: SW-H-46 Exam Method: VT-3 Comments I Corrective Measures: Class: 3 System: SW

Description:

Stanchion Results: Accept Work Order 4235395 Report No.: VE-03-051 tem No.: FI0.A Equal: 4 Summary No.: FI.40A.0003 Component ID: REC-HXA-S1 Exam Method: VT-3 Comments I Corrective Measures: Class: 3 System: REC

Description:

Vessel Support (heat exchanger) Results: Accept Work Order 4235405 Report No.: VE-03-013 Summary No.: F1.40A0004 Component ID: REC-HXA-S2 Exam Method: VT-3 Comments I Corrective Measures: Class: 3 System: REC

Description:

Vessel Support (heat exchanger) Results: Accept Work Order: 4235405 Report No.: VE-03-014 Summary No.: F1.40A.0005 Component D: REC-HXA-S3 Exam Method: VT-3 Comments/ Corrective Measures: Class: 3 System: REC

Description:

Vessel Support (heat exchanger) Results: Accept Work Order 4235405 Report No.: VE-03-015

, RFO21: Inservice Inspection Report                                                                                                                                                                                                                                          Page 26 of 67
1. Owner, NPPD P.O. Box 499 Columbus, NE 6860 4. Commerical Service Date: July, 1974 Tuesday, June 17, 2003
2. Plant: Cooper Nuclear Station P.O. Box 98 Brownville, NE 68321 5. Owner Certification of Authorization: N/A
3. Plant Unit: 1 6. National Board Number 20762 Summary No.: F1.40A0008 Component ID: REC-HXA-S4 Exam Method: VT-3 Comments I Corective Measures:

Class: 3 System: REC

Description:

Vessel Support (heat exchanger) Results: Accept Work Order: 4235405 Report No.: VE-o3-ol6

          .          Item No.:                 F1.40.B              Equal: 3 Summary No.:                         F1.40.B.0002                    Component ID:                           CS-PB-S1                                   Exam Method: VT-3                         Comments I Corrective Measures:

Class: 2 System: CS

Description:

Pump Support Results: Accept Work Order. 4235408 Report No.: VE-03-058 Summary No.: F1.40.B.0010 Component ID: RHR-PA-S1 Exam Method: VT-3 Comments I Corrective Measures: Class: 2 System: RHR

Description:

Pump Support Results: Accept Work Order 4235681 Report No.: VE-03-183 Summary No.: F1.40.B.0022 Component ID: SW-STRA-S1 Exam Method: VT-3 Comments I Corrective Measures: Class: 3 System: SW

Description:

Vessel Support (strainer) Results: Accept Work Order. 4235399 Report No.: VE-03-093 item No. F1.4.C Equa 3 Summary No.: Fl.40.C.0001 Component ID: RR-H5-B Exam Method: VT-3 Comments I Corrective Measures: Class: I System: RR

Description:

Constant Support Pump Trapeze Results: Accept Work Order: 4235633 ReportNo.: VE-03-116 Summary No.: F1.40.C.0003 Component ID: RR-HB Exam Method: VT-3 Comments I Corrective Measures: Class: 1 System: RR

Description:

Constant Support Pump Results: Accept Work Order 4235S33 Report No.: VE-03-117 Summary No.: Fi.40.C.0002 Component ID: RR-H7-B Exam Method: VT-3 Comments I Corrective Measures: Class: 1 System: RR

Description:

Constant Support Pump Results: Accept Work Order: 4235833 Report No.: VE-03-194

, RFO21: Inservice Inspection Report                                                                                                                                                                                                              Page 27 of 67
1. Owner, NPPD P.O. Box 499 Columbus, NE 6860 4. Commerical Service Date: July, 1974 Tuesday, June 17, 2003
2. Plant: Cooper Nuclear Station P.O. Box 98 Brownville, NE 68321 5. Owner Certification of Authorization: N/A
3. Plant Unit: 1 6. National Board Number 20762 Exam Credit: OWN Equal: 336 I Category: B-F Equal: I
            .         em No.:                   B5.20          Equal:

Summary No.: B5.20.0005 Component ID: SLC-BJ-1 Exam Method: EVr-2 Comments I Corrective Measures: Class: 1 System: SLC Descriptlon: Safe-End to RPV Partial Penetration Nozzle Results: Accept System Leakage Test. Removed insulation and performed a Enhanced Work Order: 4230314 Report No.: VE-0564 VT-2 leakage examination on the SLC nozzle vessel penetration safe-end extension to nozzle dissimilar metal weld per guidlines provided in BWRV1P-27A.

, RF021: Inservice Inspection Report                                                                                                                             Page 28 of 67
1. Owner, NPPD P.O. Box 499 Columbus, NE 6860 4. Commerical Service Date: July, 1974 Tuesday, June 17, 2003
2. Plant: Cooper Nuclear Station P.O. Box 98 Brownville, NE 68321 5. Owner Certification of Authorization: N/A
3. Plant Unit: 6. National Board Number 20762 Category: B-N-2 Equal: 17 F~ m B- 13.20 Eql:

Summary No.: B13.20.0008 Component D: JP-RI3PAD-ATrWLDSQ§210 Exam Method: EVr-1 Comments Corrective Measures: Class: I System: NB

Description:

Jet Pump 19 and 20Prmary RiserBrace Results: Accept BVWRVP Examination. Work Order 4235471 Attachment Pad Welds and Heat-Affected Report No.: VE-M3234 Zones to RPV at 210 degrees azimuth Summary No.: B13.20.0007 Component ID: JP-RBPAD-ATTWLDS@240 Exam Method: EVT-1 Comments I Corrective Measures: Class: System: NB

Description:

Jet Pump 17 and 18 Primary Riser Brace Results: Accept BWRVIP Examination. Work Order~ 4235471 Attachmients Pad Welds and Heat-Affected Report No.: VE-03-233 Zones to RPV at 240 degrees azimuth Summary No.: B13.20.0008 Component ID: JP-RBPAD-ATTWLDSG270 Exam Method: EVr-1 CommentslI Corrective Measures: Class: I System: NB

Description:

Jet Pump15 and 18Primary Riser Brace Results: Accept BWRVIP Examination. Work Order 4235471 Attachments Pad Welds and Heat-Affected Report No.: VE-03232 Zones to RPV at 270 degrees azimuth Summary No.: B13.20.0009 Component ID: JP-RBPAD-ATTW.DS@300 Exam Method: EVr-1 Comments I Corrective Measures: Class: I System: NB

Description:

Jet Pump 13 and 14 Primary Riser Brace Results: Accept BWRVIP Examination. Work Order 4235471 Attachments Pad Welds and Heat-Affected Report No.: VE-03-231 Zones to RPV at 300 degrees azimuth Summary No.: B13.20.0010 Component ID: JP-RBPAD-ATTWLDS@M330 Exam Method: EVr-1 Comments I Corrective Measures: Class: System: NB

Description:

Jet Pump I11and 12 Primary Riser Brace Results: Accept BW4RVIP Examination. Work Order 4235471 Altachrent Pad Welds and Heat-Affacted Report No.: VE-03-230 Zones to RPV at 330 degrees azimuth Iteom No.: B13.30 Equal: 12 1 Summary No.: B13.30.0005 Component 1D: FW-ASPRBKT-ATTWLDS(§5 Exam Method: EVr-1 Comments I Corrective Measures: Class: System: NB

Description:

Feed*we Sparger Bracket Attachment Welds Results: Accept BWRVIP Examination Work Order 4235471 at 5degrees azimuth Report No.: VE-03-222 Summary No.: B13.30.0006 Component ID: FW-ASPRBKT-ATTWLDS@S85 Exam Method: EVr-1 Comments I Corrective Measures: Class: System: NB

Description:

Feedwater Sparger Bracket Attachment at 85 Results: Accept BWRVIP Examination Work Order 4235471 degrees azimuth Report No.: VE.03-223 Summary No.: B13.30.0007 Component ID: FW-BSPRBKT-ATTWLDSQ175 Exam Method: EVT-1 Comments I Corrective Measures: Class: 1 System: NB

Description:

Feedwater Sparger Bracket Attachment Welds Results: Accept BWR\IP Examination Work Order. 4235471 at 175 degrees azimuth Report No.: VE-03-224 Summary No.: B13.30.0008 Component ID: FW.BSPRBKT-ATTWLDS@9S Exam Method: EV1T-1 Comments I Corrective Measures: Class: 1 System: NB

Description:

Feedwater Sparger Bracket Attachment at 95 Result: Accept BWR\IP Examination Work Order 4235471 degres azimuth Report No.: E-03-225 Summary No.: B13.30.0009 Component 1D: FW-CSPRBKT-ATTWLDS@185 Exam Method: EVTr-1 Comments I Corrective Measures: Class: System: NB

Description:

Feedwater Sparger Bracket Attachment Welds Results: Accept BWRVlP Examination Work Order 4235471 at 185 degrees azimuth Report No.: V-03-226

, RF021: Inservice Inspection Report                                                                                                                                                                                   Page 29 of 67
1. Owner, NPPD P.O. Box 499 Columbus, NE 6860 4. Commerical Service Date: July, 1974 Tuesday, June 17, 2003
2. Plant: Cooper Nuclear Station P.O. Box 98 Brownville, NE 68321 5. Owner Certification of Authorization: N/A
3. Plant Unit: 1 6. National Board Number 20762 Summary No.: 813.30.0010 Component ID: FW-CSPRBK-ATrWLDS§265 Exam Method: EVr-1 Comments I Corrective Measures:

Class: 1 System: NB Descriptilon: Feedwater Sparger Bracket Attachment Welds Results: Accept BWRVIP Examination Work Order 4235471 at 265 degrees azimuth Report No.: VE-03-227 Summary No.: 813.30.0011 Component ID: FW-DSPRBKT-ATrWLDS(3275 Exam Method: EVT-1 Comments I Corrective Measures: Class: 1 System: NB

Description:

Feedwater Sparger Bracket Attachment Welds Results: Accept BWRVIP Examination Work Order. 4235471 at 275 degrees azimuth Report No.: VE-03-228 Summary No.: 813.30.0012 Component ID: FW-DSPRBK-ATrWLDS@355 Exam Method: EVr-1 Comments I Corrective Measures: Class: 1 System: NB

Description:

Feedwater Sparger Bracket Attachment Welds Results: Accept BWRVIP Examination Work Order: 4235471 at 355 degrees azimuth Report No.: VE-03-229

  --- -I Summary No.:                813.30.0023            Component ID: STMDRY-SUPBKT-ATTWLDS@145                                Exam Method:       EVT-1          Comments I Corretive Measures:

Class: 1 System: NB

Description:

Steam Dryer Support Bracket Attachment to Results: Accept BWRVIP Examination Work Order 4235471 RPV Interior Wai it 145 degrees azimuth Report No.: VE-03-219 Summary No.: B13.30.0024 ComponentID: STMDRY-SUPBKT-ATTWLDS@215 Exam Method: EVr-1 Comments I Corrective Measures: Class: 1 System: NB

Description:

Steam Dryer Support Bracket Attachment to Results: Accept BWRVIP Examination Work Order: 4235471 RPV Interior Wall at 215 degrees azimuth Report No.: VE-03-220 Summary No.: B13.30.0025 ComponentlD: STMDRY-SUPBKTATTWLDS@325 Exam Method: EVT-1 CommentsICorrecve Measures: Class: I System: NB

Description:

Steam Dryer Support Bracket Attachment to Results: Accept BWRVIP Examination Work Order 4235471 RPV Interior Wall at 325 degrees azimuth Report No.: VE-03-21 Summary No.: B13.30.0026 Component ID: STMDRY-SUPBKT-ATTWLDS@35 Exam Method: EVr-1 Comments I Corrective Measures: Class: I System: NB

Description:

Steam DryerSupportBracketAttachmentto Results: Accept BWRVIP Examination Work Order 4235471 RPV Interior Wall at 35 degrees azimuth Report No.: VE-03-218

, RFO21: Inservice Inspection Report                                                                                                                                                                                                                            Page 30 of 67
1. Owner, NPPD P.O. Box 499 Columbus, NE 6860 4. Commerical Service Date: July, 1974 Tuesday, June 17, 2003
2. Plant Cooper Nuclear Station P.O. Box 98 Brownville, NE 68321 5. Owner Certification of Authorization: N/A
3. Plant Unit: 1 6. National Board Number. 20762 Catgory: V112.12 Equal: 40 ftem No.: 81L420 Equal: 40 Summary No.: S420.SL.JP1 ComponentID: JP1-SL Exam Method: VT-3 Comments I Corrective Measures:

Class: IVE System: NB

Description:

Jet Pump 1 Sensing Une Results: Accept Examined per GE SIL 420 Work Order 4235468 Report No.: VE-03-267 Summary No.: S420.SLBK.JP1 Component ID: JPI-SLBKTS Exam Method: VT-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

Jet Pump 1 Sensing line Brackets Results: Accept Examined per GE SIL 420 Work Order: 4235488 Report No.: VE-3-268 Summary No.: S420.SL.JP10 Component D: JPIO-SL Exam Method: VT-3 CommentsICorrective Measures: Class: IVE System: NB

Description:

Jet Pump 10 Sensing Line Results: Accept Examined per GE SIL 420 Work Order. 4235488 Report No.: VE-03285 Summary No.: S420.SLBK.JP1O Component D: JP10-SLBKTS Exam Method: VT-1 Comments ICorrective Measures: Class: IVE System: NB

Description:

Jet Pump 10 Sensing Une Brackets Results: Accept Examined per GE SIL 420 Work Order: 423548 Report No.: VE-03-28e Summary No.: S420.SLJP11 Component ID: JP11SL Exam Method: VT-3 Comments I Corrective Measures: Class: VE System: NB

Description:

Jet Pump 11 Sensing Line Results: Accept Examined per GE SIL 420 Work Order 423548 Report No.: V-03287 Summary No.: S420.SLBK.JPI1 Component ID: JP11-SLBKTS Exam Method: VT-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

Jet Pump 11 Sensing Line Brackets Results: Accept Examined per GE SIL 420 Work Order: 4235468 Report No.: VE-03-288 Summary No.: S420.SL.JP12 Component ID: JP12-SL Exam Method: VT-3 Comments I Corrective Measures: Class: VE System: NB

Description:

Jet Pump 12 Sensing Une R"ults: Accept Examined per GE SIL 420 Work Order: 4235468 Report No.: VE-03-289 ,I - ---- ---- ---- ---- ---- ---- . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . --- --- ---- ---- ---- - -- - --- - --- ---- ---- ---- ---- ---- --- ---- ---- ---- ---- ---- ---- ---- ---- ---- --- - ---- --- Summary No.: S420.SLBKJP12 ComponentlD: JP12-SLBKTS Exam Method: VT-1 Comments ICorrectve Measures: Class: IVE System: NB

Description:

Jet Pump 12 Sensing Line Brackets Results: Accept Examined per GE SIL 420 Work Order: 4235488 Report No.: VE-03-290 Summary No.: S420.SL.JP13 ComponentlD: JP13-SL Exam Method: VT-3 CommentsICorrective Measures: Class: VE System: NB

Description:

Jet Pump 13 Sensing Une Results: Accept Examined per GE SIL 420 Work Order 4235468 Report No.: VE-03-291 Summary No.: S420.SLBK.JP13 Component ID: JP13-SLBKTS Exam Method: VT-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

Jet Pump 13 Sensing Une Brackets Results: Accept Examined per GE SIL 420 Work Order 4235468 Report No.: VE-03-292 Summary No.: S420.SL.JP14 Component ID: JP14SL Exam Method: VT-3 Comments I Corrective Measures: Class: IVE System: NB

Description:

Jet Pump 14 Sensing Une Results: Accept Examined per GE SIL 420 Work Order 4235468 Report No.: VE-03-293

, RF021: Inservice Inspection Report                                                                                                                                                                                                                                                                                                                             Page 31 of 67
1. Owner, NPPD P.O. Box 499 Columbus, NE 6860 4. Commerical Service Date: July, 1974 Tuesday, June 17, 2003
2. Plant Cooper Nuclear Station P.O. Box 98 Brownville, NE 68321 5. Owner Certification of Authorization: N/A
3. Plant Unit: 1 6. National Board Number 20762 Summary No.: S420.SLBK.JPi4 Component ID: JP14-SLBKTS Exam Method: VT-1 Commnt I Corrective Measures:

Class: NE System: NB

Description:

Jet Pump 14 Sensing Line Brackets Results: Accept Examined per GE SIL 420 Work Order 4235488 Report No.: VE-03-294 Summary No.: S420.SLJP15 Component ID: JP15-SL Exam Method: VT-3 Comments ICorrective Measures: Class: NE System: NB

Description:

Jet Pump 15 Sensing Une Results: Accept Examined per GE SIL 420 Work Order 4235468 Report No.: VE-03-295 Summary No.: S420.SLBK.JP15 Component ID: JP15-SLBKTS Exam Method: VT-1 Comments I Corrective Measures: Class: NE System: NB

Description:

Jet Pump 15 Sensing Line Brackets Results: Accept Examined per GE SIL 420 Work Order 4235468 Report No.: VE--296 Summary No.: S420.SLJP16 ComponentlD: JP16-SL Exam Method: VT-3 Comments/Corrective Measures: Class: NE System: NB

Description:

Jet Pump 16 Sensing Line Results: Accept Examined per GE SIL420 Work Order 4235468 Report No.: VE-03-297 Summary No.: S420.SLBK.JP16 Component ID: JP1O-SLBKTS Exam Method: VT-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

JetPump16SensingLineBrackets Results: Accept Examined per GE SIL420 Work Order 4235468 Report No.: VE.03-298 Summary No.: S420.SLJP17 Component ID: JP17-SL Exam Method: VT-3 Comments I Corrective Measures: Class: NE System: NB

Description:

Jet Pump 17 Sensing Une Results: Accept Examined per GE SIL 420 Work Order 4235468 Report No.: VE-03-299 Summary No.: S420.SLBKJP17 Component ID: JP17-SLBKTS Exam Method: VT-1 Comments Corrective Measures: Class: NE System: NB

Description:

Jet Pump 17 Sensing Une Brackets Results: Accept Examined per GE SIL 420 Work Order 4235468 Report No.: VE-03-301 Summary No.: S420.SL.JPI8 Component D: JP18-SL Exam Method: VT-3 Comments I Corrective Measures: Class: NE System: NB

Description:

Jet Pump 18 Sensing Line Results: Accept Examined per GE SiL 420 Work Order 4235468 Report No.: VE-03300-Summary No.: S420.SLBKJP18 ComponentlD: JPI8-SLBKTS Exam Method: VT-1 Comments/Corrective Measures: Class: NE System: NB

Description:

JetPump185SensingLineBrackets Results: Accept Examined per GE SIL420 Work Order 4235468 Report No.: VE-03302 Summary No.: 5420.SLJP19 Component D: JP19-SL Exam Method: VT-3 Comments I Corrective Measures: Class: NE System: NB

Description:

Jet Pump 19 Sensing Line Results: Accept Examined per GE SIL 420 Work Order 4235468 Report No.: VE03-303 Summary No.: 5420.SLBK.JP19 Component ID: JP19-SLBKTS Exam Method: VT-1 Comments I Corrective Measures: Class: NE System: NB

Description:

Jet Pump 19 SensIng lne Brackets Results: Accept Examined per GE SIL 420 Work Order 4235468 Report No.: VE-03-304 Summary No.: S420.SL.JP2 Component ID: JP2-SL Exam Method: VT-3 Comments I Corrective Measures: Class: NE System: NB

Description:

Jet Pump 2 Sensing Une Results: Accept Examined per GE SiL 420 Work Order 4235468 Report No.: VE-03-269

, RFO2I: Inservice Inspection Report                                                                                                                                 Page 32 of 67
1. Owner, NPPD P.O. Box 499 Columbus, NE 6860 4. Commerical Service Date: July, 1974 Tuesday, June 17, 2003
2. Plant: Cooper Nuclear Station P.O. Box 98 Brownville, NE 68321 5. Owner Certification of Authorization: N/A
3. Plant Unit 1 5. National Board Number 20762 Summary NO.: S420.SLBK.JP2 Component ID: JP2-SLBKTS Exam Method: Vr-i Comments I Corrective Measures:

Class: 11VE System: NB

Description:

Jet Pump 2 Sensing Une Brackets Results: Accept Examined per GE SIL 420 Work Order 4235488 Report No.: VE5-03-270 Summary No.: S420.SLJP2O Component ID: JP20-SL Exam Method: VT-3 Comments I Corrective Measures: Class: 11VE System: NB

Description:

Jet Pump 20 Sensing Line Results: Accept Examined per GE SIL 420 Work Order 4235468 Report No0.: VE5-03-305 Summary No.: S420.SLBK.JP2O Component ID: JP20-SLBKTS Exam Method: VT-i Comments I Corrective Measures: Class: 11VE System: NB

Description:

Jet Pump 20 Sensing Une Brackets Results: Accept Examined per GE SIL 420 Work Order 4235468 Rapedt No.: VE5-03-306 Summary No.: S420.SLJP3 Component ID: JPS-SL Exam Methiod: VT-3 Comments I Corrective Measures: Class: WVESystem: NB

Description:

Jt Pump 3Sensing Une Results: Accept Examined per GE SIL 420 Work Order 4235468 Report No.: VE5-03-271 Summary No.: S420.SLBK.JP3 Component ID: JP3-SLBKTS Exam Method: VT-I Comments I Corrective Measures: Class: WVESystem: NB

Description:

Jet Pumps3 Sensing Una Brackets Results: Accept Examined per GE SIL 420 Work Order 4235468 Report No.: VE5-03-272 Summary No.: S420.SL.JP4 Component ID: JP4-SL Exam Method: VT-S Comments I Corrective Measures: Class: 11VE System: NB

Description:

Jet Pump 4 Sensing line Results: Accept Examined per GE SIL 420 Work Order 4235468 Report No.: VE5-03-273 Summary No.: S420.SLBK.JP4 Component ID: JP4-SLBKCTS Exam Method: VT-i Comments I Corrective Measures: Class: WVESystem: NB

Description:

Jet Pump 4 Sensing Une Brackets Results: Accept Examined per GE SIL 420 Work Order 4235468 Report No.: VE5-03-274 Summary No.: S420.SL.JP5 Component ID: JP5-SL Exam Method: VT-S Comments I Corrective Measures: Class: WVE System: NB

Description:

Jet Pumps5 Sensing Une Results: Accept Examined per GE SIL 420 Work Order 4235468 Report No.: VE5-03-275 Summary No.: 5420.SLBK.JP5 Component ID: JPS-SLBKTS Exam Method: VT-I Comments I Corrective Measures: Class: WVE System: NB Descriptio: Jet Pumps5 Sensing U~ne Brackets Results: Accept Examined per GE SIL 420 Work Order 4235488 Report No.: VE5-03-278 Summary No.: S420.SL.JP6 Component ID: JP6-SL Exam Method: VT-S Comments I Corrective Measures: Class: WVESystem: NB

Description:

Jet Pumps6 Sensing Une Results: Accept Examined per GE SIL 420 Work Order 4235468 Report No.: VE5-03-277 Summary No.: S420.SLBK.JP6 Component ID: JP6-SLBKTS Exam Method: VT-i Comments I Corrective Measures: Class: WVESystem: NB

Description:

Jet Pump 6 Sensing Une Brackets Result: Accept Examined per GE SIL 420. PrevIously recorded ndication in weld at Work Order 4235468 Report No.: VE5-03-278 upper standoff to sensing line determined to be non-relevant shadow from weld bead and undercut (Reference NF#2003-07). Summary No.: S420.SL.JP7 Component ID: JP7-SL Exam Method: VT-S Comments I Corrective Measures: Class: 11VE System: NB

Description:

Jet Pump 7 Sensing Uine Results: Accept Examined per GE SIL 420 Work Order 4235468 Report No.: VE5-03-270

, RF021: Inservice Inspection Report                                                                                                                                                                                                         Page 33   of 67
1. Owner, NPPD P.O. Box 499 Columbus, NE 6860 4. Commerical Service Date: July, 1974 Tuesday, June 17, 2003
2. Plant Cooper Nuclear Station P.O. Box 98 Brownvlle, NE 68321 5. Owner Certification ofAuthorization: N/A
3. Plant Unit 1 6. National Board Number 20762 Summary No.: S420.SLBK.JP7 Component ID: JP7-SLBKTS Exam Method: VT-1 Comments I Correcdve Measures:

Clan: IVE System: NB

Description:

Jet Pump7 Sensing Une Brackets Results: Accept Examined per GE SIL 420 Work Order 4235468 Report No.: vE-o3-280 Summary No.: S420.SL.JP8 Component ID: JP8-SL Exam Method: VT-3 Comments I Corrective Measures: Class: IVE System: NB

Description:

Jet Pump 8Sensing Une Results: Accept Examined per GE SIL 420 Work Order 4235468 Report No.: VE-03-281 Summary No.: S420.SLBKJP8 Component ID: JP8-SLBKTS Exam Method: VT-1 Commentsl Correcive Measures: Class: W\E System: NB

Description:

Jet Pump8 Sensing Une Brackets Results: Accept Examined per GE SIL 420 Work Order 4235468 Report No.: VE-03-282 Summary No.: S420.SL.JPB Component ID: JP9-SL Exam Method: VT-3 Comments Corrective Measures: Class: IVE System: NB

Description:

Jet Pump 9Sensing Una Results: Accept Examined per GE SIL 420 Work Order 4236468 Report No.: VE-03-283 Summary No.: S420.SLBK.JP9 Component ID: JP9-SLBKTS Exam Meod: VT-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

Jet Pump 9Sensing Une Brackets Results: Accept Examined per GE SIL 420 Work Orden 4235468 Report No.: VE-3-284

