NLS2002074, Revision to the Response to Order for Interim Safeguards and Security Compensatory Measures for Cooper Nuclear Station

From kanterella
Jump to navigation Jump to search
Revision to the Response to Order for Interim Safeguards and Security Compensatory Measures for Cooper Nuclear Station
ML022110012
Person / Time
Site: Cooper Entergy icon.png
Issue date: 07/26/2002
From: Coyle M
Nebraska Public Power District (NPPD)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NLS2002074
Download: ML022110012 (8)


Text

Nebraska Public Power District Nebraska's Energy Leader NLS2002074 Docket No. 50-298 10 CFR 2.202(a)(2)

July 26, 2002 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Revision to the Response to Order for Interim Safeguards and Security Compensatory Measures Cooper Nuclear Station, NRC Docket 50-298. License No. DPR-46

Reference:

I) Nebraska Public Power District Letter (NLS2002030) dated March 18.

2002. to U.S. Nuclear Regulatory Commission. "Response to Order for Interim Safeguards and Security Compensatory Measures" The purpose of this letter is to transmit a revision to the Nebraska Public Power District*s (NPPD) response to the Nuclear Regulatory Commission's (NRC) February 25. 2002. Order for Interim Safeguards and Security Compensatory Measures (Order) for the Cooper Nuclear Station (Reference 1). NPPD hereby revises one Interim Compensatory Measure (ICM) of the Order and provides additional text that provides clarification for another ICM response related to current practices at the Cooper Nuclear Station.

A recent correspondence from a government authority prompted a revision to our response related to an 1CM. Additionally. text associated with our response to another ICM is being supplemented to reflect a current station activity, which is more conservative than the requirements of the February 25. 2002. Order. NPPD deems this information important regarding y'our awareness of our current protective practices.

These revisions to our response are described in the attachment to this letter. The enclosure to this letter provides an updated response, in its entirety, with the revision and addition to the response indicated by change bars in the margin. This enclosure is provided for your convenience, in order that you may reference a single document to determine the status of the NPPD response to the Order.

The attachment and enclosure to this letter contain "SAFEGUARDS INFORMATION."

Upon separation of the attachment and enclosure, this cover letter is considered DECONTROLLED.

Cooper Nuclear Station PC0. Box 98 / Bron wnile, NE 68321-0098 Telephone: (402) 825-3811 / Fax: (402) 825 521g http //vwwv rppd om

NLS2002074 Page 2 of 4 The attachment and enclosure to this correspondence contain Safeguards Information as defined in 10 CFR 73.21. NPPD, therefore, requests that the attachment and enclosure be withheld from public disclosure.

Pursuant to the requirements of 10 CFR 2.202(a)(2), a First Supplemental Answer to the February 25, 2002, Order, is being transmitted to the NRC under separate cover.

Should you have any questions concerning this response, please contact Mr. David F. Kunsemiller at (402) 825-5236.

Sincerely.

Michael T. Coyle Site Vice President

/nr Attachment/Enclosure cc:

Secretary U.S. Nuclear Regulatory Commission Office of the Secretary ATTN: Mr. Glen Tracy U.S. Nuclear Regulatory Commission Mail Stop O-6H116 Attn: Rulemaking and Adjudications Staff One White Flint North Washington. DC 20555-0001 11555 Rockville Pike (w/attachment and enclosure) Rockville, MD 20852-2738 (w/attachment and enclosure)

Director. Office of Nuclear Reactor U.S. Nuclear Regulatory Commission Regulation Attn: Document Control Desk U.S. Nuclear Regulatory Commission Washington. DC 20555-0001 Washington, DC 20555-0001 (signed original and three copies, (w/attachment and enclosure) w/attachment and enclosure)

The attachment and enclosure to this letter contain "SAFEGUARDS INFORMATION."

Upon separation of the attachment and enclosure, this cover letter is considered DECONTROLLED.

NLS2002074 Page 3 of 4 Regional Administrator - Region IV Assistant General Counsel of Materials U.S. Nuclear Regulatory Commission Litigation and Enforcement (two copies. w/attachment and enclosure) U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 (w/o attachment and enclosure)

Senior Project Manager U.S. Nuclear Regulatory Commission NRR Project Directorate IV-1 (w/attachment and enclosure)

The attachment and enclosure to this letter contain "SAFEGUARDS INFORMATION."

Upon separation of the attachment and enclosure, this cover letter is considered DECONTROLLED.

NLS2002074 Page 4 of 4 STATE OF NEBRASKA )

)

NEMAHA COUNTY )

Michael T. Coyle, being first duly sworn, deposes and says that he is an authorized representative of the Nebraska Public Power District, a public corporation and political subdivision of the State of Nebraska; that he is duly authorized to submit this correspondence on behalf of Nebraska Public Power District; and that the statements contained herein are true to the best of his knowledge and belief.

Michael T. Coyle Before me.

LWANW BAY

11. 2=

S~MNo~

Notary Public My Commission Expires: 5-1t- .00 (P Subscribed in my presence and sworn to before me this ý-&

  • day of JL4- , 2002.