, RF021: Inservice Inspection Report                                                                                                                            Page 34 of 67
1. Owner, NPPD P.O. Box 499 Columbus, NE 6860 4. Commerical Service Date: July, 1974 Tuesday, June 17, 2003
2. Plant Cooper Nuclear Station P.O. Box 98 Brownville, NE 68321 5. Owner Certification of Authorization: N/A
3. Plant Unit: 1 6. National Board Number 20762 Category: V112.14 Equal: 10 Itm No: SlL465 Equal: 10 Summary No.: S465.MXIN.JPI I Component ID: JP1 1-NOZ-MLXINLET Exam Method: VT-3 Comments / Corrective Measures:

Class: IVE System: NB

Description:

Jet Pump 1 Inlet Nozzle and Mxer Region Results: Accept Examined per GE SIL 465 Work Order 4235468 (Crud Buildup) (CAL JP) Report No.: VE-03-307 Summary No.: S465.MXIN.JP12 Component ID: JP12-NOZ-MIXINLET Exam Method: VT-3 Comments I Corrective Measures: Class: NE System: NB

Description:

Jet Pump 12 Inlet Nozzle and Mixer Region Results: Accept Examined per GE SIL 465 Work Order 4235468 (Crud Buildup) Report No.: VE-03308 Summary No.: S465.MXIN.JP13 ComponentID: JP13-NOZ-MIXINLET Exam Method: VT-3 Comments ICorrective Measures: Clas: WE System: NB

Description:

Jet Pump 13 Inlet Nozzle and Mixer Region Results: Accept Examined per GE SIL 465 Work Order 4235468 (Crud Buildup) Report No.: VE-03-309 Summary No.: S465.MXIN JP14 Component ID: JP14-NOZ-MXINLET Exam Method: VT-3 Comments I Corrective Measures: Clas: WE System: NB

Description:

Jet Pump 14 Inlet Nozzle and Mixer Region Results: Accept Examined per GE SIL 465 Work Order 4235468 (Crud Buildup) Report No.: VE 0 Summary No.: S465.MXIN.JP15 Component ID: JP15-NOZ-MWUNLET Exam Method: VT-S Comments I Corrective Measures: Class: WE System: NB

Description:

Jet Pump 15 Inlet Nozzle and Mixer Region Results: Accept Examined per GE SIL 465 Work Order 4235468 (Crud Buildup) Report No.: VE-311 Summary No.: S465.MXIN.JPIe Component ID: JP16-NOZ-MIXINLET Exam Method: VT-3 Comments I Corrective Measures: Class: WE System: NB

Description:

Jet Pump 1 Inet Nozzle and Mixer Region Results: Accept Examined per GE SIL 465 Work Order 4235468 (Crud Buildup) (CAL JP) Report No.: VE-03-312 Summary No.: S465.MXIN.JP17 Component ID: JP17-NOZ-MIXINLET Exam Method: VT-S Comments I Corrective Measures: Class: WE System: NB

Description:

Jet Pump 17 Inlet Nozzle and Mixer Region Results: Accept Examined per GE SIL 420 Work Order 4235468 (Crud Buildup) Report No.: VE-03-313 Summary No.: S465.MXIN.JPI8 Component ID: JP18-NOZ-MIXINLET Exam Method: VT-3 Comments Cowective Measures: Class: WE System: NB

Description:

JtPump18InletNozzeandMixerRegion Resulls: Accept Examined per GE SIL 465 Work Order 4235468 (Crud Buildup) Report No.: VE-03-314 Summary No.: S465.MXIN.JP19 Component ID: JP19-NOZ-MIXINLET Exam Method: VT-3 Comments I Corrective Measures: Class: IVE System: NB

Description:

Jet Pump 19 Inle Nozzle and Mixer Region Results: Accept Examined per GE SIL 465 Work Order 4235468 (Crud Buildup) Report No.: VE-0-315 Summary No.: S465.MXIN.JP20 Component ID: JP20-NOZ-MIXINLET Exam Method: EVT-1 Comments I Corrective Measures: Class: WE System: NB

Description:

Jet Pump 20 Inlet Nozzle and Mixer Region Results: Accept Examined per GE SIL 465 Work Order 4235468 (Crud Buildup) Report No.: VE-03-3i

, RFO21: Inservice Inspection Report                                                                                                                                                                                                                                                                                                 Page 35 of 67
1. Owner, NPPD P.O. Box 499 Columbus, NE 6860 4. Commerical Service Date: July, 1974 Tuesday, June 17, 2003
2. Plant: Cooper Nuclear Station P.O. Box 98 Brownville, NE 68321 5. Owner Certilcation of Authorization: N/A
3. Plant Unit: 1 6. National Board Number 20762 Cagory:

C V112.15 Equal: 34 l Kem No.: SI474 Equal: 34 SummaryNo.: S474.STMDY.DRCHIH.23 ComponentlD: STMDRY-DRCHWLD-IH§23 Exam Method: EVT-1 Comments ICorrective Measures: Class: IVE System: NB

Description:

Steam Dryer Channnel Weld One (1)Horizontal Results: Accept Examined per GE SIL 474. Work Order 4235467 at 23 degree azimuth Report No.: VE-03-48 SummaryNo.: S474.STMDY.DRCH1H.23 ComponentlD: STMDRY-DRCHWLD-1VL@23 Exam Method: EVT-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

Steam Dryer Channnel Weld One (1)Vertical Results: Accept Examined per GE SIL 474. Previously recorded relevant indications Work Order 4235467 Left Side at 23 degrees azimuth Report No.: VE-03-456 determined to be not relevant. Summary No.: S474.STMDY.DRCHIVR.23 Component ID: STMDRY-DRCHWLD-1VR@23 Exam Method: EVT-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

Steam Dryer Channnel Weld One (1) Vertical Results: Accept Examined per GE SIL 474. Previously recorded relevant Indications Work Order 4235487 Right Side at 23 degrees azimuth Report No.: VE-o3-457 determined to be not relevant. SummaryNo.: S474.STMDY.DRCH2H.40 ComponentID: STMDRY-DRCHWLD-2Hc40 Exam Method: EVT-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

Steam Dryer Channnel Weld Two (2)Horizontal Results: Accept Examined per GE SIL 474. Work Order 4235467 at 40 degree azimuth Report No.: VE-03459 Summary No.: S474.STMDY.DRCH2VL.40 Component ID: STMDRY-DRCHWLD-2VL@40 Exam Method: EVT-1 Comments I Corrective Measures: Clan: IVE System: NB

Description:

Steam Dryer Channnl Weld Two (2) Vertical Results: Accept Examined per GE SIL 474. Work Order 4235467 Left Side at 40 degrees azimuth Report No.: VE-03-460 Summary No.: S474.STMDY.DRCH2VR.40 Component ID: STMDRY-DRCHWLD-2VR(§40 Exam Method: EVT-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

Steam Dryer Channnel Weld Two (2) Vertcal Results: Accept Examined per GE SIL 474. Previously recorded relevant indications Work Order 4235467 Right Side at 40 degrees azimuth Report No.: vE-o3-4e1 determined to be not relevant. Summary No.: S474.STMDY.DRCH3H.140 Component ID: STMDRY-DRCHWLD-3H@140 Exam Method: EVT-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

Steam Dryer Channnel Weld Three(3) Results: Accept Examined per GE SIL 474. Work Order 4235467 Horizontal at 140 degree azimuth Report No.: VE-03462 SummaryNo.: S474.STMDY.DRCH3VL.140 ComponentID: STMDRY-DRCHWLD-3VL@140 Exam Method: EVT-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

Steam Dryer Channne Weld Three (3)Vertical Results: Accept Examined per GE SIL 474. Work Order 4235467 Left Side at 140 degrees azimuth Report No.: VE-03-483 Summary No.: S474.STMDY.DRCH3VR.140 Component ID: STMDRY-DRCHWLD-3VR§140 Exam Method: EVT-1 Comments / Corrective Measures: Class: IVE System: NB

Description:

Steam Dryer Channnel Weld Three (3)Vertical Results: Accept Examined per GE SIL 474. Work Order 4235467 Right Side at 140 degrees azimuth Report No.: VE-03-464 SummaryNo.: S474.STMDY.DRCH4H.158 ComponentID: STMDRY-DRCHWLD-4H§158 Exam Method: EVT.1 Comments I Corrective Measures: Class: IVE System: NB

Description:

Steam Dryer Channnel Weld Four (4) Results: Accept Examined per GE SIL 474. Work Order 4235467 HorIzontal at 158 degree azimuth Report No.: VE-03-465 SummaryNo.: S474.STMDY.DRCH4VL.158 ComponentlD: STMDRY-DRCHWLD-4VL4158 Exam Method: EVr-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

Steam Dryer Channnel Weld Four (4) Vertical Results: Accept Examined per GE SIL 474. Work Order 4235467 Let Side at 158 degrees azimuth Report No.: VE-03-40

, RF021: Inservice Inspection Report                                                                                                                                                                                                                                        Page 36 of 67 1.Owner, NPPD P.O. Box 499 Columbus, NE 6860                                                                                                                          4. Commerical Service Date: July, 1974                                            Tuesday, June 17, 2003
2. Plant: Cooper Nuclear Station P.O. Box 98 Brownville, NE 68321 5. Owner Certification of Authorization: N/A
3. Plant Unit: 1 6. National Board Number 20762 Summary No.: S474.STMDY.DRCH4VR.158 Component iD: STMDRY-DRCHWLD-4VR@158 Exam Msthod EVr-1 Comments I Corrective Measures Class: IVE System: NB

Description:

Steam Dryer Channnel Weld Four (4)Vertical Results: Accept Examined per GE SIL 474. Work Order 4235467 Right Side at 158 degrees azimuth Report No.: VE-03-467 SummaryNo.: S474.STMDY.DRCH5H.193 ComponentID: STMDRY-DRCHWLD-5H@193 Exam Method: EVT-1 Comments i Corrective Measures: Class: IVE System: NB

Description:

Steam Dryer Channnel Weld Five (5)Horizontal Results: Accept Examined per GE SIL 474. Work Order 4235467 at 193 degree azimuth Report No.: VE-03-468 SummaryNo.: S474.STMDY.DRCH5VL.193 ComponentlD: STMDRY-DRCHWLD-5VL@193 Exam Method: EVT-1 CommentsICorrective Measures: Class: IVE System: NB

Description:

Steam Dryer Channnel Weld Five (5) Vertical Results: Accept Examined per GE SIL 474. Work Order 4235467 Left side at 193 degrees azimuth Reprt No.: VE 03s.469 SummaryNo.: S474.STMDY.DRCH5VR.193 ComponentID: STMDRY-DRCHWLD-5VR@193 Exam Method: EVr-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

Steam Dryer Channnel Weld Five (5) Vertical Results: Accept Examined per GE SIL 474. Work Order 4235467 Right Side at 193 degrees azimuth Report No.: VE.03.470 Summary No.: S474.STMDY. DRCH6H 220 Component ID: STMDRY-DRCHWLD eH@220 Exam Method: EVr-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

Steam Dryer Channnel Weld Six () Horizontal Results: Accept Examined per GE SIL 474. Work Order. 4235467 at 2 degree azimuth Report No.: VE03-471 Summary No.: S474.STMDY.DRCH6VL.220 Component ID: STMDRY-DRCHWLD-SVL@220 Exam Method: EVr-1 Comments i Corrective Measures: Class: E System: NB

Description:

Steam Dryer Channnel Weld Six (e)Vertical Results: Accept Examined per GE SIL 474. Work Order 4235467 Left Side at 220 degrees azimuth Report No.: VE03.472 Summary No.: S474.STMDY.DRCH8VR.220 Component ID: STMDRY-DRCHWLD-4VR@220 Exam Method: EVr-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

Steam Dryer Channnel Weld Six (6)Vertical Results: Accept Examined per GE SIL 474. Work Order 4235467 Right Side at 220 degrees azimuth Report No.: VE-03-473 SummaryNo.: S474.STMDYDRCH7H.310 ComponentID: STMDRY-DRCHWLD-7H@310 Exam Method: EV1r-1 Comments I Corrective Measures: Class: IE System: NB

Description:

Steam Dryer Channnel Weld Seven Horzontal Results: Accept Examined per GE SIL 474. Work Order 4235467 at 310 degree azimuth Report No.: VE-03-474 SummaryNo.: S474.STMDY.DRCH7VL.310 ComponentlD: STMDRY-DRCHWLD-7VLO310 Exam Method: EVT-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

Steam Dryer Channnel Weld Seven (7) Results: Accept Examined per GE SIL 474. Work Order 4235467 Vertical Left Side at 310 degrees azimuth Report No.: VE03-475 Summary No.: S474.STMDY.DRCH7VR.310 Component ID: STMDRY-DRCHWLD-7VR*310 Exam Method: EVr-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

Steam Dryer Channnel Weld Seven (7) Results: Accept Examined per GE SIL 474. Work Order 4235467 Vertical Right Sideat 310 degrees azimuth Report No.: VE-03-478 Summary No.: S474.STMDY.DRCH8H.347 Component ID: STMDRY-DRCHWLD.UH@347 Exam Method: EVr-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

Steam Dryer Channnel Weld Eight (8) Results: Accept Examined per GE SIL 474. Work Order 4235467 Horizontal at 347 degree azimuth Report No.: VE-03-477 Summary No.: S474.STMDY.DRCH8VL.347 Component ID: STMDRY-DRCHWLD4SVL@347 Exam Method: EVr-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

Steam Dryer Channnel Weld Eight (8) Vertical Results: Accept Examined per GE SIL 474. Work Order 4235467 Left Side at 347 degrees azimuth Report No.: VE-03-478

, RF021: Inservice Inspection Report                                                                                                                                                                                                                                     Page 37 of 67
1. Owner, NPPD P.O. Box 499 Columbus, NE 6860 4. Commerical Service Date: July, 1974 Tuesday, June 17, 2003
2. Plant: Cooper Nuclear Station P.O. Box 98 Brownville, NE 68321 5. Owner Certification of Authorization: N/A
3. Plant Unit: 1 6. National Board Number 20762 Summary No.: S474.STMDY.DRCH8VR.347 Component ID: STMDRY-DRCHWLD-6VR@347 Exam Method: EVr-1 Comments I Corrective Measures:

Class: IVE System: NB

Description:

Steam Dryer Channnel Wed Eight (8) Vertical Results: Accept Examined per GE SIL 474. Work Order: 4235487 Right Side at 347 dgrees azimuth Report No.: VE-03-479 Summary No.:S474.STMDY.DRCHMNWY.270 Component ID: STMDRY-MANWAY@M270 Exam Method: VT-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

Steam Dryer Manway Cover and Cover Welds Results: Accept Examined due to OE14300. VT-1 Examination of Cover Plate Welds at Work Order: 4235467 at 270 degrees azimuth Report No.: VE-O3-456 90 and 270 degress azImuth were Included as part this component identification. Summary No.:S474.STMDY.DRCHMNWY.270 Component ID: STMDRY-MANWAY@270 Exam Method: EVT-1 Comments I Corrective Measure: Class: IVE System: NB

Description:

Steam Dryer Manway Cover and Cover Welds Results: Accept Examined due to OE14300. VT-1 Examination of Cover Plate Welds at Work Order 4235467 at 270 degrees azimuth Report No.: VE-03-454 90 and 270 degress azimuth were included as part this component identification. Summary No.: S474.STMDYSKT.1-2 Component ID: STMDRY-SKT-BTWDCI-2 Exam Method: EVT-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

SteamDryerSkirtAreabetweenDrain Results: Accept Previously recorded relevant indications found during RFO-20 on various Work Order: 4235467 Channels I and 2,23 to 40 degrees azimuth Report No.: VE-03-480 Steam Dryer skirt areas between drain channels determined to be manufacturing roller marks.. Summary No.: S474.STMDYSKT.2-3 Component ID: STMDRY-SKT-BTWDC2-3 Exam Method: EVT-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

Steam Dryer Skirt Area between Drain Results: Accept Previously recorded relevant indications found during RFO-20 on various Work Order. 4235467 Channels 2 and 3,40 to 140 degrees azimuth Report No.: vE-o3-481 Steam Dryer skirt areas between drain channels determined to be manfacturing roller marks. Summary No.: S474.STMDYSKT.3-4 Component D: STMDRY-SKT-BTWDC3-4 Exam Method: EVT-1 Comments/Corrective Measures: Class: VE System: NB

Description:

Steam Dryer SkirtArea between Drain Results: Accept Previously recorded relevant indications found during RFO-20 on various Work Order 42354e7 Channels 3and 4, 140 to 158 degrees azimuth Report No.: VE-03-482 Steam Dryer skirt areas between drain channels determined to be manfacturing roller marks. Summary No.: S474.STMDYSKT.4-5 Component ID: STMDRY-SKT-BTWDC4-5 Exam Method: EVT-1 Comments I Corrective Measures: Class: VE System: NB

Description:

Steam Dryer Skirt Area between Drain Results: Accept Previously recorded relevant Indications found during RFO-20 on various Work Order 4235467 Channels 4-5 158 to 193 degrees azimuth Report No.: VE-03-483 Steam Dryer skirt areas between drain channels determined to be manufacturing roller marks. Summary No.: S474.STMDYSKT5-6 Component ID: STMDRY-SKT-BTWDC"-6 Exam Method: EVT-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

Steam Dryer Skirt Area between Drain Results: Accept Previously recorded relevant Indications found during RFO-20 on various Work Order 4235467 Channels Sand 6, 193 to 220 degrees azimuth Report No.: VE-03-484 Steam Dryer skirt areas between drain channels determined to be manufacturing roller marks. Summary No.: S474.STMDYSKT.6-7 Component ID: STMDRY-SKT-BTWDC6-7 Exam Method: EVT-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

Steam Dryer Skirt Area between Drain Channel Results: Accept Previously recorded relevant Indications found during RFO20 on various Work Order 4236467 6 and 7, 220 to 310 degrees azimuth Report No.: VE-03-485 Steam Dryer skirt areas between drain channels determined to be manufacturing roller marks. Summary No.: 5474.STMDYSKT.7-8 Component ID: STMDRY-SKT-BTWDC7-8 Exam Method: EVT-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

Steam Dryer SkirtArea beween Drain Channe Results: Accept Previously recorded relevant indications found during RFO-20 on various Work Order 4235467 7 and 8 310 to 347 degrees azimuth Report No.: v3-48e Steam Dryer skirt areas between drain channels determined to be manufacturing roller marks.

, RFO21: Inservice Inspection Report                                                                                                                                            Page 38 of 67 1.Owner, NPPD P.O. Box 499 Columbus, NE 6860                                                                    4. Commerical Service Date: July, 1974                          Tuesday, June 17, 2003
2. Plant: Cooper Nuclear Station P.O. Box 98 Brownville, NE 68321 5. Owner Certification of Authorization: N/A
3. Plant Unit: 1 6. National Board Number 20762 Summary No.: S474.STMDYSKT.8-1 Component ID: STMDRY-SKT-B1WDC8-1 Exam Method: EVr-1 Comments I Corrective Measures:

Class: VE System: NB

Description:

Steam Dryer Skirt Area between Drain Channel Results: Accept Previously recorded relevant Indications found during RFO-20 on various Work Order: 4235467 8and 1,347 to 23 degrees azimuth Report No.: vE03 487 Steam Dryer skirt areas between drain channels determined to be manufacturing roller marks.

Attachment 1, RF021: Inservice Inspection Report Page 39 of 67 1.Owner, NPPD P.O. Box 499 Columbus, NE 6860 4. Commerical Service Date: July, 1974 Tuesday, June 17, 2003 2.Plant: Cooper Nuclear Station P.O. Box 98 Brownville, NE 68321 5. Owner Certification of Authorization: NtA 3.Plant Unit: 1 6. National Board Number 20762 Category: PIe Equal: 57 Item No.: V18.P1 Equal: 2 Summary No.: V1S.Pi.TBJ.90 Component D: CS-A-TJB@90-(P1) Exam Method: EVT-1 Comments/ Corrective Measures: Class: IVE System: NB

Description:

Core Spray Piping Tee Junction Box at 90 Results: Accept BWRV1P Examination, examined all accessible and adjacent surfaces Work Order 4235464 degrees azimuth, Thermal Sleeve to Junction Report No.: VE-0356 Box Weld (hidden) Examine the accessible top and bottom outside surfaces of the Tee Junction Box Summary No.: V18.P1.TBJ.270 Component ID: CS-B-TJBQ270-(Pl) Exam Method: EVT-t CommentsI Corrective Measures: Class: IVE System: NB

Description:

Core Spray Piping Tee Junction Box at 270 Results: Accept BWRViP Examination, examined all accessible and adjacent surfaces Work Order: 4235464 degrees azimuth, Thermal Sleeve to Junction Report No.: VE-03-567 Box Weld (hidden) Examine the accessible top and bottom outside surfaces of the Tee Junction Box Item No.: V18.P2 Equal: 2

                                                                     ........I Summary No.:                          Vt8.P2.Al.90                         Component ID:                                          CS-AlI@90-(P2)                          Exam Method: EVT-t                            Comments ICorrective Measures:

Class: IVE System: NB

Description:

Core Spray Piping Tee Junction Box at 90 Results: Accept BWRViP Examination Work Order: 4235464 degrees azimuth. Cover Plate to Junction Box Report No.: VE-03-568 Weld Summary No.: Vt8.P2.B1t.270 Component ID: CS-B110270-(P2) Exam Method: EVTt- Comments ICorrective Measures: Class: VE System: NB

Description:

Core Spray Piping Tee Junction Box at 270 Results: Accept BWRViP Examination Work Order: 4235464 degrees azimuth. Cover Plate to Junction Box Report No.: VE-03-569 Weld Iem No.: V18.P3 Equa: 4 Summary No.: V18.P3A1O.90 ComponentlD: CS-AIO(90-(P3) Exam Method: EVT-l Comments ICorrective Measures: Class: VE System: NB

Description:

Core Spray Piping Tee Junction Box at 90 Results: Accept BWRViP Examination Work Order 4235464 degrees azimuth, Horizontal Pipe to Junction Report No.: VE-53-570 Box Weld, from Downcomer C Summary No.: Vi8.P3.At2.90 Component ID: CS-Al2@90-(P3) Exam Method: EVr-t Comments I Corrective Measures: Class: IVE System: NB

Description:

Core Spray Piping Tee Junction Box at 90 Results: Accept BWRVIP Examination Work Order: 4235464 degrese azimuth, Horizontal Pipe to Junction Report No.: VE-M0571 Box Weld, to Downcomer A Summary No: V18.P3.B10.270 Component ID: CS-B1O1 27o-P3) Exam Method: EVt-l Comments I Corrective Measures: Class: IVE System: NB

Description:

Core Spray Piping Tee Junction Box at 270 Results: Accept BWRVIP Examination Work Order. 4235464 degrees azimuth, Horizontal Pipe to Junction Report No.: VE-03-572 Box Weld, from Downomer B" Summary No.: V18.P33B12.270 Component ID: CS-B12@270-(P3) Exam Method: EVT-t Comments I Corrective Measures: Class: IVE System: NB

Description:

Core Spray Piping Tee Junction Box at 270 Results: Accept BWRVIP Examination Work Order: 4235484 degrees azimuth, Horizontal Pipe to Junction Report No.: VE43-573 Box Weld, to Downcomer D' Item No.: V18.P4 Equal: 5 I

, RF021: Inservice Inspection Report                                                                                                                                                                                     Page 40 of 67
1. Owner, NPPD P.O. Box 499 Columbus, NE 6860 4. Commerical Service Date: July, 1974 Tuesday, June 17, 2003
2. Plant: Cooper Nuclear Station P.O. Box 98 Brownville, NE 68321 5. Owner Certification of Authorization: NA
3. Plant Unit: 1 6. National Board Number 20762 Summary No.: V18.P4a.A13.10 Component D: CS-A13@10(P4a) Exam Method: EVT-1 Comments I Corrective Measures:

Clas: IVE System: NB

Description:

Core Spray Piping, Horizontal Pipe to Elbow, Results: Accept BvVRVIP Examination Work Order: 4235464 off Downcomer "A"at 10 dwgrees azimuth Report No.: VE-03-574 Summary No.: V18.P4bA14.1O Component ID: CS-A14@10-(P4b) Exam Method: EVT-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

Core Spray Piping, Elbow to Pipe, off Results: Accept BWRVIP Examination Work Order 4235464 Downomer A" at 10 degrees azimuth Report No.: VE.03-575 Summary No.: V18.P4cA18.10 Component ID: CS-A18@10P4c) Exam Method: EVT-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

CoreSprayPiping,LowerDowncomer"A"to Results: Accept BWRVIP Examination Work Order 4235464 Elbow at 10 degrees azimuth Report No.: VE-03-578 Summary No.: V18.1P4dA19.1O Component ID: CS-Al9IOI-(P4d) Exam Method: EVT-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

Core Spray Piping, Elbow to Shroud Pipe, off Results: Accept BVRVIP Examination Work Order 4235464 Downccmer "A"at 1 degrees azimuth Report No.: VEK03-577 Summary No.: V18.P4bA8.170 Component ID: CS-A8@170-(P4b) Exam Method: EVT-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

Core Spray Piping, Elbow to Pipe Downcomer Results: Accept BWRVIP Examination. Previously recorded relevant Indication found Work Order: 4235484.65 "C"at 170 degrees azimuth Report No.: VE-03-578 during RFO-20 determined to be non-relevant. IteKm No.: VIU.1P8 Equal: 1 Summary No.: V18.P8bA1.170 Component ID: CS-AI@170-(P8b) Exam Method: EVT-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

CoreSprayPipingDowncomer"C"at170 Results: Accept BWRVIP Examination. Previously recorded relevant indications were Work Order. 423546445 degrees azimuth, Colar to Shroud Weld Report No.: VE-03-582 found determined to be non-relevant. Summary No.: V18.P8bAI.17O Component ID: CS-At@170-(P8b) Exam Method: Auto UT Comments I Corrective Measures: Class: IVE System: NB

Description:

Core Spray Piping Downcomer"C at 170 Results: Accept BWRVIP Examination. Previously recorded relevant indications were Work Order 42354645 degrees amuth, Collar to Shroud Weld Report No.: VE-03-558 found determined to be non-relevant. Summary No.: V18.P8aA2.170 ComponentID: CSA2@170(P8a) Exam Method: EVT-1 CommentsICorrective Measures: Class: IVE System: NB

Description:

CoreSprayPipingDowncomer"C at170 Results: Accept BWRVIP Examination Work Order 423548445 degrees azimuth, Collar to Shroud Pipe Weld Report No.: VE-03-581 Summary No.: VIS.PBa.A2.170 Component ID: CSA2@170o(P8a) Exam Method: Auto UT Comments I Corrective Measures: Class: IVE System: NB

Description:

CoreSprayPipingDowncomerC at170 Results: Accept BWRVIP Examination Work Order 42354e445 degrees azimuth, Collar to Shroud Pipe Weld Report No.: VE03-S59 Summary No.: V18.P8a.A20.10 Component ID: CS-A20010-(P8a) Exam Method: EVT-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

CoreSprayPlpngDowomer"A"at10 Results: Accept BWRVIP Examination. Work Order 423548445 degrees azimuth, Collar to Shroud Pipe Weld Report No.: VE-03-579 Summary No.: V18.Pa.A20.10 Component ID: CS-A2001O-(P8a) Exam Method: Auto UT Comments I Correctve Measures: Class: IVE System: NB

Description:

CoreSprayPlpingDowncomer"A at10 Results: Accept BWRVIP Examination. Work Order: 423548445 degrees azimuth, Collar to Shroud Pipe Weld Report No.: VE-03-560

, RFO21: Inservice Inspection Report                                                                                                                                                                                           Page 41 of 67
1. Owner, NPPD P.O. Box 499 Columbus, NE 6860 4. Commerical Service Date: July, 1974 Tuesday, June 17, 2003
2. Plant: Cooper Nuclear Station P.O. Box 98 Brownville, NE 68321 5. Owner Certification of Authorization: N/A
3. Plant Unit: 1 6. National Board Number 20762 Summary No.: V18.Pb.A21.10 Component D: CS-A21@o0-(P8b) Exam Method: Auto UT Commrrens/Corrective Measures:

Class: VE System: NB

Description:

CoreSprayPipingDowncomer"A"at'10 Results: Accept BWRVIP Examination. Relevant Indications acceptable per NEDC 98-Work Order 423546445 degrees azimuth, Collar to Shroud Weld Report No.: VE-03-5t 054. Summary No.: Vt8.P8b.A21.1O Component D: CS-A21010-(Pab) Exam Method: EVT1 CommentshCorrective Measures: Class: iVE System: NB

Description:

CoreSprayPipingDowncofer"A"at1o Results: Accept BWRVIP Examination. Relevant Indications acceptable per NEDC 98-Work Order 423546445 degrees azimuth, Collar to Shroud Weld Report No.: VE-03-580 054. Summary No.: V18.P8b.B1.350 Component ID: CS-B1@350-(P8b) Exam Method: EVT-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

CoreSprayPipingDowncomer"B"at350 Results: Accept BWRVIP Examination Work Order. 4235464-45 degrees azimuth, Collar to Shroud Weld Report No.: VE-03-588 Summary No.: V18.P8b.B1.350 Component ID: CS-B1@350-{P8b) Exam Method: Auto UT Comments I Corrective Measures: Class: VE System: NB

Description:

CoreSprayPipingDowncomer"B"at350 Results: Accept BWRVIP Examination Work Order 4235484-45 degrees azimuth, Collar to Shroud Weld Rsport No.: VE-03-565 Summary No.: V18.P8a.B2.350 Component ID: CS-B2@350-(P8a) Exam Method: Auto UT Comments / Corrective Measures: Class: IVE System: NB

Description:

CoreSprayPipingDowncomer"B"at350 Results: Accept BWRViP Examination. Remote invessel Auto UT examination recorded Work Order. 423546445 degrees azimuth, Collar to Shroud Pipe Weld Report No.: VE-o3-564 Non Relevant Indications. Summary No.: V18.P8a.B2.350 Component ID: CS-B2@350-(P8a) Exam Method: EVT-1 Comments I Corrective Measures: Class: VE System: NB

Description:

CoreSprayPipingDowncomer"B" t350 Results: Accept BWRVIP Examination. Remote invessel Auto UT examination recorded Work Order 423546445 degrees azimuth, Collar to Shroud Pipe Weld Report No.: VE-03-585 Non Relevant Indications. Summary No.: V18.P8a.B20.190 Component ID: CS-B20190-(P8a) Exam Method: Auto UT Comments I Corrective Measures: Class: IVE System: NB

Description:

CoreSpryPipingDowncomerD"t190 Results: Accept BWRViP Examination. Relevant indications acceptable per NEDC 98. Work Order: 423546445 degrees azimuth, Collar to Shroud Weld Report No.: VE-03-562 054. Indication not observed by EVT-1 exam. Summary No.: V18.P8a.B20.190 Component ID: CS-B2001901(P8a) Exam Method: EVT-1 Comments / Corrective Measures: Class: IVE System: NB

Description:

CoreSprayPipingDowncomer"D t90 Results: Accept BWRVIP Examination. Relevant indications acceptable per NEDC 98-Work Order 42354645 degrees azimuth, Collar to Shroud Weld Report No.: VE-03-583 054. Indication not observed by EVT-1 exam. Summary No.: V18.P8b.B21.190 Component D: CS-B210190-(Plb) Exam Method: EVT-1 Comments iCorrective Measures: Class: E System: NB

Description:

Core Spry Plping Downcomer "D at190 Results: Accept BWRVIP Examination Work Order 4235484-85 degrees azimuth, Collar to Shroud Pipe Weld Report No.: VE-03-584 Summary No.: V18.P8b.B21.190 Component ID: CS-B21@190-(P~b) Exam Method: Auto UT Comments ICorrective Measures: Class: IE System: NB

Description:

Core SprayPiping DowncomerD" dt190 Results: Accept BWRVIP Examination Work Order. 4235464485 degrees azimuth, Collar to Shroud Pipe Weld Report No.: VE-03-563 7 Item No.: V18.S Equal: 2 Summary No.: V18.S.BLX.346 ComponentlD: S-BL-XTRW@348 Exam Method: EVT-1 Comments ICorrective Measures: Class: NE System: NB

Description:

Core Spray Sparger"B"Lower, SpargerPipeto Results: Accept BWRVIP Examination Work Order 4235464 Spager Pipe, Extra Weld at 348 degrees Report No.: VE-03-607 azimuth

, RFO21: Inservice Inspection Report                                                                                                                              Page 42 of 67
1. Owner, NPPD P.O. Box 499 Columbus, NE 6860 4. Commerical Service Date: July, 1974 Tuesday, June 17, 2003
2. Plant Cooper Nuclear Station P.O. Box 98 Brownville, NE 68321 5. Owner Certification of Authorization: N/A
3. Plant Unit: 1 6. National Board Number 20762 Summary No.: V18.S.BLX.354 Component ID: S-BL.XTRW@354 Exam Method: EVT-1 Comment I Corrective Measures:

Class: IVE System: NB DescriptIon: CoreSpraySparger"B"Lower, SpargerPipeto Results: Accept BWRVIP Examination Work Order. 4235464 Sparger Pipe, Extra Weld at 354 degrees Report No.: VE-03-608 azimuth Item No V18.S1 Equa 2 Summary No.: V18.S1.AUTB.10 ComponentlD: SIAU-TB010 Exam Method: EVT-1 Comments ICorrectve Measures: Class: IVE System: NB

Description:

CoreSpraySpargerA"UpperTeeBoxat10 Results: Accept BWRVIP Examination Work Order: 4238464 degrees azimuth, Cover Plate to Sparger Tee Report No.: VE43-587 Box Weld Summary No.: V18.SI.BLTB.350 Component ID: SI-BL-TB@350 Exam Method: EVT-1 Comments) Corrective Measures: Class: IVE System: NB

Description:

CoreSpraySparger"B"LowerTeeBoxat350 Results: Accept BWRVIP Examination Work Order. 4235464 degrees azimuth, Cover Plate to Sparger Tee Report No.: VE-03-602 Box Weld I

              -tem  No.:      VIS.S2  Eul Summary No.:         V18.S2AUTB.12     Component ID:            S2@12-AU-TB@10                         Exam Method: EVT-1           Comments I Corrective Measures:

Class: VE System: NB

Description:

CoreSpraySparger"A"UpperTeeBoxat10 Results: Accept BWRVIP Examination Work Order. 4235464 degrees azimuth, Sparger Pipe to Tee Box Report No.: VE-03-588 Weld at 12 degrees azimuth Summary No.: V18.S2.BLTB.348 Component ID: S2@348-BL-TB@350 Exam Method: EVT-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

CoreSpraySparger"BLowerTeeBoxat350 Results: Accept BWRVIP Examination Work Order. 4235644 degrees azimuth, Sparger Pipe to Tee Box Report No.: VE-03-603 Weld at 348 degrees azimuth Summary No.: V18.S2.BLTB.352 Component ID: S2@352-BL-TB@350 Exam Method: EVT-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

CoreSpraySparger"B"LowerTeeBoxat350 Results: Accept BWRVIP Examination Work Order. 4235464 degrees azimuth, Sparger Pipe to Tee Box Report No.: VE-03-604 Weld at 352 degrees azimuth Summary No.: V18.S2AUTB.8 Component D: S2@8-AU-TB@10 Exam Method: EVT-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

CoreSpraySparger"A"UpperTeeBoxat10 Results: Accept BWRVIP Examination Work Order 4235464 degrees azimuth, Sparger Pipe to Tee Box Report No.: VE-03-589 Weld at 8degrees azimuth Fittem No.: V18.S3a Equal: I Summary No.: V18.S3aAUNSW Component D: S3a-AU-NSPWG271>89 Exam Method: VT-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

CoreSpraySparger"A"UpperNozzleto Results: Accept BWRVIP Examination Work Order: 4235464 Sparger Pipe Welds, all spray nozzles from 89 Report No.: VE-03-591 to 271 degrees azimuth term No.: V18.S3b Equal: I Summary No.: V18.S3bAUNOW Component lD: S3b-AU-NOW@271>89 Exam Method: EVT-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

Core Spray Sparger "A" Upper, Nozzle to Results: Accept BWRVIP Examination Work Order 4235464 Orifice Welds, all spray nozzles from 89 to 271 Report No.: VE-03-590 degrees azimuth

, RFO21: Inservice Inspection Report                                                                                                                          Page 43 of 67
1. Owner, NPPD P.O. Box 499 Columbus, NE 6860 4. Commerical Service Date: July, 1974 Tuesday, June 17, 2003
2. Plant: Cooper Nuclear Station P.O. Box 98 Brownville, NE 68321 5. Owner Certification of Authorization: NA
3. Plant Unit: 1 6. National Board Number 20762 ItKem N. 1 a Eqi: 4 Summary No.: V18.S4AUEC.271 Component ID: S4-AU-ECSPWG271 Exam Method: EVr-1 Comments I Corrective Measures:

Class: IVE System: NB

Description:

Core Spray Sparger "A" Upper, End Cap to Results: Accept BWRVIP Examination Work Order 4235484 Sparger Pipe Weld at 271 degrees azimuth Report No.: VE-03-593 Assumed to be creviced internally Summary No.: V18.S4AUEC.89 Component D: S4-AU-ECSPW@89 Exam Method: EVr-1 Comments Corrective Measures: Class: IVE System: NB

Description:

CoreSpraySparger"A UpperEndCapto Results: Accept BWRVIP Examination Work Order 4235464 Sparger Pipe Weld at 89 degrees azimuth Report No.: VE-03-592 Assumed to be creviced ntemally Summary No.: Vi8S4.BLEC.271 Component D: S4-BL-ECSPW@271 Exam Method: EVT-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

Core SpraySparger"B"Lower, End Capto Results: Accept BWRVIP Examination Work Order. 4235464 Sparger Pipe Weld at 271 degrees azimuth Report No.: VE-03-06 Assumed to be creviced ntemally Summary No.: V18.S4.BLEC.89 Component D: S4-BL-ECSPW@89 Exam Method: EVT-1 Comments I CorrecVe Measures: Class: IVE System: NB

Description:

CoreSpraySparger B LowerEndCapto Results: Accept BWRVIP Examination Work Order. 4235484 Sparger Pipe Weld at 89 degrees azimuth Report No.: VE03-05 Assumed to be crevioed intemally Item No.: V18.SB Equal: 14 A Summary No.: V18. SBAUBL272 Component ID: SB-AU-BL-SPRG272 Exam Method: VT-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

Core Spray Sparger Bracket at 272 degrees Results: Accept BWRVIP Examination Work Order 4235484 azimuth between CS Sparger "A Upper and Report No.: VE-03-813 CS Sparger "B" Lower Summary No.: V18.SB.AUBL.299 Component ID: SBAU-BL-SPR@299 Exam Method: VT-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

Core Spray Sparger Bracket at 299 degrees Results: Accept BWRVIP Examination Work Order. 4235484 azimuth between CS Sparger " Upper and Report No.: VE-03-812 CS Sparger "B"Lower Summary No.: V18.SBAUBL30 Component ID: SB-AU-BL-SPRQ30.5 Exam Method: VT-1 Comments I Corrective Measures: Class: IE System: NB

Description:

Core Spray Sparger Bracket at 30.5 degrees Results: Accept BWRVIP Examination Work Order. 4235484 azimuth between CS Sparger "A"Upper and Report No.: VE-03-809 CS Sparger "BW Lower Summary No.: V18.SBAUBL329 Component ID: SB-AU-BL-SPR@329.5 Exam Method: VT-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

Core Spray Sparger Bracket at 329.5 degrees Results: Accept BWRVIP Examination Work Order 4235484 azimuth between CS Sparger "A"Upper and Report No.: VE-03-814 CS Sparger "B" Lower Summary No.: V18.SBAUBLBI Component ID: SB-AU-BL-SPR@81 Exam Method: VT-1 Comments Corrective Measures: Class: IVE System: NB

Description:

Core Spray Sparger Bracket at 81 degrees Results: Accept BWRV1P Examination Work Order. 4235464 azimuth between CS Sparger "A"Upper and Report No.: VE-03-610 CS Sparger B" Lower

Aftachment 1, RF021: Inservice Inspection Report Page 44 of 67

1. Owner, NPPD P.O. Box 499 Columbus, NE 6860 4. Commerical Service Date: July, 1974 Tuesday, June 17, 2003
2. Plant: Cooper Nuclear Station P.O. Box 98 Brownville, NE 68321 5. Owner Certification of Authorization: N/A
3. Plant Unit: 1 6. National Board Number 20762 Summary No.: V18.SB.AUBL.88 Component D: SB-AU-BL-SPR388 Exam Method: VT-1 Comments I Corrective Measures:

Class: IVE System: NB

Description:

Core Spray Sparger Bracket at 88 degree Results: Accept BWRVIP Examination Work Order. 4235464 azimuth between CS Sparger WAUpper and Report No.: VE-03-61 CS Sparger "B"Lower Summary No.: V18.SB.BLDL.270 Component D: SBBL-DL-SPR@270 Exam Method: VT-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

Core Spray Sparger Bracket at 270 degrees Results: Accept BWRVIP Examination Work Order. 4235464 azimuth between CS Sparger "B"Lower and Report No.: VE-oS18 CS Sparger DI Lower Summary No.: V18.SB.BLDL90 Component ID: SB-BL-DLSPR§90 Exam Method: VT-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

Core Spray Sparger Bracket at 90 degrees Results: Accept BWRVIP Examination Work Order 4235464 azimuth between CS Sparger "B"Lower and Report No.: VE-03-815 CS Sparger D Lower Summary No.: V18.SB.CUDL.119 Component ID: SB-CU-DL-SPRt119 Exam Method: VT-1 Comments IConective Measures: Class: IVE System: NB

Description:

CoreSpraySpargerBracktatdoegrees Results: Accept BWRVP Examination Work Order. 4235464 azimuth betwee CS Spar "C"Upper and CS ReportNo.: VE-o-e Sparger"'DI Lower Summary No.: VI8.SB.CUDL.149 Component D: SB-CU-DL-SPR0149.5 Exam Method: VT-1 Commnts I Corrective Measures: Class: IVE System: NB

Description:

Core Spray Sparger Bracket at 149.5 degrees Results: Accept BWRVIP Examination Work Order 4235464 azimuth betwee CS Sparger"C" Upper and CS ReportNo.: VE-03-B19 Sparwer"D" Lower Summary No.: V18.SB.CUDL.210 Component ID: SB-CLU-L-SPR21 0.5 Exam Method: VT-I Comments I Corrective Measures: Class: IVE System: NB

Description:

CoreSpraySpargerBracketat210.5degrees Results: Accept BWRVIP Examination Work Order 4235464 azimuth betwee CS Sparger IC' Upper and CS Report No.: VE-03-820 Sparger "0" Lower Summary No.: V16.SB.CUOL.241 Component ID: SB-CU-DL-SPR@241 Exam Method: VT-i Comments Corrective Measures: Class: IVE System: NB

Description:

Core Spray Sparger Bracket at 241 degrees Results: Accept BWRV1P Examination Work Order 4235464 azimuth betwee CS Sparger IC' Upper and CS Report No.: VE-03-621 Sparger "D Lower Summary No.: V18.SB.CUDL.268 Component D: SB-CU-DL-SPRc268 Exam Method: VT-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

Core Spray Sparger Bracket at 268 degrees Results: Accept BWRVIP Examination Work Order 4235464 azimuth betwee CS Sparger "C"Upper and CS Report No.: VE-03-622 Sparger D Lower Summary No.: V18.SB.CUDL.92 Component ID: SB-CU-DLSPR§92 Exam Method: VT-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

Core Spray Sparger Bracket at 92 degree Results: Accept BWRVIP Examination Work Order 4235464 azimuth betwee CS Sparger "C"Upper and Report No.: VE-03-817 Sparger ID' Lower

, RF021: Inservice Inspection Report                                                                                                                       Page 45 of 67
1. Owner, NPPD P.O. Box 499 Columbus, NE 6860 4. Commerical Service Date: July, 1974 Tuesday, June 17, 2003
2. Plant: Cooper Nuclear Station P.O. Box 98 Brownville, NE 68321 S. Owner Certification of Authorization: N/A
3. Plant Unit 1 6. National Board Number 20762 Category: VIP38 Equal: 4 f tem No.: V38.GW Equal 4 Summary No.: V38.GWLD.15 Component ID: GUSWLDSQ15 Exam Method: EVT-1 Commenbt I Corrective Measures:

Class: IVE System: NB

Description:

ShroudSupportPlatGussetWeldsat15 Results: Accept BWRVIP Examination Work Order 4235473 Degrees Azimuth Report No.: VE-03.450 Summary No.: V38.GWLD.165 Component D: GUSWLDStI65 Exam Method: EVT-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

Shroud Support Plate Gusset Welds at 165 Results: Accept BWRVIP Examination Work Order 4235473 Degrees Azimuth Report No.: VE-03451 Summary No.: V38.GWLD.195 Component ID: GUSWLDS§0195 Exam Method: EVT-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

ShroudSupportPlateGussetWeldsat195 Results: Accept BWRVIP Examination Work Order 4235473 Degrees Azimuth Report No.: VE-03-452 Summary No.: V38GWLD.345 Component D: GUSWLDSQt345 Exam Method: EVr-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

Shroud Support Plate Gusset Welds at 15 Results: Accept BWRVIP Examination Work Order 4235473 Degrees Azimuth Report No.: VE-03-453

, RFO2I: Inservice Inspection Report                                                                                                                              Page 46 of 67
1. Owner, NPPD P.O. Box 499 Columbus, NE 6860 4. Commerical Service Date: July, 1974 Tuesday, June 17, 2003
2. Plant: Cooper Nuclear Station P.O. Box 98 Brownville, NE 68321 5. Owner Certification of Authorization: N/A
3. Plant Unit: 1 6. National Board Number 20762 Category: VIP41 Equal:17
             -Item No.:       V41.AD1     Equal: 10  7 Summary No.:           V4I.ADI.JPI        Component ID:                  AD-1-JP11                    Exam Method: EVT.-1          CommentulI Corrective Measures:

Class: IVE System: NB

Description:

Jet Pump Adapter Top to Adapter Bottom Weld Results: Accept BWRVIP Examination Work Order 4235468 (BI-metallIc weld) Report No.: VE-034317 Summary No.: V41.AD.JP12 Component ID: AD-1-JP12 Exam Method: EVT-1 Comments I Corrective Measures: Class: NVE System: NB

Description:

Jet Pump Adapter Top to Adapter Bottom Weld Results: Accept BWRVIP Examination Work Order 4235488 (BI-lletafllO weld) Report No.: VE-03-31la Summary No.: V41.AD1.JPI3 Component ID: AD-1-JP13 Exam Method: EVr-1 Comments I Corrective Measures: Class: NVESystem: NB

Description:

Jet Pump Adapter Top to Adapter Bottom Weld Results: Accept BWRVIP Examination Work Order. 4235468 (B1-metallic weld) Report No.: VE-03-319 Summary No.: V41.AD1.JPI4 Component ID: AD-1-JPI4 Exam Method: EVT-1 CommentslI Corrective Measures: Class: NVE System: NB

Description:

Jet Pump Adapter Top to Adapter Bottom Weld Results: Accept BWRVIP Examination Work Order 4235488 (81-metallic weld) Report No.: VE-03-320 Summary No.: V41.ADI.P15 Component ID: AD-1-JPI5 Exam Method: EVT-1 Comments I Corrective Measures: Class: NVESystem: NB

Description:

Jet Pump Adapter Top to Adapter Bottom Weld Results: Accept BWRVIP Examination Work Order 4235488 (831-metallic weld) Report No.: VE-03-321 Summary No.: V41.ADI.JP18 Component ID: AD-141PI6 Exam Method: EVT-1 Comments I Corrective Measures: Class: NVE System: NB

Description:

Jet Pump Adapter Top to Adapter Bottom Weld Results: Accept BWRVIP Examination Work Order 4235468 (1-metlllc weld) Report No.: VE-03-322 Summary No.: V4IAD1.P17 Component ID: AD-1-JP17 Exam Method: EVr-1 Comments I Corrective Measures: Clans: NVE System: NB

Description:

Jet Pump Adapter Top to Adapter Bottom Weld Results: Accept BWRV1P Examination Work Order 4235468 (B1-mnetalllc weld) Repor No.: VE-03-323 Summery No.: V41.AD1.JPI8 Component ID: AD-1-JPI8 Exam Method: EVr-1 Comments I CorrectIve Measures: Class: NVE System: NB

Description:

Jet Pump Adapter Top to Adapter Bottom Weld Results: Accept BWRV1P Examination Work Order 4235408 (Bi4Tmetallic weld) Report No.: VE-03-324 Summary No.: V4IAD 1I Component ID: AD-1-JPI9 Exam Method: EVT-1 Comments I Corrective Measures: Class: NVE System: NB

Description:

Jet Pump Adapter Top to Adapter Bottom Weld Results: Accept BWRV1P Examination Work Order 4235468 (831-metallic weld) Report No.: VE-03-325 Summary No.: V41.ADI.P20 Component ID: AD-1-JP20 Exam Method: EVT-1 Comments I Corrective Measures: Class: NVE System: NB

Description:

Jet Pump Adapter Top to Adapter Bottom Weld Results: Accept BWRVIP Examination Work Order 4235468 (BI1-metallic weld) Report No.: VE-o3-326

                  ~tem-o      V41.AD2     Equal:, - 10 Summary No.:           V41AD2.JPI1        Component ID:                  AD-2-JPII                    Exam MetOd:     EVr-1        Comments I Corrective Measures:

Class: NVESystem: NB

Description:

Jet Pump Adapter Bottom to Core Shroud Results: Accept BWRVIP Examination Work Order 4235468 Support Plate Report No.: VE-03-327

, RF021: Inservice Inspection Report                                                                                                                              Page 47 of 67
1. Owner, NPPD P.O. Box 499 Columbus, NE 6860 4. Commerical Service Date: July, 1974 Tuesday, June 17, 2003
2. Plant: Cooper Nuclear Station P.O. Box 98 Brownville, NE 68321 5. Owner Certification of Authorization: NIA
3. Plant Unit: 1 6. National Board Number 20762 Summary No.: V41AD2.JP12 Component ID: AD-2-JP12 Exam Method: EVT-1 Comments I Corrective Measures:

Class: IVE System: NB

Description:

Jet Pump Adapter Bottom to Core Shroud Results: Accept BWRVIP Examination Work Order. 4235468 Support Plate Report No.: VE-0328 Summary No.: V41AD2.JP13 Component ID: AD-2JP13 Exam Method: EVT-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

Jet Pump Adapter Bottom to Core Shroud Results: Accept BWRVIP Examination Work Order 4235468 Support Plate Report No.: VE-3-329 Summary No.: V41AD2.JP14 Component D: AD-2-JP14 Exam Method: EVT-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

Jet Pump Adapter Bottom to Core Shroud Results: Accept BWRVIP Examination Work Order 4235468 Support Plate Report No.: VE03-330 Summary No.: V41AD2.JP15 Component D: AD-2-JP15 Exam Method: EVT-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

Jet Pump Adapter Bottom to Core Shroud Results: Accept BWRVIP Examination Work Order 4235468 Support Plate Report No.: VE-03-331 Summary No.: V41AD2.JP16 Component ID: AD-2-JP16 Exam Method: EVT-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

Jet Pump Adapter Bottom to Core Shroud Results: Accept BWRVIP Examination Work Order 4235468 Support Plate Report No.: VE-03-332 Summary No.: V41AD2.JP17 Component ID: AD-2-JP17 Exam Method: EVT-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