The attachment and enclosure to this letter contain "SAFEGUARDS INFORMATION."

Upon separation of the attachment and enclosure, this cover letter is considered DECONTROLLED.

H Nebraska Public Power District Nebraska's Energy Leader UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of )

)

Nebraska Public Power District ) Docket No. 50-298 Cooper Nuclear Station.

License No. DPR-46 LICENSEE'S FIRST SUPPLEMENTAL ANSWER TO FEBRUARY 25.22002 COMMISSION ORDER TO MODIFY LICENSE FOR INTERIM SAFEGUARDS AND SECURITY MEASURES On February 25. 2002, the Nuclear Regulatory Commission ("NRC'" or "Commission'*)

issued an inmmediatelv effective order in the captioned matter entitled Order Modifying Licenses (Effective Immediately) ("Order") to, inter alia, Nebraska Public Power District. The Nebraska Public Power District responded to the Order in a letter dated March 18. 2002. in accordance with the provisions of 10 C.F.R. § 50.4. as directed by the Order.' Also on that date. Nebraska Public Power District submitted an "Answer to February 25. 2002. Commission Order to Modil\

License for Interim Safeguards and Security Measures" pursuant to 10 C.F.R. § 2.202 and Section IV of the Order. consenting to the Order.

In accordance with Section IV of the Order and 10 C.F.R. § 2.202, Nebraska Public Power District hereby submits its First Supplemental Answer to the Order. This Supplemental Answer revises the District's response to two of the Interim Compensatory Measures provided in of the Order. Nebraska Public Power District maintains that it consents to the Order and does not request a hearing. We anticipate providing an additional 10 C.F.R. § 50.4 The enclosure to that letter was transmitted as Safeguards Information.

Cooper Nuclear Station PO. Box 98 / Brownville, NE 68321-0098 Telephone: (402) 825-3811 / Fax: (402) 825-5211 http //www nrpd com

letter and Supplemental Answer upon compete implementation of all Interim Compensatory Measures.

Respectfully submitted, Nebraska Public Power Disttict Michael T. Coyle Site Vice President STATE OF NEBRASKA

)

NEMAHA COUNTY Michael T. Coyle, being first duly sworn, deposes and says that he is an authorized representative of the Nebraska Public Power District, a public corporation and political subdivision of the State of Nebraska, that he is duly authorized to submit this correspondence on behalf of Nebraska Public Power District, and that the statements contained herein are true to the best of his knowledge and belief.

Michael T. Coyle IA ANOTAR60S* 1Ninbalk Before me, 2

1AyCUWflB9.MYl OOG, Notary Public My Commission Expires: 5 - 1I- AOO Subscribed in my presence and sworn to before me this ;1 h*day of 12002.

N Nebraska Public Power District Nebraska's Energy Leader UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of Nebraska Public Power District

) Docket No. 50-298 Cooper Nuclear Station )

License No. DPR-46 )

CERTIFICATE OF SERVICE I hereby certify that copies of the FIRST SUPPLEMENTAL ANSWER TO FEBRUARY 25.

2002, COMMISSION ORDER TO MODIFY LICENSE FOR INTERIM SAFEGUARDS AND SECURITY MEASURES in the captioned action have been served on the folloxwing by tnited Parcel Service, this ,L6 H day of Jt'.., . 2002.

Secretary U.S. Nuclear Regulatory Commission Office of the Secretary Attn: Document Control Desk U.S. Nuclear Regulatory Commission Washington., DC 20555-0001 ATTN: Rulemakings and Adjudications (signed original and three copies)

Staff Washington, DC 20555-0001 Director, Office of Nuclear Reactor Senior Project Manager Regulation NRC - NRR Project Directorate IV- I U.S. Nuclear Regulatory Commission Washington. DC 20555-0001 Regional Administrator - Region IV U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Attn: Mr. Glenn Tracy

[address per Part 20. App. D] Mail Stop O-6H 16 (two copies) One White Flint North 11555 Rockville Pike Rockville. MD 20852-2738 Assistant General Counsel of Materials Litigation and Enforcement U.S. Nuclear Regulatory Commission Washington. DC 20555-0001 Michael T. Coyle Site Vice President Cooper Nuclear Station P.C Box 98 / Brownwvle, NE 68321-0098 Telephone: (402) 825-3811 / Fax: (402) 825 5211 http//. ',^ r ppd co-*

STATE OF NEBRASKA )

)

NEMAHA COUNTY )

Michael T. Coyle, being first duly sworn, deposes and says that he is an authorized representative of the Nebraska Public Power District, a public corporation and political subdivision of the State of Nebraska; that he is duly authorized to submit this correspondence on behalf of Nebraska Public Power District, and that the statements contained herein are true to the best of his knowledge and belief.

Michael T. Coyle Before me, GNRLNOTARY State of Nutwask

~LLWANN BRAY MyCsnm.Eq.May11,2W0 Notary Public My Commission Expires: 5- l-- 4.0 0P Subscribed in my presence and sworn to before me this ;Lb *day of .2002.

1