Jet Pump Adapter Bottom to Core Shroud Results: Accept BWRVIP Examination Work Order 4235468 Support Plate Report No.: VE-03-333 Summary No.: V41AD2.JP18 Component ID: AD-2-JPI8 Exam Method: EVT-1 Comments / Corrective Measures: Class: WE System: NB

Description:

Jet Pump Adapter Bottom to Core Shroud Results: Accept BWRVIP Examination Work Order 4235488 Support Plate Report No.: VE-03-334 Summary No.: V41AD2.JP19 Component ID: AD-2-JP19 Exam Method: EVT-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

Jet Pump Adapter Bottom to Core Shroud Results: Accept BWRVIP Examination Work Order 4235488 Support Plate Report No.: VE-03-335 Summary No.: V41.AD2.JP20 Component ID: AD-2-JP20 Exam Method: EVT-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

Jet Pump Adapter Bottom to Core Shroud Results: Accept BWRVIP Examination Work Order 4235468 Support Plate Report No.: VE-03-336 tem No.: V41AD3a Equal: 10 Summary No.: V41AD3a.JP11 Component ID: AD-3a-JP11 Exam Method: EVT-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

Jet Pump Adapter Backing Ring Fillet Welds at Results: Accept BWRVIP Examination Work Order 4235468 the Diffuser Tailpipe-to-Adapter Interface Report No.: VE-03-347 Summary No.: V41.AD3a.JP12 Component D: AD-3a-JP12 Exam Method: EVT-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

Jet Pump Adapter Backing Ring Fillet Welds at Results: Accept BWRVIP Examination Work Order. 4235468 the Diffuser Tallpipe-to-Adapter Interface Report No.: VE-03-349

, RFO21: Inservice Inspection Report                                                                                                                                                                                       Page 48 of 67
1. Owner, NPPD P.O. Box 499 Columbus, NE 6860 4. Commerical Service Date: July, 1974 Tuesday, June 17, 2003
2. Plant: Cooper Nuclear Station P.O. Box 98 Brownville, NE 68321 5.Owner Certification of Authoriation: N/A
3. Plant Unit: 1 6. National Board Number 20762 Summary No.: V41AD3a.JP13 Component ID: AD-3a-JP13 Exam Method: EVT-1 Comments Corrective Measures:

Class: IVE System: NB

Description:

Jet Pump Adapter Backing Ring Fillet Welds at Results: Accept BWRVIP Baseline Examination Work Order 4235468 the Diffuser Tailpipeto-Adapter Interface Report No.: VE-03-351 Summary No.: V41AD3a.JP14 Component ID: AD-3a-4P14 Exam Method: EVT-1 Comments ICorrective Measures: Class: IVE System: NB DescrIptIon: Jet Pump Adapter Backing Ring Fillet Welds at Results: Accept BWRVIP Examination Work Order 4235468 the Dlffuser Tailpipe-to-Adapter Interface Report No.: VE-03-353 Summary No.: V41AD3a.JP15 Component ID: AD-3a-JP15 Exam Method: EVT-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

Jet Pump Adapter Backing Ring Filet Welds at Results: Accept BWRVIP Examination Work Order 4235408 the Diffuser Tailpipe-o-Adapter Interface Report No.: VE-o3-355 Summary No.: V41.AD3a.JP16 Component ID: AD-3a-JP16 Exam Method: EVT-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

Jet Pump Adapter Backing Ring Fillet Welds at Results: Accept BWRVIP Examination Work Order 4235468 the Diffuser Tailpipe-o-Adapter Interface Report No.: VE-03-357 Summary No.: V41AD3a.JP17 Component D: AD-3aJP17 Exam Method: EVT-1 Comments Corrective Measures: Class: IVE System: NB

Description:

Jet Pump Adapter Backing Ring Fillet Welds at Results: Accept BWRVIP Examination Work Order 4235468 the Olfser Tailpipe-to-Adapter Interrace Report No.: VE-03-359 Summary No.: V41 AD3a.JP18 Component ID: AD-3a-JP18 Exam Method: EVT-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

Jet Pump Adapter Backing Ring Fillet Welds at Results: Accept BWRVIP Examination Work Order 4235468 the Diffuser Tailpipe-to-Adapter Interface Report No.: VE-03-361 Summary No.: V41AD3a.JP19 Component ID: AD-3a-JP19 Exam Method: EVT-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

Jet Pump Adapter Backing Ring Fillet Welds at Results: Accept BWRVIP Examination Work Order 4235468 the Diffuser Tailpipe-toAdapter Interface Report No.: VE-03-363 Summary No.: V41 AD3a.JP20 Component ID: AD-3a-JP20 Exam Method: EVT-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

Jet Pump Adapter Backing Ring Fillet Welds at Results: Accept BWRVIP Examination Work Order 4235468 the Diffuser Tailpipe-toAdapter Interface Report No.: VE-03-364 L tem No V41 AD3b Equal 20 Summary No.: V41AD3b.JP1 Component ID: AD-3b-JP1 Exam Method: EVT-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

Jet Pump Adapter Backing Ring Fillet Welds at Results: Accept BWRVIP Baseline Examination Work Order 4235468 the Diffuser Tailpipe-toAdapter Interface Report No.: VE-03-337 Summary No.: V41AD3bJP10 Component D: AD-3b-JP10 Exam Method: EVT-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

Jet Pump Adapter Backing Ring Fillet Welds at Results: Accept BWRVIP Baseline Examination Work Order 4235468 the Diffuser Tailpipe-toAdapter Interface Report No;: VE-03-346 Summary No.: 41 AD3b.JP1 I Component ID: AD-3bJP11 Exam Method: EVT-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

JetPumpAdapterBackingRingFilletWeldsat Results: Accept BWRVIP Baseline Examination Work Order 4235468 the Difuser Tailpips-to-Adapter Interface Report No.: VE.03-348

, RF021: Inservice Inspection Report                                                                                                                                                                                       Page 49 of 67
1. Owner, NPPD P.O. Box 499 Columbus, NE 6860 4. Commerical Service Date: July, 1974 Tuesday, June 17, 2003
2. Plant Cooper Nuclear Station P.O. Box 98 Brownville, NE 68321 5. Owner Certification of Authorization: NA
3. Plant Unit: 1 6. National Board Number 20762 Summary No.: V41.AD3b.JP12 Component ID: AD-3b-JP12 Exam Method: EVT-1 CommentsI Corrective Measures:

Class: VE System: NB

Description:

Jet Pump Adapter Backing Ring Fillet Welds at Results: Accept BWRVIP Baseline Examination Work Order 423588 the Diffuser Tailpipe-toAdapter Interface Report No.: V3-350 Summary No V41AD3b.JP13 Component ID: AD-3b-JP13 Exam Method: EVT-1 Comments ICorrective Measures: Class: IVE System: NB

Description:

Jet Pump Adapter Backing Ring Fillet Welds at Results: Accept BWRVIP Baseline Examination Work Order 4235488 the Diffuser Tailpipe-to-Adapter Interface Report No.: VE-03-352 Summary No.: V41.AD3b.JP14 Component D: AD-3b-JP14 Exam Method: EVT-1 Comments I Corrective Measures: Cla: IVE System: NB

Description:

Jet Pump Adapter Backing Ring Fillet Welds at Results: Accept BWRVP Examination Work Order 4235408 the Diffuser TailppeoAdapter Interface Report No.: VE-03-354 Summary No.: V41AD3bJP15 Component D: AD-3b-JP15 Exam Method: EVT-1 CommentsI Corrective Measures: Class: VE System: NB

Description:

Jet Pump Adapter Backing Rig Fillet Welds at Results: Accept BWRVIP Baseline Examination Work Order 4235468 the Diffuser Tallpipe-to-Adapter Interface Report No.: VE-03-356

                            -I - - --- -- -- --- - - --- .. .. ... .. ... -- -- --- -- --- -- -- --- -- --- -- --- -- -- -- - -- --- -- -- --- -- --- -- -- --- -- --- -- -- --- -- --- -- --   -- - - - - -- - -- - - -- - -- - -- - - -- - -- - - - - -

Summary No.: V41AD3b.JP16 ComponentlD: AD-3b-JPi Exam Method: EVT-1 Comments ICorrective Measures: Class: WE System: NB

Description:

Jet Pump Adapter Backing Ring Fillet Welds at Results: Accept BWRVIP Baseline Examination Work Order 4235468 the Diffuser Tailpipe-to-Adapter Interface Report No.: VE-03-358 Summary No.: V41 AD3b.JP17 Component D: AD-3b-JP17 Exam Method: EVT-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

Jet Pump Adapter Backing Ring Fillet Welds at Results: Accept BWRVIP Baseline Examination Work Order 4235468 the Diffuser Tailpipe-to-Adapter Interface Report No.: VE-03-30 Summary No.: V41A3b.JP18 Component ID: AD-3b-JP18 Exam Method: EVT-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

Jet Pump Adapter Backing Ring Fillet Welds at Results: Accept BWRVIP Baseline Examination Work Order 4235468 the Diffuser Tallpipe-to-Adapter Interface Report No.: VE-03-362 Summary No.: V41.AD3b.JP19 Component ID: AD-3bJP19 Exam Method: EVT-1 Comments I Corrective Measures: Clas: IVE System: NB

Description:

Jet Pump Adapter Backing Ring Fillet Welds at Results: Accept BWRVIP Baseline Examination Work Order 4235488 the Diffuser Tailpipe-o-Aapter Interface Report No.: VE-03M5 Summary No.: V41 AD3b.JP2 Component ID: AD-3bJP2 Exam Method: EVT-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

Jet Pump Adapter Backing Ring Fillet Welds at Results: Accept BWRVIP Baseline Examination Work Order 4235468 the Diffuser Tailpipe-to-Adapter Interface Report No.: VE-03-338 Summary No.: V41 AD3b.JP20 Component ID: AD-3b-JP20 Exam Method: EVT-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

Jet Pump Adapter Backing Ring Fillet Welds at Results: Accept BWRVIP Baseline Examination Work Order 4235468 the Diffuser Tailpipe-to-Adapter Interface Report No.: VE-03-36e Summary No.: V41AD3b.JP3 Component D: AD-3b-JP3 Exam Method: EVT-1 Commentsl Corrective Measures: Class: VE System: NB

Description:

Jet Pump Adapter Backing Ring Fillet Welds at Results: Accept BWRVIP Baseline Examination Work Order 4235488 the Diffuser Tailpipe-o-Adapter Interface Report No: VE-03-339 Summary No.: V41AD3b.JP4 Component ID: AD-3bJP4 Exam Method: EV-1 CommentsICorrective Measures: Class: VE System: NB

Description:

Jet Pump Adapter Backing Ring Fillet Welds at Results: Accept BWRVIP Baseline Examination Work Order 4235488 the Diffuser Tailpipeto-Adapter Interface Report No.: VE-O340

, RFO21: Inservice Inspection Report                                                                                                                                                                                                                                                Page 50 of 67
1. Owner, NPPD P.O. Box 499 Columbus, NE 6860 4. Commerical Service Date: July, 1974 Tuesday, June 17, 2003
2. Plant: Cooper Nuclear Station P.O. Box 98 Brownville, NE 68321 5. Owner Certification of Authorization: N/A
3. Plant Unit 1 6. National Board Number 20762 I ........... ...- -------...-- - .. .. .. .. ........................--- ------------------------------------- ------------...- --.--- --------------.............----------.. ...................- ---------- -----------------------.-............- ---------...............-. -.....-..........

Summary No. V41 AD3b.JP5 Component ID: AD-3b-JP5 Exam Method: EVT-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

Jet Pump Adapter Backing Ring Fille Welds at Results: Accept BWRVIP Baseline Examination Work Order 4235468 the Diffuser Tallpipe-to-Adapter Interface Report No.: VE-o3-3-i Summary No.: V41 AD3b.JP8 Component ID: AD-3b-JP6 Exam Method: EVT-1 Comments I Corrective Measures: Class: E System: NB

Description:

Jet Pump Adapter Backing Ring Fillet Welds at Results: Accept BWRVIP Baseline Examination Work Order 4235468 the Diffuser Tailpipe-to-Adapter Interface Report No.: VE-03-342 Summary No.: V41 AD3b.JP7 Component ID: AD-3b-JP7 Exam Method: EVT-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

Jet Pump Adapter Backing Ring Fillet Welds at Results: Accept BWRVIP Baseline Examination Work Order 4235468 the Diffuser Tailpipe-oAdapter Interface Report No.: VE-03-343 Summary No- V41 AD3b.JP8 Component ID: AD-3b-JP8 Exam Method: EVT-1 Comments I Corrective Measures: Class: VE System: NB

Description:

Jet Pump Adapter Backing Ring Fillet Welds at Results: Accept BWRVIP Baseline Examination Work Order 4235468 the Diffuser Tailpipeto-Adapter Interface Report No.: VE-03-344 Summary No.: V41 AD3b.JP9 Component ID: AD-3b-JP9 Exam Method: EVT-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

Jet Pump Adapter Backing Ring Fillet Welds at Results: Accept BWRVIP Baseline Examination Work Order 4235468 the Diffuser Tailpipe-to-Adapter Interface Report No.: VE-03-345

                    ~temI     No.:             V41.BB3                Eq~u20~

Summary No.: V41BB.JP1 Component ID: BB-JP1 Exam Method: EVT-1 Comments I Corrective Measures: Class: IE System: NB

Description:

Jet Pump Beam Transition Arm Region Resuls: Accept Examined due to OE 13216. Work Order 4235468 MidSeclon Area (RICSIL No. 086) Report No.: VE-03-37 Summary No.: V41BB.JP10 Component ID: BB-JP1o Exam Method: EVT-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

Jet Pump Beam Transition Arm Region Results: Accept Examined due to OE 13216. Work Order 4235468 MidSecion Area (RICSIL No. 086) Report No.: VE-03-376 Summary No.: V41BB.JP11 Component ID: BB-JP11 Exam Method: EVT-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

Jet Pump Beam Transition Arm Region Results: Accept Examined due to OE 13216. Work Order 4235468 MidSectlion Area (RICSIL No. 086) Report No.: VE-03-377 Summary No.: V41BB.JP12 Component ID: BB-JP12 Exam Method: EVT-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

Jet Pump Beam Transion Arm Region Results: Accept Examined due to OE 13216. Work Order 4235468 MidSection Area (RICSIL No. 086) Report No.: VE-03-378 Summary No.: V41BB.JP13 Component ID: BB-JP13 Exam Method: EVT-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

Jet Pump Beam Transition Arm Region Results: Accept Examined due to OE 13216. Work Order 4235468 MidSection Area (RICSIL No. 086) Report No.: VE-03-379 SummaryNo.: V41BB.JP14 ComponentlD: BB-JP14 ExamMethod: EVT-1 CommentsICorrectiveMeasures: Class: IVE System: NB

Description:

Jet Pump Beam Transition Arm Region Results: Accept Examined due to OE 13216. Work Order 4235468 MidSection Area (RICSIL No. 086) Report No.: VE-03-380

, RF021: Inservice Inspection Report                                                                                                                                                                               Page 51 of 67
1. Owner, NPPD P.O. Box 499 Columbus, NE 6860 4. Commerical Service Date: July, 1974 Tuesday, June 17, 2003
2. Plant: Cooper Nuclear Station P.O. Box 98 Brownville, NE 68321 5. Owner Certification of Authorization: N/A
3. Plant Unit: 1 6. National Board Number 20762 Summary No.: V41BB.JP15 Component 10: BBJP15 Exam Method: EVT-1 Comments I Corrective Measures:

Class: WE System: NB

Description:

Jet Pump Beam Transition Arm Region Results: Accept Examined due to OE 13216. Work Order. 4235468 MidSection Area (RICSIL No. 086) Report No.: VE-03-381 Summary No.: V41BB.JP16 Component D: BB-JP16 Exam Method: EVT-1 Comments/Corrective Measures: Class: IVE System: NB

Description:

Jet Pump Beam Transition Arm Region Results: Accept Examined due to OE 13216. Work Order 4235468 MidSecbon Area (RICSIL No. 086) Report No.: VE-03-382 Summary No.: V418B.JP17 Component ID: BB-JP17 Exam Method: EVT-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

Jet Pump Beam Transition Arm Region Results: Accept Examined due to OE 13216. Work Order 4235468 idSection Area (RICSIL No. 086) Report No.: VE-03-383 Summary No.: V41BB.JP18 Component D: BB-JP18 Exam Method: EVT-1 Comments I Corrective Measures: Class: VE System: NB

Description:

Jet Pump Beam Transition Arm Region Results: Accept Examined due to OE 13216. Work Order 4235468 MidSection Area (RICSIL No. 08e) Report No.: VE-3-384 Summary No.: V41BB.JP19 Component ID: BB-JP19 Exam Method: EVT-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

Jet Pump Beam Transiton Arm Region Results: Accept Examined due to OE 13216. Work Order. 4235468 MidSection Area (RICSIL No. 08) Report No.: VE-03-385 Summary No.: V41BB.JP2 Component ID: BB-JP2 Exam Method: EVT-1 CommentsICorrectlve Measures: Class: IVE System: NB

Description:

Jet Pump Beam Transition Arm Region Results: Accept Examined due to OE 13216. Work Order 4235468 MidSection Area (RICSIL No. 086) Report No.: VE-03-388 Summary No.: V41BB.JP20 Component ID: BB-JP20 Exam Method: EVT-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

Jet Pump Beam Transition Arm Region Results: Accept Examined due to OE 13216. Work Order 4235468 MidSecton Area (RICSIL No. 086) Report No.: VE-03.386 Summary No.: V41BB.JP3 Component ID: BB-JP3 Exam Method: EVT-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

Jet Pump Beam Transition Arm Region Results: Accept Examined due to OE 13216. Work Order 4235488 MidSection Area (RICSIL No. 086) Report No.: VE-0369 Summary No.: V41 BB.JP4 Component ID: BB-JP4 Exam Method: EVT-1 Comments I Corrective Measures: Class: WE System: NB

Description:

Jet Pump Beam Transition Arm Region Results: Accept Examined due to OE 13216. Work Order 4235468 MidSection Area (RICSIL No. 086) Report No.: VE-03-370 Summary No.: V41 BB.JP5 Component ID: BB-JP5 Exam Method: EVT-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

Jet Pump Beam Transition Arm Region Results: Accept Examined due to OE 13216. Work Order 4235468 MidSection Area (RICSIL No. 086) Report No.: VE-03-371 Summary No.: V41BB.JP6 Component ID: BB-JP6 Exam Method: EVT-1 Comments i Corrective Measures: Class: IVE System: NB

Description:

Jet Pump Beam Transition Arm Region Results: Accept Examined due to OE 13216. Work Order 4235468 MidSection Area (RICSIL No. 088) Report No.: VE-03-372 Summary No.: V41 BB.JP7 Component ID: BB-JP7 Exam Method: EVT-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

Jet Pump Beam Transition Arm Region Results: Accept Examined due to OE 13216. Work Order 4235468 MidSection Area (RICSIL No. 086) Report No.: VE-03-373

, RF021: Inservice Inspection Report                                                                                                                                                                                    Page 52 of 67
1. Owner, NPPD P.O. Box 499 Columbus, NE 6860 4. Commerical Service Date: July, 1974 Tuesday, June 17, 2003
2. Plant: Cooper Nuclear Station P.O. Box 98 Brownville, NE 68321 5. Owner Certification of Authorization: N/A
3. Plant Unit: 1 6. NatIonal Board Number 20762 Summary No.: V41BB.JP8 ComponentID: BB4JP8 Exam Method: EVT-1 CommentsICorrsctive Measures:

Class: IVE System: NB

Description:

Jet Pump Beam Transition Arm Region Results: Accept Examined due to OE 13216. Work Order: 4235468 MidSection Area (RICSIL No 086) Report No.: VE-03-374 Summary No.: V41 BB.JP9 Component ID: BB-JP9 Exam Method: EVT-1 Comments I Corrective Measures: Class: NE System: NB

Description:

Jet Pump Beam Transition Arm Region Results: Accept Examined due to OE 13216. Work Order 4235488 MidSection Area (RICSIL No. 086) Report No.: VE-03-375 tm No.: V41.BB1 Equal 20 Summary No.: V41BB1.JP1 Component D: BB-1-JP1 Exam Method: Remote UT Comments ICorrective Measures: Class: IVE System: NB

Description:

Jet Pump Beam Bolt Hole Region Results: Acept BWRVIP Examination Work Order. 4235470 Report No.: VE-03-488 Summary No.: V41BB1.JP10 Component D: BB-14.P10 Exam Method: Remote UT Comments ICorrective Measures: Class: NE System: NB

Description:

Jet Pump Beam Bolt Hole Region Results: Accept BWRVIP Examination Work Order 4235470 Report No.: VE-03-497 Summary No.: V41BB1.JP11 ComponentlD: BB-1-JP11 Exam Method: Remote UT Comments ICorrective Measures: Class: IVE System: NB

Description:

Jet Pump Beam Bolt Hole Region Results: Accept BWRVIP Examination Work Order. 4235470 Report No.: E-0-498 SummaryNo.: V41BBI.JP12 ComponentlD: BB-1-JP12 ExamMethod: RemoteUT CommentsCorectlveMeasures: Class: IVE System: NB

Description:

Jet Pump Beam Bolt Hole Region Results: Accept BWRVIP Examination Work Order 4235470 Report No.: VE-03-499 Summary No.: V41BB1.JP13 Component D: BB-1-JP13 Exam Method: Remote UT Comments I Corrective Measures: Class: IVE System: NB

Description:

Jet Pump Beam Bolt Hole Region Results: Accept BWRVIP Examination Work Order 4235470 Report No.: VE-03-500 Summary No.: V41BB1.JP14 Component ID: BB-1-JP14 Exam Method: Remote UT Comments/ Corrective Measures: Class: IVE System: NB

Description:

Jet Pump Beam Bolt Hole Region Results: Accept BWRVIP Examination Work Order. 4235470 Report No.: VE-OW01 Summary No.: V41BB1.JP15 Component D: BB-1jP15 Exam Method: Remote UT Comments! Corrective Measures: Class: NE System: NB

Description:

Jet Pump Beam Bolt Hole Region Results: Accept BWRVIP Examination Work Order 4235470 Report No.: VE.03502 Summary No.: V41BB1.JP16 Component ID: BB-1P1 Exam Method: Remote UT Comments I Corrective Measures: Class: IVE System: NB DescrIptIon: Jet Pump Beam Bolt Hole Region Results: Accept BWRVIP Examination Work Order. 4235470 Report No.: VE-03-503 Summary No.: V41BB1.JP17 Component ID: BB-1JP17 Exam Method: Remote UT Comments I Corrective Measures: Class: NE System: NB

Description:

Jet Pump Beam Bolt Hole Region Results: Accept BWRVIP Examination Work Order 4235470 Report No.: VE-03-504

, RF021: Inservice Inspection Report                                                                                                              Page 53 of 67
1. Owner, NPPD P.O. Box 499 Columbus, NE 6860 4. Commerical Service Date: July, 1974 Tuesday, June 17, 2003
2. Plant: Cooper Nuclear Station P.O. Box 98 Brownville, NE 68321 5. Owner Certification of Authorization: N/A
3. Plant Unit: 1 6. National Board Number 20762 Summary No.: V41BB1.JP18 Component D: BB-1-JP18 Exam Method: Remote UT Comments Corrective Measures:

Class: IVE System: NB

Description:

Jet Pump Beam Bot Hole Region Results: Accept BWRVIP Examination Work Order 4235470 Report No.: VE-0505 Summary No.: V41BB1.JP19 Component ID: BB-1-JPI9 Exam Method: Remote UT Comments ICorrective Measures: Class: IVE System: NB

Description:

Jet Pump Beam Bolt Hole Region Results: Accept BWRVIP Examination Work Order 4235470 Report No.: VE-03-505 Summary No.: V41 BB1.JP2 Component ID: BB--141P2 Exam Method: Remote UT Comments I Corrective Measures: Class: IVE System: NB

Description:

Jet Pump Beam Bolt Hole Region Results: Accept BWRVIP Examination Work Order. 4235470 Report No.: VE-03-489 Summary No.: V41BB1.JP20 Component D: BB-1-JP20 Exam Method: Remote UT Comments I Corrective Measures: Class: WE System: NB

Description:

Jet Pump Beam Bolt Hole Region Results: Accept BWRVIP Examination Work Order 4235470 Report No.: VE-0S507 Summary No.: V41BB1.JP3 Component ID: BB-1-JP3 Exam Method: Remote UT Comments Corrective Measures: Class: IVE System: NB

Description:

Jet Pump Beam Bolt Hole Region Results: Accept BWRVIP Examination Work Order 4235470 Report No.: V-03-490 Summary No.: V411B1JP4 Component ID: BB-1-JP4 Exam Method: Remote UT Comments Corrective Measures: Class: IVE System: NB

Description:

Jet Pump Beam Bolt Hole Region Results: Accept BWRVIP Examination Work Order 4235470 Report No.: VE-03-491 Summary No.: V41 BB1.JP5 Component ID: RB--14P5 Exam Method: Remote UT Comments I Corrective Measures: Class: IVE System: NB

Description:

Jet Pump Beam Bolt Hole Region Results: Accept BWRVIP Examination Work Order 4235470 Report No.: VE-03492 Summary No.: V41BB1.JPS Component D: B-14P Exam Method: Remote UT Comments I Corrective Measures: Class: E System: NB

Description:

Jet Pump Beam Bolt Hole Region Results: Accept BWRVIP Examination Work Order 4235470 Report No.: VE-03-493 Summary No.: V41BB1.JP7 Component ID: BB-1-JP7 Exam Method: Remote UT Comments/Correctiv Measures: Class: IVE System: NB

Description:

Jet Pump Beam Bolt Hole Region Results: Accept BWRVIP Examination Work Order 4235470 Report No.: VE-03-494 Summary No.: V41BB1 .JP8 Component D: RB-JP8 Exam Method: Remote UT Comments I Corrective Measures: Class: IVE System: NB

Description:

Jet Pump Beam Bolt Hole Region Results: Accept BWRVIP Examination Work Order 4235470 Report No.: VE-03-495 Summary No.: V41BB1 .JP9 Component D: BB-JP9 Exa Method: Remote UT Comments I Corrective Measures: Cla: IVE System: NB

Description:

Jet Pump Beam Bolt Hole Region Results: Accept BWRVIP Examination Work Order 4235470 Report No.: VE-03-496 Item No.: V41.BB2 Equal: 20

Attachment 1, RF021: Inservice Inspection Report Page 54 of 67

1. Owner, NPPD P.O. Box 499 Columbus, NE 6860 4. Commerical Service Date: July, 1974 Tuesday, June 17, 2003
2. Plant: Cooper Nuclear Station P.O. Box 98 Brownville, NE 68321 5. Owner Certification of Authorization: N/A
3. Plant Unit: 1 6. National Board Number 20762 Summary No.: V41 BB2.JP1 Component ID: BB-24P1 Exam Method: Remote UT Comments I Corrective Measures:

Class: WE System: NB

Description:

Jet Pump Beam Transition Arm Region Results: Accept BWRVIP Examination Work Order 4235470 Machined Radius Area Report No.: VE-03-508 Summary No V41BB2.JP10 Component ID: BB-24PIO Exam Method: Remote UT Comments ICorrective Measures: Class: IVE System: NB

Description:

Jet Pump Beam Transition Arm Region Results: Accept BWRVIP Examination Work Order 4235470 Machined Radius Area Report No.: VE-03-517 Summary No.: V41BB2.JP11 Component ID: BB-241P11 Exam Method: Remote UT Comments/ Corrective Measures: Class: IVE System: NB

Description:

Jet Pump Beam Transition Arm Region Results: Accept BWRVIP Examination Work Order 4235470 Machined RadiusArea Report No.: VE-03-518 Summary No.: V41BB2JP12 Component ID: BB-2JP12 Exam Method: Remote UT Comments ICorrective Measures: Clan: VE System: NB

Description:

Jet Pump Beam Trans Won Arm Region Results: Accept BWRVIP Examination Work Order 4235470 Machined Radius Area Report No.: VE-03S519 summary No.: V41BB2.JP13 Component ID: BB-2JP13 Exam Method: Remote UT Comments I Corrective Measures: Class: IVE System: NB

Description:

Jet Pump Beam TransiWon Arm Region Results: Accept BWRVIP Examination Work Order 4235470 Machined Radius flea Report No.: VE-0S20 Summary No.: V41 BB2.JP14 Component ID: BB-2JP14 Exam Method: Remote UT Comments I Corrective Measures: Class: IVE System: NB

Description:

Jet Pump Beam Transition Arm Region Results: Accept BWRVIP Examination Work Order 4235470 Machined Radius Area Report No.: VE-03-521 Summary No.: V41BB2.JP15 Component ID: BB-2JP15 Exam Method: Remote UT Comments ICorrective Measures: Class: IVE System: NB

Description:

Jet Pump Beam Transition Arm Region Results: Accept BWRVIP Examination Work Order 4235470 Machined Radius Area Report No.: VE-03.522 Summary No.: V41BB2.JP1 Component ID: BB-2JP16 Exam Method: Remote UT Comments I Corrective Measures: Cla: IVE System: NB

Description:

Jet Pump Beam Transition Arm Region Results: Accept BWRVIP Examination Work Order 4235470 Machined Radius a Report No.: VE-03-523 Summary No.: V41 BB2.JP17 Component D: BB-2JP17 Exam Method: Remote UT Comments / Corrective Measures: Class: IVE System: NB

Description:

Jet Pump Beam Transition Arm Region Results: Accept BWRVIP Examination Work Order 4235470 Machined Radius Area Report No.: VE-O3-524 Summary No.: V41BB2.JP18 Component D: BB-2-JP18 Exam Method: Remote UT Comments ICorrectve Measures: Class: IVE System: NB

Description:

Jet Pump Beam Transition Arm Region Results: Accept BWRVIP Examination Work Order 4235470 Machined Radius Area Report No.: VE-03-525 Summary No.: V41BB2.JP19 Component ID: BB-2JP19 Exam Method: Remote UT Comments I Corrective Measures: Class: IVE System: NB

Description:

Jet Pump Beam Transition Arm Region Results: Accept BWRVIP Examination Work Order 4235470 Machined Radius Area Report No.: VE-03-526 Summary No.: V41 BB2.JP2 Component ID: BB-2-JP2 Exam Method: Remote UT Comments I Corrective Measures: Class: IVE System: NB

Description:

Jet Pump Beam Transition Arm Region Results: Accept BWRVIP Examination Work Order 4235470 Machined Radius Area Report No.: VE43-509

, RF021: Inservice Inspection Report                                                                                                                                                                                               Page 55 of 67
1. Owner, NPPD P.O. Box 499 Columbus, NE 6860 4. Commerical Service Date: July, 1974 Tuesday, June 17, 2003
2. Plant Cooper Nuclear Station P.O. Box 98 Brownville, NE 68321 5. Owner Certification of Authorization: N/A
3. Plant Unit: 1 6. National Board Number 20762
   ...- - - I - -- - - - - - - -- - - - - - - -- - - - -          -   -- - - - -- - - -   . .. .. .... .....  .  -- - - - - -- - - - - -- - - - - - -- - - - - -- - -   - - - - - - - - -- - - - - -- - - - - - -- - - - - . - - - - - - -- - - - - -- - - - - -

Summary No.: V41BB2.JP20 ComponentlD: BB-2-JP20 Exam Method: Remote UT CommentsICorrective Measures: Clan: IVE System: NB

Description:

Jet Pump Beam Transition Arm Region Results: Accept BWRVIP Examination Work Order 4235470 MacIned Radius Area Report No.: VE-03-527 Summary No.: V41BB2.JP3 Component ID: BB-2JP3 Exam Method: Remote UT Comments I Corrective Measures: Class: IVE System: NB

Description:

Jet Pump Beam Transion Arm Region Results: Accept BWRVIP Examination Work Order 4235470 Machined Radius Area ReportNo.: VE-O310 Summary No.: V41BB2.JP4 Component ID: BB-2-JP4 Exam Method: Remote UT Comments I Corrective Measures: Class: IVE System: NB

Description:

Jet Pump Beam Transfion Arm Region Results: Accept BWRVIP Examination Work Order 4235470 Machined Radius Area Report No.: VE-03-511 Summary No.: V41BB2.JP5 Component ID: BB-24P5 Exam Method: Remote UT Comments I Correctve Measures: Class: IVE System: NB

Description:

Jet Pump Beam Trans ion Arm Region Results: Accept BWRVIP Examination Work Order 4235470 Machined Radius Area Report No.: VE-03-512 Summary No.: V41BB2.JP6 Component ID: BB-2-JP6 Exam Method: Remote UT Comments I Corrective Measures: Class: IVE System: NB

Description:

Jet Pump Beam Transton Arm Region Results: Accept BWRVIP Examination Work Order 4235470 Machined Radius AS Report No.: VE-O3-513 Summary No.: V41BB2.JP7 ComponentlD: BB-2-JP7 Exam Method: Remote UT CommentsCorrective Measures: Class: IVE System: NB

Description:

Jet Pump Beam Transion Arm Region Results: Accept BWRVIP Examination Work Order 4235470 Machined Radius Are Report No.: VE-03514 Summary No.: V41BB2.JP8 Component D: BB-2-JP8 Exam Method: Remote UT Comments I Corrective Measures: Class: IVE System: NB

Description:

Jet Pump Beam TransitWon Am Region Results: Accept BWRVIP Examination Work Order 4235470 Machined Radius Area Report No.: VE-0s-515 Summary No.: V41BB2.JP9 Component ID: BB-2-JP9 Exam Method: Remote UT Comments I Corrective Measures: Class: IVE System: NB

Description:

Jet Pump Beam Transition Arm Region Results: Accept BWRVIP Examination Work Order 4235470 Machined Radius Area Report No.: VE-w03-516 Item No.: V41.DF1 Equal: 4 Summary No.: V41 .DFI .JP11 Component ID: DF-14P1 Exam Method: EVT-1 Comments i Correctve Measures: Class: IVE System: NB

Description:

Jet Pump Diffuser Collar to Diffuser Shell Weld Results: Accept BWRVIP Examination Work Order 4235468 Report No.: VE-03-387 Summary No.: V41.DF1.JP12 Component ID: DF-1-JP12 Exam Method: EVT-1 Comments ICorrective Measures: Class: IVE System: NB

Description:

Jet Pump Diffuser Collar to Diffuser Shell Weld Results: Accept BWRVIP Examination Work Order 4235468 Report No.: VE-03-389 SummaryNo.: V41.DF1JP13 ComponentlD: DF-1-JP13 ExamMethod: EVT-1 CommentsICorrectiveMeasures: Class: IVE System: NB

Description:

Jet Pump Diffuser Collar to Diffuser Shell Weld Results: Accept BWRVIP Examination Work Order 4235468 Report No.: VE-03-391

Attachment 1, RF021: Inservice Inspection Report Page 56 of 67

1. Owner, NPPD P.O. Box 499 Columbus, NE 6860 4. Commerical Service Date: July, 1974 Tuesday, June 17, 2003
2. Plant Cooper Nuclear Station P.O. Box 98 Brownville, NE 68321 5. Owner Certification of Authorization: N/A
3. Plant Unit: 1 6. National Board Number 20762 Summary No.: V41.DFI.JP14 Component ID: DF-1-JP14 Exam Method: EVT-1 Comments Corrective Measures:

Clan: ME System: NB

Description:

Jet Pump Difuser Collar to Diffuser Shell Weld Results: Accept BWRVIP Examination Work Order: 4235488 Report No.: VE-s-393 Item No.: V41.DF2 Equal: 10 Summary No.: V41.DF2.JPII Component D: DF-24JP11 Exam Method: EVT-1 Comments I Corrective Measures: Clas: ME System: NB

Description:

Jet Pump Diffuser Shell to Tailpipe Weld Results: Acept BWRVIP Examination Work Order. 423548 Report No.: V-03-388 Summary No.: V41.DF2.JP12 Component D: DF-2-JP12 Exam Method: EVT-1 Comments ICorrective Measures: Class: IVE System: NB

Description:

Jet Pump Diffuser Shell to Tailpipe Weld Results: Accept BWRVIP Examination Work Order 4235468 Report No.: VE-03-30 Summary No.: V41.DF2.JP13 Component ID: DF-2-JP13 Exam Method: EvT-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

Jet Pump Diffuser Shell to Tailpipe Weld Results: Accept BWRVIP Examination Work Order. 4235468 Report No.: V-03-392 Summary No.: V41.DF2.JP14 Component 0ID: DF-2-JP14 Exam Method: EVT-1 Comments I Corrective Measures: Class: NE System: NB

Description:

Jet Pump Difuser Shell to Tailpipe Weld Results: Accept BWRVIP Examination Work Order. 4235488 Report No.: VE-03-394 Summary No.: V41.DF2.JP15 Component ID: DF-2-JP15 Exam Method: EVT-1 Comments I Corrective Measures: Class: NE System: NB

Description:

Jet Pump Diffuser Shell to Tailpipe Weld Results: Accept BWRVIP Examination Work Order 4235468 Report No.: V-03-395 Summary No.: V41 .DF2.JP16 Component ID: DF-241P16 Exam Method: EV-1 Comments I Corrective Measures: Class: NE System: NB

Description:

Jet Pump Diffuser Shell to Tailpipe Weld Results: Accept BWRVIP Examination Work Order 4235468 Report No.: v-os-s-- Summary No.: V41.DF2.JP17 Component ID: DF-2JP17 Exam Method: EV-1 Comments I Corrective Measures: Class: NE System: NB

Description:

Jet Pump Diffuser Shell to Tailpipe Weld Results: Accept BWRVIP Examination Work Order: 4235468 Report No.: VE-0S3-97 I ----- ----- ----- ----- ----- . ... .. .. . ---- ----- ----- ----- ----- ----- ---- - ----- ------ - ---- ----- --- -- - ---- ----- ----- ----- -- - - - - -- - - - - - -- - - - - -- - - - - - -- - - - - - - - - - - - -- - - - - - -- - - - - - Summary No.: V41.DF2.JPI8 Component ID: DF-2JP18 Exam Method: EV-1 Commen CorrectiveMeasures: Class: NE System: NB

Description:

Jet Pump Difuser Shell to Tailpipe Weld Results: Accept BWRVIP Examination Work Order 4235468 Report No.: VE-03-398 Summary No.: V41.DF2.JP19 Component ID: DF-2-JP19 Exam Method: EV-1 Comments! Corrective Measures: Class: NE System: NB

Description:

Jet Pump Diffuser Shell to Tailpipe Weld Results: Accept BWRVIP Examination Work Order: 4235468 Report No.: VE-0S-399 Summary No.: V41.DF2.JP20 Component ID: DF-2-JP20 Exam Method: EV-1 Comments! Corrective Measures: Class: NE System: NB

Description:

Jet Pump Diffuser Shell to Tailpipe Weld Results: Accept BWRVIP Examination Work Order 4235468 Report No.: VE-03-400 I Item No.: V41.lN4 Equal: 6 I~

, RFO21: Inservice Inspection Report                                                                                                                                                                                                                   Page 57 of 67
1. Owner, NPPD P.O. Box 499 Columbus, NE 6860 4. Commerical Service Date: July, 1974 Tuesday, June 17, 2003
2. Plant: Cooper Nuclear Station P.O. Box 98 Brownvllle, NE 68321 5. Owner Certification of Authorization: N/A
3. Plant Unit: 1 6. National Board Number 20762
           -- -- -- -- -- -- -- -          -  -- - - -- - - - .......................            .......      ..... .................        I -- - - - - - - - - - -- - - - - - - - - - -- - - - - - - - - - - -- - - - - - - - - - -- - - - - - - - - - -- - - - - - - - - - -

Summary No.: V41 .IN4.JPI 1 Component ID: IN-4P11¶ Exam Method: EVT-1 Comments I Corrective Measures: Class: VE System: NB

Description:

Jet Pump Inlet Single Hole Nozzle Casting to Results: Accept BWRVIP Examination Work Order 4235468 Mixer Barrel Report No.: VE-03-403 Summary No.: V41.1N4.JP12 Component ID: IN-44P12 Exam Method: EVT-1 Comments / Corrective Measures: Class: IVE System: NB

Description:

Jet Pump Inlet Single Hole Nozzle Casting to Results: Accept BWRVIP Examination Work Order. 4235468 Mixer Barrel Report No.: VE-03-404

                 -.. I------- . -- - - - - - - - - -- - - - - - - - - - -- - - - - - - - - - .......                     ..........   ......  ..... .........    -- - -    - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ............ ....

Summary No.: V41.1N4.JP13 Component D: IN-4-JP13 Exam Method: EVT-1 Comments Corrective Measures: Class: IVE System: NB DescrIption: Jet Pump Inlet Single Hole Nozzle Casting to Results: Accept BWRVIP Examination Work Order: 4235468 Mber Barrel Report No: VE-03-405 Summary No.: V41.1N4.JP14 Component 10: IN-4-JP14 Exam Method: EVT-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

Jet Pump Inlet Single Hole Nozzle Casting to Results: Accept BWRVIP Examination Work Order: 4235468 Mxer Barrel Report No.: VE-03-406 Summary No.: V41.1N4.JP5 Component ID: IN-44P5 Exam Method: EVT-1 Comments I Corrective Measures: Class: E System: NB

Description:

Jet Pump Inlet Single Hole Nozzle Casting to Results: Accept BWRVIP Examination Work Order 4235488 Mixer Barrel Report No.: V-3-401 Summary No.: V41.1N4.JP6 Component ID: IN-4-JP8 Exam Method: EVT-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

Jet Pump Inlet Single Hole Nozzle Casting to Results: Accept BWRVIP Examination Work Order: 4235468 Mixer Barrel Report No.: VE-3-402 l Item No.: V41.MX2 Equal: 4 Summary No.: V41.K2.JPI I Component ID: MX-2-JP1I Exam Method: EVT-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

Jet Pump Barrel to Adapter Weld Results: Accept BWRVIP Examination Work Order 4235468 Report No.: VE03-407 Summary No.: V41.MX2.JP12 Component ID: MX-2JP12 Exam Method: EVT-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

Jet Pump Barrel to Adapter Weld Results: Accept BWRVIP Examination Work Order: 4235468 Report No.: VE-03-408 Summary No.: V41UK2.JP13 Component ID: MX-2-JP13 Exam Method: EVT-1 Comments I Corrective Measures: Class: E System: NB

Description:

Jet Pump Barrel to Adapter Weld Results: Accept BWRVIP Examination Work Order: 4235468 Report No.: VE-03-409 Summary No.: V41.MX2.JP14 Component ID: MX-2-JP14 Exam Method: EVr-1 Comments Corrective Measures: Class: IVE System: NB

Description:

Jet Pump Barrel to Adapter Weld Results: Accept BWRVIP Examination Work Order: 4235468 Report No.: VE.03-410 tem No.: V41.RB1a Equa Summary No.: V41.RBla.JP11-12 Component D: RB-la-JP1I&JP12 Exam Method: EVr-1 Comments ICorrective Measures: Class: IVE System: NB

Description:

Jet Pump Primary Riser Brace Leaf to Vessel Results: Accept BWRVIP Examination Work Order: 4235468 Pad Weld Report No.: VE-03-411

, RF021: Inservice Inspection Report                                                                                                                                                                                Page 58 of 67 1.Owner, NPPD P.O. Box 499 Columbus, NE 6860                                                                                          4. Commerical Service Date: July, 1974                                      Tuesday, June 17, 2003
2. Plant: Cooper Nuclear Station P.O. Box 98 Brownville, NE 68321 5. Owner Certification of Authorization: N/A
3. Plant Unit: 1 6. National Board Number 20762 Summary No.: V41.RBla.JP13-14 Component ID: RB1a-JP13&JP14 Exam Method: EVT-1 Comments I Corrective Measures:

Class: IVE System: NB

Description:

Jet Pump Primary Riser Brace Leaf to Vessel Results: Accept BWRVIP Examination Work Order 4235468 Pad Weld Report No.: VE-03-412 Item No.: V41.RB1b Equal: 2 Summary No.: V41.RB1b.JP11-12 Component ID: RB-lb-JPII&JP12 Exam Method: EVr-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

Jet Pump Primary Riser Brace Leaf to Vessel Results: Accept BWRVIP Examination Work Order: 4235468 Pad Weld Report No.: VE-03-413 Summary No.: V41.RB1b.JP13-14 Component lD: RB-lb4JP13&JP14 Exam Method EVTr1 Comments Corrective Measures: Class: IVE System: NB

Description:

Jet Pump Primary Riser Brace Leaf to Vessel Results: Accept BWRVIP Examination Work Order 4235468 Pad Weld Report No.: VE-03-414 im No.: V41.RB1c Equal: 2 I SummaryNo.: V41.RB1cJP11-12 ComponentlD: RB-lc-JPII&JP12 ExamMethod: EVT-1 CommentsICorrectiveMeasures: Class: IVE System: NB

Description:

Jet Pump Primary Riser Brace Leaf to Vessel Results: Accept BWRVIP Examination Work Order 4235468 Pad Weld Report No.: VE-o3-4i5 Summary No.: V41.RB1c.JP13-14 Component D: RB-lc-JP13&JP14 Exam Method: EVr-1 Comments Corective Measures: Class: IVE System: NB

Description:

Jet Pump Prmary Riser Brace Leaf to Vessel Results: Accept BWRVIP Examination Work Order 4235468 Pad Weld Report No.: VE-03-416 l Itm No. V41.RB1d Equal: 2 Summary No.: V41.RBId.JP11-12 Component ID: RB-1d-JP1I&JP12 Exam Method: EVT-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

Jet Pump Primary Riser Brace Leaf to Vessel Results: Accept BWRVIP Examination Work Order 4235468 Pad Weld Report No.: VE-03-417 Summary No.: V41.RBld.JP13-14 Component ID: RB-ld-JP3&JPt4 Exam Method: EVr-1 Comments Corrective Measures: Class: IVE System: NB

Description:

Jet Pump Primary Riser Brace Leaf to Vessel Results: Accept BWRVIP Examination Work Order 4235488 Pad Weld Report No.: VE-03-418 Item No.: V41.RB2a Equal 2 Summary No.: V41 .RB2a.JP11-12 Component D: RB-2a-JP11&JP12 Exam Method: EVr-1 Comments /Corrective Measures: Class: IVE System: NB

Description:

Jet Pump Primary Riser Brace Leaf to Yoke Results: Accept BWRVIP Examination Work Order 4235468 Weld Report No.: VE-03-419 Summary No.: V41.RB2a.JP13-14 Component ID: RB-2a-JP13&JP14 Exam Method: EVT-1 Comments ICorrective Measures: Class: iVE System: NB

Description:

Jet Pump Primary Rer Brace Leaf to Yoke Results: Accept BWRVIP Examination Work Order. 4235468 Weld Report No.: VE-03-420 Item No.: V41.RB2b Equal: 2 Summary No.: V41.RB2b.JP1I-12 Component ID: RB-2b4P11&JP12 Exam Method: EVT-1 Comments Corrective Measures: Class: IVE System: NB

Description:

Jet Pump Primary Riser Brace Leaf to Yoke Results: Accept BWRVIP Examination Work Order: 4235468 Weld Report No.: VE-03-421

, RF021: Inservice Inspection Report                                                                                                                                                                              Page 59 of 67
1. Owner, NPPD P.O. Box 499 Columbus, NE 6860 4. Commerical Service Date: July, 1974 Tuesday, June 17, 2003
2. Plant: Cooper Nuclear Station P.O. Box 98 Brownville, NE 68321 5. Owner Certification of Authorization: N/A
3. Plant Unit: 1 6. National Board Number 20762 Summary No.: V41.RB2b.JP13-14 Component D: RB-2bJP13&JP14 Exam Method: EVT-1 Comments ICorrective Measures:

Class: IVE System: NB

Description:

Jet Pump Primary Riser Brace Leaf to Yoke Results: Accept BWRVIP Examination Work Order: 4235468 Weld Report No.: VE-43-422 I tem No.: V41.RB2c Equal: 2 SummaryNo.: V41.RB2c.JP11-12 ComponentlD: RB-2c-JP1I&JP12 ExamMethod: EVT-1 Comments/CorrectiveMeasures: Class: IVE System: NB Descripton: Jet Pump Primary Riser Brace Leaf to Yoke Results: Accept BWRVIP Examination Work Order 4235468 Weld Report No.: VE-03-423 Summary No.: V41.RB2c.JP13-14 Component ID: RB-2cJP13&JP14 Exam Method: EVT-1 Comments ICorrective Measures: Class: IVE System: NB

Description:

Jet Pump Primary Riser Brace Leaf to Yoke Results: Accept BWRVIP Examination Work Order: 4235468 Weld Report No.: VE-o3-424

         !          Item No.:     V41.RB2d       Equl: 2 Summary No.:             V41.RB2d.JP11-12         Component ID:               RB-2d-JPII&JP12                          Exam Method: EVT-1                 Comments ICorrective Measures:

Class: IVE System: NB

Description:

Jet Pump Primary Riser Brae Leaf to Yoke Results: Accept BWRVIP Examination Work Order 4235468 Weld Report No.: VE-03-425 Summary No.: V41.RB2d.JP13-14 Component ID: RB-2d-JP13&JP14 Exam Method: EVr-1 Comments Corrective Measures: Class: IE System: NB

Description:

Jet Pump Primary Riser Brace Leaf to Yoke Results: Accept BWRVIP Examination Work Order 4235468 Weld Report No.: VE-03-426 may mNo.:V41.RS1.1 C n E Summary No.: V41.RS1.JP11-12 Component ID: RS-1-JP11&JP12 Exam Method: EVr-1 Comments I CorrectIve Measures: Class: IVE System: NB

Description:

Recirc Thermal Sleeve to Jet Pump Riser Results: Accept BWRVIP Examination Work Order: 4235468 Elbow Weld Report No.: VE-03-427 SummaryNo.: V41.RSI.JP13-14 ComponentlD: RS-1-JP13&JP14 ExamMethod: EVT-1 CommentaICorrectIveMeasures: Class: IVE System: NB

Description:

Redrc Thermal Sleeve to Jet Pump Riser Results: Accept BWRVIP Examination Work Order: 4235468 Elbow Weld Report No.: VE-03-428 Summary No.: V41.RSI.JP15-18 Component ID: RS-1-JP15&JP18 Exam Method: EVT-1 Comments ICorrective Measures: Class: IVE System: NB

Description:

Recirc Thermal Sleeve to Jet Pump Riser Results: Accept BWRVIP Examination Work Order 4235468 Elbow Weld Report No.: VE-03-429 Summary No.: V41.RSI.JP17-18 Component ID: RS-1-JP17&JP18 Exam Method: EVT-1 Comments I Corrective Measures: Class: VE System: NB

Description:

Recirc Thermal Sleeve to Jet Pump Riser Results: Accept BWRVIP Examination Work Order: 4235468 Elbow Weld Report No.: VE-03-430 emNo.:..-- Equal: 5------------ ........--------- . . . .. ----- Summary No.: V41 .RS1I.JP19 20 Component ID: RS-14P219WP120 Exam Metihod: EVT-1 Comments Corrxctive Measurs: Class: IVE System: NB

Description:

RecircThermal SleevetDJet Pump Riser Results: Accept BWRVIP Examination Work Order 42354e8 Elbow Weld Report No.: VE-03-431 l- Item No.: V41.RS2 Equal: 657-

, RF021: Inservice Inspection Report                                                                                                                               Page 60 of 67
1. Owner, NPPD P.O. Box 499 Columbus, NE 6860 4. Commerical Service Date: July, 1974 Tuesday, June 17,2003
2. Plant: Cooper Nuclear Station P.O. Box 98 Brownville, NE 68321 5. Owner Certification of Authorization: N/A
3. Plant Unit: 1 6. National Board Number 20762 Summary No.: V41.RS2.JP1-12 Component ID: RS-2-JPII&JP12 Exam Method: EVT-1 Comments I Corrective Measures:

Class: IVE System: NB

Description:

Jet Pump Riser Elbow to Riser Pipe Weld Results: Accept BWRVIP Examination Work Order 4235468 Report No.: VE-03-432 Summary No.: V41.RS2.JP13-14 Component D: RS-2-JP13&P14 Exam Method: EVT-1 Comments I Corrective Measures: Clan: IVE System: NB

Description:

Jet Pump Riser Elbow to Riser Pipe Weld Results: Accept BWRVIP Examination Work Order 4235468 Report No.: VE-03-433 Summary No.: V41.RS2.JP15-16 Component D: RS-2-JP15&JP16 Exam Method: EVT-1 Comments ICorrectve Measures: Class: WE System: NB

Description:

Jet Pump Riser Elbow to Riser Pipe Weld Results: Accept BWRVIP Examination Work Order 4235468 Report No.: VE-03-434 Summary No.: V41.RS2.JP17-18 Component D: RS-2-JP17&JPI8 Exam Method: EVT-1 Comments ICorrective Measures: Class: VE System: NB

Description:

Jet Pump Riser Elbow to Riser Pipe Weld Results: Accept BWRVIP Examination Work Order 4235468 Report No.: VE-03-435 Summary No.: V41.RS2.JP19-20 Component ID: RS-2-JP19&JP20 Exam Method: EVT-1 Comments/CorrectiveMeasures: Class: IVE System: NB

Description:

Jet Pump Riser Elbow to Riser Pipe Weld Results: Accept BWRVIP Examination Work Order 4235468 Report No.: VE.03-438 j Item No.: V41.RS3 Equal: 5 Summary No.: V41.RS3.JPII-12 Component ID: RS-3-JPII&JP12 Exam Method: EVT-1 Comments ICorrective Measures: Class: IVE System: NB

Description:

Jet Pump Riser Pipe to Transition Piece Weld Results: Accept BWRVIP Examination Work Order 4235468 Report No.: VE-03-437 Summary No.: V41.RS3.JP13-14 Component ID: RS-3-JP13&JP14 Exam Method: EVT-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

Jet Pump Riser Pipe to Transition Piece Weld Results: Accept BWRVIP Examination Work Order 4235488 Report No.: VE-03-438 SummaryNo.: V41.RS3JP15-16 ComponentlD: RS-3-JP15&JPI6 ExamMethod: EVT-1 CommentIlCorrectve Measures: Clan: IVE System: NB

Description:

Jet Pump Riser Pipe to Transition Piece Weld Results: Accept BWRVIP Examination Work Order 4235468 Report No.: VE-03-439 Summary No.: V41.RS3.JP17-18 Component D: RS-3-JP17&JP18 Exam Method: EVT-1 Comments ICorrective Measures: Class: IVE System: NB

Description:

Jet Pump Riser Pipe to Transition Piece Weld Results: Accept BWRVIP Examination Work Order 4235468 Report No.: VE-03-440 Summary No.: V41.RS3JP19-20 Component ID: RSI-JP19&JP20 Exam Method: EVT-1 Commen I Corrective Measures: Class: WE System: NB

Description:

Jet Pump Riser Pipe to Transition Piece Weld Results: Accept BWRVIP Examination Work Order: 4235468 Report No.: VE-03-441 Item No.: V41.RS6 Equal: 2 Summary No.: V41.RS6.JP11 Component D: RS4JP11 Exam Method: EVT-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

Jet Pump Riser Pipe to Restrainer Bracket Circ. Results: Accept BWRVIP Examination Work Order: 4235468 Weld Report No.: VE-03-442

, RF021: Inservice Inspectlion Report                                                                                                                                                                                                                                              Page 61 of 67
1. Owner, NPPD P.O. Box 499 Columbus, NE 6860 4. Commerical Service Date: July, 1974 Tuesday, June 17, 2003
2. Plant: Cooper Nuclear Station P.O. Box 98 Brownville, NE 68321 5. Owner Certification of Authorization: N/A
3. Plant Unit: 1 6. National Board Number 20762 Summary No.: V41.RS8.JPt3 Component ID: RS-4P13 Exam Method: EVT-1 Comments I Corrective Measures:

Class: IVE System: NB DescriptIon: Jet Pump Riser Pipe to Restrainer Bracket Circ Results: Accept BWRVIP Examination Work Order 4235468 Weld Report No.: VE-03-443 Item No.: V41.RS7 Equal: 2 1 Summary No.: V41.RS7.JP12 Component D: RS-7-JP12 Exam Method: EVT-1 Comments/Conecive Measures: Class: IVE System: NB

Description:

Jet Pump Riser Pipe to Restrainer Bracket Circ. Results: Accept BWRVIP Examination Work Order 4235468 Weld Report No.: VE-03-444 Summary No.: V41.RS7.JP14 Component ID: RS-7-JP14 Exam Method: EVT-1t Comments Corrective Measures: Class: IVE System: NB

Description:

Jet Pump Riser Pipe to Restrainer Bracket Circ Results: Accept BWRVIP Examination Work Order. 4235468 Weld Report No.: VE-3-445 Item No.: V41.RS8 Equal: 2 Summary No.: V41.RS8.JPII-12 Component D: RS-84P11&JP12 Exam Method: EVT-1 Comments I Corrective Measures: Class: IVE System: NB

Description:

Jet Pump Rir Pipe to Primary Riser Brace Results: Accept BWRVIP Examination Work Order. 4235488 Circ. Weld Report No.: VE-03-448 Summary No.: V41.RS8.JP13-14 Component ID: RS-84P13&JP14 Exam Method: EVT-1 Comments ICorrective Measures: Class: IVE System: NB

Description:

Jet Pump Riser Pipe to Primary Riser Brace Results: Accept BWRVIP Examination Work Order. 4235468 Circ. Weld Report No.: VE03-448

                          -item       No.:                    V41.RS9             Equal: 2 Summary No.:                           V41.RS9.JP11-12                            Component ID:                                        RS-9-JP11&JP12                      Exam Method:                    EVT-1        Comments ICorrective Measures:

Class: IVE System: NB

Description:

Jet Pump Riser Pipe t Primary Riser Brace Results: Accept BWRVIP Examination Work Order: 4235468 Circ. Weld Report No.: VE43-447 Summary No.: V41.RS9.JP13-14 Component ID: RS-9-JP13&JP14 Exam Method: EVT-1 Comments ICorrective Measures: Class: VE System: NB

Description:

Jet Pump Riser Pipe to Primary Riser Brace Results: Accept BWRVIP Examination Work Order 4235468 Circ. Weld Report No.: VE-03-449

Attachment 1, RF021: Inservice Inspection Report Page 62 of 67

1. Owner, NPPD P.O. Box 499 Columbus, NE 6860 4. Commerical Service Date: July, 1974 Tuesday, June 17, 2003
2. Plant: Cooper Nuclear Station P.O. Box 98 Brownville, NE 68321 5. Owner Certification of Authorization: N/A
3. Plant Unit: 1 6. National Board Number~ 20782 Exam Credit, XMAUG Equal: 66 Cateory: REC Equal: 65 Item No.: A111.12.37 Eul Summary No.: A11.12.37085 Component ID: 2848-2-W19 Exam Method: Manual UT Comments I Corrective Measures:

Class: REC System: REC

Description:

PIPE TO ELBOW Results: Accept Examination performed per Augmented 151 Program Section 11.12. Work Order 4235387 Report No.: VE-03-033 summary No.: Al11.12.37086 Component ID: 2848-2-W20 Exam Method: Manual UT CommenftsI Corrective Measures: Class: REC System: REC DescrIption: ELB3OW TO PIPE Results: Accept Examination performed per Augmented 151 Program Section 11.12. Work Order. 4235387 Report No.: VE-03-034 Summary No.: AlI1. 12.37087 Component ID: 2848-2-W21 Exam Method: Manual UT Comments I Corrective Measures: Class: REC System: REC

Description:

PIPE TO FLANGE Results: Accept Examination performed per Augmented 151 Program Section 11.12. Work Order 4235387 Report No.: VE-03-03S Summary No.: AII.12.37095 Component ID: 2s48-2-w28 Exam Method: Manual UT Comments I Corrective Measures: Class: REC System: REC

Description:

FLANGE TO TEE Results: Accept Examination performed per Augmented ISI Program Section 11.12. Work Order 4235387 Report NO.: VE-03-032 Summary No.: AIl.12.37096 Component ID: 2848-2-W29 Exam Method: Manual UT Comments I Corrective Measures: Class: REC System: REC

Description:

FLANGE TO TEE Results: Accept Examination performed per Augmented 151 Program Section 11.12. Work Order 4235387 Report No.: VE-03-031 Summary No.: Al 1.12.37097 Component ID: 2848-2-W30 Exam Method: Manual UT Comments I Corrective Measures: Class: REC System: REC

Description:

TEE TO CONC. REDUCER Results: Accept Examination performed per Augmented ISI Program Section 11.12. Work Order 4235387 Report No.: VE-03-030 Summary No.: Al1.12.37138 Component ID: 2848-2-W31 Exam Method: Manual UT Comments I Corrective Measures: Class: REC System: REC

Description:

CONC. REDUCER TO FLANGE (HTX) Results: Accept Examination performed per Augmented ISI Program Section 11. 12. Work Order 4235387 Report No.: VE-03-029 Summary No.: A11.12.37134 Component ID: 2848-2.WOS Exam Method: Manual UT Comments I Corrective Measures: Class: REC System: REC

Description:

PIPE TO12X10 CONC. REDUCER Results: Accept Examination performed per Augmented ISI Program Section 1.12. Work Order 4235387 Report No.: E-03-02 I-tem o A11.12A0 Equal:1615-Summary No.: A11.12.40051 Component ID: 2848-9-WIO Exam Method: Manual UT Comments I Corrective Measures: Class: REC System: REC

Description:

PIPE TO ELBOW Results: Accept Examination performed per Augmented ISI Program Section 11.12. Work Order 4235393 Report No.: VE.03-022 Summary No.: AlI. 12.40063 Component ID: 2848-9-W23 Exam Method: Manual UT Comments I Corrective Measures: Class: REC System: REC

Description:

ELBOW TO PIPE Results: Accept Examination performed per Augmented 151 Program Section 11.1 2. Work Order 4235393 Report No.: VE-03-024

, RF021: Inservice Inspection Report                                                                                                                    Page 63 of 67
1. Owner, NPPD P.O. Box 499 Columbus, NE 6860 4. Commerical Service Date: July, 1974 Tuesday, June 17, 2003
2. Plant: Cooper Nuclear Station P.O. Box 98 Brownville, NE 68321 5. Owner Certification of Authorization: N/A
3. Plant Unit: 1 6. National Board Number 20762 Summary No.: All.12.40064 Component ID: 2848-9-w24 Exam Method: Manual UT Comments I Corrective Mesurs:

Class: REC System: REC

Description:

PIPE TO ELBOW Results: Accept Examination performed per Augmented SI Program Section 11 12. Work Order 4235393 Report No.: VE-o3-025 Summary No.: All.12.40066 Component ID: 2848-9-W26 Exam Method: Manual UT Comments I Corrective Measures: Class: REC System: REC

Description:

TEE TO PIPE Results: Accept Examination performed per Augmented ISI Program Section 11.12. Work Order 4235393 Report No.: VE-03-027 Summary No.: A11.12.40001 Component ID: 2848-9-W28 Exam Method: Manual UT Comments I Corrective Measures: Class: REC System: REC

Description:

PIPE TO PIPE Results: Accept Examination performed per Augmented ISI Program Section 11.12. Work Order 4235393 Report No.: VE-03-036 Summary No.: Al1.12.40002 Component ID: 2848-9-W29 Exam Method: Manual UT Comments Corrective Measures: Class: REC System: REC

Description:

ELBOW TO PIPE Results: Accept Examination performed per Augmented ISI Program Section 11.12. Work Order 4235393 Report No.: VE-03-037 Summary No.: All.12.40003 ComponentlD: 2848-9-W30 Exam Method: ManualUT Comments ICorrective Measures: Class: REC System: REC

Description:

PIPE TO ELBOW Results: Accept Examination performed per Augmented ISI Program Section 11.12. Work Order 4235393 Report No.: VE-03-o1 Recorable Indication within allowable flaw sizes. Reference Notification 10224623. Repaired during RE21 reference Work Order Number 4293898. Summary No.: Al1.12.40047 Component ID: 2848-9-W8 Exam Method: Manual UT Comments I Corrective Measures: Class: REC System: REC

Description:

ELBOW TO PIPE Results: Accept Examination performed per Augmented ISI Program Section 11.12. Work Order. 4235393 Report No.: VE-03-001 Summary No.: A11.12.40013 ComponentID: 2848-9-W6e Exam Method: ManualUT Comments ICorrective Measures: Class: REC System: REC

Description:

PIPE TO PIPE Results: Accept Examination performed per Augmented ISI Program Section 11.12. Work Order: 4235393 Report No.: VE-03-038 Summary No.: Al1.12.40014 Component ID: 2848-9-W67 Exam Method: Manual UT Comments! Corrective Measures: Class: REC System: REC

Description:

PIPE TO ELBOW Results: Accept Examination performed per Augmented ISI Program Section 11.12. Work Order. 4235393 Report No.: VE-03-039 Summary No.: Al1.12.40015 Component ID: 2848-9-We8 Exam Method: Manual UT Comments I Corrective Measures: Class: REC System: REC

Description:

ELBOW TO PIPE Results: Accept Examination performed per Augmented lSIProgram Section 11.12. Work Order 4235393 Report No.: VE-03-040 Summary No.: Al1.12.40048 ComponentlD: 2848-9-W7 Exam Method: ManualUT Comments ICorrective Measures: Class: REC System: REC

Description:

ELBOW TO ELBOW Results: Accept Examination performed per Augmented ISI Program Section 11.12. Work Order. 4235393 Report No.: VE-03-026 Summary No.: All.12.40049 Component ID: 2848-9-W8 Exam Method: Manual UT Comments I Corrective Measures: Class: REC System: REC

Description:

ELBOW TO ELBOW Results: Accept Examination performed per Augmented ISI Program Section 11.12. Work Order: 4235393 Report No.: VE-03-020

, RFO21: Inservice Inspection Report                                                                                                                                                                                         Page 64 of 67
1. Owner, NPPD P.O. Box 499 Columbus, NE 6860 4. Commerical Service Date: July, 1974 Tuesday, June 17, 2003
2. Plant: Cooper Nuclear Station P.O. Box 98 Brownville, NE 68321 5. Owner Certification of Authorization: N/A
3. Plant Unit: 1 6. National Board Number 20762 Summary No.: A11.12.40050 Component D: 2848-9-W9 Exam Method: Manual UT Comments I Corrective Measures:

Class: REC System: REC

Description:

ELBOW TO PIPE Results: Accept Examination performed per Augmented ISI Program Section 11.12. Work Order: 4235393 Report No.: VE-03-021 Summary No.: A11.12.40097 Component ID: 2848-9-WC Exam Metho: Manual UT Comments ICorrective Measures: Class: REC System: REC

Description:

PIPE TO ELBOW Results: Accept Examination performed perAugmented lSI Program Section 11.12. Work Order: 4235393 Report No.: VE-03-023 ItNo. A11.12A1 Equal: 2 Summary No.: A11.12.41002 ComponentlD: 2848-14-W27 Exam Method: Manual UT CommentsCorectiveMeasures: Class: REC System: REC

Description:

PIPE TO PIPE Results: Accept Examination performed per Augmented lSI Program Section 11.12. Work Order 4235388 Report No.: VE-03464

 ..... . . . . . I - -- -- ---- ---- ---- ---- ---- ---- ---- ---- ----- ---- ---- --- - --- - ---- ---- ---- ---- -- -- ---- ---- - ---- - --- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- -- - - - - - - - - - - - - - - - - - - - - - - - - - - -

Summary No.: A11.12.41015 Component ID: 2848-14-W65 Exam Method: Manual UT Comments I Corrective Measures: Class: REC System: REC

Description:

PIPE TO PIPE Results: Accept Examination performed per Augmented ISI Program Section 11.12. Work Order. 4235388 Report No.: VE-03-o5 Ltrem No.: A11.12A2 Equal: 9 Summary No.: A11.1242033 Component ID: 2848-15-W26 Exam Method: Manual UT Commentb/Correctve Measures: Class: REC System: REC

Description:

PIPE TO ELBOW Results: Accept Examination performed per Augmented ISI Program Section 11.12. Work Order: 4235390 Report No.: VE-03-074 Summary No.: A11.12.42034 Component D: 2848-15-W27 Exam Method: Manual UT Comments Corrective Measures: Class: REC System: REC

Description:

ELBOW TO PIPE Results: Accept Examination performed perAugmented ISI Program Section 11.12. Work Order 4235390 Report No.: VE-03-08 Summary No.: A11.12.42035 Component ID: 2848-15W28 Exam Method: Manual UT Comments ICorrective Measures: Class: REC System: REC

Description:

PIPE TO ELBOW Results: Accept Examination performed perAugmented ISI Program Section 11.12. Work Order: 4235390 Report No.: VE-03-069 SummaryNo.: A11.1242013 ComponentlD: 2848-15-W3e Exam Method: Manual UT CommentsICorrectiveMeasures: Class: REC System: REC

Description:

PIPE TO ELBOW Results: Accept Examination performed per Augmented ISI Program Section 11.12. Work Order 4235389 Report No.: VE-03-076 Summary No.: A11.12.42014 Component D: 2848-15-W37 Exam Method: Manual UT Comments Corrective Measures: Class: REC System: REC

Description:

ELBOWTOPIPE Results: Accept Examination perfomed per Augmented ISI Program Section 11.12. Work Order 4235389 Report No.: VE-03-077 Summary No.: A11.12.42022 Component ID: 2848-15-W4 Exam Method: Manual UT Comments I Corrective Measures: Class: REC System: REC

Description:

ELBOW TO PIPE Results: Accept Examination performed per Augmented ISI Program Section 11.12. Work Order 4235390 Report No.: VE-03-88 Summary No.: A11.12.42023 Component D: 2848-15-W5 Exam Method: Manual UT Comments) Corrective Measures: Class: REC System: REC

Description:

PIPE TO ELBOW Results: Accept Examination performed per Augmented ISI Program Section 11.12. Work Order: 4235390 Report No.: VE-03-M7

, RF021: Inservice Inspection Report                                                                                                                                                                                              Page 65 of 67
1. Owner, NPPD P.O. Box 499 Columbus, NE 6860 4. Commerical Service Date: July, 1974 Tuesday, June 17, 2003
2. Plant: Cooper Nuclear Station P.O. Box 98 Brownville, NE 68321 5. Owner Certification of Authorization: N/A
3. Plant Unit: 1 6. National Board Number 20762 Summary No.: A11.12.42017 Component ID: 2848-15-WG Exam Method: Manual UT Comments ICorrective Measures:

Class: REC System: REC

Description:

VALVE(REC-V-102)TOELBOW Results: Accept Examination performed per Augmented SIProgram Section 11.12. Work Order. 4235389 Report No.: VE-03 63 Summary No.: A1I.12.42018 Component D: 2848-15-WJ Exam Method: Manual UT Comments ICorrective Measures: Class: REC System: REC DescriptIon: ELBOW TO PIPE Results: Accept Examination performed per Augmented ISI Program Section 11.12. Work Order. 4235389 Report No.: VE-03-078

                  . Item No.:       Al1.12A3       Equa: 4 Summary No.:                    A11.12.43011            Component D:                   2848-16-W50                                Exam Method: Manual UT           Comments ICorrective Measures:

Class: REC System: REC

Description:

ELBOW TO PIPE Results: Accept Examination performed per Augmented ISI Program Section 11.12. Work Order: 4235385 Report No.: E-o3-o91 Summary No.: Al1.12.43012 Component ID: 2848-16-W51 Exam Method: Manual UT CommentsI Corrective Measures: Class: REC System: REC

Description:

PIPE TO ELBOW Results: Accept Examination performed per Augmented ISI Program Section 11.12. Work Order. 4235385 Report No.: VE-03-071 Summary No.: A11.12.43019 Componentl: 2848-16-W8O Exam Method: Manual UT Comment Corrective Measures: Class: REC System: REC

Description:

PIPE TO PIPE Results: Accept Examination performed per Augmented ISI Program Section 11.12. Work Order. 4235385 Report No.: VE03-72 Summary No.: A11.12.43020 Component IO: 2848-16-W81 Exam Method: Manual UT Comments ICorrective Measures: Class: REC System: REC

Description:

PIPE TO PIPE Results: Accept Examination performed per Augmented lSI Program Section 11.12. Work Order: 4235385 Report No.: VE-03-073 Im No.: A11.12A4 Equal: SummaryNo.: AI1.12.44010 ComponentlD: 2848-16-Wl Exam Method: ManualUT Comments/Corecfve Measures: Class: REC System: REC

Description:

PIPE TO ELBOW Results: Accept Examination performed per Augmented ISI Program Section 11.12. Work Order 4235385 Report No.: VE-03-087 Summary No.: All.12.44026 Component ID: 2848-16-W32 Exam Method: Manual UT Comments I Corrective Measures: Class: REC System: REC

Description:

PIPE TO PIPE Results: Accept Examination performed per Augmented ISI Program Section 11.12. Work Order 4235385 Report No.: VE-03-089

.... . . .. I -- -- --- -- --- -- --- -- --- --- - -    -- - - --- -- --- -- --- -- --- --- -- --- -- - . . . . . . . . . . -- --- --- -- --- -- --- -- --- -- --- -- --- -- -- --- -- --- -- --- . . . . . . . . . . --- -- --- -- --- -- --- -- --- -- --- --

Summary No.: Al 1.12.44027 Component D: 2848-16-W33 Exam Method: Manual UT Comments I Corrective Measures: Class: REC System: REC

Description:

PIPE TO PIPE Results: Accept Examination performed per Augmented ISI Program Section 11.12. Work Order 4235385 Report No.: VE-03-00 Summary No.: A11.12.44013 Component ID: 2848-16-W4 Exam Method: Manual UT Comments/Corrective Measures: Class: REC System: REC

Description:

PIPE TO ELBOW Results: Accept Examination performed per Augmented ISI Program Section 11.12. Work Order: 4235385 Report No.: VE-03-088 Summary No.: A1.12.44031 Component ID: 2848-16-WC Exam Method: Manual UT Comments ICorrective Measures: Class: REC System: REC

Description:

ELBOW TO PIPE Results: Accept Examination performed per Augmented ISI Program Section 11.12. Work Order: 4235385 Report No.: VE-03-086 Item No.: A11.12.48 Equal: 17

, RF021: Inservice Inspection Report                                                                                                                                                                                                                       Page 66 of 67
1. Owner, NPPD P.O. Box 499 Columbus, NE 6860 4. Commerical Service Date: July, 1974 Tuesday, June 17, 2003
2. Plant: Cooper Nuclear Station P.O. Box 98 Brownville, NE 68321 5. Owner Certification of Authorization: N/A
3. Plant Unit: 1 6. National Board Number 20762 Summary No.: A11.12.48001 Component ID: 2848-54-W2 Exam Method: Manual UT Commentu/Corrective Measures:

Class: REC System: REC

Description:

PIPE TO ELBOW Results: Accept Examination performed per Augmented ISI Program Section 11.12. Work Order 4235384 Report No.: VE-03-044 Summary No.: A11.12.48013 Component ID: 2848-54-W21 Exam Method: Manual UT Comments/CorrectIve Measures: Class: REC System: REC

Description:

PIPE TO PIPE Results: Accept Examination performed per Augmented ISI Program Section 11.12. Work Order 4235384 Report No.: VE-03-080 Summary No.: Al1.12.48014 Component ID: 2848-54-W22 Exam Method: Manual UT Comments Corrective Measures: Class: REC System: REC

Description:

FLANGE TO PIPE Results: Accept Examination performed per Augmented ISI Program Section 11.12. Work Order 4235384 ReportNo.: VE-03-o1S Summary No.: A11.12.48015 Component D: 2848-54-W23 Exam Method: Manual UT Commentsl Corrective Measures: Class: REC System: REC

Description:

PIPE TO ELBOW Results: Accept Examination performed per Augmented SI Program Section 11.12. Work Order 4235384 Report No.: VE-03-081

                     ~~~~~~~~~~~~~~~~~~~~...

Summary No.: A11.12.48016 Component ID: 2848-54-W24 Exam Method: Manual UT Comments/Corrective Measures: Class: REC System: REC

Description:

ELBOW TO PIPE Results: Accept Examination performed per Augmented lSI Program Section 11.12. Work Order 4235384 Report No.: VE.03-082 Summary No.: Al1.12.48017 Component ID: 2848-54W25 Exam Method: Manual UT Comments I Corrective Measures: Class: REC System: REC

Description:

PIPE TO ELBOW Results: Accept Examination performed per Augmented ISI Program Section 11.12. Work Order 4235384 Report No.: VE-03-042 Summary No.: A11.12.48018 Component D: 2848-54-W26 Exam Method: Manual UT Comments ICorrective Measures: Class: REC System: REC

Description:

ELBOW TO PIPE Results: Accept Examination performed perAugmented SI Program Section 11.12. Work Order 4235384 Report No.: VE-03-083 Summary No.: AII.12.48019 Component ID: 2848-54-W27 Exam Method: Manual UT Commentsl Corrective Measures: Class: REC System: REC

Description:

PIPE TO ELBOW Results: Accept Examination performed per Augmented SI Program Section 11.12. Work Order 4235384 Report No.: VE-03-075 Summary No.: A11.12.48020 Component ID: 2848-54-W28 Exam Method: Manual UT Comments! Corrective Measures: Class: REC System: REC

Description:

ELBOW TO PIPE Results: Accept Examination performed per Augmented ISI Program Section 11.12. Work Order 4235384 Report No.: VE-03-084 Summary No.: Al1.12.48021 Component ID: 2848-54-W29 Exam Method: Manual UT Comments I Corrective Measures: Class: REC System: REC

Description:

PIPE TO VALVE (REC-V-98) Results: Accept Examination performed per Augmented SI Program Section 11.12. Work Order 4235384 Report No.: VE-03-043 Summary No.: Al1.12.48002 Component ID: 2848-54-W3 Exam Method: Manual UT Comments Corrective

                                                                                                                                                                                              /             Measures:

Class: REC System: REC

Description:

ELBOW TO PIPE Results: Accept Examination performed per Augmented SI Program Section 11.12. Work Order 4235384 Report No.: VE-03-045 Summary No.: A11.12.48003 ComponentlD: 2848-54W4 Exam Method: ManualUT Comments ICorrective Measures: Class: REC System: REC

Description:

PIPE TO ELBOW Results: Accept Examination performed per Augmented SI Program Section 11.12. Work Order 4235384 Report No.: VE-03-046

, RF021: Inservice Inspection Report                                                                                                                                                                                              Page 67 of 67
1. Owner, NPPD P.O. Box 499 Columbus, NE 6860 4. Commerical Service Date: July, 1974 Tuesday, June 17, 2003
2. Plant: Cooper Nuclear Station P.O. Box 98 Brownville, NE 68321 5.Owner Certification of Authorization: N/A
3. Plant Unit: 1 6. National Board Number 20762 Summary No.: A1.12.48004 Component ID: 2848-54-W5 Exam Method: Manual UT Comments I Corrective Measures:

Class: REC System: REC

Description:

ELBOW TO PIPE Results: Accept Examination performed per Augmented ISI Program Section 11.12. Work Order. 4235384 Report No.: VE-OS-050 SummaryNo.: A11.12.48005 ComponentID: 2848-54-W6 Exam Method: Manual UT CommentsICorrectlveMeasures: Class: REC System: REC

Description:

PIPE TO ELBOW Results: Accept Examination performed per Augmented ISI Program Section 11.12. Work Order: 4235384 Report No.: VE-03-047 Summary No.: A11.1248006 ComponentlD: 2848-54-W7 Exam Method: Manual UT Comments I CorrectIve Measures: Clan: REC System: REC

Description:

ELBOW TO PIPE Results: Accept Examination performed per Augmented ISI Program Section 11.12. Work Order: 4235384 Report No.: VE-03-o4i SummaryNo.: A11.12.48007 ComponentlD: 2848-54-W8 Exam Method: Manual UT CommentICorrective Measures: Class: REC System: REC

Description:

PIPE TO ELBOW Results: Accept Examination performed per Augmented lSI Program Section 11.12. Work Order: 4235384 Report No.: VE-03-048 Summary No.: All .12.48008 Component ID: 2848-54-W9 Exam Method: Manual UT Comments I Corrective Measures: Class: REC System: REC

Description:

ELBOW TO PIPE Results: Accept Examination performed per Augmented ISI Program Section 11.12. Work Order 4235384 Report No.: VE-03.049 I Item No.: AII1.112.50 Equal: Summary No.: All.12.50001 Component D: 2848-56-Wl Exam Method: Manual UT Comments ICorrective Measures: Class: REC System: REC

Description:

FLANGETOVALVE(REC-V-102) Results: Accept Examination performed per Augmented lSI Program Section 11.12. Work Order 4235389 Report No.: VE-OS-os Summary No.: A11. 12.50002 Component ID: 2848-5W3 Exam Method: Manual UT Comments ICorrective Measures: Class: REC System: REC

Description:

ELBOWTOFLANGE Results: Accept Examination performed per Augmented ISI Program Section 11.12. Work Order: 4235389 Report No.: VE-03-070 Summary No.: A11.12.50003 Component ID: 2848-56-W5 Exam Method: Manual UT Comments I Corrective Measures: Class: REC System: REC

Description:

PIPE TO ELBOW Results: Accept Examination performed per Augmented SI Program Section 11.12. Work Order 4235389 Report No.: VE-03462 Summary No.: A11.12.50004 ComponentlD: 2848-58-W6 Exam Method: ManualUT Comments ICorrective Measures: Class: REC System: REC

Description:

ELBOW TO PIPE Results: Aept Examination performed per Augmented ISI Program Section 11.12. Work Order: 4235389 Report No.: VE-03-079

               .. .....I -------------- - --- ------------- --------------- ----- ---------- -------- -------- ---- ------ -- -- - ---- ------------ ---------------- ---------------- --------------- ---------------- ---------------- --------------- -- -

Summary No.: Al1.12.50005 ComponentlD: 2848-58-W7 Exam Method: ManualUT Comments/Correcve Measures: Class: REC System: REC

Description:

PIPE TO ELBOW Results: Accept Examination performed per Augmented SI Program Section 11.12. Work Order 4235389 Report No.: VE-03-085

FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As required by the Provisions of the ASME Code Section XI

1. Owner Nebraska Public Power District Date: July 10. 2003 P.O. Box 98 Brownville. Nebraska 68321 Sheet 1 of
2. Plant: Cooper Nuclear Station Unit One P.O. Box 98 Brownville, Nebraska 68321 N/A Repak Orgow iztM P.O. No, JobNo.. etc.
3. Work Performed by NPPD Type Code Symbol Stamp N/A PO Bnx C Authorization No. N/A Brownville, Nebraska 68321 Expiration Date N/A A Identificatinn nf vqterm As shnun in te Atthed Talhe'
                             -j ----
5. (a) Applicable Construction Code As shown in the Attached Table (b) Applicable Edition of Section X Utilized for Repairs or Replacements:

1989 Edition including 1989 Addenda & 1992 Edition including 1992 Addenda (IWE)

6. Identification of Components Repaired or Replaced and Replacement Components: As shown in the Attached Table
7. Description of Work: As shown in the Attached
                                                                               ---       Table
8. Tests Conducted: As shown in the Attached Table
9. Remarks: Code Case N-416-llisted in the Third Ten-Year Interval Program was used for Repairs and Replacements:

CERTIFICATE OF COMPLIANCE We certify that the statements made in this report are correct and these repairs and replacements conform to the rules of the ASME Code, Section M. Type Code Symbol Stamp N/A Certifi of o. N/Aorizati Expiration Date N/A Signed i eit loe7I-3 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Nebraska and Employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford. Connecticut have inspected the components described in this Owner's Report during the period January 2. 2002 to April 20. 2003. and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section X. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. Commissions ,VB //t9!/7 4'V 2T C, A* ctores signatum: National Board, StatePr 4 ice, and Endorsmnens Date 4/'/e , )' 3

           /       7I'

FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As required by the Provisions of the ASME Code Section XI Nebraska Public Power District Cooper Nuclear Station Unit 1, P.O. Box 98, Brownville, Nebraska 68321 WO RIR SYST Name of Mfgr. C Name of Nat'l Description of Applicable Year Repaired ASME Pressure Tests RECORD Component Serial I Manufacturer Board Work Constr. Code Built or Code Conducted, No No. Replaced Stamp Code Cases 4160595 N/A REC REC-V-ISl N/A 3 Edwad -Vogt N/A Replace Valve &Piping B31.1 - 1967 1969 Replaced N/A 00-276 4160678 02-026 REC REC-FS-481 N/A 3 JELCO N/A Replace Flow Switch B31.1 - 1967 1969 Replaced N/A 02-315 with Pipe Plug 4175826 N/A SW SW-MOV- N/A 3 HENRY PRATT N/A Replace Valve B31.1 - 1967 1969 Replaced N/A 01-203 650MV 4189998 N/A SW SW-P-B N/A 3 Byron Jackson N/A Replace Pump Bowl B31.1 -1967 1969 Replaced N/A 01-438 Div/Bosi-Warner Asy. 4189998 N/A SW SW-CV-llCV N/A 3 ATWOOD & N/A Replace Valve B31.1- 1967 1969 Replaced N/A 01-438 MORRILL 4192174 N/A REC REC-P-A N/A 3 COLT Industries N/A Replace Pump B31.1 -1967 1969 Replaced N/A 01-313 4199753 02-001 REC REC-HX-A N/A 3 Soumestern N/A Repaited Watetboxby ASME Vm 1969 Repaired YES 01-534,N-416-1 Engineeting Co. Welding 1968 Edition 4199754 02-007 REC RBC-HX-B 27031 3 N/A Repaired Watetboxby ASME VIII 1969 Repaired YES 01-535,N-416-1 Ezgineedng Co. welding 1968 Edition_ 4216001 03-043 RWCU RWCU-CV- N/A 1 AnchorDading N/A Replaced Bonnet B31.7 - 1969 1969 Replaced N/A 03-159 15CV 4217239 02-003 DGLO, DGLO-HX-LO1, N/A 3 American Standard N/A Installed Mechanical ASME VIII 1969 Replaced N/A N/A DOIW DOJW-BX-JWI Tube Plugs 1968 Edition 4223247 02021 SW SW-CV-28CV N/A 3 Alwood&Momill N/A Replace Valve B31.1-1967 1969 Replaced N/A 02-335 4223168 02032 DO DG-1 N/A 3 PERFEX N/A Replace bolt& flexloe B31.1 -1967 1969 Replaced N/A 02-273 4223196 03-038 PC DRYWELL C-4448 M Cbicago Bridge & N/A Replace Bolts ASME m 1965 1969 Replaced YES 6.PC.525 C hm 4223246 02-022 SW SW-CV-27CV N/A 3 Atod &MorrillI N/A Replace Valve B31.1-1967 1969 Replaced N/A 02-334 Page 2 of 17

FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As required by the Provisions of the ASME Code Section XI Nebraska Public Power District Cooper Nuclear Station Unit 1, P.O. Box 98, Brownville, Nebraska 68321 WO RIR SYST Name of Mfgr. C Name of Nat'l Description of Applicable Year Repaired ASME Pressure Tests RECORD Component Serial I Manufacturer Board Work Constr. Code Built or Code Conducted, No No. Replaced Stamp Code Cases 4223307 02-010 MS MS-RV-71ARV 376 1 TARGETROCK N/A Replace Pilot Assy. ASME I 1968 1969 Replaced N/A 6.MISC.502 Edition w/S70' 4223301 02-011 MS MS-RV-71BRV 382 1 TARGETROCK N/A Replace Pilot Assy. ASME I 1968 1969 Replaced N/A 6MISC.502 Edition w/970' Add. 4223309 02-012, MS MS-RV-71DRV 3S8/3S1 I TARGETROCK N/A Replace Valve, Pilot ASME m 1968 1969 Replaced N/A 6MISC.502 7000960 02-023 Ass, and nub w/spline Edition w/S70' nuts Add r 4223310 02-013 MS MS-RV-7IFRV 380 1 TARGET ROCK N/A Replace Pilot Any. ASME III 1968 1969 Replaced N/A 6MlSC.502 Edition w/S70' Add. 42233 11 02.014, Ms MS-RV-71CRV 382/385 1 TARGET ROCK N/A Replace Valve, Pilot ASMIE II 1968 1969 Replaced N/A 6.Mwa.502 7000960 024018 Masy., and nubs w/splinec Edition w/S70' nus Add. 4223312 02-015 MS MS-RV-71ERV 338 1 TARGET ROCK N/A Replace Pilot Assy. ASME m 1968 1969 Replaced N/A 6MISC.502 Edition w/570' Add 4223313 02-016 Ms MS-RV-7HRV 377 1 TARGET ROCK N/A Replace PilotAmy. ASME III 1968 1969 Replaced N/A 6/M .02 Edition w/S70O Add 4223314 024017 Ms AMS-RV-7lGRV 384 1 TARGETROCK N/A Replace Pilot Asy. ASME M 1968 1969 Replaced N/A 6-MISC.502 Edition w/570' Add 4226850 02-124 RR RH-S20 7789 2 GRIIW1ELL N/A Replace Snubbe B31.1 - 1967 1969 Replaced N/A N/A 4232753 024020 SW SW-H196 N/A 3 JELCO N/A Replace Hanger B31.1 - 1967 1969 Replaced N/A N/A 4233097 02-008 REC REC-P-D N/A 3 COLT Induslies N/A Replace Pup B31.1 - 1967 1969 Replaced N/A 02-113 4235692 02-102 SW SW-V-160 N/A 3 JELCO N/A ReplacePipe B31.1 - 1967 1969 Replaced N/A 02-387,N-416-1 Page 3 of 17

FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As required by the Provisions of the ASME Code Section XI Nebraska Public Power District Cooper Nuclear Station Unit 1, P.O. Box 98, Brownville, Nebraska 68321 WO R/R SYST Name of Mfgr. C Name of Nat'l Description of Applicable Year Repaired ASME Pressure Tests RECORD Component Serial I Manufacturer Board Work Constr. Code Built or Code Conducted, No No. Replaced Stamp Code Cases 4235920 02028 Ms MS-S149B 462 1 Pacific Scientific N/A Replace Snubber B31.7 - 1969 1969 Replaced N/A N/A 4236704 03-021 RF RF-CV-15CV N/A 1 AnclhrDeding N/A Replace Seat Ring B31.7 - 1969 1969 Replaced N/A 02-518, N416-1 4236704 03430 RP RF-CV-1SCV n/a 1 AnciorDaiding N/A Replace Disc B31.7 - 1969 1969 Replaced N/A 02-518 4241750 02-104 SW SW-AOV-TCV- N/A 3 MASONEILAN N/A Replace Valve B31.1 - 1967 1969 Replaced N/A 02-421 45 1AI 4249284 02-129 REC REC-FS-480 N/A 3 Emergy &Prucess N/A Replace flow switch with B31.1 - 1967 1969 Replaced N/A 02-657 threaded pipe plug 4249664 03-029 SW SW-V-251 N/A 3 JELCO N/A Replace Pipmg &Valve B31.1 - 1967 1969 Replaced N/A 02-338,N-416-1 4249664 03-034 SW SW-Pipe N/A 3 JELCO N/A ReplaceDeadLegwith B31.1 - 1967 1969 Replaced N/A 02-338,N-416-1 Patch 4249664 02-150 SW SW-Piping N/A 3 JELCO N/A Replace Piping B31.1 - 1967 1969 Replaced N/A 02-338, N-416-1 4249664 02-151 SW SW-Piping N/A 3 JELCO N/A Replaced Piping B31.1 - 1967 1969 Replaced N/A 02-338,N-416-1 4249664 02-152 SW SW-S28 N/A 3 JELCO N/A RepairPiping Suppot B31.1 - 1967 1969 Repaired N/A N/A 4249664 03-035 SW SW-S29 N/A 3 JELCO N/A RepairPipingSupport B31.1- 1967 1969 Repaired N/A N/A 4251417 02025 Ms Pipe N/A 2 JELCO N/A Replace Studs &Nuts B31.7 - 1969 1969 Replaced N/A 02-313 4253760 02-153 SW SW-Piping N/A 3 JELCO N/A Replace Piping B31.1 - 1967 1969 Replaced N/A 02-349, N-416-1 4253760 02-154 SW SW-PiPing N/A 3 JELCO N/A Replace Piping B31.1 -1967 1969 Replaced N/A 02-349, N-416-1 4253760 02-155 SW SW-S23 & N/A 3 JELCO N/A RepairPiping Suppot B31.1- 1967 1969 Repaired N/A N/A SW-m2 4253760 03409 SW SW-V-1282 N/A 3 DeZURIK N/A Replace Valve B31.1 - 1967 1969 Replaced N/A 02-349 4253760 03431 SW SW-V-1282 N/A 3 NOVA N/A Replace Flange Bolt B31.1 - 1967 1969 Replaced N/A 02-349 4253760 03428 SW SW-V-250 N/A 3 JELCO N/A Replace Piping &Valve B31.1 - 1967 1969 Replcd N/A 02-349, N-416-1 Page 4 of 17

FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As required by the Provisions of the ASME Code Section XI Nebraska Public Power District Cooper Nuclear Station Unit 1, P.O. Box 98, Brownville, Nebraska 68321 WO R/R SYST Name of Mfgr. C Name of Nat'l Description of Applicable Year Repaired ASME Pressure Tests RECORD Component Serial I Manufacturer Board Work Constr. Code Built or Code Conducted, No No. Replaced Stamp Code Cases 4254437 02-117 SW SW-P-BPA N/A 3 JELCO N/A Replace Tee w/ Ebow B31.1 -1967 1969 Replaced N/A 02-579 4256490 02-127 SW SW-P-A 02JCll 3 JOHNSTON N/A Replace Bowl Assy. & B31.1 - 1967 1969 Replaced N/A 02-633 30s I Bolting 4256490 02-132 SW SW-EXPJ-SWPA N/A 3 GARLOCK N/A Replace Expansion Joint B31.1-1967 1969 Replaced N/A 02-633 4256490 02-137 SW SW-P-A N/A 3 Bynm Jackson N/A Replace Coluns & B31.1 - 1967 1969 Replaced N/A 02-633 Discharge Head 4256490 02-138 SW SW-P-A N/A 3 NOVA N/A Replace Coluna Studs B31.1 - 1967 1969 Replaced N/A 02-633 4256490 02-145 SW SW-EXPJ-SWPA N/A 3 NOVA N/A Replace Bolts &Nuts B31.1 - 1967 1969 Replaced N/A 02-633 4256491 02-141 SW SW-P-B 02JCII 3 JOHNSTON N/A ReplaceBowlAsy. B31.1 - 1967 1969 Replaced N/A 02-692 33s Bolting 4256491 03-003 SW SW-EXPJ-SWPB N/A 3 GARLOCK N/A Replace Expansion Joint B31.1 - 1967 1969 Replaced N/A 02-692 4256491 03-004 SW SW-P-B N/A 3 Byron Jackson N/A Replace Cobms & B31.1 - 1967 1969 Replaced N/A 02-692 _________ Discharge Head 4256491 03-005 SW SW-P-B N/A 3 NOVA N/A Replace Colunn Studs, B31.1 - 1967 1969 Replaced N/A 02-692 Bolts, &Nuts 4256492 02-125 SW SW-P-C 02JCII 3 JOHNSTON N/A ReplaceBowl Any. & B31.1 - 1967 1969 Replaced N/A 02-632 32s Bolting 4256492 03-008 SW SW-P-C N/A 3 Nova Machine N/A Replace Colun Studs, B31L1 - 1967 1969 Replaced N/A 02-632 Bolts, &Nuts 4256492 03-001 SW SW-P-C N/A 3 Byron Jackson N/A Replace Punp Colunma B31.1 - 1967 1969 Replaced N/A 02-632

                                                                       &Discharge Head                         _

4256492 03-002 SW SW-EXPJ-SWPC N/A 3 OARLOCK N/A Replace Expansion Joint B31.1 - 1967 969 Replaced N/A 02-632 4256493 02-142 SW SW-P-D 02JCII 3 JOHNSTON N/A Replace Pump Bowl B31.1 -1967 1969 Replaced N/A 02-680 31s Assy. _ Page 5 of 17

FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As required by the Provisions of the ASME Code Section XI Nebraska Public Power District Cooper Nuclear Station Unit 1, P.O. Box 98, Brownville, Nebraska 68321 WO R/R SYST Name of Mfgr. C Name of Nat'l Description of Applicable Year Repaired ASME Pressure Tests RECORD Component Serial I Manufacturer Board Work Constr. Code Built or Code Conducted, No No. Replaced Stamp Code Cases 4256493 02-143 SW SW-EXPJ-SWPD N/A 3 OARLOCK N/A Replace Expansion Joint B31.1 -1967 1969 Replaced N/A 02-680 4256493 02-144 SW SW-P-D N/A 3 Byron Jackson N/A Replace Pump Colunns B31.1 - 1967 1969 Replaced N/A 02-680

                                                                        &Discharge Head 4256495 02-128  SW   SW-CV-1OCV       1-    3  Atwood &Moill       N/A   Replace Valve           B31.1 -1967   1969  Replaced   N/A  02-643 51271-A 4256496 02-140  SW   SW-CV-11CV     N/A     3  Atwood &Moill       N/A   Replace Valve           B31.1 -1967   1969  Replaced   N/A  02-701 4256497 02-126  SW   SW-CV-12CV     N/A     3  Atwood &Monill      N/A   Replace Valve           B31.1-1967    1969  Replaced   N/A  02-634 4256497 03-012  SW   SW-EXPJ-SWPC   N/A     3  GARLOCK             N/A   Replace Bolting         B31.1 -1967   1969  Replaced    N/A 02-632 4256497 03-014  SW   SW-EXPJ-SWPC   N/A     3  NOVA                N/A   Replace Bolts &Adjust   B31.1 - 1967  1969  Replaced    N/A 02-632 4256498 02-136  SW   SW-CV-13CV     N/A     3  Atwood &Moill       N/A   Replace Valve           B31.1 - 1967  1969  Replaced    N/A 02-679 4258333 02-029  MS   VR-S31        25256    3  Pacific Scientific  N/A   Replace Snubber         ASMEIII7T     1969  Replaced   N/A  N/A w/S 7T Add.

4258334 02-030 MS VR-S3 8141M 3 Pacific Scientific N/A Replace Snubber ASME I7Tw/ 1969 Replaced N/A N/A S 77 Add. 4258335 02-031 RR RH-SlI 8142M 1 Pacific Scientific N/A Replace Snubber B31.1 - 1967 1969 Replaced N/A N/A 4258336 02-032 RIR RH-S14 460M 1 Pacific Scientific N/A Replace Snubber B31.1 - 1967 1969 Replaced N/A N/A 4258337 02-033 MS VR-58-12-Y 493 3 Pacific Scientific N/A Replace Snubber ASME 1II77' 1969 Replaced N/A N/A w/S 7T Add. 4258338 02-034 MS VR-S4 494 3 Pacific Scientific N/A Replace Smbber ASME II 7T 1969 Replaced N/A N/A V/S 7T Add. 4258339 02-035 RF RF-S17 5890 1 Pacific Scientific N/A Replace Snubber B31.1 - 1967 1969 Replaced N/A N/A 4258400 02-036 RF RF-S14 8138M I Pacific Scientific N/A Replace Snubber B31.1 - 1967 1969 Replaced N/A N/A Page 6 of 17

FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As required by the Provisions of the ASME Code Section XI Nebraska Public Power District Cooper Nuclear Station Unit 1, P.O. Box 98, Brownville, Nebraska 68321 WO RIR SYST Name of Mfgr. C Name of Nat'l Description of Applicable Year Repaired ASME Pressure Tests RECORD Component Serial I Manufacturer Board Work Constr. Code Built or Code Conducted, No NO. Replaced Stamp Code Cases 4258401 02-037 MS VR-H64D 5230 3 Pacific Scientific N/A Replace Snubber ASMEm7T 1969 Replaced N/A N/A S 7T Add. 4258402 02-038 MS SS-B3 480 1 Pacific Scientific N/A Replace Snubber B31.1 - 1967 1969 Replaced N/A N/A 4258403 02-039 RR SS-5B 5298 1 Pacific Scientific N/A Replace Snubber B31.1 - 1967 1969 Replaced N/A N/A 4258404 02440 RR SS-IA 5309 1 Pacific Scientific N/A Replace Snubber B31.1 - 1967 1969 Replaced N/A N/A 4258405 02-041 RR SS-2A 5313 1 Pacific Scientific N/A Replace Snubber B31.1 - 1967 1969 Replaced N/A N/A 4258406 02-042 MS VR-S7B 5322 3 Pacific Scientific N/A Replace Smubber ASMBUm7T 1969 Replaced N/A N/A w/S 7T Add. 4258407 02043 MS BS-SIB&R 353 2 Pacific Scientific N/A Replace Snubber ASMEM77 1969 Replaced N/A N/A w/S 7T Add. 4258408 02-44 MS MS-S16B 8101 2 ORDNELL N/A Replace Snabber B31.1 - 1967 1969 Replaced N/A N/A 4258409 02-045 RHR RH-S77 8579 2 GRNNELL N/A Replace Snubber ASME II 7T 1969 Replaced N/A N/A w_/S 7T Add. 4258410 02-046 RHR RH-S48B 8159 2 GRDINELL N/A Replace Snubber ASMEM7T 1969 Replaced N/A N/A w/S 77 Add. 4258411 02-047 RHR RH-S42 8023 2 GR 1NNEL N/A Replace Snubber B31.1 - 1967 1969 Replaced N/A N/A 4258412 02448 CS CS-Sll 7767 1 GRINELL N/A Replace Snubber B31.1 - 1967 1969 Replaced N/A N/A 4258413 02449 MS MS-S3 10048 2 GR1NNL N/A Replace Snubber ASME 17r 1969 Replaced N/A N/A w/S 77 Add. 4258414 02-050 RWCU CU-S3B 455 1 Pacific Scientific N/A Replace Subber ASME 1I 83' 1969 Replaced N/A N/A 4258415 02-051 MS VR-S10 15368 3 Pacific Scientific N/A Replace Snubber ASMBm7r 1969 Replaced N/A N/A w/S 77 AM. 4258416 02-052 PC PV-SLAB 393 2 Pacific Scientific N/A Replace Snubber ASMEM77' 1969 Replaced N/A N/A wIS 77 Add. Page 7 of 17

FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As required by the Provisions of the ASME Code Section XI Nebraska Public Power District Cooper Nuclear Station Unit 1, P.O. Box 98, Brownville, Nebraska 68321 WO R/R SYST Name of Mfgr. C Name of Nat'l Description of Applicable Year Repaired ASME Pressure Tests RECORD Component Serial I Manufacturer Board Work Constr. Code Built or Code Conducted, No No. Replaced Stamp Code Cases 4258417 02-053 MS VR-S62B 403 3 Pacific Scimtific N/A Replace Snubber ASMEM7T 1969 Replaced N/A N/A

                                                                                              /S 7T Ad.

4258418 02-054 RHR RH-S8A 407 1 Pacific Scientific N/A Replace Snubber B3117 - 1967 1969 Replaced N/A N/A 4258419 02-055 RFP RF-S19 416 1 Pacific Scientific N/A Replace Snubber B31.1 - 1967 1969 Replaced N/A N/A 4258420 02-056 RHR RH-S68 417 1 Pacific Scientific N/A Replace Snubber B31.1 - 1967 1969 Replaced N/A N/A 4258420 03.042 RHR RH-S68 482 1 Pacific Scientific N/A Replace Bracket Bolt B31.1 - 1967 1969 Replaced N/A N/A 4252421 02-057 RHR RH-S58 459M 2 Pacific Scientific N/A Replace Snubber B31.1 - 1967 1969 Replaced N/A N/A 4258422 02-058 MS VR-S8 471 3 Pacific Scientific N/A Replace Snubber ASMBDI7T 1969 Replaced N/A N/A _ w/S 7T Add. 4258423 02-059 MS VR-59-7-X 475 3 Pacific Scientific N/A Replace Snubber ASMB fl7T 1969 Replaced N/A N/A w/S 77' Add. 4258425 02-061 MS VR-S88 404 3 Pacific Scientific N/A Replace Smbber ASMEZ7T 1969 Replaced N/A N/A w/S 77' Add. 4252426 02-062 MS VR-S85 4883 3 Pacific Scientific N/A Replace Snubber ASME M7T 1969 Replaced N/A N/A w/S 7T Add. 4258427 02-063 RBR RH-S8C 5220 2 Pacific Scientific N/A Replace Snubber B31.1 - 1967 1969 Replaced N/A N/A 4258428 02-064 MS VR-S51 547 3 Pacific Scientific N/A Replace Snubber ASME117?? 1969 Replaced N/A N/A ulS 77 Add. 4252429 02-065 RR SS-2B 12644 1 Pacific Scientific N/A Replace Snubber B31.1 - 1967 1969 Replaced N/A N/A 4258430 02-066 RR SS-5A 12645 1 Pacific Scientific N/A Replace Smibber B31.1 - 1967 1969 Replaced N/A N/A 4258431 02-067 MS VR-S7A 341 3 Pacific Scientific N/A Replace Snubber ASMB 177 1969 Replaced N/A N/A w/S 77 Add. 4258432 02-068 RR RH-S0 9908 1 Pacific Scientific N/A Replace Snubber B31.1 - 1967 1969 Replaced N/A N/A Page 8 of 17

FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As required by the Provisions of the ASME Code Section XI Nebraska Public Power District Cooper Nuclear Station Unit 1, P.O. Box 98, Brownville, Nebraska 68321 WO R/f SYST Name of Mfgr. C Name of Nat'l Description of Applicable Year Repaired ASME Pressure Tests RECORD Component Serial I Manufacturer Board Work Constr. Code Built or Code Conducted, No No. Replaced Stamp Code Cases 4258433 02-069 RR SS-3A2 355 1 Pacific Scienftifc N/A Replace Snubber B31.1 - 1967 1969 Replaced N/A N/A 4258434 02-070 RHR RH-S9 5300 1 Pacific Scientific N/A Replace Snubber B31.1 - 1967 1969 Replaced N/A N/A 4258435 02-071 HPCI P-S15 10058 3 GRINNELL N/A Replace Snubber ASMEm177' 1969 Replaced N/A N/A w/S 77' Add. 4258436 02-072 RHR RH-S98 7729 2 (RINNELL N/A Replace Snubber ASME1m17T 1969 Replaced N/A N/A _ w/S 77' Add. 4258437 02-073 RHR RH-S22 7734 2 GRINELL N/A Replace Snubber B31.1 - 1967 1969 Replaced N/A N/A 4258438 02-074 MS MS-S19 7778 2 GRINNEL N/A Replace Snubber B31.1 - 1967 1969 Replaced N/A N/A 4258439 02-076 MS BS-S116B 7782 2 GRNl L N/A Replace Snubber B31.1 -1967 1969 Replaced N/A N/A 425840 02-077 CS CS-S3 7784 1 GR NELL N/A Replace Snubber ASMEm77T 1969 Replaced N/A N/A w/S 7 Add. 4258441 02-078 REC RCC-S20 7791 3 GRNNEL N/A Replace Snubber B31.1 - 1967 1969 Replaced N/A N/A 4258442 02-079 MS MS-S2 7804 2 GRPNNLL N/A Replace Snubber ASMBm 7 1969 Replaced N/A N/A w/S 77' Add. 4258444 02-080 RHR RH-S44B 8020 2 GRNNELL N/A Replace Snubber ASMEU7T wS 1969 Replaced N/A N/A 77'Add. 4258445 02481 RER RH-S78B 8079 2 GR2NNELL NA Replace Snubber ASMBm 77 1969 Replaced NA N/A

                                                                      . _                 w/S 7 Add.

4258446 02-082 RR RH-S30A 8082 2 GRDNNELL N/A Replace Snubber B31.1 - 1967 1969 Replaced N/A N/A 4258447 02-083 CS CS-Si 8097 1 GRINELL N/A Replace Snubber ASMEmI7T 1969 Replaced N/A N/A w/S 7 Add. 4258448 02-4 RR RH-S27A 8102 2 GRINeLL N/A Replace Snubber B31.1- 1967 1969 Replaced N/A N/A 4258449 02-085 CS CS-S2 8105 1 GRINNELL N/A Replace Snubber ASME 77' 1969 Replaced N/A N/A w/S 7 Add. Page 9 ofl7

FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As required by the Provisions of the ASME Code Section XI Nebraska Public Power District Cooper Nuclear Station Unit 1, P.O. Box 98, Brownville, Nebraska 68321 WO RIR SYST Name of Mfgr. C Name of Nat'l Description of Applicable Year Repaired ASME Pressure Tests RECORD Component Serial 1 Manufacturer Board Work Constr. Code Built or Code Conducted, No No. Replaced Stamp Code Cases 4258450 02-086 RHR RH-S55 8121 2 GRINNELL N/A Replace Snubber B31.1 - 1967 1969 Replaced N/A N/A 4258451 02-087 RHR RH-S25A 8122 2 GRINNELL N/A Replace Snubber ASMEm7T 1969 Replaced N/A N/A w/S 7r Add. 4258452 02-088 RHR RH-S59 8132 2 GRID0ELL N/A Replace Snubber B31.1 - 1967 1969 Replaced N/A N/A 4258453 02-089 RHR RH-S54 8149 2 GRINELL N/A Replace Snubber B31.1 - 1967 1969 Replaced N/A N/A 4258454 02-090 RHR RH-S48A 8158 2 GRINNELL N/A Replace Snubber ASMEmI7T 1969 Replaced N/A N/A w/S 7 Add. 4258455 02-091 RHR RH-S24 8160 2 GRINELL N/A Replace Snubber B31.1 - 1967 1969 Replaced N/A N/A 4258456 02-092 CS CS-S6 8161 2 GRDiNELL N/A Replace Snubber ASME m ?I 1969 Replaced N/A N/A w/S 77 Add. 4258457 02-093 MS MS523 8541 2 GRINEL N/A Replace Snubber B31.1 - 1967 1969 Replaced N/A N/A 4258458 02-094 Ms BS-S116A 8546 2 GRNELL N/A Replace Snubber B31.1 - 1967 1969 Replaced N/A N/A 4258459 02095 RHR RH-S52 8551 2 GRINELL N/A Replace Snubber B31.1 - 1967 1969 Replaced N/A N/a 4258460 02-096 _EC RCC-S22 8563 3 GRINNELL N/A Replace Snubber B31.1 - 1967 1969 Replaced N/A N/A 4258462 02-097 RER RH-S96A 8569 2 GRINNELL N/A Replace Snubber B31.1 - 1967 1969 Replaced N/A NIA 4258463 02-098 RHR RH-S57 8570 2 GRDNILL N/A Replace Snubber B31.1 - 1967 1969 Replaced N/A N/A 4258590 02-105 RHR RHR-HX-A 27051 3 SWECO N/A Replace dud ASMEVm 1968 1969 Replaced N/A 02-385 Edition 4259892 02-146 SW SW-STNR-BPB N/A 3 Tube Turn Tech N/A Replace Closre B31.1 - 1967 1969 Replaced N/A 02-638 4265028 02-112 SW SW-P-BPA N/A 3 Byron Jackson N/A Replace Pump B31.1 - 1967 1969 Replaced N/A 02-571 4260016 02-107 SW SW-MOV- N/A 3 Control N/A Replace Plug B31.1 - 1967 1969 Replaced N/A 02-543 M089B Cononent, Inc. II I I Page 10 of 17

FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As required by the Provisions of the ASME Code Section XI Nebraska Public Power District Cooper Nuclear Station Unit 1, P.O. Box 98, Brownvlle, Nebraska 68321 WO R/R SYST Name of Mfgr. C Name of Nat'l Description of Applicable Year Repaired ASME Pressure Tests RECORD Component Serial I Manufacturer Board Work Constr. Code Built or Code Conducted, No No. Replaced Stamp Code Cases 4260017 02-108 SW SW-MOV- N/A 3 Control N/A Replace Plug B31.1 -1967 1969 Replaced N/A 02-544 M089A Conyonnts Inc. 4267006 02-115 SW SW-P-BPB N/A 3 JELCO N/A Replace Tee wi Elbow B31.1-1967 1969 Replaced N/A 02-576 4267007 02-118 SW SW-P-BPC N/A 3 JELCO N/A Replace Tee w/ Elbow B31.1 -1967 1969 Replaced N/A 02-580 4267008 02-116 SW SW-P-BPD N/A 3 JELCO N/A Replace Tee w/ Elbow B31.1- 1967 1969 Replaced N/A 02-578 4268127 02-110 SW SW-Pip N/A 3 JELCO N/A Replace Pipe B31.1 -1967 1969 Replaced N/A 02-512 4269023 02-123 SW Pipe N/A 3 JELCO N/A Replace Pipe &Elbow B31.1 -1967 1969 Replaced N/A 02-611 4269024 02-139 SW Pipe N/A 3 JELCO N/A Replace Pipe &Elbow B31.1 -1967 1969 Replaced N/A 02-718 4269025 02-122 SW Pipe N/A 3 JELCO N/A Replace Pipe &Elbow B31.1 - 1967 1969 Replaced N/A 02-610 4272295 02-114 PV PV-H202 N/A 3 JELCO N/A Replace Bolt& JamNuts B31.1-1967 1969 Repaired N/A N/A 4272990 02-119 REC REC-FS-476A & N/A 3 JELCO N/A Replace flow switches B31.1 - 1967 1969 Replaced N/A 02-607

                      -476C                                              withpipoplug 4274312 03-041    REC  REC-FS-476B     N/A    3  JELCO              N/A   Replace Flow Switch     B31.1 - 1967  1969  Replaced     N/A  02-620 REC-FS-476D                                        with Pipe Plug                                        .

4287200 02-156 SW SW-P-D N/A 3 Byfon Jackson N/A Machine edge of flanges B31.1 - 1967 1969 Repaired N/A 02-680 4293898 03-018 REC REC-2S48-9-W30 N/A 3 JELCO N/A RepairWeld B31.1 - 1967 1969 Repaired N/A 03-060 4296820 03-023 SW SW-Pipe N/A 3 JELCO N/A Replac erded pipe B31.1-1967 1969 Replaced N/A 03-073, N-416-1 4297589 03-033 HPCI HPCI-CV-15CV N/A 2 ANCHOR N/A Replace disc ASME m 1977 1969 Replaced N/A 03-083 DARLING Edition w/S77 Add 4297589 03-037 B PCI HPCI-CV-15CV N/A 2 ANCHOR N/A Machine Valve Body ASME m 1977 1969 Repaired N/A N/A DARLING Edition w/S77 Add. Page 11 of 17

FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As required by the Provisions of the ASME Code Section XI Nebraska Public Power District Cooper Nuclear Station Unit 1, P.O. Box 98, Brownville, Nebraska 68321 WO R/R SYST Name of Mfgr. C Name of Nat'l Description of Applicable Year Repaired ASME Pressure Tests RECORD Component Serial I Manufacturer Board Work Constr. Code Built or Code Conducted, No No. Replaced Stamp Code Cases 4298558 03-027 SW SW-AOV-TCV- N/A 3 MASONELAN N/A Replace Valve B31.1 -1967 1969 Replaced N/A 03-085 451B 7000960 02-024 MS MS-RV.7Sparc 383 1 TARGET ROCK N/A Replace nut w/ spine m ASME 1968 1969 Replaced N/A N/A nuts Editionw/S70 _ ~~~~~~~~~~~~~~Adt. 7000960 03-016 MS MS-RV-7lPilot 1242 1 TARGET ROCK N/A Replace set in pilot ASME m1968 1969 Replaced N/A 6MISC.502 say. Edition w/S70' (Installed on MS-Add. RV-71RV) P.O. N/A SW SW-P-BPAD 70495C 3 JolustonPunp N/A WeldBuild up Punp B31.1 -1967 1969 Repaired N/A N/A (illbe 001693 1214528 Co. Casing and Machine to pressu tested orinal dimensios wheninsstalled) P.O. N/A SW SW-P-BPAtD 781 3 JohismonPunm N/A WeldBuildupPunp B31.1 -1967 1969 Repaired N/A N/A (will be 001693 0603 Co. Casing and Machine to pressnr tested _________ _____________ original dimensions when installed) P.O. 03-006 SW SW-P-Parts N/A 3 Byron Jackson N/A Repair th fib and wells B31.1 - 1967 1969 Repaired N/A N/A (Coluns 4500028 Div. of Bo of t6 pump coluns will be tested when 016 Warner installed) P.O. 03-011 SW SW-P-Pail N/A 3 Byron Jackson N/A Repair he fits and wil B31.1 - 1967 1969 Repaired N/A N/A (Colunus 4500028 Div. ofBotg of 6o puny column will be tested when 486 Warner installed) THESB WORK Y1EMS CORRECTED FROM LAST OUTAGE l ITAUCS 4159603 REC R EC pipe weld N/A 3 NPPD N/A Repair ccked weld B31.1-1967 1969 Repaired N/A 01-169,N-416-1 W51 4159623 PC Vent Ring Header C4448 M Chicago Bridge & N/A Repairweld bun tough ASME m, 1965 1969 Repaired 6.PC.503 C han Edition w/W. 6T Add.I Page 12 of 17

FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As required by the Provisions of the ASME Code Section XI Nebraska Public Power District Cooper Nuclear Station Unit 1, P.O. Box 98, Brownville, Nebraska 68321 WO R/R SYST Name of Mfgr. C Name of Natl Description of Applicable Year Repaired ASM15 Pressure Tests RECORD Component Serial 1 Manufacturer Board Work Constr. Code Built or Code Conducted, No No. Replaced Stamp Code Cases 4159624 PC Tous Support C-4448 M Chicago Bndge N/A Repair ndication in Weld ASME M 1965 1969 Repaied YES N/A C I= Edition WW. 6T 4159629 PC VentRingHeader C-4448 M ChicagoBridge& N/A Repair weldbmn thrugh ASMEUA 1965 1969 Repaired YES 6PC503 C hu Edition wfW. 67 Add 4159767 HPCI HPCI-CV-10CV N/A 2 AnchorDading N/A Replaced tackweUldn B31.7-1969 1969 Replaced N/A 01-004 disc nut 4159946 RHR RHR-MOV- N/A 2 AnchorDading N/A Repairdrilledhole in B31.7 -1969 1969 Repaired N/A 01-270,6.PC501 M039B disc by welding Drill new hole 4159947 HPCI HPCI-MOV- NVA 2 AnchorDading N/A Ddll hole in valve disc B31.7 -1969 1969 Repaired N/A 01-274,6.PC.501 4159954 MS MS-MO-MO77 IVA I Anchor Volve Co. N/A Replace Valveby B31.7-1969 1969 Replaced N/A 01-689,N-416-1 IWelding 4159962 RCIC RCIC-CV-20CV N/A 2 CanAloyco N/A Replace disc stad locking B31.7 -1969 1969 Replaced N/A N/A nut 4159978 _ RR RHR-MOV- N/A 2 AnchorDading N/A Drilhole in Valve Disc B31.7 -1969 1969 Repaired N/A 01-272,6PC501 M039A 4159978 RHR RHR-MOV- N/A 2 NOVAMach N/A Replace Bonnet Studs B31.7 -1969 1969 Replaced N/A 01-272 M039A Prod. 4160040 HPCI HPCI-CV-15CV N/A 2 AnchorDading N/A Replace valve and add B31.1 -1969 1969 Replaced N/A 01-487,N-416-1, new pipng 6.PC.501 4160511 RHR RHR-MOV- N/A 2 AnchorDading N/A Repairby rnoving tack B31.7 -1969 1969 Repaired N/A 01-281 MO3SA weld 4163678 R1R RHR-RV-17RV N/A 2 Consolidated N/A Replaced valve &piping B31.7 -1969 1969 Replaced N/A 00-123 (2 ) _ _ _ _ _ _ 1__ __ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ __ _ _ _ _ _ __ _ _ _ _ _ _ _ _ Page 13 of 17

FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As required by the Provisions of the ASME Code Section XI Nebraska Public Power District Cooper Nuclear Station Unit 1, P.O. Box 98, Brownville, Nebraska 68321 WO RIR SYST Name of Mfgr. C Name of Natl Description of Applicable Year Repaired ASME Pressure Tests RECORD Component Serial I Manufacturer Board Work Constr. Code Built or Code Conducted, No No. Replaced Stamp Code Cases 4164382 RHR RH-S65A 8378 2 Pacific Scientific N/A Replaced smubber ASME 11 1977 1969 Replaced N/A N/A Edition w/S. 77' Add 4164385 RHR RH-S6B 458 2 Pacific Scientific N/A Replaced Snubber ASMEN1111977 1969 Replaced N/A N/A Edition WS. 77' Add 4164386 MS VR-S87B 401 3 Pacific Scientific N/A Replaced Snubber ASMEN, 1977 1969 Replaced N/A N/A Edition, WS. 77' Add 4164390 MS VR-S81 7019 3 Pacific Scientific N/A Replaced Subber ASME, 1977 1969 Replaced N/A N/A Edition, WS. 77 Add 4164391 MS VR-59-7-Z 478 3 Pacific Scientific N/A Replaced Snubber ASMH 1977 1969 Replaced N/A N/A Edition, WS. 77' Add 4164393 Ms VR-H6CD 402 3 Pacific Scientific N/A Replaced Subber AE IHm 1977 1969 Replaced N/A N/A Edition, W'S. 77' Add 4164395 Ms VR-583A 15147 3 Pacific Scientific N/A Replaced Snubber ASME HI 1977 1969 Replaced N/A N/A Edition W. 77' Add 4164613 RF RF-S12 17205 1 Pacific Scientific N/A Replaced Snubber B31.1-1967 1969 Replaced N/A N/A 4164704 Ms VR-55-23-Z 5320 3 Pacific Scientific N/A Replaced Snubber ASME111977 1969 Replaced N/A N/A Edition, W. 77' Add 4164717 Cs cs-s7 10051 2 Orinnell N/A Replaced Snubber AEME 1111977 1969 Replaced N/A N/A Edition, WS. 77' Add Page 14 of 17

FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As required by the Provisions of the ASME Code Section XI Nebraska Public Power District Cooper Nuclear Station Unit 1, P.O. Box 98, Brownville, Nebraska 68321 WO R/R SYST Name of Mfgr. C Name of Nat'l Description of Applicable Year Repaired ASME Pressure Tests RECORD Component Serial I Manufacturer Board Work Constr. Code Built or Code Conducted, No No. Replaced Stamp Code Cases 4164740 RHR RH-S78B 8079 2 Gdinnell N/A Replaced Smibber ASME 11977 1969 Replaced N/A N/A Edition, WS. 77' Addl 4180095 RHR RHR-MOV- N/A 2 AnchorDadmg N/A Replaced B/B studs/nuts B31.7 -1969 1969 Replaced N/A 01-219 MO16B 4183975 RF RF-CV-16CV N/A 1 AneborDeAfing N/A Replace hinge cover studs B31.7 -1969 1969 Replaced N/A 01-605,6.PC.501 4184038 RCIC RCIC-RD-S240 N/A 2 Black Sivalls & N/A Rephced rupture disc B31.7 -1969 1969 Replaced N/A 01-387 4184060 PCI EPCI-RD-S241 N/A 2 BlackSivalls& N/A Replaced uptu disc B31.7 -1969 1969 Replaced N/A 01-388 4184060 HPCI BPCI RD-S241 N/A 2 NOVAMachine N/A Replaced studs B31.7 -1969 1969 Replaced N/A 01-388 4187057 MS MS-RV-7LARV 376, 1 Target Rock N/A Replaced valve body& ASE HI 1968 1969 Replaced N/A 6MISC.502 (2) 376 pilot, &box nuts with Edition, W/S70' splined nu Add 4190074 MS MS-RV-71BRV 380, 1 Target Rock N/A Replaced valve body & ASME m11968 1969 Replaced N/A 6MISC.502 382 pilot Edition, WS70' Add 4190074 MS MS-RV-71BRV 380 1 Target Rock Corp. N/A Replace hex nut witi ASE 11 1968 1969 Replaced N/A 6.MC.502 splined nut Edition, W/S70' Adet 4190074 MS MS-RV-71BRV 380 1 Target Rock Corp. N/A Machined inlet flange ASME m1 1968 1969 Repsied N/A 6.MISC.502 uxtlces Edition, W/S70' Add 4190075 MS MS-RV-71DRV 378 1 Target Rock N/A Replaeed Pilot Assy. ASME 111968 1969 Replaced N/A 6MISC.502 Edition, W/S70' Add Page 15 of 17

FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As required by the Provisions of the ASME Code Section XI Nebraska Public Power District Cooper Nuclear Station Unit 1, P.O. Box 98, Brownville, Nebraska 68321 WO R/R SYST Name of Mfgr. C Name of Natl Description of Applicable Year Repaired ASME Pressure Tests RECORD Component Serial I Manufacturer Board Work Constr. Code Built or Code Conducted, No No. Replaced Stamp Code Cases 4190076 MS MS-RV-71FRV 380 1 Target Rock N/A Replaced Pilot Assy. ASME m11968 1969 Replaced N/A 6.MISC.502 Edition, W/S70' Add 4190077 MS MS-RV-71CRV 386 1 Taiget Rock N/A Replaced PilotAs. ASME 11 1968 1969 Replaced N/A 6M1SC.502 Edition, W/S70' Add 4190078 MS MS-RV-71-ERV 383 1 Target Rock N/A Replaced Pilot Assy. ASME 1111968 1969 Replaced N/A 6UMSC.502 Edition, W/S70' Add 4190079 MS MS-RV-71HRV 377, 1 Tage Rock N/A Replaced valve body & ASME m11968 1969 Replaced N/A 6MISC.502 (2) 377 pilot, &hx nub with Edition, W/S70' splined nuts Add 4190100 MS MS-RV-71ORV 384 1 Target Rock N/A Replaced Pilot Any. ASME 11968 1969 Replaced N/A 6MlSC.502 Edition, W/S70' Add 4200917 RCIC RCIC-V-42 N/A 2 Vdon, Anderson- N/A Replaced valve and added B31. 7 -1969 1969 Replaced N/A 01-529,6.PC.519 GOeuwod new valve 4202850 RHR RH-S49 394 2 Pacific Scientific N/A Replaced mribber ASME m11977 1969 Replaced N/A N/A Edtion, WS. 77' Add 4205891 MS VR-S1I 487 3 Pacific Scientific N/A Replaced .mbber ASME m11977 1969 Replaced N/A N/A Edition, WS. 77' Add 4205892 MS VR-S86A 5217 3 Pacific Scientific N/A Replaced ubber ASME m11977 1969 Replaced N/A N/A Edition, WS. 77' Add 4205988 MS VR-S60 5301 3 Pacific Scientific N/A Replaced mubber ASME 11m1977 1969 Replaced N/A N/A Edition, WS. 77' Add Page 16 ofl7

FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As required by the Provisions of the ASME Code Section XI Nebraska Public Power District Cooper Nuclear Station Unit 1, P.O. Box 98, Brownville, Nebraska 68321 WO R SYST Name of Mfgr. C Name of Nat'l Description of Applicable Year Repaired ASME Pressure Tests RECORD Component Serial I Manufacturer Board Work Constr. Code Built or Code Conducted, No No. Replaced Stamp Code Cases 4205990 MS VR-S27 345 3 Pacific Scientific N/A Replaced snubber ASME ff11977 1969 Replaced N/A N/A Edihion, WS. 77' Add 4205992 MS VR-S12 5323 3 Pacific Scientific N/A Replaced snubber ASME 1m 1977 1969 Replaced N/A N/A Edition, WS 77' Add 4205997 MS VR-56-24-X 10797 3 Pacific Scientific N/A Replaced snubber ASME m11977 1969 Replaced N/A N/A AEditon, WS. 77' Add 4205998 MS VR-55-26-Z 5310 3 Pacific Scientific N/A Replaced miubber AS ME 11977 1969 Replaced N/A N/A Edition, WS. 77' Add 4211015 HPCI HPCI-MOV- N/A I AnchlrDaiiing N/A Repairod valve body by B31. 7 -1969 1969 Repaired N/A 6JMJSC.502 15MO gding P04500 RF RF-CV-Discs N/A I Flosern N/A Repaired new discsby B31.7 -1969 1969 Replaced N/A N/A 020233 adding bairdfacing II I I Page 17 of 17}}